IR 05000341/2016404: Difference between revisions
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
StriderTol (talk | contribs) (Created page by program invented by StriderTol) |
||
Line 3: | Line 3: | ||
| issue date = 08/11/2016 | | issue date = 08/11/2016 | ||
| title = NRC Security Baseline Inspection Report 05000341/2016404 (Cover Letter Only) | | title = NRC Security Baseline Inspection Report 05000341/2016404 (Cover Letter Only) | ||
| author name = Orth S | | author name = Orth S | ||
| author affiliation = NRC/RGN-III/DRS/PSB | | author affiliation = NRC/RGN-III/DRS/PSB | ||
| addressee name = Fessler P | | addressee name = Fessler P | ||
Line 18: | Line 18: | ||
=Text= | =Text= | ||
{{#Wiki_filter: | {{#Wiki_filter:August 11, 2016 | ||
==SUBJECT:== | |||
FERMI POWER PLANT, UNIT 2 | |||
- NRC SECURITY BASELINE INSPECTION REPORT 05000341/2016 40 4 | - NRC SECURITY BASELINE INSPECTION REPORT 05000341/2016 40 4 | ||
Line 26: | Line 27: | ||
On July 21, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fermi Nuclear Power Plant, Unit 2. On July 21, 2016, the NRC inspector discussed the results of this inspection with M r. K. Polson and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report. | On July 21, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fermi Nuclear Power Plant, Unit 2. On July 21, 2016, the NRC inspector discussed the results of this inspection with M r. K. Polson and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report. | ||
N o findings were identified during this inspection. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading | N o findings were identified during this inspection. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). | ||
-rm/adams.html (the Public Electronic Reading Room). | |||
However, the material enclosed herewith contains Security | However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1) | ||
-Related Information in accordance with 10 CFR 2.390(d)(1) | |||
and its disclosure to unauthorized individuals could present a security vulnerability. | and its disclosure to unauthorized individuals could present a security vulnerability. | ||
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security | Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | ||
-Related Information is necessary to provide an acceptable response, please mark your entire response "Security | |||
-Related Information | |||
-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you. | |||
Sincerely, | Sincerely, | ||
/RA/ | /RA/ | ||
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50 | Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure: | ||
-341 License No. NPF | |||
-43 Nonpublic Enclosure: | |||
IR 05000440/201640 4 cc: M. O'Connor, Security Manager K. Yale, State Liaison Officer, State of Michigan cc w/o encl: | IR 05000440/201640 4 cc: M. O'Connor, Security Manager K. Yale, State Liaison Officer, State of Michigan cc w/o encl: | ||
Distribution via LISTSERV | Distribution via LISTSERV | ||
}} | }} |
Revision as of 00:34, 20 June 2019
ML16224A900 | |
Person / Time | |
---|---|
Site: | Fermi ![]() |
Issue date: | 08/11/2016 |
From: | Steven Orth Plant Support Branch II |
To: | Fessler P DTE Electric Company |
References | |
IR 2016404 | |
Download: ML16224A900 (3) | |
Text
August 11, 2016
SUBJECT:
FERMI POWER PLANT, UNIT 2
- NRC SECURITY BASELINE INSPECTION REPORT 05000341/2016 40 4
Dear Mr. Fessler:
On July 21, 2016, the U.S. Nuclear Regulatory Commission (NRC) completed a security inspection at your Fermi Nuclear Power Plant, Unit 2. On July 21, 2016, the NRC inspector discussed the results of this inspection with M r. K. Polson and other members of your staff. The inspector documented the results of this inspection in the enclosed inspection report.
N o findings were identified during this inspection. In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390, "Public Inspections, Exemptions, Requests for Withholding," of the NRC's "Rules of Practice," a copy of this letter will be available electronically for public inspection in the NRC's Public Document Room or from the Publicly Available Records (PARS) component of the NRC's Agencywide Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
However, the material enclosed herewith contains Security-Related Information in accordance with 10 CFR 2.390(d)(1)
and its disclosure to unauthorized individuals could present a security vulnerability.
Therefore, the material in the enclosure will not be made available electronically for public inspection in the NRC Public Document Room or from the PARS component of NRC's ADAMS. If you choose to provide a response and Security-Related Information is necessary to provide an acceptable response, please mark your entire response "Security-Related Information-Withhold from public disclosure under 10 CFR 2.390" in accordance with 10 CFR 2.390(d)(1) and follow the instructions for withholding in 10 CFR 2.390(b)(1). In accordance with 10 CFR 2.390(b)(1)(ii), the NRC is waiving the affidavit requirements for your response. Enclosure contains Sensitive Unclassified Non-Safeguards Information. When separated from enclosure, this transmittal document is decontrolled. Should you have any questions concerning this inspection, we will be pleased to discuss them with you.
Sincerely,
/RA/
Steven K. Orth, Chief Plant Support Branch Division of Reactor Safety Docket No. 50-341 License No. NPF-43 Nonpublic Enclosure:
IR 05000440/201640 4 cc: M. O'Connor, Security Manager K. Yale, State Liaison Officer, State of Michigan cc w/o encl:
Distribution via LISTSERV