20110218 Open Item List Master TVA Update 03-08-11.docx Attachments:
20110218 Open Item List Master TVA Update 03-08-11.docx Attachments:
20110218 Open Item List Master TVA Update 03-08-11.docx All:  Attached is the updated matrix for your use. I am continuing to work on the responses and hope to have more by the end of this week.  
20110218 Open Item List Master TVA Update 03-08-11.docx All:  Attached is the updated matrix for your use. I am continuing to work on the responses and hope to have more by the end of this week.
: Regards, Steve  Steve Clark Bechtel Power Corp.Control SystemsWatts Bar 2 Completion ProjectPhone: 423.365.3007e-mail: msclark0@tva.gov Hearing Identifier:  Watts_Bar_2_Operating_LA_Public Email Number:  286  Mail Envelope Properties  (7AB41F650F76BD44B5BCAB7C0CCABFAF18169F10)   
: Regards, Steve  Steve Clark Bechtel Power Corp.Control SystemsWatts Bar 2 Completion ProjectPhone: 423.365.3007e-mail: msclark0@tva.gov Hearing Identifier:  Watts_Bar_2_Operating_LA_Public Email Number:  286  Mail Envelope Properties  (7AB41F650F76BD44B5BCAB7C0CCABFAF18169F10)   


Line 37: Line 37:
The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb        1/13/10 Public Meetin g 4. Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:
The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb        1/13/10 Public Meetin g 4. Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:
LIC-110 Rev. 1 Section 005 7.1.3.1  (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb 5. Y Closed Closed EICB RAI TVA Letter dated 006    (G A mendment 95 of the FSAR
LIC-110 Rev. 1 Section 005 7.1.3.1  (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb 5. Y Closed Closed EICB RAI TVA Letter dated 006    (G A mendment 95 of the FSAR
, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2  
, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2
: 6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1  (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12
: 6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1  (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12
, 2010 (Enclosure 1
, 2010 (Enclosure 1
, Item No. 7  
, Item No. 7
: 7. Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3  (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12
: 7. Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3  (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12
, 2010 (Enclosure 1
, 2010 (Enclosure 1
, Item No. 8  
, Item No. 8
: 8. Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12
: 8. Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12
, 2010 (Enclosure 1
, 2010 (Enclosure 1
, Item No. 9  
, Item No. 9
: 9. Y Closed Closed EICB RAI 3/12/10 ,  010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847
: 9. Y Closed Closed EICB RAI 3/12/10 ,  010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, 2010 (Enclosure 1
, Item No. 10  
, Item No. 10
: 10. Y Closed Closed EICB RAI 3/12/10 ,  011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12
: 10. Y Closed Closed EICB RAI 3/12/10 ,  011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12
, 2010 (Enclosure 1
, 2010 (Enclosure 1
, Item No. 11  
, Item No. 11
: 11. Y Closed Closed EICB RAI ML101680598
: 11. Y Closed Closed EICB RAI ML101680598
,  012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847
,  012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847
) documents that the TVA Letter Dated March 12
) documents that the TVA Letter Dated March 12
, 2010 (Enclosure 1
, 2010 (Enclosure 1
, Item No. 12  
, Item No. 12
: 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1  (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12
: 12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1  (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12
, 2010 (Enclosure 1
, 2010 (Enclosure 1
, Item No. 13  
, Item No. 13
: 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
: 13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.
014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10  
014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10
: 14. Y Closed Closed NRC Meetin g TVA Letter dated 015    (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10  
: 14. Y Closed Closed NRC Meetin g TVA Letter dated 015    (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10
: 15. Y Closed Closed NRC Meetin g TVA Letter dated 016    (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10  
: 15. Y Closed Closed NRC Meetin g TVA Letter dated 016    (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10
: 16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs
: 16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs
, if an y, for the solid state p rotection Date: 4/27/10  
, if an y, for the solid state p rotection Date: 4/27/10
: 17. Y Closed Closed NRC Meetin g TVA Letter dated 018    (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10  
: 17. Y Closed Closed NRC Meetin g TVA Letter dated 018    (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10
: 18. Y Closed Closed NRC Meetin g TVA Letter dated 019    (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10  
: 18. Y Closed Closed NRC Meetin g TVA Letter dated 019    (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10
: 19. Y Closed Closed NRC Meetin g TVA Letter dated 020    (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10  
: 19. Y Closed Closed NRC Meetin g TVA Letter dated 020    (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10
: 20. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
: 20. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
SRP Section 7.0 states:
021  7.3  (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10  
021  7.3  (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10
: 21. Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10  
: 21. Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10
: 22. Y Closed Closed  NRC Meetin g TVA Letter dated 023    (GProvide environmental q ualification (10 CFR 50.49
: 22. Y Closed Closed  NRC Meetin g TVA Letter dated 023    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10  
) information for Date: 4/27/10
: 23. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
: 23. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
SRP Section 7.0 states:
024    (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a  
024    (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a
: 24. Y Closed Closed  NRC Meetin g N/A - Re q uest f or NNC 4/30/10:
: 24. Y Closed Closed  NRC Meetin g N/A - Re q uest f or NNC 4/30/10:
Carte to address 025 7.5.2 7.5.1  (S i For the containment radiation hi g h radiation monitor
Carte to address 025 7.5.2 7.5.1  (S i For the containment radiation hi g h radiation monitor
, verif y that the Date: 4/27/10  
, verif y that the Date: 4/27/10
: 25. Y Closed Closed NRC Meetin g ML101230248
: 25. Y Closed Closed NRC Meetin g ML101230248
,  026    (GProvide environmental q ualification (10 CFR 50.49
,  026    (GProvide environmental q ualification (10 CFR 50.49
) information for Date: 4/27/10  
) information for Date: 4/27/10
: 26. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
: 26. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:
SRP Section 7.0 states:
SRP Section 7.0 states:
027 7.7.1.4  (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10  
027 7.7.1.4  (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10
: 27. Y Closed Closed NRC Meetin g TVA Letter dated 028    (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen
: 27. Y Closed Closed NRC Meetin g TVA Letter dated 028    (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen
: 28. Y Closed Closed NRC Meetin g TVA Letter dated 029    (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10  
: 28. Y Closed Closed NRC Meetin g TVA Letter dated 029    (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10
: 29. Y Closed Closed NRC Meetin g TVA Letter dated 030    (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark  
: 29. Y Closed Closed NRC Meetin g TVA Letter dated 030    (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark
: 30. Y Closed Closed NRC Meetin g TVA Letter dated 031    (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10  
: 30. Y Closed Closed NRC Meetin g TVA Letter dated 031    (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10
: 31. Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032    (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10  
: 31. Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032    (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10
: 32. Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033    (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10  
: 32. Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033    (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10
: 33. Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034    (G 2/4/2010 Res ponder: TVA  
: 33. Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034    (G 2/4/2010 Res ponder: TVA
: 34. Y Closed Closed N/A TVA Letter dated 034.1  a r g  Cha p ter 7.1 - Introduction  
: 34. Y Closed Closed N/A TVA Letter dated 034.1  a r g  Cha p ter 7.1 - Introduction
: 35. Y Closed Closed N/A N/A  034.2    (G  Cha pter 7.2 - Reactor Tri p S y stem  36. Y Closed Closed N/A N/A  034.3 7.3 7.3 (D a r  Cha p ter 7.3 - ESFAS  37. Y Closed Closed N/A N/A  034.4 7.5.1.1 7.5.2 (M a  Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y  38. Y Closed Closed  N/A N/A Closed  034.5 7.5.1.1 7.5.2 r c u  Cha p ter 7.6 -
: 35. Y Closed Closed N/A N/A  034.2    (G  Cha pter 7.2 - Reactor Tri p S y stem  36. Y Closed Closed N/A N/A  034.3 7.3 7.3 (D a r  Cha p ter 7.3 - ESFAS  37. Y Closed Closed N/A N/A  034.4 7.5.1.1 7.5.2 (M a  Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y  38. Y Closed Closed  N/A N/A Closed  034.5 7.5.1.1 7.5.2 r c u  Cha p ter 7.6 -
A ll Other S ystems Re quired for Safet y  39. Y Closed Closed  N/A  N/A Closed  034.6  n g h/  Cha pter 7.7 Control S ystems  40. Y Closed Closed  N/A N/A  035    (S i 2/18/2010 Res p onder: Clark  
A ll Other S ystems Re quired for Safet y  39. Y Closed Closed  N/A  N/A Closed  034.6  n g h/  Cha pter 7.7 Control S ystems  40. Y Closed Closed  N/A N/A  035    (S i 2/18/2010 Res p onder: Clark
: 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1  (C aFebruar y 18 , 2010 Date: 5/25/10  
: 41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1  (C aFebruar y 18 , 2010 Date: 5/25/10
: 42. Y Closed Closed NRC Meetin g  NNC: Unit 2 FSAR Section 7.5.1
: 42. Y Closed Closed NRC Meetin g  NNC: Unit 2 FSAR Section 7.5.1
, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                      Date: 5/25/10
, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark                      Date: 5/25/10
Line 105: Line 105:
: 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039    (G Januar y 13 , 2010 Res p onder: Clark                                Date: 5/25/10
: 44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039    (G Januar y 13 , 2010 Res p onder: Clark                                Date: 5/25/10
: 45. Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040    (G Januar y 13 , 2010 Res p onder: Clark                              Date: 5/25/10
: 45. Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040    (G Januar y 13 , 2010 Res p onder: Clark                              Date: 5/25/10
: 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 042 All All B (AFebruar y 25 , 2010:  Telecom Date: 5/25/10  
: 46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 042 All All B (AFebruar y 25 , 2010:  Telecom Date: 5/25/10
: 47. Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 044 7.5.2 7.5.1  (C aFebruar y 25 , 2010 Date: 5/25/10  
: 47. Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 044 7.5.2 7.5.1  (C aFebruar y 25 , 2010 Date: 5/25/10
: 48. Y Closed Closed EICB RAI TVA Letter dated 045    (C aFebruar y 25 , 2010 Date: 5/25/10  
: 48. Y Closed Closed EICB RAI TVA Letter dated 045    (C aFebruar y 25 , 2010 Date: 5/25/10
: 49. Y Closed Closed EICB RAI TVA Letter dated 046    (C aFebruar y 25 , 2010 Date: 5/25/10  
: 49. Y Closed Closed EICB RAI TVA Letter dated 046    (C aFebruar y 25 , 2010 Date: 5/25/10
: 50. Y Closed Closed N/A - Re q uest for N/A  047 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC/Hilmes                Date: 5/25/10
: 50. Y Closed Closed N/A - Re q uest for N/A  047 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC/Hilmes                Date: 5/25/10
: 51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1  (C a Ap ril 8 , 2010 Date: 5/25/10  
: 51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1  (C a Ap ril 8 , 2010 Date: 5/25/10
: 52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1  (C a 4/8/2010 Res ponder: WEC              Date: 5/25/10
: 52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1  (C a 4/8/2010 Res ponder: WEC              Date: 5/25/10
: 53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC                        Date: 5/25/10
: 53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1  (C a 4/8/2010 Res p onder: WEC                        Date: 5/25/10
: 54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10:
: 54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10:
S y sRS Rev. 2 contains 051    (G Ap ril 15 , 2010 Date: 5/25/10  
S y sRS Rev. 2 contains 051    (G Ap ril 15 , 2010 Date: 5/25/10
: 55. Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10  
: 55. Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10
: 56. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10  
: 56. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date: 5/25/10
: 57. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                    Date: 5/25/10
: 57. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                    Date: 5/25/10
: 58. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                  Date: 5/25/10
: 58. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: Slifer/Clark                  Date: 5/25/10
: 59. Y Closed Closed RAI No. 15 TVA Letter dated 056    (S i Ap ril 19 , 2010 Date: 5/25/10  
: 59. Y Closed Closed RAI No. 15 TVA Letter dated 056    (S i Ap ril 19 , 2010 Date: 5/25/10
: 60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: TVA I&C Staff                    Date: 5/25/10
: 60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1  (S i 4/19/2010 Res ponder: TVA I&C Staff                    Date: 5/25/10
: 61. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5  (S i Ap ril 19 , 2010 Date: 5/25/10  
: 61. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5  (S i Ap ril 19 , 2010 Date: 5/25/10
: 62. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date:  63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10  
: 62. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1  (S i Ap ril 19 , 2010 Date:  63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 64. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47 061 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10  
: 64. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47 061 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 65. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10  
: 65. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 66. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10  
: 66. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1  (C a Ap ril 19 , 2010 Date:  5/25/10
: 67. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1  (C a B y letter dated March 12
: 67. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1  (C a B y letter dated March 12
, 2010 TVA stated that the tar g et submittal Res p onder: Webb      Date: 4/8/2010
, 2010 TVA stated that the tar g et submittal Res p onder: Webb      Date: 4/8/2010
Line 150: Line 150:
: 77. Y Closed  Closed N/A - No q uestion TVA Letter dated 078    (G 4/26/2010 Res p onder: Clark                          Date: 5/25/10
: 77. Y Closed  Closed N/A - No q uestion TVA Letter dated 078    (G 4/26/2010 Res p onder: Clark                          Date: 5/25/10
: 78. Y Closed  Closed  EICB RAI TVA Letter dated 079    (G 4/26/2010 Res p onder: Clark                              Date: 5/25/10
: 78. Y Closed  Closed  EICB RAI TVA Letter dated 079    (G 4/26/2010 Res p onder: Clark                              Date: 5/25/10
: 79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080    (S i 4/26/2010 Res p onder: WEC  
: 79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080    (S i 4/26/2010 Res p onder: WEC
: 80. Y Closed Closed RAI No. 2 TVA Letter dated 082 7.5.2 7.5.1  (C a 5/6/2010 Res p onder: WEC                                Date: 6/18/10
: 80. Y Closed Closed RAI No. 2 TVA Letter dated 082 7.5.2 7.5.1  (C a 5/6/2010 Res p onder: WEC                                Date: 6/18/10
: 81. N Closed Closed  EICB RAI TVA Letter dated NNC 11/18/10:
: 81. N Closed Closed  EICB RAI TVA Letter dated NNC 11/18/10:
See also O p en Item No.
See also O p en Item No.
083 7.5.2 7.5.1  (C a Ma y 6 , 2010 Date:  6/18/10  
083 7.5.2 7.5.1  (C a Ma y 6 , 2010 Date:  6/18/10
: 82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1  (C a May 6, 2010 Date:  6/18/10  
: 82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1  (C a May 6, 2010 Date:  6/18/10
: 83. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1  (C a 5/6/2010 Res p onder: WEC  
: 83. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1  (C a 5/6/2010 Res p onder: WEC
: 84. N Closed Closed EICB RAI  087 7.5.2 7.5.1  (S i Ma y 6 , 2010 Date:  5/24/10  
: 84. N Closed Closed EICB RAI  087 7.5.2 7.5.1  (S i Ma y 6 , 2010 Date:  5/24/10
: 85. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1  (S i May 6, 2010 Date:  5/24/10  
: 85. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1  (S i May 6, 2010 Date:  5/24/10
: 86. Y Closed Closed RAI No. 21 TVA Letter dated  
: 86. Y Closed Closed RAI No. 21 TVA Letter dated  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 089    (C a 5/6/2010 Res p onder: Clark  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 089    (C a 5/6/2010 Res p onder: Clark
: 87. Y Closed Closed EICB RAI TVA Letter dated NNC:  Docketed res p onse states that 090    (C a 5/6/2010 Res p onder: Clark                        Date: 5/25/10
: 87. Y Closed Closed EICB RAI TVA Letter dated NNC:  Docketed res p onse states that 090    (C a 5/6/2010 Res p onder: Clark                        Date: 5/25/10
: 88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date:  5/25/10  
: 88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date:  5/25/10
: 89. Y Closed Closed EICB RAI No.1 TVA Letter dated 093    (G Ma y 20 , 2010 Date:  5/25/10  
: 89. Y Closed Closed EICB RAI No.1 TVA Letter dated 093    (G Ma y 20 , 2010 Date:  5/25/10
: 90. Y Closed Closed N/A N/A Will be reviewed under item 154 094    (G 5/20/2010 Res p onder: Clark                          Date: 5/25/10
: 90. Y Closed Closed N/A N/A Will be reviewed under item 154 094    (G 5/20/2010 Res p onder: Clark                          Date: 5/25/10
: 91. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date:  92. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: 93. Y Closed Closed  EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date:  94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date:  95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099  (B a April 12, 2010 Date:  96. Y Closed Closed  Closed to Item 129 100    (C a 5/20/2010 Res p onder: WEC  
: 91. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date:  92. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: 93. Y Closed Closed  EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date:  94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date:  95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099  (B a April 12, 2010 Date:  96. Y Closed Closed  Closed to Item 129 100    (C a 5/20/2010 Res p onder: WEC
: 97. Y Closed Closed N/A - No q uestion N/A  102    (C a Ma y 24 , 2010 Date:  5/24/10  
: 97. Y Closed Closed N/A - No q uestion N/A  102    (C a Ma y 24 , 2010 Date:  5/24/10
: 98. Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.
: 98. Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.
103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala                    Date: 5/27/10
103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala                    Date: 5/27/10
Line 274: Line 274:
Responder: WEC                          Date: 5/25/10  
Responder: WEC                          Date: 5/25/10  


The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010  
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.  
: b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.  
: c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
: d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.
To be addressed during 9/20-9/21 audit  
To be addressed during 9/20-9/21 audit  
Line 285: Line 285:


the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.
the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.
The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:  
The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:
(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -  
(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -
: 1. N Open Response included in letter dated 12/22/10.  
: 1. N Open Response included in letter dated 12/22/10.  


Line 299: Line 299:
AI688 were docketed one month late. N/A - No question was asked. Item  
AI688 were docketed one month late. N/A - No question was asked. Item  


was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Instrumentation and Controls Staff Information Requests," (Reference 5):  
was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Instrumentation and Controls Staff Information Requests," (Reference 5):
: a. EQ-EV-62-WBT, Revision 0, "Common Q PAMS Comparison of Tested Conditions for the AI687  
: a. EQ-EV-62-WBT, Revision 0, "Common Q PAMS Comparison of Tested Conditions for the AI687  


and AI688 Common Q Modules  and Supporting  
and AI688 Common Q Modules  and Supporting  


Components to the Watts Bar Unit 2 (WBT) Requirements," dated September 10, 2010  
Components to the Watts Bar Unit 2 (WBT) Requirements," dated September 10, 2010
: b. EQLR-171, Revision 0, "Environmental and Seismic Test Report, Analog Input (AI)687 &
: b. EQLR-171, Revision 0, "Environmental and Seismic Test Report, Analog Input (AI)687 &
AI688 Modules for use in Common Q PAMS,"
AI688 Modules for use in Common Q PAMS,"
dated September 10, 2010  
dated September 10, 2010
: c. CN-EQT-10-44, Revision 0, "Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS)," dated September 28, 2010  (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following  
: c. CN-EQT-10-44, Revision 0, "Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS)," dated September 28, 2010  (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following  


documents are available for NRC audit at the Westinghouse Rockville office:  
documents are available for NRC audit at the Westinghouse Rockville office:
: a. CDI-3722, Revision 7, "Next Generation PC Node Box Commercial Dedication Instruction"
: a. CDI-3722, Revision 7, "Next Generation PC Node Box Commercial Dedication Instruction"
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary"   
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary"   


(3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:  
(3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:
: a. CDI-3803, Revision 8, "Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction"
: a. CDI-3803, Revision 8, "Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction"
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" (Reference 7), the following documents are  
: b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" (Reference 7), the following documents are  


available for NRC audit at the Westinghouse Rockville office: a. CDI- 4057, Revision 4, "Commercial Dedication Instruction"
available for NRC audit at the Westinghouse Rockville office: a. CDI- 4057, Revision 4, "Commercial Dedication Instruction"
: b. EQ-TP-1 05-GEN, Revision 0, "Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter"
: b. EQ-TP-1 05-GEN, Revision 0, "Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter"
: c. Breakers," EQ-TP-114-GEN, Revision 0, "Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit"  
: c. Breakers," EQ-TP-114-GEN, Revision 0, "Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit"
: d. EQ-TP-117-GEN, Revision 0, "Environmental Qualification Test Procedure For Common Q Pow eSupplies, Quint Power Supplies, and Line Filter Assemblies" 081 7.5.2 7.5.1 (C a5/6/2010 Responder: Merten/WEC  
: d. EQ-TP-117-GEN, Revision 0, "Environmental Qualification Test Procedure For Common Q Pow eSupplies, Quint Power Supplies, and Line Filter Assemblies" 081 7.5.2 7.5.1 (C a5/6/2010 Responder: Merten/WEC
: 2. N Open Open-NRC Review EICB RAI TVA Letter dated NNC 1/5/11:
: 2. N Open Open-NRC Review EICB RAI TVA Letter dated NNC 1/5/11:
See Also Open Item No.
See Also Open Item No.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)
(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
However, LIC-110, "Watts Bar Unit 2 License Application Review,"
Line 383: Line 383:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments be addressed by a PAMS system. Awaiting TVA Response.  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments be addressed by a PAMS system. Awaiting TVA Response.  


086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review,"
(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review,"
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions."  Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.
Line 393: Line 393:


Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4  TVA Response to Follow-up NRC Request:
Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4  TVA Response to Follow-up NRC Request:
The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.  
The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.
: 3. N Open TVA to address with item OI  
: 3. N Open TVA to address with item OI
: 81. Open-NRC Review Due 2/25/11 NNC 2/3/11:  The above due date has been missed by at least 2 months.
: 81. Open-NRC Review Due 2/25/11 NNC 2/3/11:  The above due date has been missed by at least 2 months.
Please provide new due date.
Please provide new due date.
Line 403: Line 403:
& 202 101  DORL (Poole) 4/12/2010  
& 202 101  DORL (Poole) 4/12/2010  


The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.  
The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.
: 1. V&V Report 04508006A
: 1. V&V Report 04508006A
: 2. System Description 04508100-1TM  
: 2. System Description 04508100-1TM
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP  
: 3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
: 4. Functional Testing Report 04507007-1TR Responder: Slifer  
: 4. Functional Testing Report 04507007-1TR Responder: Slifer  


The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.  
The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.
: 4. Y Open Documents provided in letter  
: 4. Y Open Documents provided in letter  


Line 420: Line 420:
Software Requirements Specifications."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is  
Software Requirements Specifications."  IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is  


traceable of the origin of each of its requirements is clear-"  
traceable of the origin of each of its requirements is clear-"
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.  
: 1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.  


Line 428: Line 428:


TVA Response to 1:
TVA Response to 1:
Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:  
Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:
: a. Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, "Post-
: a. Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, "Post-
: 5. N Open  Revised response included in letter dated 02/25/11 Response included in letter dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element Open-NRC Review Due 2/25/11 (document submittals)
: 5. N Open  Revised response included in letter dated 02/25/11 Response included in letter dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element Open-NRC Review Due 2/25/11 (document submittals)
Line 434: Line 434:


TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?  
: 2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
: 3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?
Does the same apply to documents referenced by the SRS?
Does the same apply to documents referenced by the SRS?
Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
R2.3-2  [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.  
If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document?  If so, what are these sources or documents?  
: 4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification?  Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document?  If so, what are these sources or documents?  


Line 465: Line 465:


00000-ICE-3239, Revision 13, "Software Requirements Specification for the Common Q Generic Flat Panel Display development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5) next audit.
00000-ICE-3239, Revision 13, "Software Requirements Specification for the Common Q Generic Flat Panel Display development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5) next audit.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".
: 5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".
These references are used in the body of the SRS, for example:"  
These references are used in the body of the SRS, for example:"  
Line 473: Line 473:
12]).]    They are also included via tables such as found in requirement R7.1.2-1  
12]).]    They are also included via tables such as found in requirement R7.1.2-1  


[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]  
[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]  


Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their origin? Software"  Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)  
Do the referenced reusable software element documents include requirements not explicitly stated in the SRS?    If so what is their origin? Software"  Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)  
Line 482: Line 482:


RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceabili ty Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements."  This  document can be made available for audit at the  Westinghouse Rockville office.
RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceabili ty Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements."  This  document can be made available for audit at the  Westinghouse Rockville office.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.  
At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.
: 1. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 1. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.


Line 489: Line 489:
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
TVA Response:
TVA Response:
See response to letter Item 13 (NRC Matrix Item 145).
See response to letter Item 13 (NRC Matrix Item 145).
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.  
: 3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.  


Line 538: Line 538:


Test Display," 7.2.25 "Saturation Margin Test Display,"
Test Display," 7.2.25 "Saturation Margin Test Display,"
and 7.2.26 "Analog Output Test Display."  
and 7.2.26 "Analog Output Test Display."
: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position.
: 11. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position.
TVA Response:
TVA Response:
Westinghouse has elected to standardize on the terms "FE keyswitch" and "ENABLE."  A review of recent documents for compliance with this comment and commitment was performed with the following results:  
Westinghouse has elected to standardize on the terms "FE keyswitch" and "ENABLE."  A review of recent documents for compliance with this comment and commitment was performed with the following results:
: a. Revision 3 of the SysRS, and SDS have been revised to use the terms "FE keyswitch."  Revision 3 of the SDS is consistent in use of the term "ENABLE." b. SysRS Revision 3 is not consistent in use of the term "ENABLE" as noted below:
: a. Revision 3 of the SysRS, and SDS have been revised to use the terms "FE keyswitch."  Revision 3 of the SDS is consistent in use of the term "ENABLE." b. SysRS Revision 3 is not consistent in use of the term "ENABLE" as noted below:
: i. R2.5.2.1-2 uses the term "ENABLED" instead of "ENABLE" ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term "Enable"  
: i. R2.5.2.1-2 uses the term "ENABLED" instead of "ENABLE" ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term "Enable"  
Line 552: Line 552:
ii. Section 2.1, page 2-4, uses the term "Enable" instead of "ENABLE" iii. Requirements R7.2.14-6 and R7.2.16-7 use the Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments term "active" instead of "ENABLE" iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term "enabled" instead of  
ii. Section 2.1, page 2-4, uses the term "Enable" instead of "ENABLE" iii. Requirements R7.2.14-6 and R7.2.16-7 use the Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments term "active" instead of "ENABLE" iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term "enabled" instead of  


"ENABLE" d. WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA letter to NRC dated (Reference  
"ENABLE" d. WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA letter to NRC dated (Reference
: 12) is not consistent in use of the term "FE keyswitch" as noted below:
: 12) is not consistent in use of the term "FE keyswitch" as noted below:
: i. Section 2.2 "System Description" and Table 3-1 "WB2 PAMS FMEA" refer to the FE switch.
: i. Section 2.2 "System Description" and Table 3-1 "WB2 PAMS FMEA" refer to the FE switch.
Line 562: Line 562:
The identified discrepancies in the use of the terms "FE  
The identified discrepancies in the use of the terms "FE  


keyswitch" and "ENABLE" in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.  
keyswitch" and "ENABLE" in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.
: 12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.  
: 12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.  


TVA Response:
TVA Response:
See response to letter item 13 (NRC Matrix Item 145).  
See response to letter item 13 (NRC Matrix Item 145).
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:
: 13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:
The revised document submittal schedule was included  
The revised document submittal schedule was included  
Line 577: Line 577:
The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, "TVA Contract Compliance Matrix."  
The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, "TVA Contract Compliance Matrix."  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 15. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:
: 15. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:
The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.
The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.
Line 594: Line 594:


TVA Response:
TVA Response:
See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).  
See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).
: 18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)  
: 18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?  
: a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
: b. What are the SDDs?  
: b. What are the SDDs?
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
: c. PAMS is a delta document so how do we capture all the generic requirements for traceability.
TVA Response:
TVA Response:
: a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
: a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
: b. The SDDs developed for this project are:  
: b. The SDDs developed for this project are:
: i. WNA-SD-00248-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C  
: i. WNA-SD-00248-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C  


Line 608: Line 608:
Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details"   
Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details"   


iv. Other generic SDDs referenced by the PAMS project are: (a) 00000-ICE-20157, Revision 18, "Software Design Description for the Common Q Generic Flat-Panel Software" (b) 00000-ICE-30152, Revision 5, "Software Design Description Post Accident Monitoring System AC160" (c) 00000-ICE-30140, Revision 4, "Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions"  
iv. Other generic SDDs referenced by the PAMS project are: (a) 00000-ICE-20157, Revision 18, "Software Design Description for the Common Q Generic Flat-Panel Software" (b) 00000-ICE-30152, Revision 5, "Software Design Description Post Accident Monitoring System AC160" (c) 00000-ICE-30140, Revision 4, "Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions"
: c. Refer to WNA-VR-00279-WBT, Revision 3.
: c. Refer to WNA-VR-00279-WBT, Revision 3.
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Line 635: Line 635:
(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.
(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.
Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. A detailed explanation will be provided.
Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. A detailed explanation will be provided.
TVA Response:  
TVA Response:
  (a) and (b) The requested information is provided in the following documents:  
(a) and (b) The requested information is provided in the following documents:
: i. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing  
: i. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing
: 6. N Open  Response included in letter  
: 6. N Open  Response included in letter  


Line 648: Line 648:
(c) What other documents contain the requirements for the other software components?  
(c) What other documents contain the requirements for the other software components?  


The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this document is to define the hardware design requirements -"  
The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this document is to define the hardware design requirements -"
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?  
(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?  


(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. Technical Report," Table 6-1, "Document Requirements" which lists the software documentation requirements for the Common Q PAMS and Section 11 "TVA Contract Compliance Matrix" submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. Technical Report," Table 6-1, "Document Requirements" which lists the software documentation requirements for the Common Q PAMS and Section 11 "TVA Contract Compliance Matrix" submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated December 2010 (Attachment 1) iii. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010 (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) To the best of TVA's knowledge, no prior NRC review of the software components has been performed. (c) WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) (d) No. Please see Item (e) below. (e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated December 2010 (Attachment 1) iii. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010 (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) To the best of TVA's knowledge, no prior NRC review of the software components has been performed. (c) WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) (d) No. Please see Item (e) below. (e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:
: i. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)
: i. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)
Line 659: Line 659:
Specifications and RTMs to be provided b y TVA  NNC 2/3/11:  The above due date has been missed by at least 2 months.
Specifications and RTMs to be provided b y TVA  NNC 2/3/11:  The above due date has been missed by at least 2 months.
Please provide new due date. 145  EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability  
Please provide new due date. 145  EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability  
& Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.  
& Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.
(a) Does the WBN2 PAMS SDS implement all of the hardware Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.  
(a) Does the WBN2 PAMS SDS implement all of the hardware Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.
: 7. N Open Response included in letter  
: 7. N Open Response included in letter  


dated 12/22/10 During the September 20-21, Open-NRC Review Due 2/25/11 To be addressed by Revision of the RTM, ML101650255, Item No. 9  WBN2 PAMS System Design Specification  
dated 12/22/10 During the September 20-21, Open-NRC Review Due 2/25/11 To be addressed by Revision of the RTM, ML101650255, Item No. 9  WBN2 PAMS System Design Specification  


TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments requirements in the WBN2 PAMS SysRS?  
TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments requirements in the WBN2 PAMS SysRS?
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.  
(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.  


This item is used to track all traceability issues with the System Design Specification (SDS).
This item is used to track all traceability issues with the System Design Specification (SDS).


At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.  
: 1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
: 2. Some hardware requirements are contained in the SRS instead of the S y stem Desi gn Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.  
: 2. Some hardware requirements are contained in the SRS instead of the S y stem Desi gn Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the  
: 3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and  SRS (11) at the  


revisions reviewed by V&V. Have these been addressed?  Yes. The next revisions of the SDS and SRS address these issues.  
revisions reviewed by V&V. Have these been addressed?  Yes. The next revisions of the SDS and SRS address these issues.
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.  
: 4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.  
: 5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 6. Westinghouse to provide the generic AC160 and flat panel specifications.
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.  
: 7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
: 8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.
(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).  
(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).
  (3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).  
(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).
(4) Section 11 "TVA Contract Compliance Matrix" was added to WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).  
(4) Section 11 "TVA Contract Compliance Matrix" was added to WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).
(5) WNA-VR-00283-WBT, Revision 1, "IV&V Summary Report for the Post Accident Monitoring System," submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.  
(5) WNA-VR-00283-WBT, Revision 1, "IV&V Summary Report for the Post Accident Monitoring System," submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.
(6) Per Westinghouse letter WBT-D-2268 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated August 16, 2010 (Reference 9) "System Requirements Specification for the Common Q Generic Flat Panel Display," 00000-ICE-30155, Revision 9 is available for audit at the Westin ghouse Rockville office.
(6) Per Westinghouse letter WBT-D-2268 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated August 16, 2010 (Reference 9) "System Requirements Specification for the Common Q Generic Flat Panel Display," 00000-ICE-30155, Revision 9 is available for audit at the Westin ghouse Rockville office.
The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.  
The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.
(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.  
(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.
(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.  
(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.
(9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
(9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 TVA Response to Follow-up NRC Request:
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 TVA Response to Follow-up NRC Request:
See Response to item 3 (Item number 142) 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:  
See Response to item 3 (Item number 142) 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:  
Line 708: Line 708:


audit.
audit.
TVA Response to Follow-up NRC Request:  
TVA Response to Follow-up NRC Request:
(1) See NRC Matrix Item 144
(1) See NRC Matrix Item 144
: 8. N Open Response included in letter dated 12/22/10.
: 8. N Open Response included in letter dated 12/22/10.
Open-NRC Review  
Open-NRC Review  
Line 752: Line 752:
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"
Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"
dated December 2010.
dated December 2010.
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)  
Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)
: 9. N Open Revised response is included in  
: 9. N Open Revised response is included in  


Line 792: Line 792:


TVA Response to Follow-up NRC Request:
TVA Response to Follow-up NRC Request:
The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.  
The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.
: 1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:  
: 1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
: a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.  
: a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
: b. Section 2.2.2, "Software" has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle. 2. WNA-PT-00138-WBT, Revision 0, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan,"  
: b. Section 2.2.2, "Software" has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle. 2. WNA-PT-00138-WBT, Revision 0, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan,"
(Proprietary),  dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
(Proprietary),  dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).
: 10. N Open  Revised response included in  
: 10. N Open  Revised response included in  


Line 815: Line 815:


The following responses are based on WBN Unit 2 Common Q PAMS traceability:
The following responses are based on WBN Unit 2 Common Q PAMS traceability:
Software requirements traceability analysis is described in the following documents:  
Software requirements traceability analysis is described in the following documents:
: 1. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "TVA  
: 1. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "TVA  


Contract Compliance Matrix"  
Contract Compliance Matrix"
: 11. N Open Response included in letter dated 12/22/10  
: 11. N Open Response included in letter dated 12/22/10  


Line 829: Line 829:


of the proposal in terms of regulatory requirements and the protection of public health and safety."
of the proposal in terms of regulatory requirements and the protection of public health and safety."
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: 2. WNA-VR-00279-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville  
: 2. WNA-VR-00279-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville  


office)  
office)
: 3. WNA-VR-00280-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)  This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
: 3. WNA-VR-00280-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)  This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:  
The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:
: 1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases  
: 1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases
("Nuclear Automation Watts Bar Unit 2 NSSS  
("Nuclear Automation Watts Bar Unit 2 NSSS  


Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).  
Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases  
: 2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases
("Nuclear Automation Watts Bar Unit 2 NSSS  
("Nuclear Automation Watts Bar Unit 2 NSSS  


Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010),  submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).  
Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010),  submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).
: 3. The integration phase is covered in Attachment 10, the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-
: 3. The integration phase is covered in Attachment 10, the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-


Line 851: Line 851:


(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) Responder: Temples (i) Applicable to WBN Unit 2.
(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) Responder: Temples (i) Applicable to WBN Unit 2.
04508905-1QR is applicable only in regards to the RM-1000, with the  
04508905-1QR is applicable only in regards to the RM-1000, with the
: 12. N Open Revised response is included in  
: 12. N Open Revised response is included in  


Line 865: Line 865:
Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.
Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions?  If with exceptions, then please clarify what those are.
Supplement 3 was issued one month prior to supplement 2.
Supplement 3 was issued one month prior to supplement 2.
Please explain the reason for the same. exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.  
Please explain the reason for the same. exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.
(ii) Applicable to WBN Unit 2.  (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release  
(ii) Applicable to WBN Unit 2.  (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release  


time difference. TVA Response to Follow-up NRC Request:
time difference. TVA Response to Follow-up NRC Request:
NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).
NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).
(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19
(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19
) is as follows:  
) is as follows:
: a. 04508905-QR "Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.  
: a. 04508905-QR "Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.
: b. 04508905-1SP "Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 module.  
: b. 04508905-1SP "Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 module.
: c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.  
: c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.
: d. 04508905-2SP "Qualification Test Report Supplement, I-F Converter Upgrades" is applicable to the WBN Unit 2 I to F converter module.
: d. 04508905-2SP "Qualification Test Report Supplement, I-F Converter Upgrades" is applicable to the WBN Unit 2 I to F converter module.
GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are: QR. Staff version is QR only.
GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are: QR. Staff version is QR only.
Line 886: Line 886:
Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. This information is needed to verify that the model or part number used is the equipment that has been qualified for WBN-
Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. This information is needed to verify that the model or part number used is the equipment that has been qualified for WBN-
: 2.
: 2.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments
: e. GA-ESI report 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors:"  The report is the principle report and the starting point for all  
: e. GA-ESI report 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors:"  The report is the principle report and the starting point for all  


Line 893: Line 893:
the major components of the monitor system.   
the major components of the monitor system.   


Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5.
Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5.
: f. GA-ESI report 04038903-7SP, "Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]:"  GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than  
: f. GA-ESI report 04038903-7SP, "Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]:"  GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than  


40 years.  
40 years.
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)  
(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)  
(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades" is not applicable to WBN Unit 2 (Reference 19).   
(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades" is not applicable to WBN Unit 2 (Reference 19).   


Please see Item 1, above, for applicability of the other reports.  
Please see Item 1, above, for applicability of the other reports.
(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference  23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been Provide qualification reports 04038903-QSR and 04038903-7SP by the dues date of 1/22/11.
(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference  23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been Provide qualification reports 04038903-QSR and 04038903-7SP by the dues date of 1/22/11.
Submit a copy of any other relevant reviewed versions of the qualification reports.
Submit a copy of any other relevant reviewed versions of the qualification reports.
Line 907: Line 907:
Clarification of applicability of existing reports is acceptable.  
Clarification of applicability of existing reports is acceptable.  


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments erroneously marked as having not been reviewed. 04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments erroneously marked as having not been reviewed. 04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.
(6) See item 5. TVA Response to Follow-up NRC Request:
(6) See item 5. TVA Response to Follow-up NRC Request:
The following documents are the qualification documents associated with the RM-1000 radiation monitors: Attachment 5 contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, "Qualification Test Report Supplement, RM-1000 Upgrade."  Attachment 6 contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, "Qualification Test Report Supplement, I-F Converter Upgrades."    Attachment 7 contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)."    Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear  
The following documents are the qualification documents associated with the RM-1000 radiation monitors: Attachment 5 contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, "Qualification Test Report Supplement, RM-1000 Upgrade."  Attachment 6 contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, "Qualification Test Report Supplement, I-F Converter Upgrades."    Attachment 7 contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)."    Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear  
Line 923: Line 923:
Due 11/24/10    335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.
Due 11/24/10    335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.
Responder: WEC TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled  
Responder: WEC TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled
: 14. Y Open  Partial Response included in letter dated 12/22/10 Open-NRC Review Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Encl 1, Item 28.
: 14. Y Open  Partial Response included in letter dated 12/22/10 Open-NRC Review Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Encl 1, Item 28.
Due 12/22/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and will be submitted by March 11, 2011.
Due 12/22/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and will be submitted by March 11, 2011.
Partial Response included in TVA to NRC letter dated December 22, 2010 (Reference 1).
Partial Response included in TVA to NRC letter dated December 22, 2010 (Reference 1).
Attachment 18 contains the proprietary version of EQ-EV-71-WBT-P, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2" dated February 2011 (Proprietary). Attachment 19 contains the non-proprietary version EQ-EV-71-WBT-NP, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2," dated February 2011. Attachment 20 contains the Application for Withholding Proprietary Information from Public Disclosure, EQ-EV-71-WBT-P, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2,"  
Attachment 18 contains the proprietary version of EQ-EV-71-WBT-P, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2" dated February 2011 (Proprietary). Attachment 19 contains the non-proprietary version EQ-EV-71-WBT-NP, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2," dated February 2011. Attachment 20 contains the Application for Withholding Proprietary Information from Public Disclosure, EQ-EV-71-WBT-P, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2,"
(Proprietar y) dated Februar y 18, 2011. 338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The  RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.  
(Proprietar y) dated Februar y 18, 2011. 338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The  RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.  


In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions. 04508905-QR, "Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter," (Attachment 23) documents the original baseline testing of the RM-1000 and current-to-frequency converter. The document has been revised to discuss the actual test spectra versus the required WBN response spectra used in the tests (see Attachment 22). 04508905-QR serves as a reference document for the WBN Unit 2 specific seismic qualification of the RM-1000 radiation monitors and current-to-frequency converters documented in 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)," (Attachment 7) and 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors," (Attachment 8). 04038903-7SP makes the comparison of the actual test response spectra used in 04508905-QR and the WBN required response spectra (see Attachment 22).  
In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions. 04508905-QR, "Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter," (Attachment 23) documents the original baseline testing of the RM-1000 and current-to-frequency converter. The document has been revised to discuss the actual test spectra versus the required WBN response spectra used in the tests (see Attachment 22). 04508905-QR serves as a reference document for the WBN Unit 2 specific seismic qualification of the RM-1000 radiation monitors and current-to-frequency converters documented in 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)," (Attachment 7) and 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors," (Attachment 8). 04038903-7SP makes the comparison of the actual test response spectra used in 04508905-QR and the WBN required response spectra (see Attachment 22).
: 15. N Open Open-NRC Review Due:    339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the  licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. As agreed to with the reviewer, Attachment 1 contains the applicable ARS plots for Elevation 755 where the TRS does not envelope the RRS. Attachment 2 contains the applicable Wyle Test Report 41991 SSE TRS plots.  
: 15. N Open Open-NRC Review Due:    339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the  licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. As agreed to with the reviewer, Attachment 1 contains the applicable ARS plots for Elevation 755 where the TRS does not envelope the RRS. Attachment 2 contains the applicable Wyle Test Report 41991 SSE TRS plots.
: 16. N Open Open-NRC Review Due: 2/25/11    340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),  
: 16. N Open Open-NRC Review Due: 2/25/11    340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.
Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test  
Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test
: 17. Y Open Response included in letter dated 12/22/10.
: 17. Y Open Response included in letter dated 12/22/10.
Open-NRC Review Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.
Open-NRC Review Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.
Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.
Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.
(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:  
(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:
: a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test  
: a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
: b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
: b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
: c. EN 55022 - Information technology equipment -
: c. EN 55022 - Information technology equipment -
Radio disturbance characteristics - Limits and methods of measurement TVA Response to Follow-up NRC Request:
Radio disturbance characteristics - Limits and methods of measurement TVA Response to Follow-up NRC Request:
Line 947: Line 947:
Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors." See section 3.4 for electromagnetic compatability qualification requirements. Attachment 23 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, "Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter." See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.
Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors." See section 3.4 for electromagnetic compatability qualification requirements. Attachment 23 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, "Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter." See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.
Attachments 7 and 8 document the EMI/RFI testing specific to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.
Attachments 7 and 8 document the EMI/RFI testing specific to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.
346 7.5.2.3 7.5 EICB (Sing h) TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 Document 04507007-1TR is the RM-1000 System Verification Test Results. 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2  
346 7.5.2.3 7.5 EICB (Sing h) TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 Document 04507007-1TR is the RM-1000 System Verification Test Results. 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2
: 18. N Open Open-NRC Review Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments specific test results report. Please identify and provide the appropriate test results reports to complete the review. Replacement Radiation Monitors" (Attachment 8) and and 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit 2 equipment specific qualification reports.
: 18. N Open Open-NRC Review Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments specific test results report. Please identify and provide the appropriate test results reports to complete the review. Replacement Radiation Monitors" (Attachment 8) and and 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit 2 equipment specific qualification reports.
The proposed response appears to be conflicting with the proposed response for OI-351 regarding not submitting the 04508905-QR report. TVA to re-assess proposed response for both OIs.
The proposed response appears to be conflicting with the proposed response for OI-351 regarding not submitting the 04508905-QR report. TVA to re-assess proposed response for both OIs.
347 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-1SP does not address EMI/RFI qualification for the new RM-1000 modules. TVA to provide the updated qualification or explain the basis for not addressing the  
347 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-1SP does not address EMI/RFI qualification for the new RM-1000 modules. TVA to provide the updated qualification or explain the basis for not addressing the  


EMI/RFI qualification. Qualification report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274)  
EMI/RFI qualification. Qualification report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274)
(Attachment 7), addresses the EMI/RFI qualifications for the entire loop including the RM-1000 and current to frequency (I/F) converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in  
(Attachment 7), addresses the EMI/RFI qualifications for the entire loop including the RM-1000 and current to frequency (I/F) converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in  


04038903-7SP.  
04038903-7SP.
: 19. N Open Open-NRC Review Due: 2/25/11    348 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-2SP does not address EMI/RFI qualification for the new I/F converters. TVA to provide the updated qualification or explain the basis for not addressing the EMI/RFI qualification. Qualification report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274), (Attachment 7) addresses the EMI/RFI qualifications for the entire loop including the RM-1000 & I/F converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in 04038903-7S P. 20. N Open Open-NRC Review Due: 2/25/11    349 7.5.2.3 7.5 EICB (Singh) Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 10 3 rads for total integrated dose (TID). However,  the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE)  (e.g., temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 10 4 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 10 4 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for  
: 19. N Open Open-NRC Review Due: 2/25/11    348 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-2SP does not address EMI/RFI qualification for the new I/F converters. TVA to provide the updated qualification or explain the basis for not addressing the EMI/RFI qualification. Qualification report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274), (Attachment 7) addresses the EMI/RFI qualifications for the entire loop including the RM-1000 & I/F converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in 04038903-7S P. 20. N Open Open-NRC Review Due: 2/25/11    349 7.5.2.3 7.5 EICB (Singh) Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 10 3 rads for total integrated dose (TID). However,  the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE)  (e.g., temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 10 4 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 10 4 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for  


WBN-2. The design criteria provides the criteria for determining what is a mild environment at WBN Unit 2. Calculation WBNAPS4004 "Summar y of Mild Environment Conditions for Watts Bar Nuclear Plant" provides the actual values for each area of the plant. In accordance with Table 1, the Control Room has a 40 year maximum TID of 3.5x10 2 RAD and a maximum integrated accident dose of 710.5 RAD for a maximum TID of 1060.5 RAD.
WBN-2. The design criteria provides the criteria for determining what is a mild environment at WBN Unit 2. Calculation WBNAPS4004 "Summar y of Mild Environment Conditions for Watts Bar Nuclear Plant" provides the actual values for each area of the plant. In accordance with Table 1, the Control Room has a 40 year maximum TID of 3.5x10 2 RAD and a maximum integrated accident dose of 710.5 RAD for a maximum TID of 1060.5 RAD.
The accident dose of 710.5 RAD is the dose for a 100 day LOCA at the surface of the HEPA filter in the Mechanical Equipment Room. This is documented in TVA calculation WBNTSR-005, "Dose Due to the Control Building Emergency Air Cleanup Filters" Revision 3. However, on page 25 of WBNTSR-005, the shine from this source into the control room is negligible and is not considered in the dose calculation for the control room.
The accident dose of 710.5 RAD is the dose for a 100 day LOCA at the surface of the HEPA filter in the Mechanical Equipment Room. This is documented in TVA calculation WBNTSR-005, "Dose Due to the Control Building Emergency Air Cleanup Filters" Revision 3. However, on page 25 of WBNTSR-005, the shine from this source into the control room is negligible and is not considered in the dose calculation for the control room.
Calculation WBNAPS3-126, "EQ Dose in the U1/U2 Auxiliar y Instrument Rooms and the Computer Room in the Control Building" Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x10 3 RAD. Calculation WBNAPS3-126, will be revised to include the control room b y Jul y 1, 2011. Since the control room TID has been determined to be less than 1x10 3 RAD, radiation qualification of the RM-1000.  
Calculation WBNAPS3-126, "EQ Dose in the U1/U2 Auxiliar y Instrument Rooms and the Computer Room in the Control Building" Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x10 3 RAD. Calculation WBNAPS3-126, will be revised to include the control room b y Jul y 1, 2011. Since the control room TID has been determined to be less than 1x10 3 RAD, radiation qualification of the RM-1000.
: 21. N Open Open-NRC Review Due: 2/25/11 TVA to provide the assessment document or a suumary of the document with the reference to the appropriate document/documents. 350 7.5.2.3 7.5 EICB (Singh) The seismic required response spectra (RRS) is shown in Figures 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of 04508905-QR report. The actual test response spectra does not The RM-1000 was seismically tested in a NIM Bin and the actual test response spectra fully envelopes the RRS of TVA Standard Specification CEB-SS-5.10 "For Seismic Qualification of Electrical, Mechanical and I&C Devices  
: 21. N Open Open-NRC Review Due: 2/25/11 TVA to provide the assessment document or a suumary of the document with the reference to the appropriate document/documents. 350 7.5.2.3 7.5 EICB (Singh) The seismic required response spectra (RRS) is shown in Figures 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of 04508905-QR report. The actual test response spectra does not The RM-1000 was seismically tested in a NIM Bin and the actual test response spectra fully envelopes the RRS of TVA Standard Specification CEB-SS-5.10 "For Seismic Qualification of Electrical, Mechanical and I&C Devices
: 22. N Open Open-NRC Review Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the RRS and the actual test response spectra. The seismic qualification issue is open  till further clarification is received from  
: 22. N Open Open-NRC Review Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the RRS and the actual test response spectra. The seismic qualification issue is open  till further clarification is received from  


Line 969: Line 969:
to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 Attachment 12 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 Attachment 12 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.
TVA Response to Follow-up NRC Request A FSAR change will be submitted in a future FSAR amendment to change the revision level back to 1.
TVA Response to Follow-up NRC Request A FSAR change will be submitted in a future FSAR amendment to change the revision level back to 1.
TVA Response to Second Follow-up NRC Request There is no technical difference between the Revision 1 and Revision 2 WCAPs. As documented in Attachment 12, "WCAP 13869 Revision 2 Change Analysis", to TVA to NRC letter dated October 29, 2010, the differences are all administrative clarifications. Since WBN Unit 2 is required to match the WBN Unit 1 licensing basis to the extent practical, the decision was made to revise the WBN Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.  
TVA Response to Second Follow-up NRC Request There is no technical difference between the Revision 1 and Revision 2 WCAPs. As documented in Attachment 12, "WCAP 13869 Revision 2 Change Analysis", to TVA to NRC letter dated October 29, 2010, the differences are all administrative clarifications. Since WBN Unit 2 is required to match the WBN Unit 1 licensing basis to the extent practical, the decision was made to revise the WBN Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.
: 1. Y Open  Due 3/29/11 Revised Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg  not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA/Bechtel Due:  Need to provide additional info on why Rev. 1 is acceptable for both units. TVA Letter dated 10/29/10  Item  
: 1. Y Open  Due 3/29/11 Revised Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg  not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA/Bechtel Due:  Need to provide additional info on why Rev. 1 is acceptable for both units. TVA Letter dated 10/29/10  Item  


No. 36  344 7.6.6 ? Eicg(Garg) Unit 1 SE discussed in Section 7.6.5, "Valve Power Lockout". There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the design is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety. How do we meet the PSB?  (a) In accordance with0PDP-6, "Locked Valve/Breaker Program," Revision 1 (Attachment 25), valves locked by design are shown on design output documents (flow diagrams, system descriptions, etc.). As documented in 0PDP-6, valves are locked for multiple reasons. It is anticipated that many of the valves that were locked to provide positive isolation between Unit 1 and Unit 2 will not be locked when Unit 2 becomes operational and will be removed from the locked valve program. At the same time, Unit 1 valves locked for operational/Appendix R/Single Failure criteria will result in the corresponding Unit 2 valves being locked.
No. 36  344 7.6.6 ? Eicg(Garg) Unit 1 SE discussed in Section 7.6.5, "Valve Power Lockout". There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the design is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety. How do we meet the PSB?  (a) In accordance with0PDP-6, "Locked Valve/Breaker Program," Revision 1 (Attachment 25), valves locked by design are shown on design output documents (flow diagrams, system descriptions, etc.). As documented in 0PDP-6, valves are locked for multiple reasons. It is anticipated that many of the valves that were locked to provide positive isolation between Unit 1 and Unit 2 will not be locked when Unit 2 becomes operational and will be removed from the locked valve program. At the same time, Unit 1 valves locked for operational/Appendix R/Single Failure criteria will result in the corresponding Unit 2 valves being locked.
(b) The list of valves locked by design is contained in 0-PI-OPS-17.0, "18 Month Locked Valve Verification," Revision 44 (Attachment 21). Valves locked out by opening the associated circuit breaker are listed in 0-PI-OPS-17.1, "18 Month Locked Breaker Verification," Revision 14 (Attachment 24).
(b) The list of valves locked by design is contained in 0-PI-OPS-17.0, "18 Month Locked Valve Verification," Revision 44 (Attachment 21). Valves locked out by opening the associated circuit breaker are listed in 0-PI-OPS-17.1, "18 Month Locked Breaker Verification," Revision 14 (Attachment 24).
TVA Response to Follow Up NRC Question SER Supplement 0, Section 8.3.1.8 states:
TVA Response to Follow Up NRC Question SER Supplement 0, Section 8.3.1.8 states:
8.3.1.8 Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves - page 8-9 With regard to safety-related manually controlled, electrically operated valves, the staff asked the applicant to provide (1) an evaluation of all safety-related fluid systems to identify all such valves whose failure (that is, failure to  
8.3.1.8 Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves - page 8-9 With regard to safety-related manually controlled, electrically operated valves, the staff asked the applicant to provide (1) an evaluation of all safety-related fluid systems to identify all such valves whose failure (that is, failure to
: 2. N Open  ICSB-18 provides guidance on application of the single failure  
: 2. N Open  ICSB-18 provides guidance on application of the single failure  


Line 987: Line 987:
Subsequentl y, the applicant stated that the method of lockin g out power with the required redundant instrumentation is shown on electrical drawing 45W760-63-2  Based on this drawing, the staff concludes that the design meets the staff's position and is acceptable.
Subsequentl y, the applicant stated that the method of lockin g out power with the required redundant instrumentation is shown on electrical drawing 45W760-63-2  Based on this drawing, the staff concludes that the design meets the staff's position and is acceptable.
SER Supplement 5 states:
SER Supplement 5 states:
6.3.2 Evaluation, Page 6-3, Supplement 5 In the SER, the staff stated that the applicant will lock out power from certain valves in the emergency core cooling system (ECCS) whose misalignment might affect ECCS effectiveness. Some of these valves would be required to operate following a LOCA, and the manual restoration of power would add to post-accident operational complexity. By letters dated September 15, 1982, and April 10, 1985, the applicant stated Watts Bar would use modified control circuits for these valves to ensure that no sin gle failure would be able to energize the opening or closing coils of the valve operators. The design uses redundant contacts that are wired before and after each opening and closing coil. In addition, clear protective covers will be attached to the main control board over each respective control switch to prevent inadvertent actuation. As discussed in SER Sections 7.6.4 and 8.3.1.8, the staff found this design acceptable. Accordingly, power will not be locked out from the following valves during operation:  
6.3.2 Evaluation, Page 6-3, Supplement 5 In the SER, the staff stated that the applicant will lock out power from certain valves in the emergency core cooling system (ECCS) whose misalignment might affect ECCS effectiveness. Some of these valves would be required to operate following a LOCA, and the manual restoration of power would add to post-accident operational complexity. By letters dated September 15, 1982, and April 10, 1985, the applicant stated Watts Bar would use modified control circuits for these valves to ensure that no sin gle failure would be able to energize the opening or closing coils of the valve operators. The design uses redundant contacts that are wired before and after each opening and closing coil. In addition, clear protective covers will be attached to the main control board over each respective control switch to prevent inadvertent actuation. As discussed in SER Sections 7.6.4 and 8.3.1.8, the staff found this design acceptable. Accordingly, power will not be locked out from the following valves during operation:
(1) hot-leg injection line valves (2) valves from residual heat removal (RHR) discharge to safety injection (SI) and charging pump suction (3) RHR suction valves from containment sump (4) RHR discharge valves   
(1) hot-leg injection line valves (2) valves from residual heat removal (RHR) discharge to safety injection (SI) and charging pump suction (3) RHR suction valves from containment sump (4) RHR discharge valves   


Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (5) SI pump suction valve from refueling water storage tank  (6) SI miniflow valve In addition, the applicant evaluated other valves that may be used for SI miniflow, RHR to SI cross-connect, and SI injection, but for which the consequences of single failure would be acceptable. Power will also not be locked out from these valves. This revision is acceptable to the staff. This review was tracked under TAC 63630.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (5) SI pump suction valve from refueling water storage tank  (6) SI miniflow valve In addition, the applicant evaluated other valves that may be used for SI miniflow, RHR to SI cross-connect, and SI injection, but for which the consequences of single failure would be acceptable. Power will also not be locked out from these valves. This revision is acceptable to the staff. This review was tracked under TAC 63630.
Line 1,012: Line 1,012:
Please correct this in a future FSAR amendment.  
Please correct this in a future FSAR amendment.  


Update: Please fix s ymbols for Gate Valve, Globe Valve and Float operated valve. Responder: Stockton  
Update: Please fix s ymbols for Gate Valve, Globe Valve and Float operated valve. Responder: Stockton
: 1. Y Open Figure will be corrected in FSAR  
: 1. Y Open Figure will be corrected in FSAR  


Line 1,018: Line 1,018:


RAI not required. N/A RAI not required because the figure is not part of any SE section.
RAI not required. N/A RAI not required because the figure is not part of any SE section.
341 7.5.2.3 7.5 EICB (Singh) FSAR Tables 3.10 list seismically qualified equipment. However, these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables. A review of WBN Unit 2 FSAR amendment 102 chapters 3.10, 11 and 12 was performed. The reviewer was unable to locate seismic qualification information for the radiation monitoring system in those chapters. A review of chapter 3.11 confirmed that radiation monitoring is included in the environmentally qualified systems.
341 7.5.2.3 7.5 EICB (Singh) FSAR Tables 3.10 list seismically qualified equipment. However, these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables. A review of WBN Unit 2 FSAR amendment 102 chapters 3.10, 11 and 12 was performed. The reviewer was unable to locate seismic qualification information for the radiation monitoring system in those chapters. A review of chapter 3.11 confirmed that radiation monitoring is included in the environmentally qualified systems.
: 2. Y Open  FSAR section 3.10 will be updated in Amendment 103. Open-TVA/Licensing Will be closed on update of FSAR 3.10 series tables.
: 2. Y Open  FSAR section 3.10 will be updated in Amendment 103. Open-TVA/Licensing Will be closed on update of FSAR 3.10 series tables.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in FSAR  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in FSAR  
Line 1,024: Line 1,024:
amendment 103.
amendment 103.
092  DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.
092  DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.
Responder: Hilmes This item will close when we are no longer using this document as a communications tool.  
Responder: Hilmes This item will close when we are no longer using this document as a communications tool.
: 1. Y Open Open-TVA/Oversight Due: SER Issue  Continuous review as items are added 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:  
: 1. Y Open Open-TVA/Oversight Due: SER Issue  Continuous review as items are added 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:
(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements  
(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements  


Line 1,043: Line 1,043:
TVA Response to Follow-up NRC Request As agreed, a revised test plan document will not be submitted. The issues with the WNB Unit 2 test plan document WNA-PT-00138-WBT Rev. 0 will be addressed by submitting a non-proprietary WBN Unit 2 specific Test  
TVA Response to Follow-up NRC Request As agreed, a revised test plan document will not be submitted. The issues with the WNB Unit 2 test plan document WNA-PT-00138-WBT Rev. 0 will be addressed by submitting a non-proprietary WBN Unit 2 specific Test  


Summary Report.
Summary Report.
: 1. N Open  Pending Submittal of the Test Summary Report due 3/29/11 Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
: 1. N Open  Pending Submittal of the Test Summary Report due 3/29/11 Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.
The SysRS and SRS incorporate requirements from many other documents by reference.
The SysRS and SRS incorporate requirements from many other documents by reference.
Line 1,050: Line 1,050:
NNC 1/27/11:
NNC 1/27/11:
Issues with the STP were discussed in the weekl y public meetings.
Issues with the STP were discussed in the weekl y public meetings.
Westinghouse to:
Westinghouse to:
(1) perfrom STP self assessment., and  (2) Augment Test Summary report to provide missing test plan information  
(1) perfrom STP self assessment., and  (2) Augment Test Summary report to provide missing test plan information  


Line 1,067: Line 1,067:
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information Responder: WEC                        Date: 5/25/10  
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information Responder: WEC                        Date: 5/25/10  


The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the  
The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the
: 2. N Open  Pending Submittal of Revision 3 of the Licensing Technical Open-TVA/WEC  
: 2. N Open  Pending Submittal of Revision 3 of the Licensing Technical Open-TVA/WEC  


Line 1,103: Line 1,103:
requests:  
requests:  


(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and  
(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and  


software which includes the RSEDs.  
software which includes the RSEDs.
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD)
(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD)


Line 1,129: Line 1,129:
Responder: WEC                          Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to  
Responder: WEC                          Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to  


Item 43:
Item 43:
: a. AI687, AI688 - Scheduled for September 28, 2010  
: a. AI687, AI688 - Scheduled for September 28, 2010
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7
: b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7
), these items are available for audit at the Westinghouse Rockville office.
), these items are available for audit at the Westinghouse Rockville office.
: 3. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
: 3. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Response included in letter dated 12/22/10.
Response included in letter dated 12/22/10.
Line 1,138: Line 1,138:


NNC 2/2/11:
NNC 2/2/11:
Section 7 of the WBN2 PAMS LTR should be updated to include:  
Section 7 of the WBN2 PAMS LTR should be updated to include:
(1) non-proprietary description of commercial grade N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.   
(1) non-proprietary description of commercial grade N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.   


Line 1,150: Line 1,150:
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010.
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010.
As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be submitted. Instead a non-proprietary PAMS Test Summary Report will be submitted.
As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be submitted. Instead a non-proprietary PAMS Test Summary Report will be submitted.
Responder: WEC                    Date: 5/25/10  
Responder: WEC                    Date: 5/25/10
: 4. N Open  Pending Submittal of the Test Summary Report due 3/29/11 Awaiting for document to be docketed by TVA.
: 4. N Open  Pending Submittal of the Test Summary Report due 3/29/11 Awaiting for document to be docketed by TVA.
Open-TVA/WEC Due 3/29/11  
Open-TVA/WEC Due 3/29/11  
Line 1,158: Line 1,158:
N/A  074 7.5.2 7.5.1 EICB (Carte)
N/A  074 7.5.2 7.5.1 EICB (Carte)
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010.
B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010.
Responder: WEC                  Date: 5/25/10  
Responder: WEC                  Date: 5/25/10
: 5. N Open  Pending Submittal of Revision 4 of the IV&V Phase Report due 3/29/11. Open-TVA/WEC  
: 5. N Open  Pending Submittal of Revision 4 of the IV&V Phase Report due 3/29/11. Open-TVA/WEC  


Line 1,168: Line 1,168:
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."  Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program."  Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.  
Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.  
(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.  


(i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Responder: WEC This item is used to track all Commercial Grade Dedication issues.
(i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Responder: WEC This item is used to track all Commercial Grade Dedication issues.
: a. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:
: a. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:
Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.
As listed in Table 6-3. "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: (list included in letter)
As listed in Table 6-3. "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: (list included in letter)
: b. It is TVA's understanding that the submittal of the  
: b. It is TVA's understanding that the submittal of the
: 6. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
: 6. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report.  (see ML102920031 Item No 1)
Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report.  (see ML102920031 Item No 1)
Line 1,185: Line 1,185:


the CQ PAMS LTR Rev. 2 should be updated to include a non-proprietary description and to include a software example. ML101650255, Item No. 2  See also No. 82.
the CQ PAMS LTR Rev. 2 should be updated to include a non-proprietary description and to include a software example. ML101650255, Item No. 2  See also No. 82.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Applications."  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Applications."
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." documents listed in (b.i) and (b.ii) is no longer required. Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)
(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." documents listed in (b.i) and (b.ii) is no longer required. Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)
Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.
Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.
ML102920031 Item No 2)
ML102920031 Item No 2)
Line 1,192: Line 1,192:
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS  
TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 144  EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS  


SRS was created to support the three documents identified (two of these documents have been provided on the docket).  
SRS was created to support the three documents identified (two of these documents have been provided on the docket).
(a) Please describe the third document (i.e., NABU-DP-00014-
(a) Please describe the third document (i.e., NABU-DP-00014-


GEN Revision 2, "Design Process for Common Q Safety Systems").
GEN Revision 2, "Design Process for Common Q Safety Systems").
(b) Please describe the flow of information between these three documents.  
(b) Please describe the flow of information between these three documents.  


(c) Does the PAMS SRS implement the requirements in these three documents?  
(c) Does the PAMS SRS implement the requirements in these three documents?  


(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.  
(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.  
Line 1,213: Line 1,213:
of the document.  
of the document.  


(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e)  WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).
IV&V performed a Requirements Traceability Assessment  
IV&V performed a Requirements Traceability Assessment  


during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification  
during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification
: 7. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
: 7. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.
Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.
Line 1,225: Line 1,225:


NNC 11/18/10:
NNC 11/18/10:
  (1) Items b-d closed to other Open Item nos. (2) The point of these questions was to  
(1) Items b-d closed to other Open Item nos. (2) The point of these questions was to  


understand how the origin of the requirements in the  
understand how the origin of the requirements in the  
Line 1,249: Line 1,249:
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.  
IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.  


TVA Response to Follow-up NRC Request:  
TVA Response to Follow-up NRC Request:
  (1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems," is available for NRC audit at the Westinghouse Rockville office.
(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems," is available for NRC audit at the Westinghouse Rockville office.
  (2) WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
(2) WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:
Section 11, "TVA Contract Compliance Matrix" showing the origin of the requirements was added.   
Section 11, "TVA Contract Compliance Matrix" showing the origin of the requirements was added.   


Line 1,271: Line 1,271:


TVA Response to Second Follow-up NRC Request:
TVA Response to Second Follow-up NRC Request:
This item will be addressed by updating the Compliance Matrix in the Licensing Technical Report and by adding a System Requirements Specification Compliance matrix to the Revision 3 of the Licensing Technical Report.  
This item will be addressed by updating the Compliance Matrix in the Licensing Technical Report and by adding a System Requirements Specification Compliance matrix to the Revision 3 of the Licensing Technical Report.
: 8. Y Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
: 8. Y Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Revised response included in letter dated 12/22/10.
Revised response included in letter dated 12/22/10.
Line 1,321: Line 1,321:
Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.
Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.
LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluiation: (1) IEEE 830-1998 is not the current SRP acceptance criteria.
LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluiation: (1) IEEE 830-1998 is not the current SRP acceptance criteria.
IEEE 830-1998 has not been formally endorsed by a regulatory guide.  
IEEE 830-1998 has not been formally endorsed by a regulatory guide.
(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.
(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.
Yes ISG-4 is one new criteria, and an evaluation against it has been provided.
Yes ISG-4 is one new criteria, and an evaluation against it has been provided.
Line 1,336: Line 1,336:
By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer  
By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer  


Integrity, Test and Calibration..."  The staff has reviewed these documents, and it is not clear how this is the case.  
Integrity, Test and Calibration..."  The staff has reviewed these documents, and it is not clear how this is the case.
(1) Please describe how the information provided demonstrates Responder: WEC  
(1) Please describe how the information provided demonstrates Responder: WEC  


Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.  
Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.  


WEC to provide the information and determine where the information will be located.  
WEC to provide the information and determine where the information will be located.
: 10. N Open Response included in letter  
: 10. N Open Response included in letter  


Line 1,347: Line 1,347:
Open-TVA/WEC EICB RAI ML102980066 Item  
Open-TVA/WEC EICB RAI ML102980066 Item  


No. 10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.  
No. 10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.
IEEE-603 1991:
IEEE-603 1991:
 
5.5 System Integrity. The safety systems shall be desi gned to accomplish their safet y functions under the full range of applicable conditions enumerated in the design basis.
===5.5 System===
TVA Response: The applicable conditions and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, Section 11, "Contract Compliance Matrix" items:  87 and 88 Seismic  89, 90, 91, 92 and 185 EMI/RFI  300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
Integrity. The safety systems shall be desi gned to accomplish their safet y functions under the full range of applicable conditions enumerated in the design basis.
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:
TVA Response: The applicable conditions and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, Section 11, "Contract Compliance Matrix" items:  87 and 88 Seismic  89, 90, 91, 92 and 185 EMI/RFI  300, 301 and 302 Environmental  
 
===5.7 Capability===
for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.
The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:  
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists), (2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.  
(1) appropriate justification shall be provided (for example, demonstration that no practical design exists), (2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.  


Line 1,368: Line 1,363:
NNC 2/18/11: Clause 5.7 is acceptably addressed.
NNC 2/18/11: Clause 5.7 is acceptably addressed.
NNC 2/18/2011:
NNC 2/18/2011:
WNA-AR-00189-WBT Rev. 0 Table 5-2 shows a MTTR of 7.2 hours. It Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items:  179 Mean time to repair  202 self test  398 3.7 Maintenance  399 3.7.1 Troubleshooting  
WNA-AR-00189-WBT Rev. 0 Table 5-2 shows a MTTR of 7.2 hours. It Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items:  179 Mean time to repair  202 self test  398 3.7 Maintenance  399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration


===6.5 Capability===
6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation. This may be accomplished in various ways; for example:
for Testing and Calibration
 
====6.5.1 Means====
shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation. This may be accomplished in various ways; for example:  
(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured  
(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured  


Line 1,380: Line 1,371:
6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident  
6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident  


period:  
period:
(1) Checkin g the operational availabilit y of sensors b y use of the methods described in 6.5.1.
(1) Checkin g the operational availabilit y of sensors b y use of the methods described in 6.5.1.
(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.
(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.
TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:  10, display of sensor diagnostic information  202 self test  205 self diagnostics and watchdog timer  264 through 271, system self checks  311 system status displays,  341 alarms,  344 on-line diagnostics IEEE 7-4.3.2-2003  
TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items:  10, display of sensor diagnostic information  202 self test  205 self diagnostics and watchdog timer  264 through 271, system self checks  311 system status displays,  341 alarms,  344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:  
 
===5.5 System===
integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:  
- Design for computer integrity  
- Design for computer integrity  
- Design for test and calibration is not clear how this satisfies the  contractual item No.
- Design for test and calibration is not clear how this satisfies the  contractual item No.
179.
179.
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments  
- Fault detection and self-diagnostics  
- Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output  
 
====5.5.1 Design====
for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output  


processing failures, precis ion or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.   
processing failures, precis ion or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.   
Line 1,403: Line 1,388:


inhibited from performing its function.
inhibited from performing its function.
TVA Response: Common Q PAMS system reliability and failure modes are described in:  WNA-AR-00180-WBT, Revision 0, "Failure Modes and Effects Anal y sis (FMEA) for the Post Accident Monitoring System"  WNA-AR-00189-WBT, Revision 0 "Post Accident Monitoring System Reliability Analysis" The requirements for mean time between failure and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Section 11 "TVA Contract Compliance Matrix" item 178.  
TVA Response: Common Q PAMS system reliability and failure modes are described in:  WNA-AR-00180-WBT, Revision 0, "Failure Modes and Effects Anal y sis (FMEA) for the Post Accident Monitoring System"  WNA-AR-00189-WBT, Revision 0 "Post Accident Monitoring System Reliability Analysis" The requirements for mean time between failure and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Section 11 "TVA Contract Compliance Matrix" item 178.
 
5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint  
====5.5.2 Design====
for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint  


change). V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data. V&V, configuration management, and QA shall be required when the test and calibration function is  
change). V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data. V&V, configuration management, and QA shall be required when the test and calibration function is  
Line 1,414: Line 1,397:
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing  
Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing  


Technical Report" Section 11 "TVA Contract Compliance Matrix" items:  202 self test    350 Maintenance Bypass  351 Loop Tuning Parameters,  400 and 401 3.7.2 Testing, Calibration, and Verification  402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation  
Technical Report" Section 11 "TVA Contract Compliance Matrix" items:  202 self test    350 Maintenance Bypass  351 Loop Tuning Parameters,  400 and 401 3.7.2 Testing, Calibration, and Verification  402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system. Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
 
====5.5.3 Fault====
detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system. Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.
If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:  
If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:  
Line 1,428: Line 1,408:
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract  
a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract  


Compliance Matrix" items:  107 error free download  202 self test  205 self diagnostics and watchdog timer  263 primary and backup communication  264 through 271, continuous on-line self checks  311 system status displays,  341 alarms,  344 on-line diagnostics
Compliance Matrix" items:  107 error free download  202 self test  205 self diagnostics and watchdog timer  263 primary and backup communication  264 through 271, continuous on-line self checks  311 system status displays,  341 alarms,  344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
 
===5.7 Capability===
for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.
TVA Response: No response required.  
TVA Response: No response required.  


Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 213 7.5.2  EICB (Carte) 7/27/2010  
Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 213 7.5.2  EICB (Carte) 7/27/2010  


By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description."  The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.  
By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description."  The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.
(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS. (2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory  
(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS. (2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory  


Line 1,444: Line 1,421:


Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.
contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.
contains the proprietary version of Westinghouse document  "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.
: 11. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
: 11. N Open  Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.
Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.
Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.
Line 1,507: Line 1,484:
Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" TVA Response to Follow-up NRC Request:  
Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" TVA Response to Follow-up NRC Request:  


Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.  
Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.
: 14. N Open  Pending Submittal of the Test Summary Report due 3/29/11 Revised response included in letter dated 12/22/10 Partial response is provided in letter dated 10/25/10 Open-TVA/WEC  
: 14. N Open  Pending Submittal of the Test Summary Report due 3/29/11 Revised response included in letter dated 12/22/10 Partial response is provided in letter dated 10/25/10 Open-TVA/WEC  



Revision as of 17:35, 30 April 2019

2011/03/08 Watts Bar 2 OL - 20110218 Open Item List Master TVA Update 03-08-11.docx
ML110680650
Person / Time
Site: Watts Bar Tennessee Valley Authority icon.png
Issue date: 03/08/2011
From:
- No Known Affiliation
To:
Division of Operating Reactor Licensing
References
Download: ML110680650 (47)


Text

1 WBN2Public Resource From: Clark, Mark Steven [msclark0@tva.gov]

Sent: Tuesday, March 08, 2011 12:27 PM To: Crouch, William D; Hilmes, Steven A; Knuettel, Edward Terry; Drake, Andrew P.; Poole, Justin

Subject:

20110218 Open Item List Master TVA Update 03-08-11.docx Attachments:

20110218 Open Item List Master TVA Update 03-08-11.docx All: Attached is the updated matrix for your use. I am continuing to work on the responses and hope to have more by the end of this week.

Regards, Steve Steve Clark Bechtel Power Corp.Control SystemsWatts Bar 2 Completion ProjectPhone: 423.365.3007e-mail: msclark0@tva.gov Hearing Identifier: Watts_Bar_2_Operating_LA_Public Email Number: 286 Mail Envelope Properties (7AB41F650F76BD44B5BCAB7C0CCABFAF18169F10)

Subject:

20110218 Open Item List Master TVA Update 03-08-11.docx Sent Date: 3/8/2011 12:27:09 PM Received Date: 3/8/2011 12:27:27 PM From: Clark, Mark Steven Created By: msclark0@tva.gov Recipients: "Crouch, William D" <wdcrouch@tva.gov> Tracking Status: None "Hilmes, Steven A" <sahilmes@tva.gov>

Tracking Status: None "Knuettel, Edward Terry" <etknuettel@tva.gov> Tracking Status: None "Drake, Andrew P." <drake1ap@westinghouse.com> Tracking Status: None "Poole, Justin" <Justin.Poole@nrc.gov>

Tracking Status: None Post Office: TVANUCXVS2.main.tva.gov

Files Size Date & Time MESSAGE 374 3/8/2011 12:27:27 PM 20110218 Open Item List Master TVA Update 03-08-11.docx 439856 Options Priority: Standard Return Notification: No Reply Requested: No Sensitivity: Normal Expiration Date: Recipients Received:

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 001 All All B (A The Watts Bar Nuclear Plant FSAR red-line for Unit 2 (A g enc y 12/15/2009 Presentation Slides

1. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:

The FSAR contains 002 All All B (A Are there I&C com p onents and s y stems that have chan g ed to a 12/15/2009 Presentation Slides

2. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:

The FSAR contains 003 All All B (A Because a di gital I&C p latform can be confi g ured and p ro grammed 12/15/2009 Presentation Slides

3. Y Closed Closed EICB RAI 3/12/2010 NNC 11/19/09:

The FSAR contains 004 All All B (APlease identif y the information that will be submitted for each Res p onder: Webb 1/13/10 Public Meetin g 4. Y Closed Closed EICB RAI Januar y 13 , 2010 NNC 11/19/09:

LIC-110 Rev. 1 Section 005 7.1.3.1 (G B y letter date Februar y 28 , 2008 (A g enc ywide Documents Access Res p onder: Crai g/Webb 5. Y Closed Closed EICB RAI TVA Letter dated 006 (G A mendment 95 of the FSAR

, Cha p ter 7.3 , shows that chan g e 7.3-B y letter dated Februar y 5 , 2010: TVA p rovided the Unit 2

6. Y Closed Closed EICB RAI TVA Letter dated NNC: WCAP-12096 Rev. 7 007 7.1.3.1 (G The set p oint methodolo gy has been reviewed and a pp roved b y the TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 7

7. Y Closed Closed EICB RAI TVA Letter dated TVA to p rovide Rev. 8 of the Unit 1 008 7.3 (G There are several staff positions that p rovide guidance on set point TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 8

8. Y Closed Closed EICB RAI TVA Letter dated 009 7.3.2 5.6 , (D a r Chan g e 7.3-2 , identified in Watts Bar Nuclear Plant FSAR red-line TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 9

9. Y Closed Closed EICB RAI 3/12/10 , 010 7.3 7.3 (D a r The ori g inal SER on Watts Bar (NUREG-0847

) documents that the TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 10

10. Y Closed Closed EICB RAI 3/12/10 , 011 7.3.2 5.6 , (D a rNUREG-0847 Su pplement No. 2 Section 7.3.2 includes an TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 11

11. Y Closed Closed EICB RAI ML101680598

, 012 7.4 7.4 (D a r The ori g inal SER on Watts Bar (NUREG-0847

) documents that the TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 12

12. Y Closed Closed EICB RAI TVA Letter dated 013 7.1.3.1 (G Cha p ter 7 and Cha p ter 16 of Amendment 95 to the FSAR do not TVA Letter Dated March 12

, 2010 (Enclosure 1

, Item No. 13

13. Y Closed Closed EICB RAI TVA Letter dated TS have been docketed.

014 All All B (A Provide the justification for an y hardware and software chan g es Date: 4/27/10

14. Y Closed Closed NRC Meetin g TVA Letter dated 015 (G Verif y that the refurbishment of the p ower ran ge nuclear Date: 4/27/10
15. Y Closed Closed NRC Meetin g TVA Letter dated 016 (C aIdentify the precedents in license amendment requests (LARs), if Date: 4/27/10
16. Y Closed Closed NRC Meeting TVA Letter dated 017 7.3.1 7.3.1 , (D a r Identif y precedents in LARs

, if an y, for the solid state p rotection Date: 4/27/10

17. Y Closed Closed NRC Meetin g TVA Letter dated 018 (G Identif y an y chan g es made to an y instrumentation and control Date: 4/27/10
18. Y Closed Closed NRC Meetin g TVA Letter dated 019 (G Verif y that the containment p ur ge isolation radiation monitor is the Date: 4/27/10
19. Y Closed Closed NRC Meetin g TVA Letter dated 020 (GProvide environmental q ualification information p ursuant to Section Date: 4/27/10
20. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:

SRP Section 7.0 states:

021 7.3 (GFor the Foxboro S p ec 200 p latform , identif y an y chan g es in Date: 5/25/10

21. Y Closed Closed NRC Meetin g TVA Letter dated The resolution of this item will be 022 7.3.2 5.6 , (D a r Verif y the auxiliar y feedwater control refurbishment results in a Date: 4/27/10
22. Y Closed Closed NRC Meetin g TVA Letter dated 023 (GProvide environmental q ualification (10 CFR 50.49

) information for Date: 4/27/10

23. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:

SRP Section 7.0 states:

024 (C aProvide a schedule b y the Januar y 13 , 2010 , meetin g for providin g Durin g the Januar y 13 , 2010 meetin g, TVA p resented a

24. Y Closed Closed NRC Meetin g N/A - Re q uest f or NNC 4/30/10:

Carte to address 025 7.5.2 7.5.1 (S i For the containment radiation hi g h radiation monitor

, verif y that the Date: 4/27/10

25. Y Closed Closed NRC Meetin g ML101230248

, 026 (GProvide environmental q ualification (10 CFR 50.49

) information for Date: 4/27/10

26. Y Closed Closed NRC Meetin g TVA Letter dated NNC 4/30/10:

SRP Section 7.0 states:

027 7.7.1.4 (C aFor Foxboro I/A p rovide information re g ardin g safet y/non-safet y-Date: 4/27/10

27. Y Closed Closed NRC Meetin g TVA Letter dated 028 (GFor the turbine control AEH s ystem , verif y that the refurbishment Res p onder: Mark Scansen
28. Y Closed Closed NRC Meetin g TVA Letter dated 029 (C aFor the rod control s y stem , verif y that the refurbishment results in a Date: 4/27/10
29. Y Closed Closed NRC Meetin g TVA Letter dated 030 (G Re g ardin g the refurbishment of I&C e q ui p ment , identif y an y Res p onder: Clark
30. Y Closed Closed NRC Meetin g TVA Letter dated 031 (C a For the rod position indication s y stem (CERPI), p rovide information Date: 4/27/10
31. Y Closed Closed NRC Meetin g TVA Letter dated CERPI is non-safet y related. 032 (C a For the process com p uter , need to consider c yber securit y issues Date: 4/27/10
32. Y Closed Closed NRC Meetin g TVA Letter dated EICB will no lon g er consider c yber 033 (C a For the loose p arts monitorin g s y stem , provide information Date: 4/27/10
33. Y Closed Closed NRC Meetin g TVA Letter dated The loose p arts monitorin g s ystem is 034 (G 2/4/2010 Res ponder: TVA
34. Y Closed Closed N/A TVA Letter dated 034.1 a r g Cha p ter 7.1 - Introduction
35. Y Closed Closed N/A N/A 034.2 (G Cha pter 7.2 - Reactor Tri p S y stem 36. Y Closed Closed N/A N/A 034.3 7.3 7.3 (D a r Cha p ter 7.3 - ESFAS 37. Y Closed Closed N/A N/A 034.4 7.5.1.1 7.5.2 (M a Cha pter 7.5 - Instrumentation S y stems Im p ortant to Safet y 38. Y Closed Closed N/A N/A Closed 034.5 7.5.1.1 7.5.2 r c u Cha p ter 7.6 -

A ll Other S ystems Re quired for Safet y 39. Y Closed Closed N/A N/A Closed 034.6 n g h/ Cha pter 7.7 Control S ystems 40. Y Closed Closed N/A N/A 035 (S i 2/18/2010 Res p onder: Clark

41. Y Closed Closed RAI No. 1 TVA Letter dated LIC-110 Section 6.2.2 states: "Desi g n 036 7.5.2 7.5.1 (C aFebruar y 18 , 2010 Date: 5/25/10
42. Y Closed Closed NRC Meetin g NNC: Unit 2 FSAR Section 7.5.1

, "Post 037 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark Date: 5/25/10

43. Y Closed Closed N/A TVA Letter dated FSAR Amendment 100 p rovides Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 038 7.5.1.1 7.5.2 (M a 2/18/2010 Res p onder: Clark Date: 5/25/10
44. Y Closed Closed EICB RAI TVA Letter dated The slides presented at the December 039 (G Januar y 13 , 2010 Res p onder: Clark Date: 5/25/10
45. Y Closed Closed EICB RAI FSAR amendment The e quation for the calculation of the 040 (G Januar y 13 , 2010 Res p onder: Clark Date: 5/25/10
46. Y Closed Closed EICB RAI EICB RAI FSAR amendment The e quation for the calculation of the 042 All All B (AFebruar y 25 , 2010: Telecom Date: 5/25/10
47. Y Closed Closed EICB RAI TVA Letter dated The drawin g provided did not have the 044 7.5.2 7.5.1 (C aFebruar y 25 , 2010 Date: 5/25/10
48. Y Closed Closed EICB RAI TVA Letter dated 045 (C aFebruar y 25 , 2010 Date: 5/25/10
49. Y Closed Closed EICB RAI TVA Letter dated 046 (C aFebruar y 25 , 2010 Date: 5/25/10
50. Y Closed Closed N/A - Re q uest for N/A 047 7.5.2 7.5.1 (C a 4/8/2010 Res p onder: WEC/Hilmes Date: 5/25/10
51. Y Closed Closed EICB RAI TVA Letter dated 048 7.5.2 7.5.1 (C a Ap ril 8 , 2010 Date: 5/25/10
52. Y Closed Closed EICB RAI TVA Letter dated 049 7.5.2 7.5.1 (C a 4/8/2010 Res ponder: WEC Date: 5/25/10
53. Y Closed Closed EICB RAI TVA Letter dated 050 7.5.2 7.5.1 (C a 4/8/2010 Res p onder: WEC Date: 5/25/10
54. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10:

S y sRS Rev. 2 contains 051 (G Ap ril 15 , 2010 Date: 5/25/10

55. Y Closed Closed N/A N/A Review addressed b y another O p en 052 7.5.2 7.5.1 (S i Ap ril 19 , 2010 Date: 5/25/10
56. Y Closed Closed RAI No. 12 053 7.5.2 7.5.1 (S i Ap ril 19 , 2010 Date: 5/25/10
57. Y Closed Closed RAI No. 13 054 7.5.2 7.5.1 (S i 4/19/2010 Res ponder: Slifer/Clark Date: 5/25/10
58. Y Closed Closed RAI No. 14 TVA Letter dated 055 7.5.2 7.5.1 (S i 4/19/2010 Res ponder: Slifer/Clark Date: 5/25/10
59. Y Closed Closed RAI No. 15 TVA Letter dated 056 (S i Ap ril 19 , 2010 Date: 5/25/10
60. Y Closed Closed RAI No. 16 TVA Letter dated Sorrento Radiation Monitorin g 057 7.5.2 7.5.1 (S i 4/19/2010 Res ponder: TVA I&C Staff Date: 5/25/10
61. Y Closed Closed RAI No. 17 TVA Letter dated 058 7.5.0 7.5 (S i Ap ril 19 , 2010 Date: 5/25/10
62. Y Closed Closed RAI No. 18 TVA Letter dated 059 7.5.2 7.5.1 (S i Ap ril 19 , 2010 Date: 63. Y Closed Closed RAI No. 19 TVA Letter dated 060 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
64. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 47 061 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
65. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 48 062 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
66. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 49 063 7.5.2 7.5.1 (C a Ap ril 19 , 2010 Date: 5/25/10
67. Y Closed Closed N/A N/A A ddressed b y O p en Item No. 50 064 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: Webb Date: 4/8/2010

68. Y Closed Closed N/A - No q uestion TVA Letter dated 065 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res ponder: WEC Date: 5/25/10

69. Y Closed Closed N/A - No q uestion TVA Letter dated 066 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

70. Y Closed Closed N/A - No q uestion TVA Letter dated 070 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

71. N Closed Closed N/A - No q uestion TVA Letter dated NNC 11/23/10:

The dues date in this 071 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res ponder: WEC Date: 5/25/10

72. N Closed Closed N/A - No q uestion N/A NNC 11/23/10:

The dues date in this 072 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

73. Y Closed Closed N/A - No q uestion N/A 073 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

74. N Closed Closed N/A - No q uestion N/A 075 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res ponder: WEC Date: 5/25/10

75. N Closed Closed N/A - No q uestion N/A 076 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: Clark Date: 5/25/10

76. Y Closed Closed N/A - No q uestion N/A 077 7.5.2 7.5.1 (C a B y letter dated March 12

, 2010 TVA stated that the tar g et submittal Res p onder: WEC Date: 5/25/10

77. Y Closed Closed N/A - No q uestion TVA Letter dated 078 (G 4/26/2010 Res p onder: Clark Date: 5/25/10
78. Y Closed Closed EICB RAI TVA Letter dated 079 (G 4/26/2010 Res p onder: Clark Date: 5/25/10
79. Y Closed Closed EICB RAI TVA Letter dated Reviewed under Item 154 080 (S i 4/26/2010 Res p onder: WEC
80. Y Closed Closed RAI No. 2 TVA Letter dated 082 7.5.2 7.5.1 (C a 5/6/2010 Res p onder: WEC Date: 6/18/10
81. N Closed Closed EICB RAI TVA Letter dated NNC 11/18/10:

See also O p en Item No.

083 7.5.2 7.5.1 (C a Ma y 6 , 2010 Date: 6/18/10

82. Y Closed Closed EICB RAI TVA Letter dated 084 7.5.2 7.5.1 (C a May 6, 2010 Date: 6/18/10
83. Y Closed Closed EICB RAI TVA Letter dated 085 7.5.2 7.5.1 (C a 5/6/2010 Res p onder: WEC
84. N Closed Closed EICB RAI 087 7.5.2 7.5.1 (S i Ma y 6 , 2010 Date: 5/24/10
85. Y Closed Closed RAI No. 20 TVA Letter dated 088 7.5.2 7.5.1 (S i May 6, 2010 Date: 5/24/10
86. Y Closed Closed RAI No. 21 TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 089 (C a 5/6/2010 Res p onder: Clark

87. Y Closed Closed EICB RAI TVA Letter dated NNC: Docketed res p onse states that 090 (C a 5/6/2010 Res p onder: Clark Date: 5/25/10
88. Y Closed Closed EICB RAI TVA Letter dated 091 7.4 7.4 (D a r Ma y 20 , 2010 Date: 5/25/10
89. Y Closed Closed EICB RAI No.1 TVA Letter dated 093 (G Ma y 20 , 2010 Date: 5/25/10
90. Y Closed Closed N/A N/A Will be reviewed under item 154 094 (G 5/20/2010 Res p onder: Clark Date: 5/25/10
91. Y Closed Closed N/A N/A Information was found in FSAR 095 7.8.1 , XX (D a r Ma y 20 , 2010 Date: 92. Y Closed Closed EICB RAI No. 2 TVA Letter dated 096 7.7.5 XX (D a r 5/20/2010 Res p onder: 93. Y Closed Closed EICB RAI No.3 TVA Letter dated 097 7.4.2 7.4 (D a r Ma y 20 , 2010 Date: 94. Y Closed Closed EICB RAI No.4 TVA Letter dated 098 7.4.2 7.4 (D a r Ma y 25 , 2010 Date: 95. Y Closed Closed EICB RAI No.5 TVA Letter dated 099 (B a April 12, 2010 Date: 96. Y Closed Closed Closed to Item 129 100 (C a 5/20/2010 Res p onder: WEC
97. Y Closed Closed N/A - No q uestion N/A 102 (C a Ma y 24 , 2010 Date: 5/24/10
98. Y Closed Closed N/A TVA Letter dated Re q uest for schedule not information.

103 7.4 7.4 (D a r 5/27/2010 Res p onder: A y ala Date: 5/27/10

99. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 104 7.4 7.4 (D a r 5/27/2010 Res ponder: Merten Date: 5/27/10 100. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 105 (G Ap ril 29 , 2010 Date: 101. Y Closed Closed N/A N/A Will be reviewed under item 154.

106 (S i May 6, 2010 Date: 5/25/10 102. Y Closed Closed RAI No. 9 TVA Letter dated 107 (S i May 6, 2010 Date: 5/28/10 103. Y Closed Closed RAI No. 22 TVA Letter dated 108 (G Ma y 6 , 2010 Date: 5/25/10 104. Y Closed Closed N/A N/A Will be reviewed under OI#154 109.b (C a 5/6/2010 Res ponder: N/A 105. Y Closed Closed N/A N/A Du plicate of another o p en Item. 109.a 7.8 XX (D a r 5/6/2010 Res ponder: N/A 106. Y Closed Closed N/A N/A 110 (G Ma y 6 , 2010 Date: 107. Y Closed Closed N/A N/A Information was found.

111 (C a May 6, 2010 Date: 5/28/10 108. Y Closed Closed N/A TVA Letter dated Request to help find, not a request for 112 (G June 1, 2010 Date: 109. Y Closed Closed N/A N/A Information was received 113 (G 6/1/2010 Res p onder: Clark 110. Y Closed Closed EICB RAI TVA Letter dated 114 7.2 7.2 (G 6/1/2010 Res p onder: WEC 111. Y Close Closed EICB RAI TVA Letter dated 115 (C a 2/25/2010 Res p onder: Clark 112. Y Closed Closed EICB RAI TVA Letter dated 116 (G 6/3/2010 Res p onder: WEC 113. Y Closed Closed EICB RAI TVA Letter dated Letter sent to Westin g house re q uestin g 117 7.1 7.1 (G 6/3/2010 Res p onder: Hilmes 114. Y Closed Closed EICB RAI TVA Letter dated 118 7.4 7.4 (D a r 6/8/2010 Res ponder: Merten 115. Y Closed Closed EICB RAI No.1 TVA Letter dated Submittal date is based on current 119 (S i June 10 , 2010 Date: 116. Y Closed Closed RAI No. 23 TVA Letter dated 120 (C a 5/6/2010 Res p onder: Hilmes/Merten/Costle y 117. Y Closed Closed EICB RAI TVA Letter dated 121 (C a 5/6/2010 Res p onder: Webb/Webber 118. Y Closed Closed EICB RAI TVA Letter dated 122 (C a June 14 , 2010 Date: 119. Y Closed Closed N/A - Re quest for N/A 123 7.7.3 7.4.1 , (D a r 6/14/2010 Res p onder: 120. Y Closed Closed ML101720589

, TVA Letter dated 124 7.7.5 XX (D a r 6/14/2010 Res p onder: 121. Y Closed Closed ML101720589

, Item TVA Letter dated 125 7.7.8 7.7.1.12 (D a r 6/14/2010 Res p onder: 122. Y Closed Closed ML101720589

, Item TVA Letter dated 126 7.8 7.8 (D a r June 14 , 2010 Date: 123. Y Closed Closed ML101720589

, Item TVA Letter dated 127 7.2 7.2 (G 6/16/2010 Res p onder: WEC/Clar k 124. Y Closed Closed EICB RAI TVA Letter dated 128 7.2 7.2 (G 6/18/2010 Res p onder: WEC Drake /TVA Crai g 125. Y Closed Closed EICB RAI TVA Letter dated Track throu gh SE o p en item 129 (P o 6/12/2010 Res p onder: WEC 126. Y Closed Closed N/A TVA Letter dated 130 (P o 6/28/2010 Res p onder: Clark 127. Y Closed Closed N/A TVA Letter dated 131 (P o 6/28/2010 Res p onder: Clark 128. Y Closed Closed N/A TVA Letter dated 132 (P o 6/28/2010 Res p onder: Clark 129. Y Closed Closed N/A TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 133 (P o 6/28/2010 Res p onder: Clark 130. Y Closed Closed TVA Letter dated 134 (P o 6/28/2010 Res p onder: Clark 131. Y Closed Closed TVA Letter dated 135 7.3.1 7.3.1 (D a r 6/30/2010 Res p onder: Clark 132. Y Closed Closed RAI not necessar y TVA Letter dated 136 7.3.2 , 7.4 , 5.6 , (D a r 6/30/2010 Res p onder: Clark 133. Y Closed Closed RAI not necessar y TVA Letter dated 137 (C aSeveral WBN2 PAMS documents contain a table titled

, "Document Res p onder: WEC 134. Y Closed Closed ML101650255

, Item TVA Letter dated 139 (C a The WBN2 PAMS S y stem Re q uirements S p ecification (WBN2 Res p onder: WEC 135. Y Closed Closed ML101650255

, Item TVA Letter dated WBN2 PAMS S y stem Re q uirements 140 (C a The first re quirement in the WBN2 PAMS S y sRS (i.e., R2.2-1) Res p onder: Clark 136. N Closed Closed ML101650255

, Item TVA Letter dated WBN2 PAMS S y stem Re q uirements 141 (C a Deleted b y DORL Date: 137. Y Closed Closed ML101650255

, Item WBN2 PAMS S y stem Re q uirements 146 (C a 6/17/2010 Res p onder: 138. Y Closed Closed ML101650255

, Item PAMS S ystem Re q uirements 147 (C a 6/17/2010 Res p onder: 139. Y Closed Closed ML101650255

, Item PAMS S ystem Re q uirements 148 (C a 6/17/2010 Res p onder: 140. Y Closed Closed ML101650255

, Item PAMS S ystem Re q uirements 149 7.2 7.2 (G FSAR Section 7.1.1.2 (2), Overtem perature delta T and Res ponder: Tindell 141. Y Close Closed ML101720589

, Item TVA Letter dated 150 7.2 7.2 (G Man y of the chan g es were based on the Westin ghouse document Res p onder: Clark 142. Y Close Closed ML101720589

, Item TVA Letter dated 151 7.2 7.2 (G Provide the EDCR 52378 and 54504 which discusses the basis for Res p onder: Clark 143. Y Close Closed ML101720589

, Item TVA Letter dated 152 7.2 7.2 (G Deleted portion of FSAR section 7.2.3.3.4 and moved to FSAR Res ponder: Merten/Clark 144. Y Close Closed ML101720589

, Item TVA Letter dated 153 7.2 7.2 (GFSAR section 7.2.1.1.7 added the reference to FSAR section Res p onder: Crai g/Webb 145. Y Close Closed ML101720589

, Item TVA Letter dated 154 7.2 7.2 (GFSAR section 7.2.1.1.10

, set p oints: NRC staff has issued RIS Res p onder: Crai g/Webb 146. Y Closed Closed ML101720589

, Item TVA Letter dated EICB RAI ML102861885 sent to DORL 155 7.2 7.2 (G Summar y of FSAR chan ge document section 7.2 states that Date: 147. Y Closed Closed ML101720589

, Item 156 7.2 7.2 (GFSAR section 7.2.2.1.1 states that dashed lines in Fi g ure 15.1-Res p onder: WEC 148. Y Closed Closed ML101720589

, Item TVA Letter dated Res p onse on hold p endin g 157 7.2 7.2 (GFSAR section 7.2.2.1.1

, fifth p ara g ra p h was deleted exce p t for the Res ponder: Tindell 149. Y Close Closed ML101720589

, Item TVA Letter dated 158 7.2 7.2 (GFSAR section 7.2.2.1.1

, p ara g ra p h six was chan g ed to state that Res ponder: Tindell 150. Y Closed Closed ML101720589

, Item TVA Letter dated 159 7.2 7.2 (GFSAR section 7.2.2.1.2 discusses reactor coolant flow Res p onder: Crai g 151. Y Close Closed ML101720589

, Item TVA Letter dated 160 7.2 7.2 (GFSAR section 7.2.2.2 (7) deleted text which has references 12 and Res ponder: Tindell 152. Y Close Closed ML101720589

, Item TVA Letter dated 161 7.2 7.2 (GFSAR section 7.2.2.3 states that chan g es to the control function Res p onder: Clark 153. Y Closed Closed ML101720589

, Item TVA Letter dated 162 7.2 7.2 (GFSAR section 7.2.2.2 (14) states that b yp ass of a p rotection Res ponder: Tindell 154. Y Closed Closed ML101720589

, Item TVA Letter dated 163 7.2 7.2 (G Deleted b y DORL Date: 155. Y Closed Closed ML101720589

, Item 164 7.2 7.2 a r glFSAR section 7.2.2.2 (20) has been revised to include the p lant Res p onder: Perkins 156. Y Closed Closed ML101720589

, Item TVA Letter dated Item No. 8 sent to DORL 165 7.2 7.2 (GFSAR section 7.2.2.3.2

, last p ara g ra p h of this section has been Res p onder: Clark 157. Y Closed Closed ML101720589

, Item TVA Letter dated 166 7.2 7.2 (G Chan ges to FSAR section 7.2.2.2 (20) are justified based on the Res p onder: Clark 158. Y Closed Closed ML101720589

, Item TVA Letter dated 167 7.2 7.2 (GFSAR section 7.2.2.4

, p rovide an anal y sis or reference to cha p ter Res p onder: Clark 159. Y Close Closed ML101720589

, Item TVA Letter dated 168 7.2 7.2 (G FSAR table 7.2-4

, item 9 deleted loss of offsite p ower to station Res p onder: Clark 160. Y Close Closed ML101720589

, Item TVA Letter dated 169 (G 6/18/2010 Res p onder: Clark 161. Y Closed Closed 170 (G 6/17/2010 Res p onder: Clark 162. Y Closed Closed 171 7.2 7.2 (G 6/17/2010 Res p onder: Crai g 163. Y Closed Closed EICB RAI TVA Letter dated Closed to SE O p en Item 172 (G 6/17/2010 Res p onder: Crai g 164. Y Closed Closed EICB RAI 173 7.1 7.1 (G 6/17/2010 Res p onder: Crai g/Webb/Powers 165. Y Closed Closed EICB RAI 174 (G 6/28/2010 Res p onder: Hilmes/Crai g 166. Y Closed Closed EICB RAI 175 (G June 28 , 2010 Res p onder: 167. Y Closed Closed EICB RAI 176 7.1 7.1 (G 6/28/2010 Res p onder: Crai g/Webb 168. Y Closed Closed EICB RAI 177 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 169. Y Closed Closed N/A TVA Letter dated RAI not re q uired 178 7.5.2.1 7.5.1 (M a 7/15/2010 Res p onder: Clark 170. Y Closed Closed N/A TVA Letter dated RAI not re q uired 179 (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 171. Y Closed Closed N/A - Closed to NA 180 (C a The SRP , BTP 7-14 , Section B.3.3.1 states that Re g ulator y Guide Res p onder: WEC 172. Y Closed Closed N/A - Closed to NA Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 181 (C a A n em p hasis is placed on traceabilit y in S ystem Re q uirements Res p onder: WEC 173. Y Closed Closed N/A - Closed to NA 182 (C aCharacteristics that the SRP states that a Software Re quirements Res p onder: WEC 174. Y Closed Closed N/A - Closed to NA 184 (C a 7/15/2010 Res p onder: WEC 175. Y Closed Closed N/A - Closed to N/A 186 7.7.8 7.7.1.12 (D a r 7/15/2010 Res p onder: Perkins/Clark 176. Y Closed Closed EICB RAI No.6 TVA Letter dated 187 (C a B y letter dated June 18

, 2010 , TVA docketed res p onses to NRC Res ponder: Merten 177. N Closed Closed ML101970033

, Item TVA Letter dated A re these connections alread y 188 (C a B y letter dated June 30

, 2010 , TVA docketed

, "Tennessee Valle y Res p onder: Clark 178. Y Closed Closed ML101970033

, Item TVA Letter dated 189 7.6.7 (S i 7/20/2010 Res p onder: Clark 179. Y Closed Closed RAI No. 3 TVA Letter dated 190 7.9 (S i FSAR Table 7.1-1 states: "Re g ulator y Guide 1.133

, Ma y 1981 Res p onder: Clark 180. Y Closed Closed RAI No. 4 TVA Letter dated Closed to OI-331.

191 7.9 (C aNUREG-0800 Cha p ter 7 , Section 7.9

, "Data Communication Res p onder: Jimmie Perkins 181. Y Closed Closed ML10197016

, Item TVA Letter dated 192 7.5.1.1 7.5.2 (M a The NRC Staff is usin g SRP (NUREG-0800

) Cha p ter 7 Section Res p onder: Clark 182. Y Closed Closed Item No. 1 sent to TVA Letter dated EICB RAI ML1028618855 sent to 193 7.5.1.1 7.5.2 (M aThe WBU2 FSAR

, Section 7.5.2

, "Plant Com p uter S y stem ," Res p onder: Clark 183. Y Closed Closed Item No. 2 sent to TVA Letter dated EICB RAI ML1028618855 sent to 194 7.5.1.1 7.5.2.1 (M aThe WBU2 FSAR Section 7.5.2.1

, "Safet y Parameter Dis p la y Res p onder: Costle y/Norman 184. Y Closed Closed Item No. 3 sent to TVA Letter dated EICB RAI ML1028618855 sent to 195 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 185. Y Closed Closed Item No. 4 sent to TVA Letter dated EICB RAI ML1028618855 sent to 196 7.5.1.1 7.5.2.2 (M a B ypassed and Ino p erable Status Indication (BISI) Res p onder: Costle y/Norman 186. Y Closed Closed Item No. 5 sent to TVA Letter dated EICB RAI ML1028618855 sent to 197 X O pen Item 197 was never issued.

187. Y Closed Closed 198 7.5.1.1 7.5.2.2 (M a SRP Section 7.5

, Subsection III

, "Review Procedures" states:

Res p onder: Costle y/Norman 188. Y Closed Closed Item No. 6 sent to TVA Letter dated EICB RAI ML1028618855 sent to 199 7.5.1.1 7.5.2.3 (M aThe WBU2 FSAR Section 7.5.2.3

, "Technical Su pport Center and Res p onder: Costle y/Norman 189. Y Closed Closed Item No. 7 sent to TVA Letter dated Related SE Section 7.5.5.3 EICB RAI 200 7.2 7/21/2010 Res p onder: Clark 190. Y Closed Closed EICB RAI TVA Letter dated 201 7.7.1.1 7.7.11 (C a 7/21/2010 Res p onder: Webb 191. Y Closed Closed EICB RAI TVA Letter dated 203 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Clark 192. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 204 7.5.1.1 7.5.2 (M a 7/26/2010 Res p onder: Costle y/Norman 193. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 205 (G 7/26/2010 Res p onder: Clark 194. Y Closed Closed EICB RAI TVA Letter dated Question B related to prior NRC 206 7.5.1.1 7.5.2 (M a 7/27/2010 Res p onder: Clark 195. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 207 (C a Jul y 27 , 2010 Date: 196. Y Closed Closed 208 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 197. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 209 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 198. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 210 7.5.2.1 7.5.1 (M a 7/27/2010 Res p onder: Clark 199. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 211 7.5.1.1 (C a 7/27/2010 Res p onder: Clark 200. Y Closed Closed EICB RAI TVA Letter dated Relates to SE Sections:

214 (C a 7/27/2010 Res p onder: WEC 201. Y Closed Closed EICB RAI TVA Letter dated 215 (P o 7/29/2010 Res p onder: WEC 202. Y Closed Closed 216 7.5.1.1 7.5.2 (M a 7/29/2010 Res p onder: Clark 203. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 217 (G 7/6/2010 Res p onder: Clark 204. Y Close Closed EICB RAI TVA Letter dated 218 (G 7/6/2010 Res p onder: Clark 205. Y Closed Closed EICB RAI TVA Letter dated 219 (G 8/4/2010 Res ponder: TVA Licensin g 206. Y Closed Closed EICB RAI 220 (G 8/4/2010 Res p onder: A y ala 207. Y Closed Closed EICB RAI TVA Letter dated 221 7.7.1.2 7.7.1.3 (M a 8/4/2010 Res ponder: Trelease 208. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 222 (G 8/4/2010 Res p onder: Clark 209. Y Close Closed EICB RAI TVA Letter dated 223 (G 8/4/2010 Res p onder: Clark 210. Y Closed Closed EICB RAI 224 7.5.1.1 7.5.2 (M a 8/4/2010 Res p onder: Norman (TVA CEG) 211. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 225 (G 8/4/2010 Res p onder: Scansen 212. Y Close Closed EICB RAI TVA Letter dated 226 (C a 8/4/2010 Res ponder: TVA Licensin g 213. Y Closed Closed N/A - Information TVA Letter dated See also O p en Item Nos. 41 & 270.

227 (G 8/4/2010 Res p onder: Clark 214. Y Close Closed EICB RAI TVA Letter dated 228 (C a 8/4/2010 Res p onder: Clark 215. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 229 (C a 8/4/2010 Res p onder: Clark 216. Y Closed Closed EICB RAI TVA Letter dated 230 (C a 8/4/2010 Res p onder: Webb 217. Y Closed Closed EICB RAI TVA Letter dated 231 (G 8/4/2010 Res p onder: Clark 218. Y Closed Closed EICB RAI TVA Letter dated 232 (S i 8/4/2010 Res p onder: Clark 219. Y Closed Closed RAI No. 5 TVA Letter dated 233 (C a 8/4/2010 Res p onder: Clark 220. Y Closed Closed EICB RAI TVA Letter dated 234 (C a 8/4/2010 Res p onder: 221. Y Closed Closed N/A - Du p licate N/A 235 (G 8/4/2010 Res ponder: TVA Licensin g 222. Y Closed Closed N/A N/A 236 (G 8/4/2010 Res p onder: Clark 223. Y Close Closed EICB RAI TVA Letter dated 237 (C a 8/4/2010 Res p onder: Clark 224. Y Closed Closed EICB RAI TVA Letter dated 238 (C a 8/4/2010 Res p onder: Webb/Hilmes 225. Y Closed Closed N/A - Du p licate N/A 239 (C a 8/4/2010 Res p onder: Hilmes 226. Y Closed Closed N/A - Meetin g N/A 240 (G 8/4/2010 Res p onder: Clark 227. Y Close Closed Ml102910008 TVA Letter dated 241 (S i 8/4/2010 Res p onder: Davies 228. Y Closed Closed RAI No. 10 TVA Letter dated 242 (G 8/4/2010 Res p onder: Hilmes 229. Y Close Closed EICB RAI TVA Letter dated 243 (C a 8/3/2010 Res p onder: WEC 230. Y Closed Closed N/A - Closed to N/A 247 (C a 8/8/2010 Res p onder: WEC 231. Y Closed Closed EICB RAI Res p onse is LIC-101 Rev. 3 A ppendix B Section 4

, 248 (C a 8/8/2010 Res p onder: WEC 232. Y Closed Closed Res p onse is LIC-101 Rev.

3 A ppendix B Section 4

, 249 (C a 8/8/2010 Res p onder: WEC 233. Y Closed Closed LIC-101 Rev. 3 A ppendix B Section 4

, 253 (C a 8/8/2010 Res p onder: Clark 234. Y Closed Closed TVA Letter dated Related to O pen Item no. 83.

254 (C a 8/10/2010 Res p onder: WEC 235. Y Closed Closed N/A - Re quest to TVA Letter dated 255 (C a 8/10/2010 Res p onder: WEC 236. Y Closed Closed N/A - Re quest to TVA Letter dated 256 (C a 8/10/2010 Res p onder: WEC 237. Y Closed Closed N/A - Re quest to TVA Letter dated 257 (C a 8/10/2010 Res p onder: WEC 238. Y Closed Closed N/A - Re quest to N/A 258 (C a 8/10/2010 Res p onder: WEC 239. Y Closed Closed N/A - Re quest to N/A 259 (C a 8/10/2010 Res p onder: WEC 240. Y Closed Closed N/A - Re quest to TVA Letter dated 260 (C a 8/10/2010 Res p onder: WEC 241. Y Closed Closed N/A - Re quest to N/A 261 (C a 8/10/2010 Res p onder: WEC 242. Y Closed Closed N/A - Closed to TVA Letter dated LIC-110 Rev. 1 Section 6.2.2 states:

262 (C a 8/10/2010 Res p onder: WEC 243. Y Closed Closed N/A - Re quest to N/A 263 (C a 8/11/2010 Res p onder: WEC 244. Y Closed Closed ML101650255

, Item 264 (C a 8/11/2010 Res p onder: WEC 245. Y Closed Closed ML101650255

, Item 265 (C a 8/11/2010 Res p onder: WEC 246. Y Closed Closed ML101650255

, Item 266 (C a 8/11/2010 Res p onder: Webb/Webber 247. Y Closed Closed TVA Letter dated 267 (C a 8/11/2010 Res p onder: WEC 248. Y Closed Closed 268 (C a 8/19/2010 Res p onder: WEC 249. N Closed Closed 269 (P o 8/20/2010 Res p onder: NRC 250. Y Closed Closed N/A N/A 270 (C a 8/23/2010 Res p onder: Clark 251. Y Closed Closed See also O p en Item Nod. 41 & 245.

271 (C a 8/23/2010 Res p onder: WEC 252. Y Closed Closed N/A - Closed to NA 272 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 253. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 273 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 254. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.a 7.5.2.1 7.5.1 (M a 8/26/2010 Res p onder: Clark 255. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 274.b (S i 8/26/2010 Res p onder: Stockton 256. Y Closed Closed RAI No. 6 TVA Letter dated 275 (S i 8/27/2010 Res p onder: Clark 257. Y Closed Closed Not Re q uired N/A 276 7.6 7.6 (G 8/27/2010 Res p onder: Webb 258. Y Closed Closed EICB RAI TVA Letter dated

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 277 7.6 7.6.3 (G 8/27/2010 Res p onder: Clark 259. Y Close Closed EICB RAI TVA Letter dated 278 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 260. Y Close Closed EICB RAI TVA Letter dated 279 7.6 7.6.6 (G 8/27/2010 Res ponder: Mather 261. Y Close Closed EICB RAI TVA Letter dated 280 7.6 7.6.6 (G 8/27/2010 Res ponder: Trelease 262. Y Closed Closed EICB RAI TVA Letter dated 281 7.6 7.6.8 (G 8/27/2010 Res p onder: Webb 263. Closed Closed EICB RAI TVA Letter dated 282 7.6 7.6.9 (G 8/27/2010 Res ponder: Trelease 264. Y Close Closed EICB RAI TVA Letter dated 283 7.7.5 XX (D a r 8/27/2010 Res p onder: Clark 265. Y Closed Closed EICB RAI No.13 TVA Letter dated This item is a follow-u p q uestion to item 284 7.7.3 7.4.1 (D a r 8/27/2010 Res p onder: Webber 266. Y Closed Closed EICB RAI No.14 TVA Letter dated This item is a follow-u p q uestion to item 285 7.3.3 7.3 (D a r 8/27/2010 Res p onder: McNeil 267. Y Closed Closed EICB RAI No.15 TVA Letter dated This item is a follow-u p q uestion to item 286 7.7.3 9.3.4.2.(D a r 8/27/2010 Res p onder: Webber 268. Y Closed Closed EICB RAI No.16 TVA Letter dated 287 7.3 7.3-1 (D a r 8/27/2010 Res p onder: Elton 269. Y Closed Closed ML102390538

, Item Res p onse 288 7.3 (G 9/2/2010 Res p onder: McNeil 270. Y Closed Closed EICB RAI 289 (S i 9/2/2010 Res ponder: Faulkner 271. Y Closed Closed RAI No. 24 TVA Letter dated 290 7.7 (C a 9/7/2010 Res p onder: Clark 272. Y Closed Closed N/A N/A This item is a du plicate of item 291.

291 7.7 (C a 9/7/2010 Res p onder: Clark 273. Y Closed Closed TVA Letter dated 292 7.2.5 7.2 (G 9/7/2010 Res p onder: Crai g 274. Y Closed Closed EICB RAI TVA Letter dated 293 7.7.4 7.2.2.3.(M a 9/8/2010 Res p onder: Crai g 275. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 294 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 276. Y Closed Closed ML102390538

, Item Res p onse 295 7.3 7.3.1.1.(D a r 9/9/2010 Res p onder: Elton 277. Y Closed Closed ML102390538

, Item Res p onse 296 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 278. Y Closed Closed ML102390538

, Item Res p onse 297 7.3 7.3.1.2.(D a r 9/9/2010 Res p onder: Elton 279. Y Closed Closed ML102390538

, Item Res p onse 298 7.3 XX (D a r 9/9/2010 Res p onder: Clark 280.Y Closed Closed ML102390538

, Item Res p onse 299 (C aProvide Common Q Software Re q uirements S pecification Post A ttachment 41 of the 10/5 letter contains the Common Q 281. Y Closed Closed TVA Letter dated 300 (S i Need Radiation Monitorin g S ystem Descri p tion/Desi g n Criteria Res p onder: Tem p les/Mather 282. Y Closed Closed RAI No. 25 TVA Letter 301 (S i 1.TVA is re q uested to address the conse q uences of software Res ponder: WEC/Davies/Clark 283. Y Closed Closed RAI No. 11 TVA Letter dated Note 1: 302 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 284. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 303 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 285. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 304 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 286. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 305 7.5.2.1 7.5.1 (M a 09/17/2010 Res ponder: Tindell 287. Y Closed Closed EICB RAI TVA Letter dated EICB RAI ML102861885 sent to DORL 306 7.1 7.1 (GFSAR amendment 100

, p a g e 7.1-12 p rovides the definition of Res p onder: Hilmes 288. Y Closed Closed EICB RAI TVA Letter dated 307 7.1 7.1 (G (1) FSAR amendment 100

, Section 7.1

, p a g e 7.1-12 , definition of Res p onder: Hilmes 289. Y Closed Closed EICB RAI TVA Letter dated 308 7.1 7.1 (G (1) FSAR Amendment 100

, Section 7.1

, p a g e 7.1-13 , definition of Res p onder: Hilmes 290. Y Closed Closed EICB RAI TVA Letter dated 309 7.1 7.1.2.1. (G (1) FSAR amendment 100

, Pa g e 7.1-14 , Westin g house set p oint Res p onder: Hilmes 291. Y Closed Closed EICB RAI TVA Letter dated 310 7.1 7.1.2.1. (G (1) FSAR amendment 100

, Pa g e 7.1-14 , TVA set p oint Res p onder: Hilmes 292. Y Closed Closed EICB RAI TVA Letter dated 311 7.1 7.1 (G Both Westin ghouse and TVA set p oint methodolo gy do not have Res p onder: Hilmes 293. Y Closed Closed EICB RAI TVA Letter dated 312 7.0 (G B y letter dated Se p tember 10 ,2010 , TVA p rovided the summar y Res p onder: Stockton 294. Y Close Closed EICB RAI TVA Letter dated 313 7.7.8 7.7.1.12 (D a r EDCR 52408 (installation of AMSAC in Unit 2

) states that Desi g n Res p onder: A y ala 295. Y Closed Closed EICB RAI No.18 TVA Letter dated 314 7.3 7.3 (D a r The followin g 50.59 chan ges were listed in the March 12 RAI Res p onder: Stockton 296. Y Closed Closed EICB RAI No. 19 TVA Letter dated Related to OI 10 315 7.5.3 7.5.3 (GIE Bulletin 79-27 re quired that emer g enc y o p eratin g p rocedures to Res p onder: S. Smith (TVA O perations) 297. Y Close Closed EICB RAI TVA Letter dated 316 7.5.2.3 7.5 (S i TVA has provided various documents in su pport of RM-1000 hi g h Res p onder: Tem p les/Mather 298. Y Closed Closed RAI No. 26 317 7.5.2.3 7.5 (S i TVA has p rovided a p ro p rietar y and a non-p ro prietar y version of Res p onder: Tem ples 299. Y Closed Closed RAI No. 27 TVA Letter dated 319 7.5.2.3 7.5 (S i TVA p rovided S ystem Verification Test Results 04507007-1TR Res p onder: Tem ples 300. Y Closed Closed RAI No. 29 TVA Letter dated 320 E I Per Westin g house letter WBT-D-2340

, TENNESSEE VALLEY Res p onder: Clark 301. Y Closed Closed N/A N/A Du plicate of item 156

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments 321 E I For the p ur poses of measurin g reactor coolant flow for Reactor Res p onder: Clark 302. Y Closed Closed N/A N/A Du plicate of OI# 157 322 7.7.1.11 (C aSection 7.7.1.11 will be added to FSAR Amendment 101 to provide Res p onder: Clark 303. Y Closed Closed 324 (M aPer the NRC reviewer

, the BISI calculation is not re q uired to be 304. Y Closed Closed 325 B (G a The Unit 2 loo ps in service for Unit 1 that are scheduled to be Res ponder: TVA Startu p Olson 305. Y Closed Closed Closed to o p en item ? 326 B (G a TVA uses double-sided methodolo gy for as-found and as-left Res p onder: Webb 306. Y Closed Closed TVA Letter dated 328 7.5.2.3 7.5 (S iProvide the model number for the four containment hi g h ran g e Res p onder: Tem ples 307. Y Closed Closed RAI No. 30 TVA Letter dated 329 7.6.1 7.6.7 (S iSection 7.6.7 of the FSAR (Amendment 100

) states that

, "The Res p onder: Clark 308. Y Closed Closed RAI No. 1 TVA Letter dated 330 7.3 7.3 (D a r Related to Item 298 Res p onder: Hilmes/Faulkner 309. Y Closed Closed EICB RAI No.20 Item 7 , TVA letter 331 7.6.1 7.6.7 (S i A s a follow u p of OI 190

, Staff has reviewed the p ro p rietar y version Res p onder: WEC/Harless/Clark 310. Y Closed Closed RAI No. 8 TVA Letter dated Follow-u p of OI-190.

332 7.5.2.1 7.5.1 (M a 10/26/2010 311. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 333 7.5.2.1 7.5.1 (M a 10/27/2010 312. Y Closed Closed ML103000105 Item TBD EICB RAI ML103000105 sent to DORL 336 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 313. Y Closed Closed 337 7.5.2.3 7.5 (S iRe: RM-1000 Re p ort 04508905-QR Res ponder: GA 314. Y Closed Closed 342 7.5.2.3 7.5 (S iPlease confirm that RM-1000 monitors and the associated The RM-1000 containment hi g h ran g e radiation monitors are 315. Y Closed Closed 343 7.5.2.3 7.5 (S iSeismic RRS in the 04508905-QR re p ort Fi gures 3-2 and 3-3 (1) The cause of the difference between the RRS and TRS 316. Y Closed Closed 351 7.5.2.3 7.5 (S i The re placement schedule for the com ponents that have a The re placement schedules stated in 04508905-1SP

, 317. Y Closed Closed 352 7.5.2.3 7.5 (S iPlease calrif y how man y RM-1000 radaition monitors are bein g The total number of RM-1000 units p rocured under MR 318. Y Closed Closed 068 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Summary Report on acceptance of AI687, AI688, Upgraded PC node box, flat panels, and power supplies." was September 28, 2010.

Responder: WEC Date: 5/25/10

The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
c. Flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7), this item is available for audit at the Westinghouse Rockville office.
d. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit

TVA Response to Follow-up NRC Request:

For the commercial grade dedication process, please see

the response to Request for Additional Information (RAI) item 3 in this letter, NRC Matrix Item 067.

The component level EQ/Seismic summary reports for the hardware listed above are available for NRC review/audit as described below:

(1) AI687 and AI688, the following documents were submitted in TVA Letter to NRC dated October 26, 2010, "Watts Bar Nuclear Plant (WBN) Unit 2 -

1. N Open Response included in letter dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-NRC Review

NNC 2/2/11:

Commercial grade dedication will be

addressed at the next

audit. Summary reports for AI687 &

AI688 were docketed one month late. N/A - No question was asked. Item

was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Instrumentation and Controls Staff Information Requests," (Reference 5):

a. EQ-EV-62-WBT, Revision 0, "Common Q PAMS Comparison of Tested Conditions for the AI687

and AI688 Common Q Modules and Supporting

Components to the Watts Bar Unit 2 (WBT) Requirements," dated September 10, 2010

b. EQLR-171, Revision 0, "Environmental and Seismic Test Report, Analog Input (AI)687 &

AI688 Modules for use in Common Q PAMS,"

dated September 10, 2010

c. CN-EQT-10-44, Revision 0, "Dynamic Similarity Analysis for the Watts Bar Unit 2 Post Accident Monitoring System (PAMS)," dated September 28, 2010 (2) Upgraded PC Node Box - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following

documents are available for NRC audit at the Westinghouse Rockville office:

a. CDI-3722, Revision 7, "Next Generation PC Node Box Commercial Dedication Instruction"
b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary"

(3) Flat Panel Displays - As stated in Westinghouse letter WBT-D-2024, dated June 9, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office," (Reference 6), the following documents are available for NRC audit at the Westinghouse Rockville office:

a. CDI-3803, Revision 8, "Next Generation Flat Panel Display (FPD) Commercial Dedication Instruction"
b. LTR-EQ-10-50 "PC Node Box/Flat Panel Display System Components Qualification Summary" (4) Power supplies - As stated in Westinghouse letter WBT-D-2035 dated June 11, 2010 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" (Reference 7), the following documents are

available for NRC audit at the Westinghouse Rockville office: a. CDI- 4057, Revision 4, "Commercial Dedication Instruction"

b. EQ-TP-1 05-GEN, Revision 0, "Electromagnetic Compatibility Test Plan and Procedure for Quint Power Supplies and Safety System Line Filter"
c. Breakers," EQ-TP-114-GEN, Revision 0, "Seismic Qualification Test Procedure For Common Q Power Supplies, Quint Power Supplies, Line Filter Assemblies, and South Texas Units 3 & 4 Circuit"
d. EQ-TP-117-GEN, Revision 0, "Environmental Qualification Test Procedure For Common Q Pow eSupplies, Quint Power Supplies, and Line Filter Assemblies" 081 7.5.2 7.5.1 (C a5/6/2010 Responder: Merten/WEC
2. N Open Open-NRC Review EICB RAI TVA Letter dated NNC 1/5/11:

See Also Open Item No.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 7, lists codes and standards applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) RG 1.29 - September 1978 vs. March 2007 (2) RG 1.53 - June 1973 vs. November 2003 (a) IEEE 379-1994 vs. -2000 (3) RG 1.75 - September 1975 vs. February 2005 (a) IEEE 384-1992 vs. -1992 (4) RG 1.100 - June 1988 vs. September 2009 (a) IEEE 344-1987 vs. -2004 (5) RG 1.152 - January 1996 vs. January 2006 (a) IEEE 7-4.33.2-1993 vs. -2003 (6) RG 1.168 - September 1997 vs. February 2004 (a) IEEE 1012-1986 vs. -1998 (b) IEEE 1028-1988 vs. -1997 (7) IEEE 279-1991 vs. 603-1991 (8) IEEE 323-1983 vs. -1974 (RG 1.89 Rev. 1 June 1984 endorses 323-1974)

However, LIC-110, "Watts Bar Unit 2 License Application Review,"

states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.

The codes and standards documents listed in Section 7 of the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the codes and standards on which the SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

Bechtel to develop a matrix and work with Westinghouse to provide justification.

TVA Response to Follow-up NRC Request:

Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common

Q PAMS design meets the applicable requirements and is acceptable.

ML101600092 Item No.1: There are three sets of regulatory

criteria that relate to a Common

Q application (e.g. WBN2

PAMS): (a) Common Q platform components - Common Q TR (b) Application Development Processes - Common Q SPM (c) Application Specific - current regulatory criteria The Common Q Topical Report and associated appendices primarily addressed (a) and (b). The Common Q SER states:

'-Appendix 1, "Post Accident Monitoring Systems," provides the functional requirements and

conceptual design approach for

upgrading an existing PAMS based on Common Q components (page 58, Section

4.4.1.1, "Description")-On the basis of the above review, the staff concludes that Appendix 1 does not contain sufficient information to establish the generic acceptability of the

proposed PAMS design (page 56, Section 4.4.1.3, "PAMS Evaluation")-'

The NRC did not approve the proposed PAMS design.

Section 6, "References," and

Section 7, "Codes and

Standards Applicable to the Common Q PAMS," of the PAMS Licensing Technical

Report contain items that are

not the current regulatory criteria.

Please provide an explanation

of how the WBN2 PAMS conforms with the application specific regulatory criteria applicable to the WBN2 PAMS

design. For example IEEE Std.

603-1991 Clause 5.6.3, "Independence Between Safety

Systems and Other Systems,"

and Clause 6.3, "Interaction Between the Sense and Command Features and Other

Systems," contain application

specific requirements that must Due 2/25/11 TVA to provide requested information.

NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

ML102910002 Item No. 9 6/18/10 86 and 202.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments be addressed by a PAMS system. Awaiting TVA Response.

086 7.5.2 7.5.1 EICB (Carte) 5/6/2010 The PAMS Licensing Technical Report (WNA-LI-00058-WBT Rev. 0, Dated April 2010), in Section 6, lists references applicable to the Common Q PAMS. This list contains references to old revisions of several regulatory documents, for example:

(1) DI&C-ISG04 - Rev. 0 (ML072540138) vs. Rev. 1 (ML083310185) However, LIC-110, "Watts Bar Unit 2 License Application Review,"

states: "Design features and administrative programs that are unique to Unit 2 should then be reviewed in accordance with the current staff positions." Please identify all differences between the versions referenced and the current staff positions. Please provide a justification for the acceptability PAMS with respect to these differences.

Responder: WEC Date: 5/24/10

The regulatory documents listed in the Common Q PAMS Licensing Technical Report are the documents that the Common Q platform was licensed to when the NRC approved the original topical report and issued the approved SER. The WBN Unit 2 Common Q PAMS is designed in accordance with the approved Common Q topical report and approved SER and the regulatory documents on which the

SER was based. Since the current versions referenced are not applicable to WBN Unit 2, there is no basis for a comparison review.

Rev 0 of the Licensin g Technical Report references Rev. 1 of ISG4 TVA Response to Follow-up NRC Request:

The analysis for compliance with DI&C-ISG04, Revision 0 to Revision 1 was previously submitted as part of the Common Q PAMS Licensing Technical Report Revision 2 on December 22, 2010. Attachment 4 contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.

3. N Open TVA to address with item OI
81. Open-NRC Review Due 2/25/11 NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date.

EICB RAI ML102910002

Item No. 14 TVA Letter dated 6/18/10 NNC 1/6/11:

See Also Open Item No.81

& 202 101 DORL (Poole) 4/12/2010

The non-proprietary versions of the following RM-1000, Containment High Range Post Accident Radiation Monitor documents will be provided by June 30, 2010.

1. V&V Report 04508006A
2. System Description 04508100-1TM
3. Qualification Reports 04508905-QR, 04508905-1 SP, 04508905-2SP, 04508905-3SP
4. Functional Testing Report 04507007-1TR Responder: Slifer

The documents, and affidavits for withholding for the listed documents were submitted to the NRC on TVA letter to the NRC dated July 15, 2010.

4. Y Open Documents provided in letter

dated 07/15/10 Open-NRC Review

Due 10/14/10

Confirm receipt. N/A TVA is working with the vendor to meet the 6/30 date, however there is the potential this will slip to 7/14.

142 EICB (Carte) The applicable regulatory guidance for reviewing the WBN2 PAMS SysRS would be IEEE 830 as endorsed by Regulatory Guide 1.172 and BTP 7-14 Section B.3.3.1, Requirements Activities -

Software Requirements Specifications." IEEE 830-1994 Section 4.3.8, "Traceable," states: "A [requirements specification] is

traceable of the origin of each of its requirements is clear-"

1. How did TVA ensure the traceability of each requirement in the WBN2 PAMS SysRS.

Responder: WEC

This item is used to track all traceability issues with the Software Requirements Specification (SRS).

TVA Response to 1:

Traceability of requirements for the WBN Unit 2 Common Q PAMS is ensured by:

a. Preparation of the TVA Contract Compliance Matrix contained in WNA-LI-00058-WBT-P, Revision 2, "Post-
5. N Open Revised response included in letter dated 02/25/11 Response included in letter dated 12/22/10 TVA/Westinghouse agreed to include the V&V evaluation of their reusable software element Open-NRC Review Due 2/25/11 (document submittals)

NNC 2/2/11: Updated Specifications and RTMs to be provided b y TVA Tracability to be addressed during the ML101650255, Item No. 6 WBN2 PAMS System Requirements Specification

TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

2. Explain the source(s) of the requirements present in the Post Accident Monitoring System's Software Requirements Specification. To clarify, many documents have requirements that are incorporated by reference into the SRS, but what served to direct the author to include those various documents in the SRS or, if the requirement is based on the System Requirements Specification, what directed the author to include the requirement there?
3. Clarify whether the unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, or are all such sections simply considered to be informative?

Does the same apply to documents referenced by the SRS?

Such as WCAP-16096-NP-A, Rev. 1A, "Software Program Manual for Common Q Systems," which is incorporated by reference in requirement R2.3-2 in the SRS.

R2.3-2 [The PAMS software shall comply with the requirements and guidelines defined in WCAP-16096-NP-A, "Software Program Manual for Common Q Systems" (reference 5).]

If any requirements are expressed in such unnumbered paragraph form instead of individually identified requirements, please list them, describe why they satisfy the fundamental requirement of unambiguity, and describe how they were verified.

4. Are there any sources of requirements in parallel with the Post Accident Monitoring System's Software Requirements Specification? Meaning does the SRS contain, explicitly or by reference, all the requirements that were used in the design phase for the application specific software, or do software design phase activities use requirements found in any other source or document? If so, what are these sources or documents?

Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

b. Engineering review/comment/status of each revision of: i. WNA-DS-01617-WBT, "Post Accident Monitoring System - System Requirements Specification" ii. WNA-DS-01667-WBT, "Post Accident Monitoring System - System Design Specification" (hardware) iii. WNA-SD-00239-WBT, "Software Requirements Specification for the Post Accident Monitoring

System" (software)

TVA Response to 2:

As documented in the RTM, some software requirements are taken from generic documents. The decision to include generic software requirements was to reduce the overall scope for Common Q features that are unchanged across projects. Westinghouse reviewed the generic PAMS requirements and included those requirements that were applicable to WBN Unit 2 PAMS.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 3:

Unnumbered paragraphs in the Post Accident Monitoring System's Software Requirements Specification, such as in the section headings, are informative and are not to be interpreted as requirements. All requirements are explicitly

numbered. It depends on the document type. The statement would be true for requirements documents (such as the SysRS or SDS) if they were incorporated by reference. However, for the specific item cited, WCAP-16096-NP-A, Rev. 1A, it does not contain numbered requirements. The requirements contained in this document are contained within the text of the various sections.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 4:

The Westinghouse SRS, WNA-SD-00239-WBT, Revision 3 contains references to other Westinghouse software requirements documents. Specifically,

00000-ICE-3238, Revision 5, "Software Requirements Specification Post Accident Monitoring System"

00000-ICE-3239, Revision 13, "Software Requirements Specification for the Common Q Generic Flat Panel Display development process in the V&V design phase summary report. This evaluation would include an evaluation against the development process requirements. This evaluation would also include an evaluation of how the WBN2 specific requirements were addressed by the reusable software elements. (see ML102920031 Item No 5) next audit.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

5. References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".

These references are used in the body of the SRS, for example:"

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference

12]).] They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their origin? Software" Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to 5:

Requirements for the reusable software elements (RSEDs) are evaluated in WNA-VR-00283-WBT-P, Revision 3, "IV&V Summary Report for the Post Accident Monitoring System,"

dated December 2010 (Attachment 10).

RSED traceability is contained in WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceabili ty Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements." This document can be made available for audit at the Westinghouse Rockville office.

At the September 15 public meeting in Rockville, the following actions were agreed to. These items address the traceability concerns with the Software Requirements Specification.

1. Westinghouse will perform a review of the Requirements Traceability Matrix(RTM), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

2. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.

TVA Response:

See response to letter Item 13 (NRC Matrix Item 145).

3. Westinghouse will add a comments column in the Requirements Traceability Matrix (RTM) to address items not in the SRS or SysRS.

TVA Response:

A comments column has been added to WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System." Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

4. IEEE 830 says you shouldn't have planning information in the SRS. Westinghouse has agreed to remove this information.

TVA Response:

Westin ghouse has confirmed that process requirements Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments have been removed from the SRS.

Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

5. IEEE 830 says you shouldn't have process requirements in the SRS. Westinghouse has agreed to remove these requirements.

TVA Response:

Westinghouse confirmed that process requirements

have been removed from the SRS.

Source: E-mail from Westi nghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

6. Westinghouse will perform and document an evaluation of the SRS to ensure compliance with Reg.

Guide 1.172 and justify any deviations.

TVA Response:

WNA-LI-00058-WBT-P, Revision 2, "Post-Accident

Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1):

Section 9, "Compliance Evaluation Of The Watts Bar 2 PAMS Software Requirements Specification To IEEE Standard 830-1998 And Regulatory Guide 1.172" has been added.

7. 25 issues identified by V&V where some requirements have not been included in the System Design Specification (SDS) (14) and SRS (11) at the revisions reviewed by V&V. Have these been addressed?

TVA Response:

The twenty-five (25) issues are captured in Exception Reports (ERs): V&V-769 and V&V-770. These ERs have all been addressed and the ERs have been closed satisfactorily by Westinghouse IV&V.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

8. Some hardware requirements are contained in the SRS instead of the System Design Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.

TVA Response:

The hardware requirements in the Software Requirements Specification have been deleted and moved to System Design Specification.

Source: E-mail from Westinghouse (Matthew A.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 16, 2010 (Reference 15)

9. RTM item R4.2-2 protection class software set to 0. Needs to be fixed internally. Write CAPs to revise the application restrictions document on AC160.

TVA Response:

Westinghouse CAPs IR# 10-259-M034 has been issued. This item will be addressed in revision 4 of the RTM. Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

10. Westinghouse to improve the traceability of the tests that are performed with the function enable (FE) switch in the "ENABLE" position.

TVA Response:

The tests that are performed with the FE keyswitch in the ENABLE position are defined in the SRS Sections:

6.2 "Manually Initiated Testing," 7.2.23 "Annunciator

Test Display," 7.2.25 "Saturation Margin Test Display,"

and 7.2.26 "Analog Output Test Display."

11. Westinghouse to revise documents to be consistent with referring to the FE switch in the "ENABLE" position.

TVA Response:

Westinghouse has elected to standardize on the terms "FE keyswitch" and "ENABLE." A review of recent documents for compliance with this comment and commitment was performed with the following results:

a. Revision 3 of the SysRS, and SDS have been revised to use the terms "FE keyswitch." Revision 3 of the SDS is consistent in use of the term "ENABLE." b. SysRS Revision 3 is not consistent in use of the term "ENABLE" as noted below:
i. R2.5.2.1-2 uses the term "ENABLED" instead of "ENABLE" ii. R2.5.2.1.3-3, R2.6.3.3-1, R2.6.3.3-2, R2.6.3.3-3, and R2.6.3.3-7, use the term "Enable"

instead of "ENABLE"

c. Revision 3 of the SRS is not consistent in use of the terms "FE keyswitch" and "ENABLE" as noted

below: i. Tables 7.2-1 "Train A PAMS Data Transmitted to the Plant Computer" and 7.2-2 "Train B PAMS Data Transmitted to the Plant Computer" items 101 and 102 in the SRS refer to the FE switch.

All other items in the SRS refer to the FE keyswitch.

ii. Section 2.1, page 2-4, uses the term "Enable" instead of "ENABLE" iii. Requirements R7.2.14-6 and R7.2.16-7 use the Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments term "active" instead of "ENABLE" iv. Requirements R7.2.23-2, R7.2.25-2, R7.2.26-2, R7.2.31-4, 7.2.56 FPDS Availability, and R7.2.57-4 use the term "enabled" instead of

"ENABLE" d. WNA-AR-00180-WBT-P, Revision 0, "Failure Modes and Effects Analysis (FMEA) for the Post Accident Monitoring System," dated October 2010, submitted in TVA letter to NRC dated (Reference

12) is not consistent in use of the term "FE keyswitch" as noted below:
i. Section 2.2 "System Description" and Table 3-1 "WB2 PAMS FMEA" refer to the FE switch.

ii. Table 3-1 describes the switch as the "Functional Enable (FE) switch" and the "FE key-switch"

e. Revision 2 of the Licensing Technical Report is not consistent in use of the term "FE keyswitch" as noted below:
i. Sections 2.2, 5.3 use the term (FE) keylock switch on pages 2-3 (2 places), page 5-3, page

5-6 (4 places)

The identified discrepancies in the use of the terms "FE

keyswitch" and "ENABLE" in the SysRS, SRS, FMEA and Licensing Technical Report, will be corrected in the next revision of the documents.

12. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

TVA Response:

See response to letter item 13 (NRC Matrix Item 145).

13. Westinghouse and TVA will develop a revised schedule for document submittals and provide it to the NRC no later than 9/30/10 TVA Response:

The revised document submittal schedule was included

as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010 (Reference 5).

14. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract

requirements.

TVA Response:

The Procurement Requisition Resolution Matrix has been updated and is included in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1), as Section 11, "TVA Contract Compliance Matrix."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

15. Westinghouse to add the Software Design Descriptions to the RTM TVA Response:

The Software Design Description documents were added to the RTM in WNA-VR-00279-WBT, Rev 2.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

16. Westinghouse to clarify how requirements or documents are incorporated by reference into the Common Q PAMS requirements.

TVA Response:

When a Common Q PAMS requirements document

references a section of another document, all requirements in that section are applicable.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

17. Westinghouse to review the use of "shall" outside of numbered paragraphs in requirements documents to

ensure that all requirements are captured and clearly identified.

TVA Response:

See response in letter dated December 22, 2010, item 2 (NRC Matrix Item 050).

18. Westinghouse to resolve the following questions concerning Software Design Descriptions (SDDs)
a. Is the SDD a standalone document or will it incorporate the generic SDD by reference?
b. What are the SDDs?
c. PAMS is a delta document so how do we capture all the generic requirements for traceability.

TVA Response:

a. There are three SDDs prepared specifically for the Watts Bar 2 PAMS project. These are listed below in Item b. These documents and superior requirements documents refer to other generic SDDs also listed in Item b.
b. The SDDs developed for this project are:
i. WNA-SD-00248-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C

Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display" ii. WNA-SD-00250-WBT, Revision 1, "Watts Bar 2 NSSS Completion Program I&C Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Projects Software Design Description for the Post Accident Monitoring System AC160 Software" iii. WNA-SD-00277-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C

Projects Software Design Description for the Post Accident Monitoring System Flat Panel Display System Screen Design Details"

iv. Other generic SDDs referenced by the PAMS project are: (a) 00000-ICE-20157, Revision 18, "Software Design Description for the Common Q Generic Flat-Panel Software" (b) 00000-ICE-30152, Revision 5, "Software Design Description Post Accident Monitoring System AC160" (c) 00000-ICE-30140, Revision 4, "Software Design Description for the Common Q Core Protection Calculator System Database and Utility Functions"

c. Refer to WNA-VR-00279-WBT, Revision 3.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

19. For Reusable Software Elements, Westinghouse to describe as qualified libraries b y following the SPM and qualified using the Software Elements Test procedure under Appendix B program. Provide a summary of RSEDs generic WCAP. Westinghouse to determine if the WCAP was docketed under the AP1000. RSED concept is not in the SPM. WCAP-15927 AP-1000 does not discuss RCEDs. WCAP process was

acceptable. RSEDs are listed in the SDD References.

TVA Response:

Section 3.2.4.1 of WCAP-15927 describes the RSED design process for custom PC elements and type circuits. The Glossary of Terms in the SPM defines custom PC elements and type circuits as modules.

Therefore, the relationship between WCAP-15927 describing the RSED process as circuits, is defined in the SPM requirements for software module development.

WCAP-15927 is on the AP1000 docket.

Source: E-mail from Westinghouse (Matthew A.

Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

WNA-VR-00279-WBT, Revision 4, "Watts Bar 2 NSSS Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" is scheduled to be available for audit at the Westinghouse Rockville office February 21, 2011. The document will be available at the Westinghouse Cranberry offices to support the NRC Common Q PAMS audit.

Attachment 9 contains the proprietary version of WNA-DS-01617-WBT-P, Revision 4, "Post Accident Monitoring System - System Requirements Specification," dated February 2011. Attachment 10 contains the non-proprietary version WNA-DS-01617-WBT-NP, Revision 4, "Post Accident Monitoring System - System Requirements Specification," dated February, 2011. Attachment 11 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01617-WBT-P, Revision 4, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System - System Requirements Specification" (Proprietary), dated February 10, 2011.

2 contains the proprietary version of WNA-DS-01667-WBT-P, Revision 4, "Post Accident Monitoring System - System Design Specification," dated February 2011. Attachment 13 contains the non-proprietary version WNA-DS-01667-WBT-NP, Revision 4, "Post Accident Monitoring System - System Design Specification," dated February 2011. Attachment 14 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-DS-01667-WBT-P, Revision 4, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification" (Proprietary), dated February 11, 2011.

5 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 4, "Software Requirements Specification for the Post Accident Monitoring System,"

dated February 2011. Attachment 16 contains the non-proprietary version WNA-SD-00239-WBT-NP, Revision 4, "Software Requirements Specification for the Post Accident Monitoring System," dated February 2011. Attachment 17 contains the Application for Withholding Proprietary Information from Public Disclosure, WNA-SD-00239-WBT-P, Revision 4, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System" (Proprietary), dated February 10, 2011.

143 EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS - ML101050202) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the

WBN2 PAMS SRS was created to support the three documents identified (one of which is the WBN2 PAMS SysRS). Section 1.1, "Overview," of the WBN2 PAMS SRS states: "This document describes requirements for the major software components -"

(a) Please list and describe each of the "major software components". Please include a description of any NRC review for each of these components.

Responder: WEC Addressed in the 9/15 public meeting and 9/20 - 9/21 audit. A detailed explanation will be provided.

TVA Response:

(a) and (b) The requested information is provided in the following documents:

i. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing
6. N Open Response included in letter

dated 12/22/10 Open-NRC Review Due 2/25/11 (document submittals)

To be addressed by Revision of the RTM, SRS, SysRS, and SysDS. NNC 2/2/11: Updated ML101650255, Item No. 7 WBN2 PAMS System Requirements Specification

TVA docketed WNA-DS-01617-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System- System Requirements Specification," dated December 2009.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (b) Please list and describe each of the other software components. Please include a description of any NRC review for each of these components.

(c) What other documents contain the requirements for the other software components?

The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS SysRS was created to support the WBN2 PAMS SysRS. Section 1.1, "Purpose," of the WBN2 PAMS SDS states: "The purpose of this document is to define the hardware design requirements -"

(c) Do the WBN2 PAMS SRS and SDS, together, implement all of the requirements in the WBN2 PAMS SysRS?

(e) Please briefly describe all of the documents that implement the WBN2 PAMS SysRS. Technical Report," Table 6-1, "Document Requirements" which lists the software documentation requirements for the Common Q PAMS and Section 11 "TVA Contract Compliance Matrix" submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

ii. WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System- System Requirements Specification," dated December 2010 (Attachment 1) iii. WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System," dated December 2010 (Attachment 7) iv. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) To the best of TVA's knowledge, no prior NRC review of the software components has been performed. (c) WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) (d) No. Please see Item (e) below. (e) The documents that describe the requirements that implement the WBN Unit 2 SysRS are:

i. WNA-VR-00279-WBT, Revision 3, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville office) ii. WNA-VR-00280-WBT, Revision 2, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office)

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010 (Reference 13)

TVA Response to Follow-up NRC Request:

See Response to item 3 (Item number 142)

Specifications and RTMs to be provided b y TVA NNC 2/3/11: The above due date has been missed by at least 2 months.

Please provide new due date. 145 EICB (Carte) The WBN2 PAMS System Design Specification (WBN2 PAMS SDS) contains a table (see page iii) titled, "Document Traceability

& Compliance," which states that the WBN2 PAMS SDS was created to support the WBN2 PAMS SysRS.

(a) Does the WBN2 PAMS SDS implement all of the hardware Responder: WEC (1) The review and update of the RTM is complete. The revised RTM can be made available for NRC audit at the Westinghouse office in Rockville.

7. N Open Response included in letter

dated 12/22/10 During the September 20-21, Open-NRC Review Due 2/25/11 To be addressed by Revision of the RTM, ML101650255, Item No. 9 WBN2 PAMS System Design Specification

TVA docketed WNA-DS-01667-WBT Rev. 1, "RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments requirements in the WBN2 PAMS SysRS?

(b) Please briefly describe all of the documents that implement the hardware requirements of the WBN2 PAMS SysRS.

This item is used to track all traceability issues with the System Design Specification (SDS).

At the September 15 public meeting in Rockville, the following actions were agreed to. These items partially address the traceability concerns with the System Design Specification. This item will be updated with the results of the September 20 and 21 Commercial Grade Dedication and SDS RTM audit.

1. Westinghouse will perform completed a review of the Requirements Traceability Matrix(RT), using the issues identified at the 9/15 public meeting as a guide (documented below) and update the RTM as required.
2. Some hardware requirements are contained in the SRS instead of the S y stem Desi gn Specification (SDS). These will be removed from the SRS and incorporated into the next revision of the SDS.
3. 25 issues identified by V&V where some requirements have not been included in the SDS (14) and SRS (11) at the

revisions reviewed by V&V. Have these been addressed? Yes. The next revisions of the SDS and SRS address these issues.

4. TVA will update the Procurement Requisition Resolution Matrix and submit it to show how the Common Q PAMS design meets the contract requirements.
5. The next issue of the IV&V report will include the Requirements phase review of the RTM and a partial review for the Design phase.
6. Westinghouse to provide the generic AC160 and flat panel specifications.
7. Westinghouse and TVA to develop a schedule of licensing document submittals that can be met by the project team.
8. The flow of information is from the SysRS to the SDS (hardware) and SRS (software). Describe how the documents are used. Describe in 1.1 of the SysRS. Need a good write up of how the process works.

(2) Please see letter Item 10 (NRC Matrix Item 142, sub item 13).

(3) Please see letter Item 10 (NRC Matrix Item 142, sub item 12).

(4) Section 11 "TVA Contract Compliance Matrix" was added to WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1).

(5) WNA-VR-00283-WBT, Revision 1, "IV&V Summary Report for the Post Accident Monitoring System," submitted in TVA to NRC letter dated December 3, 2010 (Reference 1) includes the Requirements and Design phase reviews.

(6) Per Westinghouse letter WBT-D-2268 "NRC Access to Common Q Documents at the Westinghouse Rockville Office" dated August 16, 2010 (Reference 9) "System Requirements Specification for the Common Q Generic Flat Panel Display," 00000-ICE-30155, Revision 9 is available for audit at the Westin ghouse Rockville office.

The generic AC160 specifications are contained in the documents listed below. The documents are available for NRC audit at the Westinghouse Rockville office in accordance with the letter number referenced. List is contained in letter.

(7) A schedule was developed and is reviewed weekly by Westinghouse and TVA project management.

(8) The revised document submittal schedule was included as item 3 NRC Request (Matrix Item Number 142, TVA Commitments Nos. 10 and 17) in TVA letter to NRC dated October 26, 2010.

(9) The flow of documentation information was provided to the NRC inspector during the Common Q PAMS audit.

Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI on SysRS, dated December 8, 2010 TVA Response to Follow-up NRC Request:

See Response to item 3 (Item number 142) 2010 audit at Westinghouse, it was acknowledged that TVA/Westinghouse had previously (in September 15, 2010 public meeting) stated:

TVA would provide the RSED RTM. (see ML102920031 Item

No 6)

TVA would revise and resubmit the PAMS RTM to address all types of issues identified in the public meeting. (see ML102920031 Item No 7)

TVA would revise and resubmit

the Software Verification and Validation phase summary report for the requirements phase to document the completion of the requirements phase review. (see ML102920031 Item No 8) SRS, SysRS, and SysDS. Accident Monitoring System- System Design Specification," dated December 2009. 185 EICB (Carte) 7/15/2010

An emphasis is placed on the traceability of requirements in Software Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS must be traceable backwards to the system requirements and the design bases or Responder: WEC

Steve Clark to look at how to combine traceability items.

Was addressed to during the 9/15 meeting and 9/20 - 9/21

audit.

TVA Response to Follow-up NRC Request:

(1) See NRC Matrix Item 144

8. N Open Response included in letter dated 12/22/10.

Open-NRC Review

NNC 11/18/10

(1)The point behind this open item was that TVA must

demonstrate that the

origin of each requirement in the WEC requirements EICB RAI ML102980066 Item

No. 17 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments regulatory requirements that is satisfies" Also the NRC considers that the SRS is the complete set of requirements used for the design of the software, whether it is contained within one document or many. In order to evaluate an SRS against the guidance in the SRP the staff needs access to all the

requirements.

References 12, 27, 29, and 31-44 in the Post Accident Monitoring System's Software Requirements Specification are various types of "-Reusable Software Element-".

These references are used in the body of the SRS, for example:"

R5.3.14-2 [The Addressable Constants CRC error signal shall be TRUE when any CAL CRC's respective ERROR terminal = TRUE (WNA-DS-00315-GEN, "Reusable Software Element Document CRC for Calibration Data" [Reference 12]).]

They are also included via tables such as found in requirement R7.1.2-1

[The Watts Bar 2 PAMS shall use the application-specific type circuits and custom PC elements listed in Table 7.1-1.]

Do the referenced reusable software element documents include requirements not explicitly stated in the SRS? If so what is their

origin? (2) There is no RTM for development of the individual reusable software elements. As listed in item 15 of Table 6-1 "Document Requirements" of WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC, dated December 3, 2010, a RTM for implementation of the RSEDs (WNA-VR-00280-WBT) for the WBN Unit 2 Common Q PAMS has been developed. This document is available for NRC audit at the Westinghouse Rockville office. specification is known and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.

(2) TVA also said it would provide a RTM for the RSED

NNC 2/3/11: To be addressed during next audit. 244 EICB (Carte) 8/3/2010 Section 8.2.2 of the Common Q SPM (ML050350234) states that the Software Requirements Specification (SRS) shall be developed using IEEE 830 and RE 1.172. Clause 4.8, "Embedding project requirements in the SRS," of the IEEE 830 states that an SRS should address the software product, not the process of producing the software. In addition Section 4.3.2.1 of the SPM states "Any alternatives to the SPM processe s or additional project specific information for the ...SCMP...shall be specified in the PQP.

Contrary to these two statements in the SPM, the WBN2 PAMS

SRS (ML101050202

) contains man y process related requirements, for example all seventeen requirements in Section 2.3.2, "Configuration Control," address process requirements for configuration control.

Please explain how the above meets the intent of the approved SPM. Responder: WEC The process related requirements have been removed from revision 2 of the Software Requirements Specification (SRS).

Attachment 3 of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Nuclear Automation, Watts Bar 2 NSSS Completion Program, I&C Projects, Software Requirements Specification for the Post Accident Monitoring System", WNA-SD-00239-WBT, Revision 2, Dated September 2010.

TVA Response to Follow-up NRC Request:

As shown is the listed documents, process related requirements have been deleted from the SRS and S y sRS in Revision 3:

Attachment 1 contains proprietary version of WNA-DS-01617-WBT-P, Revision 3, "Post Accident Monitoring System-System Requirements Specification," dated December 2010.

Attachment 7 contains the proprietary version of WNA-SD-00239-WBT-P, Revision 3, "Software Requirements Specification for the Post Accident Monitoring System,"

dated December 2010.

Source: E-mail from Westinghous e (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: Common Q RAI concerns, dated December 8, 2010 (Reference 17)

9. N Open Revised response is included in

letter dated 12/22/10 Response is provided in letter

dated 10/25/10.

NNC 11/18/10: SysRS Rev. 2 also contains process

requirements that are more

appropriately incorporated into process documentation.

Open-NRC Review Due 2/25/11 Document revisions NNC 2/2/11:

Issues with Common Q TR &

SPM compliance were discussed in the weekl y public meetings. Westinghouse to perform Common Q TR & SPM compliance self assessment; this will be discussed in detail on the next audit.

EICB RAI ML102980066 Item

No. 14 Response is provided in letter

dated 10/25/10. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the

information relied upon in the SE must

be docketed correspondence." LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability

of the proposal in terms of regulatory

requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response to Follow-up NRC Request:

The documents discussed in Item 3 have been revised to address compliance with the Topical Report (TR) and the Software Program Manual (SPM).

250 EICB (Carte) 8/8/2010 The SPM describes the software and documents that will be

created and placed under configuration control. The SCMP (e.g.,

SPM Section 6, "Software Configuration Management Plan") describes the implementation tasks that are to be carried out. The acceptance criterion for software CM implementation is that the tasks in the SCMP have been carried out in their entirety.

Documentation should exist that shows that the configuration management tasks for that activity group have been successfully accomplished. Please provide information that shows that the CM tasks have been successfully accomplished for each life cycle activity group.

Responder: WEC Westinghouse develops Software Release Reports/Records

and a Configuration Management Release Report. Describe the documents and when they will be produced. Summarize guidance on how to produce these records, focus on project specific requirements in SPM etc.

TVA Response to Follow-up NRC Request:

The following documentation shows that the configuration management tasks for that activity group have been successfully accomplished.

1. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC requests:
a. Section 2.2.1 Hardware/Software Change Process has been added to describe the process of how changes are evaluated.
b. Section 2.2.2, "Software" has been expanded to include a table detailing evolutionary software changes that have occurred since the initial submittal and the change evaluation of the life cycle. 2. WNA-PT-00138-WBT, Revision 0, "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan,"

(Proprietary), dated November 2010 submitted in TVA Letter to NRC, dated December 3, 2010 (Reference 1).

10. N Open Revised response included in

letter dated 12/22/10

Response included in letter dated 10/25/10.

Open-NRC Review NNC 2/2/11: To be addressed during the next audit. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must

be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability

of the proposal in terms of regulatory

requirements and the protection of public health and safety." 252 EICB (Carte) 8/8/2010 The SPM contain requirements for software requirements traceability analysis and associated documentation (see Section 5.4.5.3, "Requirements Traceability Analysis"). Please provide information that demonstrates that requirements traceability analysis has been successfully accomplished.

Responder: WEC

Explain response to AP1000 audit report. RTM docketed NRC awaiting V&V evaluation of RTM.

The following responses are based on WBN Unit 2 Common Q PAMS traceability:

Software requirements traceability analysis is described in the following documents:

1. WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) Section 11, "TVA

Contract Compliance Matrix"

11. N Open Response included in letter dated 12/22/10

Read ML091560352 Open-NRC Review Due 2/25/11 (document submittals)

NNC 2/2/11: Updated RTMs and specifications to be provided.

Requirements traceability to be addressed during he next audit. LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the

information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability

of the proposal in terms of regulatory requirements and the protection of public health and safety."

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

2. WNA-VR-00279-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Post Accident Monitoring System" (available for NRC audit at the Westinghouse Rockville

office)

3. WNA-VR-00280-WBT, "Watts Bar 2 NSSS Completion Program I&C Projects Requirements Traceability Matrix for the Reactor Vessel Level Indication System (RVLIS) Custom PC Elements" (available for NRC audit at the Westinghouse Rockville office) This document addresses the RSEDs used in the WBN Unit 2 Common Q PAMS.

The V&V evaluation of the RTM is documented in section 2.2.2 of the following documents:

1. The Independent Verification & Validation (IV&V) report covering the Concept and Definition phases

("Nuclear Automation Watts Bar Unit 2 NSSS

Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 1, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

2. The Independent Verification &Validation (IV&V) report covering the Design and Implementation phases

("Nuclear Automation Watts Bar Unit 2 NSSS

Completion Program I&C Projects, IV&V Summary Report for the Post Accident Monitoring System," (Proprietary), WNA-VR-00283-WBT, Revision 2, dated November 2010), submitted in TVA Letter to NRC dated December 3, 2010 (Reference 1).

3. The integration phase is covered in Attachment 10, the proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-

WBT-P, Revision 3, dated December 2010. 1 contains the non-proprietary version of "IV&V Summary Report for the Post Accident Monitoring System," WNA-VR-00283-WBT-NP, Revision 3, dated December 2010. Attachment 12 contains the "Application For Withholding Proprietary Information From Public Disclosure WNA-VR-00283-WBT-P, Revision 3, "IV &V Summary Report for the Post Accident Monitoring System" (Proprietary)," dated December 2010.

TVA Response to Follow-up NRC Request:

See Response to item 3 (Matrix Item Number 142) 318 7.5.2.3 7.5 EICB (Singh) TVA has provided the following documents for RM-1000 equipment qualification:

(i) Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter 04508905-QR (January 2001) Responder: Temples (i) Applicable to WBN Unit 2.

04508905-1QR is applicable only in regards to the RM-1000, with the

12. N Open Revised response is included in

letter dated 12/22/10.

Note check 04508905-1QR or Open-NRC Review Due 2/25/11 Response update required. It is clear that RAI No. 28 ML102980005

10/26/2010 TVA Letter dated 10/29/10, Encl 1

Item 34, and TVA

letter 11/24/10, Att. 2.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (ii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-1SP (June 2006) (iii) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-2SP (June 2008) (iv) Qualification Test Report Supplement, RM-1000 Upgrades 04508905-3SP (May 2008)

Please clarify whether all of thes e are fully applicable to WBN2 or are they applicable with exceptions? If with exceptions, then please clarify what those are.

Supplement 3 was issued one month prior to supplement 2.

Please explain the reason for the same. exception of re-qualification of certain RM-1000 equipment differences covered in the -1SP report. The Current-to-Frequency (I-F) converter module qualifications in the base report and the -1SP report are not applicable to the RM-1000s, and will be used later as references in the WBN Unit 2 specific qualification reports.

(ii) Applicable to WBN Unit 2. (iii) Not applicable to WBN Unit 2 (iv) Not applicable to WBN Unit 2 The 04508905-3SP report was prepared for another TVA plant, as a monitor system-level report, where the system included equipment mostly based on the base report equipment items. These two -2SP and -3SP supplement reports were essentially worked concurrently, but the -2SP document review/release process resulted in the release

time difference. TVA Response to Follow-up NRC Request:

NOTE: The response for the current to frequency (I to F) converter in item 1 below is a reversal of the response previously provided in TVA to NRC letter dated October 29, 2010 (Reference 22). General Atomics Electronic Systems Inc. (GA-ESI) notified TVA of this change on December 8, 2010 (Reference 20).

(1) The applicability of the qualification reports from GA-ESI e-mail dated December 10, 2010 (Reference 19

) is as follows:

a. 04508905-QR "Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 and I to F converter modules.
b. 04508905-1SP "Supplement to Qualification Test Report for RM-1000 Processor Module and Current-to-Frequency Converter" is applicable to the WBN Unit 2 RM-1000 module.
c. 04508905-1SP is not applicable to the WBN Unit 2 I to F converter module.
d. 04508905-2SP "Qualification Test Report Supplement, I-F Converter Upgrades" is applicable to the WBN Unit 2 I to F converter module.

GA-ESI provided two other reports required to support qualification of the containment high range radiation monitors. The report descriptions are from GA-ESI e-mail on December 8, 2010 (Reference 20). The reports are: QR. Staff version is QR only.

Response is included in letter dated 10/29/10 04508903-2SP and -

3SP are not applicable.

The response for applicability of 04508905-QR and -1SP to RM-1000 and IF converter is not clear.

Check pa g e numbers of Appendix F (missing/duplicate pages). Check applicability of Appendix C to RM1000 instead of RM2300? See items 336 and 337.

All equipment qualification reports including supplements 2SP and 3SP have been reviewed as vendor drawings for WBN-2. Please explain the reason for applicability of one report and not the other. Further all TVA/Bechtel reviews seems to be dispositioned as Code 4, "Review not required.

Work may proceed."

The applicable reports should have been reviewed prior to dispositioning them. Please explain the apparent lack of review of WBN-2 applicable documents. Was appropriate review guidance used?

Further update required Provide model number/part number for the RM-1000 and I/F converter used for WBN-2. This information is needed to verify that the model or part number used is the equipment that has been qualified for WBN-

2.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

e. GA-ESI report 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors:" The report is the principle report and the starting point for all

the radiation monitors provided as part of the replacement contract. The report describes each monitor; referenced to the technical manual for the physical and functional description and lists

the major components of the monitor system.

Report section 3 identifies the TVA Watts Bar Unit 2 Environmental, Seismic, Electromagnetic Compatibility (EMC), and software requirements for each monitor. In section 4 a brief description of GA-ESI generic qualification programs for all radiation monitoring equipment in each of the four above areas is provided. The qualification basis for each monitor is provided in a separate supplement to the principle report and is identified in section 5.

f. GA-ESI report 04038903-7SP, "Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274) [TVA Note: These are the containment post accident high range radiation monitors.]:" GA-ESI report 04038903-7SP is divided into subsections to address the Environmental, Seismic, EMC, and Software qualification basis for the High Range Area Monitors. Within each subsection, the HRAM is compared to a tested or analyzed article to demonstrate similarity and/or evaluate differences, the tests that were performed, and evaluation to demonstrate qualification. In most cases, the qualification basis references other documents. In addition to qualification, a section is provided that lists the life of those replaceable components that have life expectancy less than

40 years.

(2) This is addressed by response to RAI Question 336 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(3) This is addressed by response to RAI Question 337 in TVA to NRC letter dated November 24, 2010 (Reference 8)

(4) The 04508905-3SP Qualification Test Report Supplement, RM-1000 Upgrades" is not applicable to WBN Unit 2 (Reference 19).

Please see Item 1, above, for applicability of the other reports.

(5) TVA provided the proprietary versions of the reports by letter dated March 12, 2010 (Reference 10). By letter dated July 15, 2010 (Reference 23), TVA provided the non-proprietary version of the reports and included a copy of the proprietary report which had been Provide qualification reports 04038903-QSR and 04038903-7SP by the dues date of 1/22/11.

Submit a copy of any other relevant reviewed versions of the qualification reports.

Submit copies of the reviewed reports for 04508905-QR, 04508905-1SP, 04508905-2SP.

Clarification of applicability of existing reports is acceptable.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments erroneously marked as having not been reviewed. 04508905-QR report has been reviewed by TVA. The review of the remaining reports is ongoing.

(6) See item 5. TVA Response to Follow-up NRC Request:

The following documents are the qualification documents associated with the RM-1000 radiation monitors: Attachment 5 contains the approved proprietary version of General Atomics Electronic Systems 04508905-1SP, "Qualification Test Report Supplement, RM-1000 Upgrade." Attachment 6 contains the approved proprietary version of General Atomics Electronic Systems 04508905-2SP, "Qualification Test Report Supplement, I-F Converter Upgrades." Attachment 7 contains the approved proprietary version of General Atomics Electronic Systems 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)." Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear

Plant Unit 2 Replacement Radiation Monitors." In order to meet the NRC submittal schedule, the engineering review of this document was limited to the RM-1000. The document has been accepted for the RM-1000 monitors. Engineering approval will not occur until full review for all covered monitors is

complete.

Attachment 23 contains the approved proprietary version of General Atomics Electronic Systems 04508905-QR, "Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter."

327 DORL (Poole) Attachment 36 contains Foxboro proprietary drawings 08F802403-SC-2001 sheets 1 through 6. An affidavit for withholding and non-proprietary versions of the drawings will be submitted by January 31, 2011.

Responder: Webber

In accordance with correspondence from Foxboro, there is no proprietary information contained in the 08F802403-SC-2001 drawings. Based on this, no affidavit for withholding is required. Attachment 1 contains versions of the drawings with the proprietary information block removed.

13. Y Open Response Included in letter dated 11/24/10 Open-NRC Review

Due 11/24/10 335 7.6.1 7.6.7 EICB (Singh) LPMS: Reference to OI-331, sub item 2.

Provide analysis, test, or combined analysis and test for normal operating radiation, temperature, and humidity environment per regulatory position C.1.g of RG 1.133. As an alternate TVA may confirm that the required equipment has been qualified for the environments stated in RG 1.133, position C.1.g and that TVA has reviewed the test report and found it acceptable.

Responder: WEC TVA has reviewed the information provided by Westinghouse describing how the Loose Part Monitoring System (LPMS) sensor is qualified for normal operating conditions provided in Westinghouse letter WBT-D-2782, dated December 17, 2010 (Reference 11) as addressed in regulatory position C.1.g of Reg. Guide 1.133 and found it acceptable. The qualification information on the softline cable and charge converter/preamplifier is being assembled

14. Y Open Partial Response included in letter dated 12/22/10 Open-NRC Review Submit qual report by 3/11/11 as stated in TVA letter of 12/22/10, Encl 1, Item 28.

Due 12/22/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments and will be submitted by March 11, 2011.

Partial Response included in TVA to NRC letter dated December 22, 2010 (Reference 1).

Attachment 18 contains the proprietary version of EQ-EV-71-WBT-P, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2" dated February 2011 (Proprietary). Attachment 19 contains the non-proprietary version EQ-EV-71-WBT-NP, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2," dated February 2011. Attachment 20 contains the Application for Withholding Proprietary Information from Public Disclosure, EQ-EV-71-WBT-P, Revision 1, "Environmental Evaluation and Operating History of the Westinghouse DMIMS-DX Preamplifier and Softline Cable Used at Watts Bar 2,"

(Proprietar y) dated Februar y 18, 2011. 338 7.5.2.3 7.5 EICB (Singh) In page 3-15 and appendix B of Qualification Test Report 04508905-QR, licensee described the selection of seismic required response spectra (RRS) and indicated Figure 3-2 (page 3-17), Figure 3-3 (page 3-18) are the RRSs used. The RRS curves used for actual testing are lower than the RRS curves that are shown on Figures 3-2 and 3-3. The RRS curves used for testing are shown in Figure 4-5, 4-6, 4-7, 4-8, 4-11, 4-12, 4-13, and 4-14 (pages 4-25, 4-26, 4-28, 4-29, 4-37, 4-38, 4-40, 4-41). Please clarify and justify why the RRS curves used in actual tests are lower than the RRS curves determined in Figures 3-2 and 3-3.

In addition please justify that the RRS used for testing envelopes the RRS required for WBN-2 application specific seismic conditions. 04508905-QR, "Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter," (Attachment 23) documents the original baseline testing of the RM-1000 and current-to-frequency converter. The document has been revised to discuss the actual test spectra versus the required WBN response spectra used in the tests (see Attachment 22). 04508905-QR serves as a reference document for the WBN Unit 2 specific seismic qualification of the RM-1000 radiation monitors and current-to-frequency converters documented in 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)," (Attachment 7) and 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors," (Attachment 8). 04038903-7SP makes the comparison of the actual test response spectra used in 04508905-QR and the WBN required response spectra (see Attachment 22).

15. N Open Open-NRC Review Due: 339 7.5.2.3 7.5 EICB (Singh) In the Qualification Test Report 04508905-QR, the licensee provided only eight Safe Shutdown Earthquake (SSE) Test Response Spectra (TRS) as mentioned in the previous open item (OI-338). Please provide all SSE and Operating Basis Earthquake (OBE) TRS plots for NRC review. As agreed to with the reviewer, Attachment 1 contains the applicable ARS plots for Elevation 755 where the TRS does not envelope the RRS. Attachment 2 contains the applicable Wyle Test Report 41991 SSE TRS plots.
16. N Open Open-NRC Review Due: 2/25/11 340 7.5.2.3 7.5 EICB (Singh) Provide test result curves for all EMI/RFI tests listed in Table 3.2.3 (page 3-8) of the Qualification Test Report 04508905-QR. In addition, please provide the standards or the guidance documents used as the source for ENV 50140, ENV 55011 Class A, and EN 55022 Class B. Responder: GA The following responses are based on e-mail: GA-ESI to Bechtel, dated December 8, 2010 (Reference 20),

(1) The EMI/RFI tests described in Table 3-2 are based on GA-ESI report 04509050 and are summarized in GA-ESI report 04508905-QR. The independent laboratory report, with curves, is part of GA-ESI report 04509050.

Subsequent to issuing GA-ESI report 04508905-QR additional EMC testing was performed in accordance with TVA specific requirements. The results of the subsequent EMC testing are reported in GA-ESI report 04038800. GA-ESI report 04038800 includes the test

17. Y Open Response included in letter dated 12/22/10.

Open-NRC Review Provide the qual reports by 1/28/11 per TVA letter of 12/22/10.

Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments curves and the report is used as the basis for EMC qualification of the Upper and Lower Inside Containment Post Accident Radiation Monitors (2-RE-90-271 through -274). The results of the testing and the acceptability of the RM-1000 monitors for use at WBN Unit 2 are addressed in GA-ESI report 04038903-7SP. This report will be submitted no later than January 28, 2010.

(2) ENV 50140, EN 55011, and EN 55022 are British Standard Institution (BSI) publications concerning equipment electromagnetic and radio frequency performance. The standard titles are shown below:

a. ENV 50140 - Electromagnetic Compatibility - Basic Immunity Standard - Radiated Radio-Frequency Electromagnetic Field - Immunity Test
b. EN 55011 - Industrial, scientific and medical equipment - Radio-frequency disturbance characteristics - Limits and methods of measurement
c. EN 55022 - Information technology equipment -

Radio disturbance characteristics - Limits and methods of measurement TVA Response to Follow-up NRC Request:

The total EMI/RFI testing of the RM-1000 and current-to-frequency converter is documented in the following reports:

Attachment 5 contains the proprietary version of General Atomics Electronic Systems 04508905-1SP, "Qualification Test Report Supplement, RM-1000 Upgrade." See sections 5.1.1, 5.1.2 and 5.1.4 for EMI/RFI. Attachment 7 contains the proprietary version of General Atomics Electronic Systems 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274)." See section 5 for EMC qualification basis.

Attachment 8 contains the proprietary version of General Atomics Electronic Systems 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors." See section 3.4 for electromagnetic compatability qualification requirements. Attachment 23 contains the proprietary version of General Atomics Electronic Systems 04508905-QR, "Qualification Test Report for RM-1000 Processor Module and Current-To-Frequency Converter." See sections 3.2.1 through 3.2.5 and 6.2 for EMI/RFI.

Attachments 7 and 8 document the EMI/RFI testing specific to the WBN Unit 2 RM-1000 monitors and current-to-frequency converters.

346 7.5.2.3 7.5 EICB (Sing h) TVA has previously stated in response to open item 319 that RM-1000 System Verification Test Results report, 04507007-1TR is not applicable to WBN-2. However, TVA has not provided a WBN-2 Document 04507007-1TR is the RM-1000 System Verification Test Results. 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2

18. N Open Open-NRC Review Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments specific test results report. Please identify and provide the appropriate test results reports to complete the review. Replacement Radiation Monitors" (Attachment 8) and and 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274) (Attachment 7) are the Watts Bar Unit 2 equipment specific qualification reports.

The proposed response appears to be conflicting with the proposed response for OI-351 regarding not submitting the 04508905-QR report. TVA to re-assess proposed response for both OIs.

347 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-1SP does not address EMI/RFI qualification for the new RM-1000 modules. TVA to provide the updated qualification or explain the basis for not addressing the

EMI/RFI qualification. Qualification report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274)

(Attachment 7), addresses the EMI/RFI qualifications for the entire loop including the RM-1000 and current to frequency (I/F) converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in

04038903-7SP.

19. N Open Open-NRC Review Due: 2/25/11 348 7.5.2.3 7.5 EICB (Singh) Qualification report 04508905-2SP does not address EMI/RFI qualification for the new I/F converters. TVA to provide the updated qualification or explain the basis for not addressing the EMI/RFI qualification. Qualification report 04038903-7SP, Qualification Basis for 04034101-001 (2-RE-90-271, -272, -273, & -274), (Attachment 7) addresses the EMI/RFI qualifications for the entire loop including the RM-1000 & I/F converter. This report references 04038800, RM-1000 EMC Test Report, TVA, and the results are summarized in 04038903-7S P. 20. N Open Open-NRC Review Due: 2/25/11 349 7.5.2.3 7.5 EICB (Singh) Radiation testing was not considered in any of the test reports as all the equipment has been assumed to be located in nuclear power plant areas with mild environments and radiation dosages less than 1 x 10 3 rads for total integrated dose (TID). However, the radiation monitors and the I/F converters are located in the main control room which is defined as mild environment. For WBN-2 mild environment is defined as room or building zone where (1) the temperature, pressure, or relative humidity resulting from the direct effects of a design basis event (DBE) (e.g., temperature rise due to steam release) are no more severe than those which would occur during an abnormal plant operational condition, (2) the temperature will not exceed 130ºF due to indirect effects of a DBE, (3) the event radiation dose is less than or equal to 1 x 10 4 rads, and (4) the total event plus the 40 year TID (total integrated dose) is less than or equal to 5 x 10 4 rads (reference WB-DC-40-54). TVA to address lack of radiation qualification for

WBN-2. The design criteria provides the criteria for determining what is a mild environment at WBN Unit 2. Calculation WBNAPS4004 "Summar y of Mild Environment Conditions for Watts Bar Nuclear Plant" provides the actual values for each area of the plant. In accordance with Table 1, the Control Room has a 40 year maximum TID of 3.5x10 2 RAD and a maximum integrated accident dose of 710.5 RAD for a maximum TID of 1060.5 RAD.

The accident dose of 710.5 RAD is the dose for a 100 day LOCA at the surface of the HEPA filter in the Mechanical Equipment Room. This is documented in TVA calculation WBNTSR-005, "Dose Due to the Control Building Emergency Air Cleanup Filters" Revision 3. However, on page 25 of WBNTSR-005, the shine from this source into the control room is negligible and is not considered in the dose calculation for the control room.

Calculation WBNAPS3-126, "EQ Dose in the U1/U2 Auxiliar y Instrument Rooms and the Computer Room in the Control Building" Revision 0 documents the environmental qualification (EQ) radiation dose in the control building. A review of this document by the TVA radiation protection engineer determined that the TID including the normal and accident dose values for the control room is less than 1x10 3 RAD. Calculation WBNAPS3-126, will be revised to include the control room b y Jul y 1, 2011. Since the control room TID has been determined to be less than 1x10 3 RAD, radiation qualification of the RM-1000.

21. N Open Open-NRC Review Due: 2/25/11 TVA to provide the assessment document or a suumary of the document with the reference to the appropriate document/documents. 350 7.5.2.3 7.5 EICB (Singh) The seismic required response spectra (RRS) is shown in Figures 3-1 of 04508905-1SP and Figure 3-1 of 0458905-2SP report. The actual test response spectra are shown in Figures 4-5 and 4-6 of 04508905-QR report. The actual test response spectra does not The RM-1000 was seismically tested in a NIM Bin and the actual test response spectra fully envelopes the RRS of TVA Standard Specification CEB-SS-5.10 "For Seismic Qualification of Electrical, Mechanical and I&C Devices
22. N Open Open-NRC Review Due: 2/25/11 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments seem to fully envelope the RRS. However, this statement is based on visual reading of unidentified numbers. TVA to provide clarification to the values at the inflection point of all lines on the RRS and the actual test response spectra. The seismic qualification issue is open till further clarification is received from

TVA. Revision 3, (Attachment 3) Figure 3-1 as shown in Section 3.0, Figures 3-4 and 3-5 of 04038903-7SP, "Qualification Basis for 04034101 (2-RE-90-271, 272, 273 & 274) (Attachment 7). Seismic qualification of the WBN Unit 2 RM-1000 monitors is summarized in 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors" (Attachment 8).

323 EICB(Garg) WCAP-13869 revision 1 was previously reviewed under WBN Unit 1 SER SSER 13 (Reference 8). Unit 2 references revision 2. An analysis of the differences and their acceptability will be submitted

to the NRC by November 15, 2010 Responder: Hilmes/Unit 1 Attachment 12 contains the WCAP 13869 Revision 1 to Revision 2 Change Analysis.

TVA Response to Follow-up NRC Request A FSAR change will be submitted in a future FSAR amendment to change the revision level back to 1.

TVA Response to Second Follow-up NRC Request There is no technical difference between the Revision 1 and Revision 2 WCAPs. As documented in Attachment 12, "WCAP 13869 Revision 2 Change Analysis", to TVA to NRC letter dated October 29, 2010, the differences are all administrative clarifications. Since WBN Unit 2 is required to match the WBN Unit 1 licensing basis to the extent practical, the decision was made to revise the WBN Unit 2 FSAR to agree with the WBN Unit 1 FSAR which uses Revision 1.

1. Y Open Due 3/29/11 Revised Response is included in letter dated 10/29/10 The staff is confused with the response since both units have reference leg not insulated Rev 2 should apply to Unit 1 also and there should be no difference between Unit 1 and 2 Open-TVA/Bechtel Due: Need to provide additional info on why Rev. 1 is acceptable for both units. TVA Letter dated 10/29/10 Item

No. 36 344 7.6.6 ? Eicg(Garg) Unit 1 SE discussed in Section 7.6.5, "Valve Power Lockout". There is no section in FSAR which provides discussion on this subject. SE section discusses compliance with PSB-18. Provide a discussion which can be used by the staff to determine similar conclusion as Unit 1 and if the design is similar to Unit 1 then make a statement to that effect. Also provide the list of the valves where power lockout during normal reactor operation is utilized for valves whose inadvertent operation could affect plant safety. How do we meet the PSB? (a) In accordance with0PDP-6, "Locked Valve/Breaker Program," Revision 1 (Attachment 25), valves locked by design are shown on design output documents (flow diagrams, system descriptions, etc.). As documented in 0PDP-6, valves are locked for multiple reasons. It is anticipated that many of the valves that were locked to provide positive isolation between Unit 1 and Unit 2 will not be locked when Unit 2 becomes operational and will be removed from the locked valve program. At the same time, Unit 1 valves locked for operational/Appendix R/Single Failure criteria will result in the corresponding Unit 2 valves being locked.

(b) The list of valves locked by design is contained in 0-PI-OPS-17.0, "18 Month Locked Valve Verification," Revision 44 (Attachment 21). Valves locked out by opening the associated circuit breaker are listed in 0-PI-OPS-17.1, "18 Month Locked Breaker Verification," Revision 14 (Attachment 24).

TVA Response to Follow Up NRC Question SER Supplement 0, Section 8.3.1.8 states:

8.3.1.8 Application of the Single Failure Criterion to Manually Controlled Electrically Operated Valves - page 8-9 With regard to safety-related manually controlled, electrically operated valves, the staff asked the applicant to provide (1) an evaluation of all safety-related fluid systems to identify all such valves whose failure (that is, failure to

2. N Open ICSB-18 provides guidance on application of the single failure

criterion to manually controlled electrically operated valves..

According to this BTP, electrically operated valves

includes MOV, SOV and those valves operated indirectly by an electrical device, e.g.an air operated valves whose air

supply is controlled by an electrical solenoid valves.

FSAR Section 7.6.6 addresses only MOVs. If TVA has done an analysis to demonstrate compliance with the guidance of this BTP for Unit 1 and this analysis does not change for Unit 2 for other valves than TVA shouls make a statement to that effect. If there are changes to the analysis then justify those changes based on this BTP. Open-TVA/Bechtel Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments operate on demand or undesired spurious operation) could result in the loss of capability to perform a system safety function (2) a description of the means provided to meet the single-failure criterion in safety-related fluid s ystems where it is identified that a single failure, as defined above, would result in the loss of capability to perform the system safety function In response, the applicant identified 17 such valves and documented in Section 7.6.6 of the FSAR that the design for these valves consists of modified control circuits. The modified circuit utilizes redundant contacts which are wired before and after each opening and closing coil. Based on its review of the information provided by the applicant, the staff concluded that the above provisions are in accordance with BTP ICSB 18 of SRP Appendix 8-A, with the exception of redundant valve position indication.

Subsequentl y, the applicant stated that the method of lockin g out power with the required redundant instrumentation is shown on electrical drawing 45W760-63-2 Based on this drawing, the staff concludes that the design meets the staff's position and is acceptable.

SER Supplement 5 states:

6.3.2 Evaluation, Page 6-3, Supplement 5 In the SER, the staff stated that the applicant will lock out power from certain valves in the emergency core cooling system (ECCS) whose misalignment might affect ECCS effectiveness. Some of these valves would be required to operate following a LOCA, and the manual restoration of power would add to post-accident operational complexity. By letters dated September 15, 1982, and April 10, 1985, the applicant stated Watts Bar would use modified control circuits for these valves to ensure that no sin gle failure would be able to energize the opening or closing coils of the valve operators. The design uses redundant contacts that are wired before and after each opening and closing coil. In addition, clear protective covers will be attached to the main control board over each respective control switch to prevent inadvertent actuation. As discussed in SER Sections 7.6.4 and 8.3.1.8, the staff found this design acceptable. Accordingly, power will not be locked out from the following valves during operation:

(1) hot-leg injection line valves (2) valves from residual heat removal (RHR) discharge to safety injection (SI) and charging pump suction (3) RHR suction valves from containment sump (4) RHR discharge valves

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (5) SI pump suction valve from refueling water storage tank (6) SI miniflow valve In addition, the applicant evaluated other valves that may be used for SI miniflow, RHR to SI cross-connect, and SI injection, but for which the consequences of single failure would be acceptable. Power will also not be locked out from these valves. This revision is acceptable to the staff. This review was tracked under TAC 63630.

The design of WBN Unit 2 mirrors the design WBN Unit 1. As a result, the locked valves for PSB-18 are the same for WBN Unit 2 as for WBN Unit 1 and the list in the Unit 2 FSAR Section 7.6.6 is accurate for Unit 2.

345 7.5.2.3 7.5 EICB (Singh) Provide the normal temperatures and expected periods of high/low temperature excursions to assess aging requirements. TVA to further clarify if 86ºF for 40 years was used as the qualification requirement for aging tests. This has been stated in some of the subsections under section 4.2 of the 04508905-QR report but the

rationale for using 86ºF (includes an internal temperature rise of 18ºF) for 40 years has not been justified in the 04508905-QR report or the supplement reports.

TVA to provide the rationale for this acceptance criteria for WBN-2.

Check on verification of the 40 y ear life of the rad monitors. How is this explained.

RM-1000 in a NIM Bin was Tested at 39°F for 72 Hrs and Tested at 131°F for 72 Hrs per Section 4.2.6 of 04508905-QR. This is stated in document 04038903-7SP, Section 2.1.

The ambient temperature used for aging was 86°F(30°C).

The NIM Bin has perforated holes in top and bottom covers

and has an average internal temperature rise of approximately 18 °F due to natural air convection. So the average internal temperature used for aging was 104°F (40°C) In accordance with Attachment 8, 04038903-QSR, "Qualification Summary Report for Watts Bar Nuclear Plant Unit 2 Replacement Radiation Monitors" Section 3.2, the aging is to an ambient equivalent condition of 104°F which is based on an 86°F average ambient temperature of the environment and an enclosure temperature rise of 18°F.

IEEE Std 1205-2000, Table D.8 shows that the upper bounding temperature is 104°F for all plant areas except the reactor building. The intent in qualifying the part for 40 years is to identify each component's failure mechanisms and to determine whether 40 years 1 of aging has a significant effect of these failure mechanisms.

1The design life goal for most Class 1E equipment is 40 years, but for most electronic assemblies 20 years, or less, is more realistic. Because of rapidly changing technologies, replacement components sometimes become unavailable in a relatively short period of time.

3. N Open Open-TVA/Bechtel

Due: 2/25/11 334 7 7 EICB (Darbali) FSAR Figure 7A-3 "Mechanical Flow and Control Diagram Symbols" doesn't show the symbols for the first column of valves.

Please correct this in a future FSAR amendment.

Update: Please fix s ymbols for Gate Valve, Globe Valve and Float operated valve. Responder: Stockton

1. Y Open Figure will be corrected in FSAR

Amendment 103. Open-TVA/Licensing

RAI not required. N/A RAI not required because the figure is not part of any SE section.

341 7.5.2.3 7.5 EICB (Singh) FSAR Tables 3.10 list seismically qualified equipment. However, these tables do not list the containment high range radiation monitors. Please add them to the appropriate FSAR table(s) or justify why they should not be included in the FSAR 3.10 series of tables. A review of WBN Unit 2 FSAR amendment 102 chapters 3.10, 11 and 12 was performed. The reviewer was unable to locate seismic qualification information for the radiation monitoring system in those chapters. A review of chapter 3.11 confirmed that radiation monitoring is included in the environmentally qualified systems.

2. Y Open FSAR section 3.10 will be updated in Amendment 103. Open-TVA/Licensing Will be closed on update of FSAR 3.10 series tables.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments It appears that seismic qualification of the radiation monitoring equipment was unintentionally omitted from FSAR chapter 3.10. FSAR chapter 3.10 will be updated to include the qualified radiation monitoring equipment in FSAR

amendment 103.

092 DORL (Poole) 5/20/2010 TVA to review Licensee Open Item list and determine which items are proprietary.

Responder: Hilmes This item will close when we are no longer using this document as a communications tool.

1. Y Open Open-TVA/Oversight Due: SER Issue Continuous review as items are added 041 7.5.2 7.5.1 EICB (Carte) 2/19/2010 Please provide the following Westinghouse documents:

(1) WNA-DS-01617-WBT Rev. 1, "PAMS System Requirements

Specification" (2) WNA-DS-01667-WBT Rev. 0, "PAMS System Design Specification" (3) WNA-CD-00018-GEN Rev. 3, "CGD for QNX version 4.5g" Please provide the following Westinghouse documents or pointers to where the material was reviewed and approved in the CQ TR or SPM: (4) WNA-PT-00058-GEN Rev. 0, "Testing Process for Common Q Safety systems" (5) WNA-TP-00357-GEN Rev. 4, "Element Software Test Procedure" Responder: WEC Items (1) and (2) were docketed by TVA letter dated April 8, 2010.

Item (3) will be addressed by Revision 2 of the Licensing Technical Report. Due 12/3/10

Item (4) will be addressed by Westinghouse developing a WBN2 Specific Test Plan to compensate for the fact that the NRC disapproved WNA-PT-00058-GEN during the original Common Q review. Due 12/7/10

Item (5) Procedures that are listed in the SPM compliance table in the Licensing Technical Report revision 1 supersede that test procedure WNA-TP-00357-GEN.Due 10/22/10

For Item 3, Attachment 19 contains the Westinghouse document "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision

2, dated December 2010. Attachment 20 contains the Westinghouse Application for Withholding for the "Post-Accident Monitoring System (PAMS) Licensing Technical Report," WNA-LI-00058-WBT, Revision 2, dated December 2010.

For Item 4, Attachment 9 contains the Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 contains the Westinghouse Application for Withholding for the WNA-PT-00138-WBT, Revision 0 "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects, Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 17, 2010.

TVA Response to Follow-up NRC Request As agreed, a revised test plan document will not be submitted. The issues with the WNB Unit 2 test plan document WNA-PT-00138-WBT Rev. 0 will be addressed by submitting a non-proprietary WBN Unit 2 specific Test

Summary Report.

1. N Open Pending Submittal of the Test Summary Report due 3/29/11 Final Response included in letter dated 12/3/10 Partial Response is included in letter dated 10/5/10.

The SysRS and SRS incorporate requirements from many other documents by reference.

NNC 8/25/10: (3) An earlier version of this report was docketed for the Common Q topical report; therefore, there should be no problem to docket this version. (4) Per ML091560352, the testing process document does not address the test plan requirements of the SPM. Please provide a test plan that implements the requirements of the SPM. Open-TVA/WEC Due 3/29/11

NNC 1/27/11:

Issues with the STP were discussed in the weekl y public meetings.

Westinghouse to:

(1) perfrom STP self assessment., and (2) Augment Test Summary report to provide missing test plan information

NNC 2/3/11:

At next audit compare & discuss: (1) WNA-PT-00058-GEN Rev. 0

(2) WNA-PT-00138-WBT Rev. 0 (3) AP1000 STP NRC Meeting Summary NRC Meeting Summary

ML093560019, Item

No. 11 TVA Letter dated 6/18/10 TVA Letter dated

10/5/10 See also Open Item Nos. 226 & 270.

043 7.5.2 7.5.1 EICB (Carte) 2/19/2010

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the information Responder: WEC Date: 5/25/10

The PAMS ISG6 compliance matrix supplied as Enclosure 1 to TVA letter dated February 5, 2010 is a first draft of the

2. N Open Pending Submittal of Revision 3 of the Licensing Technical Open-TVA/WEC

Due 3/29/11

EICB RAI ML102910002

Item No. 2 TVA Letter dated 2/5/10

TVA Letter dated NNC 8/25/10:

A CQ PAMS ISG6 compliance matrix was docketed on: (1)

February, 5 12010, (2) March 12, 2010,

& (3) June 18, 2010. The staff has Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments needed. The shortcomings of the firs t three lines in the matrix are:

Line 1: Section 11 of the Common Q topical report did include a commercial grade dedication program, but this program was not approved in the associated SE. Westinghouse stated that this was the program and it could now be reviewed. The NRC stated that TVA should identified what they believe was previously reviewed and approved.

Line 2: TVA stated the D3 analysis was not applicable to PAMS, but provided no justification. The NRC asked for justification since SRP Chapter 7.5 identified SRM to SECV-93-087 Item II.Q as being SRP acceptance criteria for PAMS.

Line 3: TVA identified that the Design report for computer integrity was completed as part of the common Q topical report. The NRC noted that this report is applicable for a system in a plant, and the CQ topical report did no specifically address this PAMS system at Watts Bar Unit 2.

NRC then concluded that TVA should go through and provide a more complete and thorough compliance matrix.

information needed.

By letter dated April 8, 2010 TVA provided the PAMS Licensing Technical Report provided additional information.

contains the revised Common Q PAMS ISG-6 Compliance Matrix, dated June 11, 2010, that addresses these items (Reference 13).

By letter Dated June 18, 2010 (see Attachment 3) TVA provided a table, "Watts Bar 2 - Common Q PAMS ISG-6 Compliance Matrix."

It is TVA's understanding that this comment is focused on the fact that there are documents that NRC has requested that are currently listed as being available for audit at the Westinghouse offices. For those Common Q PAMS documents that are TVA deliverable documents from Westinghouse, TVA has agreed to provide those to NRC.

Westin ghouse documents that are not deliverable to TVA will be available for audit as stated above. Requirements Traceability Matrix issues will be tracked under NRC RAI Matrix Items 142 (Software Requirements Specification) and 145 (System Design Specification). Commercial Item Dedication issues will be tracked under NRC RAI Matrix Item 138. This item is considered closed.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC

requests:

(1) While RSEDs are not specifically mentioned, Section 7 has been revised to be applicable to both hardware and

software which includes the RSEDs.

(2) Table 6-1 item 15 reference added for WNA-VR-00280-WBT (RESD)

TVA Response to Second Follow-up NRC Request:

This item will be addressed by updating the Compliance Matrix in the Licensing Technical Report and by adding a System Requirements Specification Compliance matrix to the Revision 3 of the Licensing Technical Report. Report due 3/29/11.

Revised response included in letter dated 12/22/10.

Response is included in letter dated 10/5/10.

Revised compliance matrix is unacceptable.

NNC 8/12/10:

It is not quite enough to provide all of the documents requested. There are two possible routes to review that the NRC can undertake: (1) follow ISG6, and (2) follow the CQ SPM. The TVA response that was originally pursued was to follow ISG6, but some of the compliance items for ISG6 were addressed by referencing the SPM. The NRC approved the CQ TR and associated SPM; it may be more appropriate to review the WBN2 PAMS application to for adherence to the SPM that to ISG6. In either path chosen, the applicant should provide documents and a justification for the acceptability of any deviation from the path chosen. For example, it appears that the Westinghouse's CDIs are commercial grade dedication plans, but Westinghouse maintains that they are commercial grade dedication reports; this apparent deviation should be justified or explained. NNC 2/2/11:

Issues with Common Q TR &

SPM compliance were discussed in the weekl y public meetings.

Westinghouse to perform Common Q TR & SPM compliance self assessment; his will be discussed in detail on the next audit.

5/12/10 TVA Letter dated 6/18/10

TVA Letter dated 10/5/10 expressed issued with all of these compliance evaluations. The staff is still waiting for a good compliance evaluation.

NNC 11/23/10: WNA-LI-00058-WT-P Rev. 1 Section 7 does not include the RSED documents, and it should. Table 6-1 Item No. 15 should also include the

RSED RTMs.

067 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Commercial Grade Dedication Instructions for AI687, AI688, Upgraded PC node box and flat panels." was September 28, 2010.

Responder: WEC Date: 5/25/10 The following status is from the revised WB2 Common Q PAMS ISG-6 Compliance Matrix submitted in response to

Item 43:

a. AI687, AI688 - Scheduled for September 28, 2010
b. Upgraded PC node box and flat panel displays - Per Westinghouse letter WBT-D-2024 (Reference 7

), these items are available for audit at the Westinghouse Rockville office.

3. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response included in letter dated 12/22/10.

This item is addressed in Rev. 2 of the Licensing Technical Report Open-TVA/WEC Due: 3/29/11

NNC 2/2/11:

Section 7 of the WBN2 PAMS LTR should be updated to include:

(1) non-proprietary description of commercial grade N/A - No question was asked. Item was opened to track comm8ittment made by applicant. TVA Letter dated 6/18/10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments c. Power supplies - Per Westinghouse letter WBT-D-2035 (Reference 12), these items are available for audit at the Westinghouse Rockville office.

To be addressed during 9/20-9/21 audit TVA Response to Follow-up NRC Request:

WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 7, "Commercial Grade Dedication Process," has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied. dedication, and (2) Software example Commercial grade

dedication will also be

addressed at the next audit. 069 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the "Watts Bar 2 PAMS Specific FAT Report" was October 2010.

As agreed, the Watts Bar 2 PAMS Specific FAT Report will not be submitted. Instead a non-proprietary PAMS Test Summary Report will be submitted.

Responder: WEC Date: 5/25/10

4. N Open Pending Submittal of the Test Summary Report due 3/29/11 Awaiting for document to be docketed by TVA.

Open-TVA/WEC Due 3/29/11

NNC 2/3/11: The current due dated above is 4 months later than planned. N/A - No question was asked. Item was opened to track comm8ittment made by applicant.

N/A 074 7.5.2 7.5.1 EICB (Carte)

B y letter dated March 12, 2010 TVA stated that the tar g et submittal date for the Post FAT IV&V Phase Summary Report was November 30, 2010.

Responder: WEC Date: 5/25/10

5. N Open Pending Submittal of Revision 4 of the IV&V Phase Report due 3/29/11. Open-TVA/WEC

Due TBD NNC 2/3/11:

At least 3 months later than planned. N/A - No question was asked. Item

was opened to track commitment made by applicant. N/A Rev. 4 will be available for the NRC audit on 2/28/11. This document will not be submitted. Rev. 5 will be submitted after resolution of the datastorm display issue. 138 EICB (Carte) By letter dated February 3, 2010, Westinghouse informed TVA that certain PAMS documentation has been completed.

(a) The draft ISG6 states that a commercial grade dedication plan should be provided with an application for a Tier 2 review.

By letter dated February 5, 2010, TVA stated that the commercial grade dedication plan was included in the Common Q Topical Report Section 11, "Commercial Grade Dedication Program." Section 11 includes a description of the Common Q Commercial Grade Dedication Program, and states: "A detailed review plan is developed for each Common Q hardware or software component that requires commercial grade dedication."

Please provide the commercial grade dedication plans for each Common Q hardware or software component that has not been previously reviewed and approved by the NRC.

(b) The draft ISG6 states that a commercial grade dedication report should be provided within 12 months of requested approval for a Tier 2 review.

(i) Please provide 00000-ICE-37722 Rev. 0, "Commercial Grade Dedication Report for the QNX Operating System for Common Q Responder: WEC This item is used to track all Commercial Grade Dedication issues.

a. WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following changes to address the NRC request:

Section 7, "Commercial Grade Dedication Process" has been revised to describe the general commercial grade dedication process for both hardware and software and uses a description of the AI687 dedication process as an example of how the process is applied.

As listed in Table 6-3. "Westinghouse Watts Bar 2 Common Q PAMS Documents at Westinghouse Rockville Office, the following commercial grade dedication documents are available for NRC audit at the Westinghouse Rockville office: (list included in letter)

b. It is TVA's understanding that the submittal of the
6. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10 TVA agreed to include a description of the generic Westinghouse hardware commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 1)

TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial Westinghouse hardware components against the generic critical characteristics. (see Open-TVA/WEC NNC 2/2/11:

Commercial grade dedication will be addressed at the next audit.

NNC 2/17/11:

The description of the commercial grade dedication process in

the CQ PAMS LTR Rev. 2 should be updated to include a non-proprietary description and to include a software example. ML101650255, Item No. 2 See also No. 82.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Applications."

(ii) Please provide WNA-CD-00018-GEN Rev. 3, "Commercial Dedication Report for QNX 4.25G for Common Q Applications." documents listed in (b.i) and (b.ii) is no longer required. Rather, it was agreed, that the inclusion of a description of the commercial grade dedication process in revision 2 of the Post-Accident Monitoring System (PAMS)

Licensing Technical Report, WNA-LI-00058-WT-P, would be sufficient to address this request.

ML102920031 Item No 2)

TVA agreed to include a description of the generic Westinghouse software commercial grade dedication process in the PAMS licensing technical report. (see ML102920031 Item No 3)

TVA agreed to include (in the PAMS licensin g technical report) an evaluation of WBN2 critical characteristics for commercial software components against the generic critical characteristics. (see ML102920031 Item No 4) 144 EICB (Carte) The WBN2 PAMS Software Requirements Specification (WBN2 PAMS SRS) contains a table (see page iii) titled, "Document Traceability & Compliance," which states that the WBN2 PAMS

SRS was created to support the three documents identified (two of these documents have been provided on the docket).

(a) Please describe the third document (i.e., NABU-DP-00014-

GEN Revision 2, "Design Process for Common Q Safety Systems").

(b) Please describe the flow of information between these three documents.

(c) Does the PAMS SRS implement the requirements in these three documents?

(d) Please describe if and how these three documents are used in the development of the PAMS Software Design Description.

(e) Do the WBN2 V&V activities include verification that the requirements of these three documents have been incorporated

into the WBN2 PAMS SRS.

Responder: WEC (a) The purpose of NABU-DP-00014-GEN document is to define the process for system level design, software design

and implementation, and hardware design and implementation for Common Q safety system development. This document supplements the Common Q SPM, WCAP-16096-NP-A. The scope of NABU-DP-00014-GEN includes

the design and implementation processes for the application development. For a fuller description of the design process described in NABU-DP-00014-GEN please refer to the Design Process for AP1000 Common Q Safety Systems, WCAP-15927 on the AP1000 docket. Since this is a Westinghouse process document that is not specifically referenced in the SRS, it will be removed in the next revision

of the document.

(b) - Closed to items 142 and 145 (c) - Closed 142 (d) - Closed to Item 142 (e) WBN2 PAMS Software Requirements Specification (WNA-SD-00239-WBT, Rev. 1) refers to Document Traceability & Compliance table on page iii. This table has three entries; Design Process for Common Q Safety Systems (NABU-DP-00014-GEN, Rev. 2), RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Requirements Specification (WNA-DS-01617-WBT, Rev. 1), and RRAS Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification (WNA-DS-01667-WBT, Rev. 1).

IV&V performed a Requirements Traceability Assessment

during which it reviewed Software Requirements Specification (WBN2 PAMS SRS, WNA-SD-00239-WBT, Rev. 1) against System Requirements Specification (WNA-DS-01617-WBT, Rev. 1) and System Design Specification

7. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10 Response provided in letter dated 10/5/10 NRC Review and WEC to complete response.

b-d to be addressed at public meeting and audit. Will require information to be docketed.

Open-TVA/WEC Due 3/29/11

Responses to items a and e provided.

NNC 11/18/10:

(1) Items b-d closed to other Open Item nos. (2) The point of these questions was to

understand how the origin of the requirements in the

requirements specifications were documented. TVA stated that the origin of the requirements would

be demonstrated in

Rev. 2 of the CQ PAMS LTR.

NNC 2/3/11:

CQ PAMS LTR Rev. 2 Section 11 & 12 do not adequately

demonstrate the origin

of requirements in SysRS. TVA to describe how to

address concern.

ML101650255, Item No. 8 TVA Letter dated 10/5/10 WBN2 PAMS Software Requirements Specification

By letter dated April 8, 2010 (ML10101050203), TVA docketed WNA-SD-00239-WBT, Revision 1, ""RRAS Watts Bar 2 NSSS Completion Program I&C Projects, Software Requirements Specification for the Post Accident Monitoring System," dated February 2010 (ML101050202).

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments (WNA-DS-01667-WBT, Rev. 1). Requirements within Software Requirements Specification that are referring to NABU-DP-00014-GEN, Rev 2, Design Process for Common Q Safety Systems, have also been reviewed for traceability and compliance. During IV&V's RTA effort the anomaly reports V&V-769 and V&V- 770 have been initiated and reported in the IV&V Phase Summary Report for the System Definition Phase, WNA-VR-00283-WBT, Rev. 0.

IV&V has verified that the requirements in SRS are derived from the specified documents listed in the Document Traceability and Compliance Table of WBN2 PAMS SRS.

TVA Response to Follow-up NRC Request:

(1) Item (a) in the original list, NABU-DP-00014-GEN Revision 2, "Design Process for Common Q Safety Systems," is available for NRC audit at the Westinghouse Rockville office.

(2) WNA-LI-00058-WT-P, Revision 2, "Post-Accident Monitorin g S ystem (PAMS) Licensin g Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, (Reference 1) contains the following change to address the NRC request:

Section 11, "TVA Contract Compliance Matrix" showing the origin of the requirements was added.

TVA Response to Second Follow-up NRC Request:

This item will be addressed by updating the Compliance Matrix in the Licensing Technical Report and by adding a System Requirements Specification Compliance matrix to the Revision 3 of the Licensing Technical Report.

183 EICB (Carte) 7/15/2010

An emphasis is placed on traceability in System Requirements Specifications in the SRP, in the unmodified IEEE std 830-1993, and even more so given the modifications to the standard listed in Regulatory Guide 1.172, which breaks with typical NRC use of the word "should" to say "Each identifiable requirement in an SRS

must be traceable backwards to the system requirements and the design bases or regulatory requirements that is satisfies" On page 1-2 of the Post Accident Monitoring System's Software Requirements Specification in the background section, is the sentence "Those sections of the above references that require modification from the generic PAMS are defined in the document" referring purely to the changes from WNA-DS-01617-WBT "Post Accident Monitoring System-System Requirements Specification" or is it saying that there are additional changes beyond those and that the SRS defines them?

If there are additional changes, what is their origin?

Responder: WEC

The generic Software Requirements Specification applies except as modified b y the WBN Unit 2 S y stem Requirements Specification.

TVA Response to Follow-up NRC Request:

Please see the response to RAI item 12 in letter dated 12/22/10, NRC Matrix Item 144.

TVA Response to Second Follow-up NRC Request:

This item will be addressed by updating the Compliance Matrix in the Licensing Technical Report and by adding a System Requirements Specification Compliance matrix to the Revision 3 of the Licensing Technical Report.

8. Y Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Revised response included in letter dated 12/22/10.

Response provided in letter dated 10/21/10 Open-TVA/WEC

Due 3/29/11

NNC 11/18/10: The point behind this open item was that TVA must

demonstrate that the

origin of each requirement in the WEC requirements specification is known

and documented. TVA stated that this information would be in CQ PAMS LTR Rev. 2.

NNC 2/3/11:

CQ PMS LTR Rev. 2 Sections 11

& 12 do not prove this

information. TVA to proive a plan to address requested EICB RAI ML102980066 Item

No. 9 TVA Letter dated 10/21/10 Item

No. 4 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments information.

202 7.5.2 EICB (Carte) 7/22/2010 The letter (ML0003740165) which transmitted the Safety Evaluation for the Common Q topical report to Westinghouse stated: "Should our criteria or regulations change so that our conclusions as to the acceptability of the report are invalidated, CE Nuclear Power and/or the applicant referencing the topical report will be expected to revise and resubmit their respective documentation, or submit justification for continued applicability of the topical report without revision of the respective documentation." Question No 81 identified many criteria changes; please revise the respective documentation or submit justification for continued applicability of the topical report.

Responder: WEC Revision 1 of the Licensing Technical Report will provide more detailed information on the changes to the platform.

Rev. 2 of the Licensing Technical Report will include the applicability of guidance.

TVA Response to Follow-up NRC Request:

WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" (LTR) submitted in TVA Letter to NRC dated December 3, 2010, contains the following change to address the NRC

request: Section 9, "Compliance Evaluation of the Watts Bar 2 PAMS Software Requirements Specification to IEEE Standard 830-

1998 and Regulatory Guide 1.172" to show the origin of the requirements has been added.

The descriptions and commitments in the Topical Report (TR) still apply. The LTR provides compliance evidence to the new ISG-04 criteria. The statement in the SE means that the TR can be evaluated against later NRC criteria when it

appears.

Source: E-mail from Westinghouse (Matthew A. Shakun) to Bechtel (Mark S. Clark), RE: December 22 letter review, dated December 17, 2010

Partial TVA Response to Follow-up NRC Request:

contains the results of the TVA analysis of standards and regulatory guides applicable to the Common Q PAMS. Based on the results of the analysis, the Common Q PAMS design is acceptable.

The final response is pending submittal of the Licensing Technical Report Revision 3 scheduled for March 29, 2011.

9. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response included in letter dated 12/22/10 Partial Response provided in letter dated 10/5/10 NNC 1/5/11:

Summary provided in Licensing Technical Report R2 has been reviewed and found to be unacceptable.

LTR Section 9 evaluates the compliance of the SRS to IEEE 830-1998. There are two issues with this evaluiation: (1) IEEE 830-1998 is not the current SRP acceptance criteria.

IEEE 830-1998 has not been formally endorsed by a regulatory guide.

(2) Westinghouse committed to evaluate the SRS against 830 when the NRC identified several inconsistencies.

Yes ISG-4 is one new criteria, and an evaluation against it has been provided.

In addition, LTR Rev. 2 Section 13 states: "The applicable NRC regulatory guides, IEEE and EPRI industry standards fo the common Q PAMS are shown below. Compliance to these codes and standards are stated in Section 4 of Reference 1."

Reference 1 is the common Q topical report.

Open-TVA/WEC Due 2/25/11 &

3/29/11 to provide information requested.

Due TBD EICB RAI ML102980066 Item No. 4 TVA Letter dated 10/5/10 NNC 1/5/11:

See Also Open Item No.

81 and 86.

212 7.5.2 EICB (Carte) 7/27/2010

By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Design Report on Computer

Integrity, Test and Calibration..." The staff has reviewed these documents, and it is not clear how this is the case.

(1) Please describe how the information provided demonstrates Responder: WEC

Application specific requirements for testing. This cannot be addressed in a topical report. Evaluation of how the hardware meets the regulatory requirements.

WEC to provide the information and determine where the information will be located.

10. N Open Response included in letter

dated 12/22/10.

Open-TVA/WEC EICB RAI ML102980066 Item

No. 10 Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments compliance with IEEE 603-1991 Clauses 5.5, 5.7, 5.10, & 6.5.

(2) Please describe how the information provided demonstrates conformance with IEEE 7-4.3.2-2003 Clauses 5.5 & 57.

IEEE-603 1991:

5.5 System Integrity. The safety systems shall be desi gned to accomplish their safet y functions under the full range of applicable conditions enumerated in the design basis.

TVA Response: The applicable conditions and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" submitted in TVA Letter to NRC dated December 3, 2010, Section 11, "Contract Compliance Matrix" items: 87 and 88 Seismic 89, 90, 91, 92 and 185 EMI/RFI 300, 301 and 302 Environmental 5.7 Capability for Test and Calibration. Capability for testing and calibration of safety system equipment shall be provided while retaining the capability of the safety systems to accomplish their safety functions.

The capability for testing and calibration of safety system equipment shall be provided during power operation and shall duplicate, as closely as practicable, performance of the safety function. Testing of Class 1E systems shall be in accordance with the requirements of IEEE Std 338-1987. Exceptions to testing and calibration during power operation are allowed where this capability cannot be provided without adversely affecting the safety or operability of the generating station. In this case:

(1) appropriate justification shall be provided (for example, demonstration that no practical design exists), (2) acceptable reliability of equipment operation shall be otherwise demonstrated, and (3) the capability shall be provided while the generating station is shut down.

TVA Response: The requirements for test and calibration and Common Q PAMS system compliance, are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing

Technical Report" Section 11, "TVA Contract Compliance Matrix" items: 202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.10 Repair. The safety systems shall be designed to facilitate timely recognition, location, replacement, repair, and adjustment of malfunctioning equipment.

TVA Response: The requirements for repair and NNC 2/17/2011:

IEEE 603 Clause 5.5 basically states that conditions identified in IEEE 603 Clauses 4.7

& 4.8 must be addressed in the design. Energy supply conditions have not been identified, or explicitly addressed.

NNC 2/18/11: Clause 5.7 is acceptably addressed.

NNC 2/18/2011:

WNA-AR-00189-WBT Rev. 0 Table 5-2 shows a MTTR of 7.2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br />. It Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11, "TVA Contract Compliance Matrix" items: 179 Mean time to repair 202 self test 398 3.7 Maintenance 399 3.7.1 Troubleshooting 6.5 Capability for Testing and Calibration

6.5.1 Means shall be provided for checking, with a high degree of confidence, the operational availability of each sense and command feature input sensor required for a safety function during reactor operation. This may be accomplished in various ways; for example:

(1) by perturbing the monitored variable, (2) within the constraints of 6.6, by introducing and varying, as appropriate, a substitute input to the sensor of the same nature as the measured

variable, or (3) by cross-checking between channels that bear a known relationship to each other and that have readouts available.

6.5.2 One of the following means shall be provided for assuring the operational availability of each sense and command feature required during the post-accident

period:

(1) Checkin g the operational availabilit y of sensors b y use of the methods described in 6.5.1.

(2) Specifying equipment that is stable and retains its calibration during the post-accident time period.

TVA Response: The requirements for sense and command feature testing and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract Compliance Matrix" items: 10, display of sensor diagnostic information 202 self test 205 self diagnostics and watchdog timer 264 through 271, system self checks 311 system status displays, 341 alarms, 344 on-line diagnostics IEEE 7-4.3.2-2003 5.5 System integrity In addition to the system integrity criteria provided by IEEE Std 603-1998, the following are necessary to achieve system integrity in digital equipment for use in safety systems:

- Design for computer integrity

- Design for test and calibration is not clear how this satisfies the contractual item No.

179.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments

- Fault detection and self-diagnostics 5.5.1 Design for computer integrity The computer shall be designed to perform its safety function when subjected to conditions, external or internal, that have significant potential for defeating the safety function. For example, input and output

processing failures, precis ion or round off problems, improper recovery actions, electrical input voltage and frequency fluctuations, and maximum credible number of coincident signal changes.

If the system requirements identify a safety system

preferred failure mode, failures of the computer shall not preclude the safety system from being placed in that mode. Performance of computer system restart operations shall not result in the safety system being

inhibited from performing its function.

TVA Response: Common Q PAMS system reliability and failure modes are described in: WNA-AR-00180-WBT, Revision 0, "Failure Modes and Effects Anal y sis (FMEA) for the Post Accident Monitoring System" WNA-AR-00189-WBT, Revision 0 "Post Accident Monitoring System Reliability Analysis" The requirements for mean time between failure and Common Q PAMS s ystem compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report," Section 11 "TVA Contract Compliance Matrix" item 178.

5.5.2 Design for test and calibration Test and calibration functions shall not adversely affect the ability of the computer to perform its safety function. Appropriate bypass of one redundant channel is not considered an adverse effect in this context. It shall be verified that the test and calibration functions do not affect computer functions that are not included in a calibration change (e.g., setpoint

change). V&V, configuration management, and QA shall be required for test and calibration functions on separate computers (e.g., test and calibration computer) that provide the sole verification of test and calibration data. V&V, configuration management, and QA shall be required when the test and calibration function is

inherent to the computer that is part of the safety system.

V&V, configuration management, and QA are not required when the test and calibration function is resident on a separate computer and does not provide the sole verification of test and calibration data for the computer that is part of the safety system.

Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments TVA Response: The requirements for test and calibration and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Revision 2, "Post-Accident Monitoring System (PAMS) Licensing

Technical Report" Section 11 "TVA Contract Compliance Matrix" items: 202 self test 350 Maintenance Bypass 351 Loop Tuning Parameters, 400 and 401 3.7.2 Testing, Calibration, and Verification 402, 403 and 404, 3.7.3 Channel Bypass or Removal from Operation 5.5.3 Fault detection and self-diagnostics Computer systems can experience partial failures that can degrade the capabilities of the computer system, but may not be immediately detectable by the system. Self-diagnostics are one means that can be used to assist in detecting these failures. Fault detection and self-diagnostics requirements are addressed in this sub-clause.

The reliability requirements of the safety system shall be used to establish the need for self-diagnostics. Self diagnostics are not required for systems in which failures can be detected by alternate means in a timely manner. If self-diagnostics are incorporated into the system requirements, these functions shall be subject to the same V&V processes as the safety system functions.

If reliability requirements warrant self-diagnostics, then computer programs shall incorporate functions to detect and report computer system faults and failures in a timely manner. Conversely, self-diagnostic functions shall not adversely affect the ability of the computer system to perform its safety function, or cause spurious actuations of the safety function. A typical set of self-diagnostic functions includes the following:

- Memory functionality and integrity tests (e.g., PROM checksum and RAM tests)

- Computer system instruction set (e.g., calculation tests) - Computer peripheral hardware tests (e.g., watchdog timers and keyboards)

- Computer architecture support hardware (e.g., address lines and shared memory interfaces)

- Communication link diagnostics (e.g., CRC checks) Infrequent communication link failures that do not result in a system failure or a lack of system functionality do not require reporting.

When self-diagnostics are applied, the following self-Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments diagnostic features shall be incorporated into the system design:

a) Self-diagnostics during computer system startup b) Periodic self-diagnostics while the computer system is operating c) Self-diagnostic test failure reporting TVA Response: The requirements for fault detection and self diagnostics and Common Q PAMS system compliance are contained in WNA-LI-00058-WBT-P, Rev. 2, "Post-Accident Monitoring System (PAMS) Licensing Technical Report" Section 11 "TVA Contract

Compliance Matrix" items: 107 error free download 202 self test 205 self diagnostics and watchdog timer 263 primary and backup communication 264 through 271, continuous on-line self checks 311 system status displays, 341 alarms, 344 on-line diagnostics 5.7 Capability for test and calibration No requirements beyond IEEE Std 603-1998 are necessary.

TVA Response: No response required.

Concurrence: E-mail from Westinghouse (Andrew P. Drake) to Bechtel (Mark S. Clark), RE: RAI 212 Response - Errors in the Contract Compliance Matrix, dated December 17, 2010 213 7.5.2 EICB (Carte) 7/27/2010

By letter dated June 18, 2010 (ML101940236) TVA stated (Enclosure 1, Attachment 3, Item No. 3) that the PAMS system design specification and software requirements specification contain information to address the "Theory of Operation Description." The staff has reviewed these documents, and it is not clear how this is the case. The docketed material does not appear to contain the design basis information that is required to evaluate compliance with the Clause of IEEE 603.

(1) Please provide the design basis (as described in IEEE 604 Clause 4) of the Common Q PAMS. (2) Please provide a regulatory evaluation of how the PAMs complies with the applicable regulatory requirements for the theory

of operation.

For example: Regarding IEEE 603 Clause 5.8.4 (1) What are the manually controlled protective actions? (2) How do the documents identified demonstrate compliance with this clause?

Responder: WEC

Conformance with IEEE 603 is documented in the revised Common Q PAMS Licensing Technical Report and the Common Q PAMS System Design Specification.

contains the proprietary version of Westinghouse document "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" Attachment 8 contains the proprietary version of Westinghouse document "Nuclear Automation Watts Bar 2 NSSS Completion Program I&C Projects Post Accident Monitoring System - System Design Specification", WNA-DS-01667-WBT, Rev. 2 dated September 2010.

11. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11.

Response is included in letter dated 10/25/10 NNC to review and revise this question after LTR R2 is received.

Open-TVA/WEC

Due 3/29/11

NNC 2/3/11: The identified documentation does not include the design bases. Please provide schedule for providing

the requested

information.

EICB RAI ML102980066 Item

No. 18 245 EICB (Carte) 8/3/2010 Section 5.8 of the Common Q SPM (ML050350234) identifies the required test documentation for systems developed using the Common Q SPM. Please provide sufficient information for the

NRC staff to independently assess whether the test plan for WBN2 PAMS, is as described in the SPM (e.g., Section 5.8.1).

Responder: WEC

Relates to the commitment to provide the test plan and the SPM compliance matrix

Attachment 9 contains the Westinghouse document "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010. Attachment 10 12. N Open Pending Submittal of the Test Summary Report due 3/29/11 Response included in letter dated 12/3/10 Open-TVA/WEC

Due 3/29/11 NNC 2/2/11:

Issues with the Common Q TR

& SPM were discussed in the weekly public EICB RAI ML102980066 Item

No. 119 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the

information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical Agenda for Weekly Telecom with TVA (I&C Chapter 7 only) radAC62F.docx Open Items to be Resolved for SER Approval No. SE Sec. FSAR Sec. NRC POC Issue TVA Response(s) Response Acceptable Y/N Status/ Current Actions Resolution Path RAI No. & Date RAI Resp. Date Comments contains the Westinghouse Application for Withholding for the "Post Accident Monitoring System Test Plan," WNA-PT-00138-WBT, Revision 0, dated November 2010.

TVA Revised Response:

This is to be addressed in the non-proprietary Common Q PAMS Test Summary Report scheduled to be submitted

March 29, 2011.

Common Q PAMS Test Summary Report scheduled to be submitted March 29, 2011.

meetings. Westinghouse to perform Common Q TR & SPM compliance self assessment information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory

requirements and the protection of public health and safety." 246 EICB (Carte) 8/3/2010 Section 4.3.2.1, "Initiation Phase" of the Common Q SPM (ML050350234) requires that a Project Quality Plan (PQP) be developed. Many other section of the SPM identify that this PQP should contain information required by ISG6. Please provide the PQP. If "PQP" is not the name of the documentation produced, please describe the documentation produced and provide the information that the SPM states should be in the PQP.

Responder: WEC As agreed ISG6 does not apply to the Common Q PAMS platform. The information required to address this question concerning the PQP and SPM has been added to compliance matrix in revision 1 of the Licensing Technical Report. of letter dated 10/25/10 contains the proprietary version of Westinghouse document "Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS), Licensing Technical

Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" 13. N Open Pending Submittal of Revision 3 of the Licensing Technical Report due 3/29/11. PQP provided for audit the week of 2/28/11.

Response is provided in letter dated 10/25/10 NNC 11/18/10: PQP has not been provided and CQ PAMS LTR Rev. 1 does not contain comparable information.

Open-TVA/WEC Due 3/29/11

NNC 2/2/11:

Issues with the Common Q TR & SPM implementation were discussed in the

weekl y public meetin g s. Westinghouse to perform Common Q TR & SPM compliance self assessment EICB RAI ML102980066 Item No. 15 Response is provided in letter dated 10/25/10 LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the information relied upon in the SE must be docketed correspondence."

LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability of the proposal in terms of regulatory

requirements and the protection of public health and safety." 251 EICB (Carte) 8/8/2010 The SPM describes the software testing and documents that will be created. The SPM also describes the testing tasks that are to be carried out. The acceptance criterion for software test implementation is that the tasks in the SPM have been carried out in their entirety. Please provide information that shows that testing been successfully accomplished.

Responder: WEC

The software testing performed and documents created are addressed by the SPM Compliance matrix contained in Revision 1 of the Licensing Technical Report.

Attachment 1 of the letter dated 10/25/10 contains the Proprietary version of Westinghouse's document titled:

"Tennessee Valley Authority (TVA), Watts Bar Unit 2 (WBN2), Post-Accident Monitoring System (PAMS),

Licensing Technical Report, Revision 1, WNA-LI-00058-WBT-P, Dated October 2010" TVA Response to Follow-up NRC Request:

Please see the response to RAI item 21 in letter dated 12/22/10, NRC Matrix Item 250.

14. N Open Pending Submittal of the Test Summary Report due 3/29/11 Revised response included in letter dated 12/22/10 Partial response is provided in letter dated 10/25/10 Open-TVA/WEC

Due 3/29/11

NNC 2/2/11:

Issues with the Common Q TR

& SPM were discussed in the weekly public meetings. Westinghouse to perform Common Q TR

& SPM compliance self assessment LIC-101 Rev. 3 Appendix B Section 4, "Safety Evaluation" states: "the

information relied upon in the SE must

be docketed correspondence." LIC-101 Rev. 3 states: "The safety analysis that supports the change requested should include technical information in sufficient detail to enable the NRC staff to make an independent assessment regarding the acceptability

of the proposal in terms of regulatory requirements and the protection of public health and safety."