ML12233A635: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 2: Line 2:
| number = ML12233A635
| number = ML12233A635
| issue date = 08/16/2012
| issue date = 08/16/2012
| title = Shearon Harris Nuclear Plant - Notification of Inspection and Request for Information
| title = Notification of Inspection and Request for Information
| author name = Vias S J
| author name = Vias S J
| author affiliation = NRC/RGN-II/DRS/EB3
| author affiliation = NRC/RGN-II/DRS/EB3

Revision as of 12:40, 4 April 2019

Notification of Inspection and Request for Information
ML12233A635
Person / Time
Site: Harris Duke Energy icon.png
Issue date: 08/16/2012
From: Vias S J
NRC/RGN-II/DRS/EB3
To: Hamrick G T
Carolina Power & Light Co
References
Download: ML12233A635 (8)


Text

UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II 245 PEACHTREE CENTER AVENUE NE, SUITE 1200 ATLANTA, GEORGIA 30303-1257 August 16, 2012 Mr. George T. Hamrick Vice President Shearon Harris Nuclear Power Plant Carolina Power and Light Company P.O. Box 165, Mail Code: Zone 1 New Hill, NC 27562-0165

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Dear Mr. Hamrick:

On October 22, 2012, the Nuclear Regulatory Commission (NRC) will begin inspection activities for Shearon Harris Nuclear Plant at the NRC Region II office in Atlanta, GA., in accordance with Temporary Instruction (TI) 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks." This in-office inspection is scheduled to be performed from October 22 to October 23, 2012, and will address the inspection requirements for Phase 1 of this TI. In order to minimize the impact to your on-site resources, and to ensure a productive inspection, we have enclosed a list of documents needed for the preparation and implementation of this inspection. The documents that are requested for this inspection include all relevant documents that will allow the inspector(s) to adequately complete Phase 1 of this inspection. We have discussed the schedule for this inspection activity with your staff and understand that our licensing contact for this inspection will be Mr. John Doorhy of your organization. If there are any questions about this inspection or the material requested, please contact the lead inspector Cecil Fletcher at 404-997-4402 or Cecil.Fletcher@nrc.gov. In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its Enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's Agencywide G. Hamrick 2 Documents Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/ adams.html (the Public Electronic Reading Room).

Sincerely,

/RA: J. Rivera-Ortiz for/

Steven J. Vias, Chief Engineering Branch 3 Division of Reactor Safety Docket No. 50-400 License No. NPF-63

Enclosure:

Temporary Instruction (TI 2515-182) Inspection Document Request

cc w/encl: (See page 3)

_________________________ x G SUNSI REVIEW COMPLETE G FORM 665 ATTACHED OFFICE RII:DRS RII:DRS SIGNATURE RA RA NAME FLETCHER VIAS DATE 8/16/2012 8/16/2012 8/ /2012 8/ /2012 8/ /2012 8/ /2012 8/ /2012 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO G. Hamrick 3 cc w/encl: Brian Bernard Manager, Nuclear Services and EP Nuclear Protective Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution Brian C. McCabe Manager, Nuclear Oversight Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution George T. Hamrick Vice President Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution Lara S. Nichols Deputy General Counsel Duke Energy Corporation Electronic Mail Distribution M. Christopher Nolan Director - Regulatory Affairs Duke Energy Carolinas, LLC Electronic Mail Distribution Robert J. Duncan II Senior Vice President Progress Energy Electronic Mail Distribution Sean T. O'Connor Manager, Support Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution Donald L. Griffith Training Manager Shearon Harris Nuclear Power Plant Progress Energy Electronic Mail Distribution

R. Keith Holbrook Manager, Support Services Shearon Harris Nuclear Power Plant Electronic Mail Distribution

David H. Corlett Supervisor Licensing/Regulatory Programs Progress Energy Electronic Mail Distribution

David T. Conley Senior Counsel Legal Department Progress Energy Electronic Mail Distribution Donna B. Alexander Manager, Nuclear Regulatory Affairs (interim) Progress Energy Electronic Mail Distribution

John H. O'Neill, Jr. Shaw, Pittman, Potts & Trowbridge 2300 N. Street, NW Washington, DC 20037-1128

Joseph W. Donahue Vice President Nuclear Oversight Progress Energy Electronic Mail Distribution W. Lee Cox, III Section Chief Radiation Protection Section N.C. Department of Environmental Commerce & Natural Resources Electronic Mail Distribution Public Service Commission State of South Carolina P.O. Box 11649 Columbia, SC 29211 Chairman North Carolina Utilities Commission Electronic Mail Distribution

(cc w/encl cont'd - See page 4)

G. Hamrick 4 (cc w/encl cont'd) Terrence E. Slake Manager Nuclear Plant Security Shearon Harris Nuclear Power Plant Electronic Mail Distribution

Robert P. Gruber Executive Director Public Staff - NCUC 4326 Mail Service Center Raleigh, NC 27699-4326 Chair Board of County Commissioners of Wake County P.O. Box 550 Raleigh, NC 27602

Ernest J. Kapopoulos Jr. Plant General Manager Carolina Power and Light Company Shearon Harris Nuclear Power Plant Electronic Mail Distribution

Chair Board of County Commissioners of Chatham County P.O. Box 1809 Pittsboro, NC 27312

Senior Resident Inspector U.S. Nuclear Regulatory Commission Shearon Harris Nuclear Power Plant U.S. NRC 5421 Shearon Harris Rd New Hill, NC 27562-9998 G. Hamrick 5 Letter to George T. Hamrick from Steven J. Vias dated August 16, 2012.

SUBJECT:

SHEARON HARRIS NUCLEAR PLANT - NOTIFICATION OF INSPECTION AND REQUEST FOR INFORMATION

Distribution w/encl:

RIDSNRRDIRS PUBLIC RidsNrrPMShearonHarris Resource Enclosure TI 2515-182 INSPECTION DOCUMENT REQUEST Inspection Dates: October 22 - 23, 2012 Inspection Procedures: TI 2515-182, "Review of Implementation of the Industry Initiative to Control Degradation of Underground Piping and Tanks" Inspector: Cecil Fletcher, Senior Reactor Inspector Information Requested for the Preparation and Completion of the In-Office Inspection 1. The following documents listed below are requested (electronic copy or CD ROM if possible) by October 12, 2012, to facilitate the preparation for the inspection. A. Site point(s) of contact responsible for the implementation of the underground piping and tanks program; and B. Schedule for completion of the following NEI 09-14, "Guideline For The Management of Underground Piping and Tank Integrity," Revision 1, attributes: Buried Piping

  • Procedures and Oversight
  • Risk Ranking
  • Inspection Plan
  • Plan Implementation
  • Asset Management Plan Underground Piping and Tanks
  • Procedures and Oversight
  • Prioritization
  • Condition Assessment Plan
  • Plan Implementation
  • Asset Management Plan C. Copy of Site Underground Piping and Tanks Program.

D. Self or third party assessments of the Underground Piping and Tanks Program (if any have been performed).

2 Enclosure E. For any of the NEI 09-14, Revision 1, or subsequent revision attributes identified below which have been completed prior to the NRC's Phase 1 inspection, provide written records that demonstrate that the program attribute is complete.

Buried Piping

  • Procedures and Oversight
  • Risk Ranking
  • Inspection Plan
  • Plan Implementation
  • Asset Management Plan Underground Piping and Tanks
  • Procedures and Oversight
  • Prioritization
  • Condition Assessment Plan
  • Plan Implementation
  • Asset Management Plan