| | title = Letter Withdrawal of TSTF-517, Revision 0, Allowance for Non-TS Cooling/Ventilation Systems Degradation on Support System Operability (TAC No. ME2950) | | | title = Letter Withdrawal of TSTF-517, Revision 0, Allowance for Non-TS Cooling/Ventilation Systems Degradation on Support System Operability |
| | author name = Rosenberg S L | | | author name = Rosenberg S L |
| | author affiliation = NRC/NRR/DPR | | | author affiliation = NRC/NRR/DPR |
Letter Sequence Withdrawal |
---|
TAC:ME2950, Allowance for Non Technical Specification Barrier Degradation on Supported System Operability, Allowance for NON-TS Cooling / Ventilation Systems Degradation on Support System Operability (Withdrawn, Closed) |
|
|
|
---|
Category:Letter
MONTHYEARML24264A0232024-09-20020 September 2024 RAI TSTF-600, Rev. 0, Revise the Reactor Coolant System (RCS) Pressure Isolation Valve (PIV) Leakage Testing Frequency ML24249A1482024-09-11011 September 2024 Cover Letter for Final Traveler SE of TSTF 576, Revision 3, Revise Safety/Relief Valve Requirements ML24247A3162024-09-0606 September 2024 Cover Letter for Final Model SE of Traveler TSTF 592, Rev 2, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML24222A4002024-08-14014 August 2024 TSTF-602, Revise the Ventilation Filter Testing Program to Permit Alternate Challenge Agents, Acceptance Review Letter ML24106A2762024-08-0101 August 2024 Draft Safety Evaluation of Technical Specifications Task Force Traveler TSTF-576, Revision 3, Revise Safety/Relief Valve Requirements (EPID L -2019-PMP-0207) ML24207A1822024-07-25025 July 2024 TSTF-601, Extend Shield Building Completion Time After Refueling, Acceptance Review Letter ML24114A2572024-04-24024 April 2024 TSTF-599 Acceptance Review Letter ML24114A2652024-04-24024 April 2024 TSTF-597 Acceptance Review Letter ML23325A2132023-12-18018 December 2023 Cover Letter for Final Model SE of TSTF-591, Revise Risk Informed Completion Time (RICT) Program ML23262B2292023-09-21021 September 2023 Cover Letter Transmitting Final SE of TSTF-591, Revision 0, Revise Risk-Informed Completion Time (RICT) Program ML23124A2212023-09-11011 September 2023 Cover Letter for Final SEs of TSTF-589, Eliminate Automatic Diesel Generator (DG) Start During Shutdown ML23206A1242023-07-31031 July 2023 TSTF-584 Cover Letter for Final SE ML23205A2342023-07-0606 July 2023 Draft TSTF-601, 'Extend Shield Building Completion Time After Refueling' ML23012A2812023-03-13013 March 2023 Draft SEs of TSTF-584, Eliminate Automatic RWCU System Isolation on SLC Initiation ML23059A3342023-02-28028 February 2023 TSTF-576 Open Issues Letter ML23010A2592023-01-11011 January 2023 Request for Additional Information Traveler TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22272A5542022-10-0707 October 2022 Request for Additional Information Traveler TSTF-591, Revise Risk Informed Completion Time (RICT) Program TSTF-22-07, Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements2022-07-19019 July 2022 Transmittal of TSTF-592, Revision 0, Revise Automatic Depressurization System (ADS) Instrumentation Requirements ML22193A2372022-07-12012 July 2022 Request for Additional Information TSTF-589, Eliminate Automatic Diesel Generator Start During Shutdown TSTF-22-06, Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability2022-07-0808 July 2022 Technical Specifications Task Force - Request for a Workshop to Discuss the Interaction of Natural Phenomena Protection Design Features and Operability ML22110A1712022-04-26026 April 2022 Acceptance for Review Regarding Traveler Tstf-584, Rev 0, Eliminate Automatic RWCU System Isolation on SLC Initiation TSTF-22-04, Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program2022-03-22022 March 2022 Technical Specifications Task Force - Transmittal of TSTF-591, Revision 0, Revise Risk Informed Completion Time (RICT) Program ML21188A2782021-07-11011 July 2021 Cover Letter Transmitting Final SEs of CLIIP TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR (Residual Heat Removal) Shutdown Cooling TSTF-21-03, TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 12021-06-23023 June 2021 TSTF Response to NRC Questions on TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements and Submittal of Revision 1 ML21054A2512021-05-26026 May 2021 Cover Letter Transmitting Draft SEs of CLIIP TSTF-580, RHR Shutdown Cooling System - Hot Shutdown ML21106A2452021-04-20020 April 2021 Cover Letter Transmitting Final Model SE of TSTF 554, Revision 1, Revise Reactor Coolant Leakage Requirements ML21098A2422021-04-14014 April 2021 Cover Letter for Final SEs of TSTF-577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections ML21068A4012021-03-24024 March 2021 Cover Letter for Draft SEs TSTF 577, Revision 1, Revised Frequencies for Steam Generator Tube Inspections TSTF-21-01, Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling2021-01-26026 January 2021 Transmittal of TSTF-580, Revision 1, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling ML20322A3612020-12-18018 December 2020 TSTF-554 Cover Letter for Final SE ML20308A6562020-11-0606 November 2020 Request for Additional Information Traveler TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20168A3962020-10-30030 October 2020 Cover Letter Transmitting Draft SE of TSTF-554, Revision 1, Revise Reactor Coolant Leakage Requirements ML20265A1152020-10-0909 October 2020 Cover Letter Transmitting Model SE of TSTF-582 and TSTF-583-T ML20133J8832020-07-29029 July 2020 Letter Transmitting Draft SE of Traveler TSTF-582, Revision 0, RPV WIC Enhancements TSTF-20-04, Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections2020-06-0808 June 2020 Technical Specifications Task Force - Transmittal of TSTF-577, Revision 0, Revised Frequencies for Steam Generator Tube Inspections ML20133J8152020-05-13013 May 2020 Letter Transmitting Revised Final SE of Traveler TSTF-564, Revision 2, Safety Limit MCPR, Using the Consolidated Line Item Improvement Process ML20132A1832020-05-11011 May 2020 Request for Additional Information TSTF-576, Revision 0, Revised Safety/Relief Valve Requirement TSTF-20-01, Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP)2020-04-0909 April 2020 Transmittal of TSTF-IG-20-02, Guidance on Evaluating One-Time Surveillance Frequency Changes Under the Surveillance Frequency Control Program (TSTF-425M SFCP) TSTF-19-14, Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements2020-02-12012 February 2020 Technical Specifications Task Force - TSTF Response to NRC Questions on TSTF-582, RPV WIC Enhancements TSTF-19-11, TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements2020-01-16016 January 2020 TSTF Response to NRC Questions on TSTF-554, Revise Reactor Coolant Leakage Requirements ML19325C4362019-12-17017 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-568, Revision 2, Revise Applicability of BWR/4 TS 3.6.2.5 and TS 3.6.3.2 TSTF-19-09, Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements2019-12-13013 December 2019 Technical Specifications Task Force - Transmittal of TSTF-576, Revision 0, Revise Safety/Relief Valve Requirements ML19323E9282019-12-10010 December 2019 Cover Letter Transmitting Final SEs of Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position TSTF-19-13, Technical Specifications Task Force - Updated TSTF Membership and Distribution2019-12-0303 December 2019 Technical Specifications Task Force - Updated TSTF Membership and Distribution TSTF-19-12, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position.2019-11-0505 November 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position. TSTF-19-10, Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position2019-08-28028 August 2019 Transmittal of Errata Changes to TSTF-541, Revision 2, Add Exceptions to Surveillance Requirements for Valves and Dampers Locked in the Actuated Position ML19176A1892019-08-14014 August 2019 Cover Letter Transmitting Final Safety Evaluations of Traveler TSTF-569, Revision 2, Revise Response Time Testing Definition TSTF-19-03, Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter2019-07-0808 July 2019 Request for Fee Exemption for TSTF-554, Revision 0, Revise Reactor Coolant Leakage Requirements - Letter TSTF-19-08, Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements.2019-07-0303 July 2019 Draft of Traveler TSTF-582, Revision 0, RPV WIC Enhancements. TSTF-19-06, TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition2019-06-25025 June 2019 TSTF Comments on Draft Safety Evaluations for Traveler TSTF-569, Revision 1, Revise Response Time Testing Definition 2024-09-06
[Table view] |
Text
June 17, 2010
Technical Specifications Task Force (TSTF) 11921 Rockville Pike, Suite 100 Rockville, MD 20852
SUBJECT:
WITHDRAWAL OF TSTF-517, REVISION 0, "ALLOWANCE FOR NON-TS COOLING/VENTILATION SYSTEMS DEGRADATION ON SUPPORT SYSTEM OPERABILITY" (TAC NO. ME2950)
Dear Members of the TSTF:
By letter dated October 28, 2009 (Agencywide Documents Access and Management System (ADAMS) Accession Number ML093020066), the Technical Specifications Task Force (TSTF) submitted for U.S. Nuclear Regulatory Commission (NRC) staff review Traveler TSTF-517, Revision 0, "Allowance for Non-TS Cooling/Ventilation Systems Degradation on Support System Operability." The scope of the Traveler was limited to cooling or ventilation systems not separately addressed by Technical Specifications (TS).
During the acceptance review, the NRC staff identified concerns with TSTF-517, Revision 0, and discussed them with the TSTF in a telephone conference held on April 29, 2010. Specifically, the staff noted that TSTF-517 proposed to use a simplified risk assessment methodology that was similar to the methodology used by approved Traveler TSTF-427-A, Revision 2. The staff noted that TSTF
-427-A addressed the unavailability of passive hazard barriers not separately addressed by TS and that a simplified risk assessment was justified because the impact of unavailability of these barriers only affected a low probability initiating event (high energy line break). The impact of cooling and ventilation system unavailability, however, is more significant because it renders supported components unavailable for any initiating event and has the same impact as a supported component being inoperable for other causes. Additionally, plant-specific
risk models should be capable of a direct assessment of risk due to the unavailability of cooling or ventilation support systems, which is not the case for passive hazard barriers. Finally, the staff indicated that the guidance in NEI 06-09, Revision 0, approved by the staff to support Risk Informed Initiative 4b, is the appropriate method to determine a risk-informed completion time for cooling or ventilation support system unavailability.
By letter dated May 13, 2010, the TSTF withdrew Traveler TSTF-517 from further NRC review.
In the withdrawal letter, you indicated that the methodology used to support TSTF-517 is not sufficiently rigorous to support the proposed changes and that the methodology employed for Risk Informed Initiative 4b is better suited to this application. You further indicated that this is being pursued in a separate Traveler.
Based upon your withdrawal of TSTF-517, Revi sion 0, the NRC staff will terminate review and TAC No. ME2950 will be closed.
TSTF
If you have any questions regarding this matter, please contact Barry Miller at (301) 415-4117.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Project No: 753
cc: See next page TSTF If you have any questions regarding this matter, please contact Barry Miller at (301) 415-4117.
Sincerely,
/RA/
Stacey L. Rosenberg, Chief Licensing Processes Branch Division of Policy and Rulemaking Office of Nuclear Reactor Regulation
Project No: 753
cc: See next page
DISTRIBUTION
- PUBLIC RidsOgcMailCenter RidsNrrDssScvb RidsNrrDraApla RidsNrrDirsItsb PLPB Reading File RidsNrrDpr RidsNrrDprPlpb Barry Miller Carl Schulten AHowe
ADAMS ACCESSION NO.: ML101650770 OFFICE PLPB/PM PLPB/LA SCVB/BC APLA/BC ITSB/BC PLPB/BC
NAME BMiller EHylton RDennig DHarrison RElliott SRosenberg
DATE 06/ 15 /10 06/ 15 /10 06/ 15 /10 06/ 15 /10 06/ 15 /10 6/17/10 OFFICIAL RECORD COPY Technical Specifications Task Force Mailing List
cc:
Technical Specifications Task Force
11921 Rockv ille Pike Suite 100 Attention: Donald Hoffman Rockville, MD 20852 Telephone: 301-984-4400 E-mail: donaldh@excelservices.com
Kenneth Schrader Diablo Canyon Power Plant Building 104/5/21A P.O. Box 56 Avila Beach, CA 93424 Telephone: 805-545-4328 E-mail: kjse@pge.com
Donald W. Gregoire Energy Northwest Columbia Generating Station Mail Drop PE20 PO Box 968 Richland, WA 99352-0968 Telephone: 509-377-8616 E-mail: dwgregoire@energy-northwest.com Thomas Raidy Southern California Edison Mail Stop D-3-E P.O. Box 128 San Clemente, CA 92672 Telephone: 949-368-7582 E-mail: Tom.Raidy@sce.com Wendy E. Croft Exelon Nuclear 200 Exelon Way, Suite 340 Kennett Square, PA 19348 Telephone: 610-765-5726 E-mail: Wendi.Croft@exeloncorp.com Reene' V. Gambrell Duke Energy Mailcode: ON03RC 7800 Rochester Highway Seneca, SC 29672 Telephone: 864-885-3364 E-mail: RVGambrell@duke-energy.com Brian Mann EXCEL Services Corporation 11921 Rockville Pike, Suite 100 Rockville, MD 20852 Telephone: 301-984-4400 E-mail: brianm@excelservices.com