IR 05000397/2019301: Difference between revisions

From kanterella
Jump to navigation Jump to search
(Created page by program invented by StriderTol)
(Created page by program invented by StriderTol)
Line 1: Line 1:
{{Adams
{{Adams
| number = ML18145A231
| number = ML19050A485
| issue date = 05/29/2018
| issue date = 02/19/2019
| title = Errata for Columbia Generating Station - Notification of NRC Initial Operator Licensing Examination 05000397/2019301
| title = Columbia Generating Station - NRC Initial Operator Licensing Examination Approval 05000397/2019301
| author name = Gaddy V G
| author name = Werner G E
| author affiliation = NRC/RGN-IV/DRS/OB
| author affiliation = NRC/RGN-IV/DRS/OB
| addressee name = Sawatzke B J
| addressee name = Sawatzke B J
Line 10: Line 10:
| license number = NPF-021
| license number = NPF-021
| contact person =  
| contact person =  
| case reference number = 50-397/2019-01
| case reference number = 50-397/19-01
| document report number = 50-397/OL-2019
| document report number = 50-397/OL-19
| document type = Letter, License-Operator, Part 55 Examination Related Material
| document type = Letter, License-Operator License Exam, Draft
| page count = 5
| page count = 3
}}
}}


Line 19: Line 19:


=Text=
=Text=
{{#Wiki_filter:Mr. Brad Sawatzke, Chief Executive Officer Energy Northwest MD 1023 P.O. Box968 Richland, WA 99352 UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1800 EAST LAMAR BOULEVARD ARLINGTON, TEXAS 76011*4611 May 29, 2018
{{#Wiki_filter:
 
SUBJECT: ERRATA FOR COLUMBIA GENERATING STATION -NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000397/2019301
 
==Dear Mr. Sawatzke:==
It was identified that the notification sent to you dated April 30, 2018 (NRC's Agencywide Documents Access and Management System (ADAMS) Accession No. ML 18121A306)
improperly listed the due date for the written examinations, operating tests, and supporting reference materials.
 
The correct date should read December 12, 2018. Please note no other dates in the notification have changed. This letter, its enclosure, and your response (if any) will be made available for public inspection and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document Room in accordance with 10 CFR 2.390, "Public Inspections, Exemptions, Requests for Withholding." Docket No. 50-397 License No. NPF-21
 
===Enclosure:===
Sincerely,IRA/ Vincent G. Gaddy, Chief Operations Branch Division of Reactor Safety COLUMBIA GENERATING NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000397 /2019301 cc: Electronic Distribution Mr. Brad Sawatzke, Chief Executive Officer Energy Northwest MD 1023 P.O. Box 968 Richland, WA 99352 UNITED STATES NUCLEAR REGULATORY COMMISSION REGJON IV 1600 EAST LAMAR BOULEVARD ARLINGTON, TEXAS 76011-4511 May 29, 2018
 
SUBJECT: COLUMBIA GENERATING STATION-NOTIFICATION OF NRC INITIAL OPERATOR LICENSING EXAMINATION 05000397/2019301 Dear
}}
}}

Revision as of 19:01, 14 March 2019

Columbia Generating Station - NRC Initial Operator Licensing Examination Approval 05000397/2019301
ML19050A485
Person / Time
Site: Columbia Energy Northwest icon.png
Issue date: 02/19/2019
From: Werner G E
Operations Branch IV
To: Sawatzke B J
Energy Northwest
References
50-397/19-01 50-397/OL-19
Download: ML19050A485 (3)


Text