| {{Adams | | {{Adams |
| | number = ML091480773 | | | number = ML100351155 |
| | issue date = 05/26/2009 | | | issue date = 02/04/2010 |
| | title = IR 05000335-09-006, & IR 05000389-09-006, for 08/03/2009 - 08/14/2008, and 08/31/2009 - 09/04/2009, St. Lucie, Component Design Bases Inspection | | | title = 02/19/2010 Notice of Category 1 Public Meeting with Florida Power and Light Company to Discuss Risk Significance of the Two Preliminary Greater than Green Inspection Report 05000335-09-006 and 05000389-09-006 |
| | author name = Desai B B | | | author name = Desai B B |
| | author affiliation = NRC/RGN-II/DRS/EB1 | | | author affiliation = NRC/RGN-II/DRS/EB1 |
Line 10: |
Line 10: |
| | license number = DPR-067, NPF-016 | | | license number = DPR-067, NPF-016 |
| | contact person = | | | contact person = |
| | document report number = IR-09-006 | | | case reference number = IR-09-006 |
| | document type = Letter, Inspection Report | | | document type = Letter, Meeting Notice |
| | page count = 6 | | | page count = 5 |
| }} | | }} |
|
| |
|
Line 18: |
Line 18: |
|
| |
|
| =Text= | | =Text= |
| {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 May 26, 2009 | | {{#Wiki_filter:UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 February 4, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O.Box 14000 Juno Beach, FL 33408-0420 |
|
| |
|
| Mr. Mano Nazar Senior Vice President and Chief Nuclear Officer Florida Power and Light Company P. O. Box 14000 Juno Beach, FL 33408-0420
| | SUBJECT: MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 REGULATORY CONFERENCE - ST. LUCIE NUCLEAR PLANT DOCKET NOS. 50-335 AND 50-389 |
|
| |
|
| SUBJECT: ST. LUCIE NUCLEAR PLANT - COMPONENT DESIGN BASES INSPECTION - NRC INSPECTION REPORT 05000335/2009006 AND 05000389/2009006
| | ==Dear Mr. Nazar:== |
| | This letter confirms the telephone conversation between Mr. Eric Katzman of your staff and Mr. Binoy Desai of the NRC, on February 1, 2010, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for February 19, 2010, from 2 p.m. to 4:00 p.m. (EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. |
|
| |
|
| Dear Mr. Nazar The purpose of this letter is to notify you that the U.S. Nuclear Regulatory Commission (NRC) Region II staff will conduct a component design bases inspection at your St. Lucie Nuclear Plant Units 1 and 2 during the weeks of August 3-14, and August 31- September 4, 2009. The inspection team will be led by Mr. S. Rose, a Senior Operations Inspector from the NRC's Region II Office. This inspection will be conducted in accordance with the baseline inspection procedure, Procedure 71111.21, Component Design Bases Inspection, issued August 19, 2008.
| | In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). |
|
| |
|
| The inspection will evaluate the capability of risk significant / low margin components to function as designed and to support proper system operation. The inspection will also include a review of selected operator actions, operating experience, and modifications.
| | Should you have any questions concerning this meeting, please contact me at (404) 562-4519. |
|
| |
|
| During a telephone conversation on May 13, 2009, Mr. Rose confirmed with Mr. K. Frehafer of your staff, arrangements for an information gathering site visit and the three-week onsite inspection. The schedule is as follows:
| | Sincerely,/RA: Original signed by Mark Franke for/ |
| * Information gathering visit: Week of July 13-17, 2009.
| | Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety |
|
| |
|
| * Onsite weeks: August 3-14 and August 31-September 4, 2009.
| | Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16 |
|
| |
|
| The purpose of the information gathering visit is to meet with members of your staff to identify risk-significant components and operator actions. Information and documentation needed to support the inspection will also be identified. Mr. W. Rogers, a Region II Senior Reactor Analyst, may accompany Mr. Rose during the information gathering visit to review probabilistic risk assessment data and identify risk significant components which will be examined during the inspection.
| | ===Enclosure:=== |
| | As stated |
|
| |
|
| Please provide the information requested in the enclosure to the Region II office by July 6, 2009. The enclosure lists documents that will be needed prior to the information gathering visit. The inspectors will try to minimize your administrative burden by specifically identifying only those documents required for the inspection preparation. Contact Mr. Rose with any questions related to the information request. During the information gathering visit, the team leader will also discuss the following inspection support administrative details: office space; supplemental documents requested to be made available to the team in the Region II office prior to the FP&L 2 inspection preparation week of July 27-31, 2009; arrangements for site access; and the availability of knowledgeable plant engineering and licensing personnel to serve as points of contact during the inspection.
| | cc w/encl: (See page 2) |
| | FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution |
|
| |
|
| In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
| | Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution |
|
| |
|
| Thank you for your cooperation in this matter. If you have any questions regarding the information requested or the inspection, please contact Mr. Rose at (404) 562-4609 or me at (404) 562-4519.
| | Gene St. Pierre Vice President - Fleet Organizational Support Florida Power & Light Company Electronic Mail Distribution |
|
| |
|
| Sincerely,/RA/
| | Mark Hicks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution |
| Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety Docket Nos. 50-335, 50-389 License Nos. DPR-67, NPF-16
| |
|
| |
|
| ===Enclosure:===
| | Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution |
| Information Request For St. Lucie Nuclear Plant Units 1 and 2 Component Design Bases Inspection
| | |
| | Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420 |
| | |
| | McHenry Cornell Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution |
| | |
| | Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution |
|
| |
|
| cc w/encl: (See page 3)
| | Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution |
|
| |
|
| FP&L 3 cc w/encl: Gordon L. Johnston Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution
| | Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution |
|
| |
|
| Christopher R. Costanzo Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution
| | William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution |
|
| |
|
| Mark Hicks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
| | Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution |
|
| |
|
| Robert J. Hughes Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution
| | J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution |
|
| |
|
| Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution
| | Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company Electronic Mail Distribution |
|
| |
|
| Don E. Grissette Vice President, Nuclear Operations - South Region Florida Power & Light Company Electronic Mail Distribution
| | Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 |
|
| |
|
| M. S. Ross Managing Attorney Florida Power & Light Company Electronic Mail Distribution
| | (Vacant) |
| | Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution |
|
| |
|
| Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
| | Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution |
|
| |
|
| Craig Fugate Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution
| | Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution |
|
| |
|
| Mano Nazar Senior Vice President and Chief Nuclear Officer Florida Power & Light Company Electronic Mail Distribution
| | _ |
| | x G SUNSI REVIEW COMPLETE /RA M. Thomas/ OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME JHAMMON MSYKES BDESAI DATE 2/4/2010 2/4/2010 2/4/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure |
|
| |
|
| Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010 Peter Wells Vice President, Safety Assurance Florida Power and Light Company Electronic Mail Distribution Mark E. Warner Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution
| | SUBJECT: PUBLIC MEETING WITH FLORIDA POWER & LIGHT FACILITY: |
| | ST. LUCIE NUCLEAR PLANT DOCKETS: 05000335 and 05000389 DATE & TIME: |
| | Friday, February 19, 2010 - 2:00 p.m. to 4:00 p.m. |
|
| |
|
| (cc w/encl cont'd - See page 4)
| | LOCATION: |
| FP&L 4 (cc w/encl cont'd) Faye Outlaw County Adminstrator St. Lucie County Electronic Mail Distribution
| | Suite 24T25 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings. |
|
| |
|
| Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
| | CATEGORY: |
| | This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opport unities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRC provides |
|
| |
|
| _________________________ X G SUNSI REVIEW COMPLETE OFFICE RII:DRS RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA RA NAME SROSE WROGERS MSYKES BDESAI DATE 5/26/2009 5/26/2009 5/26/2009 5//26/2009 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure INFORMATION REQUEST FOR ST. LUCIE NUCLEAR PLANT UNITS 1 AND 2 COMPONENT DESIGN BASES INSPECTION Please provide the information electronically in ".pdf" files, Excel, or other searchable format on CDROM. The CDROM should be indexed and hyperlinked to facilitate ease of use. Information in "lists" should contain enough information to be easily understood to someone who has knowledge of pressurized water reactor technology.
| | reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC |
| | =s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis. |
|
| |
|
| 1. From your most recent probabilistic safety analysis (PSA) excluding external events and fires, please provide: a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance. b. A list of the top 500 cutsets.
| | NRC OFFICE PARTICIPATING: |
| | Region II OTHER ORGANIZATIONS PARTICIPATING: |
| | None PARTICIPANTS: |
| | NRC (partial list) L. Reyes, Regional Administrator, Region II (RII) |
| | V. McCree, Deputy Regional Administrator for Operations, RII K. Kennedy, Director, Division of Reactor Safety (DRS), RII L. Wert, Director, Division of Reactor Projects (DRP), RII B. Desai, Chief, Engineering Branch 1, DRS, RII W. Rogers, Senior Reactor Analyst |
|
| |
|
| 2. From your most recent probabilistic safety analysis (PSA) including external events and fires, please provide: a. Two risk rankings of components from your site-specific probabilistic safety analysis (PSA) - one sorted by Risk Achievement Worth (RAW), and the other sorted by Birnbaum Importance. b. A list of the top 500 cutsets.
| | LICENSEE (partial list) Richard Anderson, Site Vice President Bob Hughes, Plant General Manager Eric Katzman, Licensing Manager Tom Cosgrove, Engineering Manager Abdy Khanpour, Engineering Support Jim Porter, Engineering Design Manager Cheng Guey, Risk Assessment George Tullidge, Risk Assessment 2 Enclosure MEETING CONTACT: |
| | Binoy Desai 404-562-4519 Binoy.Desai@nrc.gov AUDIO TELE-CONFERENCING Interested members of the public may participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information no later than 4:30 p.m. Wednesday, February 17, 2010. |
|
| |
|
| 3. Risk ranking of operator actions from your site specific PSA sorted by RAW. Provide copies of your human reliability worksheets for these items. 4. Any pre-existing evaluation or list of components and calculations with low design margins (i.e., pumps closest to the design limit for flow or pressure, diesel generator close to design required output, heat exchangers close to rated design heat removal, MOV risk-margin rankings, etc.). 5. A list of station applicability evaluations/reviews performed and documented in the station corrective action program in the past two years for industry events, critical equipment failures, and safety related equipment vulnerabilities (as communicated by NRC generic communications, industry communications, 10 CFR Part 21 notifications, etc.). 6. A list of operability evaluations completed within the last two years, sorted by associated component or system. 7. A list of common-cause failures of components that have occurred at the St. Lucie Nuclear Plant and have been identified within the last five years. 8. A list of equipment currently on the site's Key Equipment Priorities List, including a description of the reason(s) why each component (i.e. not a programmatic or system level concern) is on that list and summaries (if available) of your plans to address those reasons. 9. A list of equipment currently in RIS 05-020 (formerly GL 91-18) status, or in MR (a)(1) status. 10. Contact information for a person to discuss PRA information prior to the information gathering trip: name, title, phone number, and e-mail address.
| | VIDEO TELE-CONFERENCING Not Available |
| }} | | }} |
|
---|
Category:Letter
MONTHYEARIR 05000335/20230102024-01-26026 January 2024 NRC Quadrennial Focused Engineering Inspection (FEI) Commercial Grade Dedication Report 05000335/2023010 and 05000389/2023010 L-2024-010, Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3)2024-01-25025 January 2024 Point Units 3 and 4, Seabrook, Duane Arnold, and Point Beach Units 1 and 2, Nuclear Property Insurance - 10 CFR 50.54(w)(3) IR 05000335/20230042024-01-24024 January 2024 Integrated Inspection Report 05000335/2023004 and 05000389/2023004 L-2024-004, Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years2024-01-18018 January 2024 Relief Request (RR) 7, Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1) Extension of Inspection Interval for Reactor Pressure Vessel Welds from 10 to 20 Years L-2024-002, Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2024-01-0808 January 2024 Withdrawal of Proposed Alternative to American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-173, Quality Assurance Topical Report (FPL-1) Revision 30 Update2023-12-15015 December 2023 Quality Assurance Topical Report (FPL-1) Revision 30 Update L-2023-179, Unusual or Important Environmental Event - Turtle Mortality2023-12-14014 December 2023 Unusual or Important Environmental Event - Turtle Mortality L-2023-168, License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 52023-12-12012 December 2023 License Amendment Request Supplement to Revision 2 for the Technical Specifications Conversion to NUREG-1432 Revision 5 L-2023-155, Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-06542023-11-28028 November 2023 Supplement to Response to Request for Additional Information, Revised NextEra Common Emergency Plan, and Revised Site-Specific Emergency Plan Annexes Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, ML23332A1772023-11-28028 November 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-162, Response to 50.69 2nd Round of Rals2023-11-21021 November 2023 Response to 50.69 2nd Round of Rals IR 05000335/20230032023-11-0606 November 2023 Integrated Inspection Report 05000335/2023003 and 05000389/2023003 ML23270B8882023-10-23023 October 2023 Regulatory Audit Summary Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structure, Systems, and Components for Nuclear Power Reactors EPID L-2022-LLA-0182 ML23346A1322023-10-0606 October 2023 Communication from C-10 Research & Education Foundation Regarding NextEra Common Emergency Fleet Plan License Amendment Request and Related Documents Subsequently Published ML23275A1102023-10-0202 October 2023 License Amendment Request Revision 2 for the Technical Specifications Conversion to NUREG-1432, Revision 5 L-2023-131, Subsequent License Renewal Application - Second Annual Update2023-09-28028 September 2023 Subsequent License Renewal Application - Second Annual Update L-2023-136, Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-26026 September 2023 Supplement to License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-122, Corrections to the 2022 Annual Radiological Environmental Operating Report2023-09-20020 September 2023 Corrections to the 2022 Annual Radiological Environmental Operating Report IR 05000335/20233012023-09-20020 September 2023 NRC Operator License Examination Report 05000335/2023301 and 05000389/2023301 L-2023-127, Correction to the 2022 Annual Radioactive Effluent Release Report2023-09-18018 September 2023 Correction to the 2022 Annual Radioactive Effluent Release Report L-2023-113, Correction to the 2020 Annual Radiological Environmental Operating Report2023-09-14014 September 2023 Correction to the 2020 Annual Radiological Environmental Operating Report L-2023-108, Report of 10 CFR 50.59 Plant Changes2023-09-11011 September 2023 Report of 10 CFR 50.59 Plant Changes L-2023-118, Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors2023-09-11011 September 2023 Response to Request for Additional Information Regarding License Amendment Request to Adopt 10 CFR 50.69, Risk-Informed Categorization and Treatment of Structures, Systems and Components for Nuclear Power Reactors L-2023-112, Corrections to the 2021 Annual Radioactive Effluent Release Report2023-09-0606 September 2023 Corrections to the 2021 Annual Radioactive Effluent Release Report L-2023-107, Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.42023-09-0606 September 2023 Technical Specification Bases Control Program Periodic Report of Bases Changes TS 6.8.4.j.4 ML23219A0042023-09-0101 September 2023 Transmittal Letter - Safety Evaluation Related to the SLRA of St. Lucie Plant, Units 1and 2, Revision 1 L-2023-114, Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update2023-08-17017 August 2023 Proposed Turkey Point Units 6 and 7; Seabrook Station; Point Beach Units 1 and 2 - Official Service List Update L-2023-098, and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 22023-08-0707 August 2023 and Point Beach Units 1 and 2 - Response to Request for Additional Information Regarding License Amendment Request for Common Emergency Plan Consistent with NUREG-0654, Revision 2 IR 05000335/20230022023-08-0707 August 2023 Integrated Inspection Report 05000335/2023002 and 05000389/2023002 L-2023-105, Preparation and Scheduling of Operator Licensing Examinations2023-08-0303 August 2023 Preparation and Scheduling of Operator Licensing Examinations ML23201A0872023-08-0303 August 2023 Audit Plan in Support of Review of License Amendment ML23212B2652023-07-27027 July 2023 Operator Licensing Written Examination Approval 05000335/2023301 and 05000389/2023301 L-2023-099, Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump2023-07-26026 July 2023 Pump Relief Request 10 (PR-10), One-Time Request for an Alternative to the American Society of Mechanical Engineers (ASME) Operation and Maintenance (OM) Code for the Auxiliary Feedwater (AFW) 2C Pump L-2023-102, Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches2023-07-26026 July 2023 Relief Request PSL2-15-RR-01, Proposed Alternative to ASME Section XI Code Examination Requirements for Reactor Vessel Bottom Area and Piping in Covered Trenches ML23200A1232023-07-21021 July 2023 Transmittal Letter for the St. Lucie SLRA Review L-2023-097, Subsequent License Renewal Application Revision 1 - Supplement 62023-07-13013 July 2023 Subsequent License Renewal Application Revision 1 - Supplement 6 L-2023-076, In-Service Inspection Program Owner'S Activity Report (OAR-1)2023-07-11011 July 2023 In-Service Inspection Program Owner'S Activity Report (OAR-1) ML23184A0352023-06-30030 June 2023 Notification of St. Lucie Units 1 & 2 Focused Engineering Inspection (FEI) 05000335/2023010 and 05000389/2023010 and Initial Information Request L-2023-087, Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452)2023-06-29029 June 2023 Florida Power & Light/Nextera Energy, Results of the Safety Culture Program Effectiveness Review, March 20, 2023 (ADAMS Accession No. ML22340A452) IR 05000335/20234032023-06-29029 June 2023 Security Inspection Report 05000335/2023403 and 05000389/2023403 IR 05000335/20234022023-06-20020 June 2023 Security Baseline Inspection Report 05000335/2023402 and 05000389/2023402 L-2023-082, Subsequent License Renewal Application Revision 1, Supplement 52023-06-14014 June 2023 Subsequent License Renewal Application Revision 1, Supplement 5 L-2023-074, Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update2023-06-0202 June 2023 Addendum to 2021 Decommissioning Funding Status Reports / Independent Spent Fuel Storage Installation Ctsfsi) Financial Assurance Update L-2023-071, NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal2023-05-22022 May 2023 NextEra Energy Quality Assurance Topical Report (FPL-1) Revision 29 and Florida Power and Light Company Quality Assurance Program Description for 10 CFR Part 52 Licenses (FPL-2) Revision 11, Annual Submittal IR 05000335/20234012023-05-16016 May 2023 Cyber Security Inspection Report 05000335/2023401 and 05000389/2023401 (Cover Letter) IR 05000335/20230012023-05-0909 May 2023 Integrated Inspection Report 05000335/2023001 and 05000389/2023001 ML23109A1132023-04-30030 April 2023 SLRA Change Schedule Letter L-2023-059, Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response2023-04-21021 April 2023 Subsequent License Renewal Application - Aging Management Requests for Additional Information (RAI) Set 4 Supplemental Response ML23097A1642023-04-17017 April 2023 Summary of March 23, 2023, Meeting with Florida Power and Light on St. Lucie and Turkey Point Improved Technical Specifications Conversion License Amendment Requests L-2023-055, 2022 Annual Environmental Operating Report2023-04-12012 April 2023 2022 Annual Environmental Operating Report 2024-01-08
[Table view] Category:Meeting Notice
MONTHYEARPMNS20231192, Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company2023-11-0808 November 2023 Notice of Presubmittal Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20230932, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-14014 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230879, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-08-0101 August 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230809, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-07-11011 July 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230775, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-30030 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230718, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-06-12012 June 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230673, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-26026 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230599, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-05-15015 May 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230594, Annual Assessment Meeting2023-05-0404 May 2023 Annual Assessment Meeting PMNS20230449, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-18018 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230409, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-11011 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230278, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-04-0303 April 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230226, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-03-0707 March 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230134, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-22022 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230159, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-02-15015 February 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-26026 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230060, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-18018 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20230003, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2023-01-0505 January 2023 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221124, Notice of Presubmittal Meeting with Florida Power and Light to Discuss a Planned License Amendment Request for the St. Lucie Units 1 and 2 Facilities2022-10-31031 October 2022 Notice of Presubmittal Meeting with Florida Power and Light to Discuss a Planned License Amendment Request for the St. Lucie Units 1 and 2 Facilities PMNS20221132, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-31031 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20221080, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-17017 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220997, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests2022-10-0303 October 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications License Amendment Requests PMNS20220935, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-09-0909 September 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220832, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-16016 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Units 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220748, Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests2022-08-0303 August 2022 Meeting with NextEra Energy/Florida Power & Light Company to Discuss the St. Lucie Plant, Units 1 and 2 and Turkey Point Nuclear Generating, Unit Nos. 3 and 4 Improved Technical Specifications (ITS) License Amendment Requests PMNS20220468, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-05-0404 May 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20220434, Annual Assessment Meeting2022-04-21021 April 2022 Annual Assessment Meeting PMNS20220063, Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company2022-02-0101 February 2022 Notice of Meeting with NextEra Energy Llc/Florida Power & Light Company PMNS20211440, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-11-0808 November 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20211354, Environmental Scoping Meeting Related to the Saint Lucie Plant, Units 1 and 2, Subsequent License Renewal Application2021-10-19019 October 2021 Environmental Scoping Meeting Related to the Saint Lucie Plant, Units 1 and 2, Subsequent License Renewal Application PMNS20211012, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-08-13013 August 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20210781, Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications2021-06-10010 June 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light (FPL) Regarding the Conversion of Turkey Point Nuclear Generating Station, Units 3 and 4, and St. Lucie Plant, Units 1 and 2 to Improved Technical Specifications PMNS20210621, Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant,Units 1 and 2 - Safety2021-05-14014 May 2021 Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant,Units 1 and 2 - Safety PMNS20210558, Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Environmental2021-05-0606 May 2021 Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Environmental PMNS20210505, Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 2020 Annual Assessment Meeting2021-04-20020 April 2021 Annual Assessment Meeting Turkey Point Nuclear Generating Station Unit 3 & 4 2020 Annual Assessment Meeting PMNS20210362, Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Safety2021-04-19019 April 2021 Pre-Submittal Meeting for Subsequent License Renewal Application for St. Lucie Plant, Units 1 and 2 - Safety ML21076A6152021-03-22022 March 2021 NRC Pre-Submittal Meeting, St. Lucie and Turkey Point Nuclear Plants - Improved Technical Specification Conversion - March 22, 2021 (EPID L-2021-LRM-0032) (Presentation) PMNS20210260, Notice of Forthcoming Meeting with Nextera/Florida Power and Light Regarding the Conversion of Turkey Point, Units 3 and 4 and St. Lucie, Units 1 and 2 to Improved Technical Specifications2021-03-19019 March 2021 Notice of Forthcoming Meeting with Nextera/Florida Power and Light Regarding the Conversion of Turkey Point, Units 3 and 4 and St. Lucie, Units 1 and 2 to Improved Technical Specifications PMNS20201308, Meeting with NextEra Energy/Florida Power & Light Company to Discuss Generic Safety Issue-191/Generic Letter 2004-02 Closeout Letters2020-11-0505 November 2020 Meeting with NextEra Energy/Florida Power & Light Company to Discuss Generic Safety Issue-191/Generic Letter 2004-02 Closeout Letters ML20282A5872020-10-0808 October 2020 Public Pre-submittal Teleconference with Florida Power & Light Company to Discuss a Proposed License Amendment Request for St. Lucie Plant, Unit Nos. 1 and 2, to Allow Risk-Informed Completion Times for Electrical Systems ML17074A2682017-03-15015 March 2017 Notice of Public Meeting for St. Lucie Nuclear Plant Regulatory Conference Regarding White Finding ML13136A0562013-05-16016 May 2013 7/23-24/2013 Notice of Public Meeting Announcement with All Region II Licensees, Initial Examination Writers' Workshop ML13079A3462013-03-20020 March 2013 Notice of Meeting with Florida Power & Light Company to Discuss the Results of the Annual Assessment of the St. Lucie Nuclear Plant Performance and to Provide Opportunities to Discuss the Public the NRC Reactor Oversight Process ML13059A5522013-03-0101 March 2013 3/14/13 - Forthcoming Meeting with Florida Power and Light Company Regarding Steam Generator Performance at St. Lucie Nuclear Plant, Units 1 and 2 ML12299A3502012-10-23023 October 2012 Notice of Category 1 Public Meeting - St. Lucie Nuclear Plant - Unit 1 ML12297A1772012-10-23023 October 2012 Meeting Announcement Category 1 Public Meeting St. Lucie Nuclear Plant - Unit 1 Docket No. 50-335 ML12222A0392012-08-0909 August 2012 8/16/2012 Cancellation Notice of Forthcoming Conference Call with NextEra Energy and Florida Power and Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Proto ML12221A2612012-08-0707 August 2012 09/25-26/2012 Noticeo of Meeting Announcement - 2012 U.S. Nuclear Regulatory Commission (NRC) Initial Examination Writers' Workshop ML12213A0612012-08-0101 August 2012 8/16/12 Forthcoming Conference Call with NextEra Energy and Florida Power & Light Concerning Generic Letter 2004-02 and Request for NRC Staff Review of Draft Proposed Guideline for Strainer Fiber Bypass Test Protocol ML12121A5852012-04-30030 April 2012 Notice of Meeting with Florida Power & Light Company to NRC Reactor Oversight Process Annual Assessment of St. Lucie Nuclear Plant 2023-08-14
[Table view] |
Text
UNITED STATES NUCLEAR REGULATORY COMMISSION REGION II SAM NUNN ATLANTA FEDERAL CENTER 61 FORSYTH STREET, SW, SUITE 23T85 ATLANTA, GEORGIA 30303-8931 February 4, 2010 Mr. Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power and Light Company P.O.Box 14000 Juno Beach, FL 33408-0420
SUBJECT: MEETING ANNOUNCEMENT - PUBLIC MEETING CATEGORY 1 REGULATORY CONFERENCE - ST. LUCIE NUCLEAR PLANT DOCKET NOS. 50-335 AND 50-389
Dear Mr. Nazar:
This letter confirms the telephone conversation between Mr. Eric Katzman of your staff and Mr. Binoy Desai of the NRC, on February 1, 2010, concerning a Regulatory Conference, being conducted at your request, which has been scheduled for February 19, 2010, from 2 p.m. to 4:00 p.m. (EST). The meeting notice, which provides additional details, is enclosed. The purpose of the Regulatory Conference is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system.
In accordance with 10 CFR 2.390 of the NRC's "Rules of Practice," a copy of this letter and its enclosure will be available electronically for public ins pection in the NRC Public Document Room (PDR) or from the Publicly Available Records (PARS) component of NRC's Agencywide Document Access and Management System (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room).
Should you have any questions concerning this meeting, please contact me at (404) 562-4519.
Sincerely,/RA: Original signed by Mark Franke for/
Binoy B. Desai, Chief Engineering Branch 1 Division of Reactor Safety
Docket Nos.: 50-335, 50-389 License Nos.: DPR-67, NPF-16
Enclosure:
As stated
cc w/encl: (See page 2)
FP&L 2 cc w/encl: Richard L. Anderson Site Vice President St. Lucie Nuclear Plant Electronic Mail Distribution
Robert J. Hughes Plant General Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Gene St. Pierre Vice President - Fleet Organizational Support Florida Power & Light Company Electronic Mail Distribution
Mark Hicks Operations Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Eric Katzman Licensing Manager St. Lucie Nuclear Plant Electronic Mail Distribution
Abdy Khanpour Vice President Engineering Support Florida Power and Light Company P.O. Box 14000 Juno Beach, FL 33408-0420
McHenry Cornell Director Licensing and Performance Improvement Florida Power & Light Company Electronic Mail Distribution
Alison Brown Nuclear Licensing Florida Power & Light Company Electronic Mail Distribution
Mitch S. Ross Vice President and Associate General Counsel Florida Power & Light Company Electronic Mail Distribution
Marjan Mashhadi Senior Attorney Florida Power & Light Company Electronic Mail Distribution
William A. Passetti Chief Florida Bureau of Radiation Control Department of Health Electronic Mail Distribution
Ruben D. Almaguer Director Division of Emergency Preparedness Department of Community Affairs Electronic Mail Distribution
J. Kammel Radiological Emergency Planning Administrator Department of Public Safety Electronic Mail Distribution
Mano Nazar Executive Vice President and Chief Nuclear Officer Florida Power & Light Company Electronic Mail Distribution
Senior Resident Inspector St. Lucie Nuclear Plant U.S. Nuclear Regulatory Commission P.O. Box 6090 Jensen Beach, FL 34957-2010
(Vacant)
Vice President Nuclear Plant Support Florida Power & Light Company Electronic Mail Distribution
Faye Outlaw County Administrator St. Lucie County Electronic Mail Distribution
Jack Southard Director Public Safety Department St. Lucie County Electronic Mail Distribution
_
x G SUNSI REVIEW COMPLETE /RA M. Thomas/ OFFICE RII:DRS RII:DRP RII:DRS SIGNATURE RA RA RA NAME JHAMMON MSYKES BDESAI DATE 2/4/2010 2/4/2010 2/4/2010 E-MAIL COPY? YES NO YES NO YES NO YES NO YES NO YES NO YES NO Enclosure
SUBJECT: PUBLIC MEETING WITH FLORIDA POWER & LIGHT FACILITY:
ST. LUCIE NUCLEAR PLANT DOCKETS: 05000335 and 05000389 DATE & TIME:
Friday, February 19, 2010 - 2:00 p.m. to 4:00 p.m.
LOCATION:
Suite 24T25 Region II Office, Sam Nunn Atlanta Federal Center, 61 Forsyth Street, S.W., Atlanta, GA PURPOSE: The purpose of the meeting is to discuss the risk significance of the two preliminary greater than green inspection findings documented in NRC Inspection Report 05000335, 389/2009006. These findings concern apparent failures to identify and correct design issues associated with an October 8, 2008, air intrusion event from the Unit 1 containment instrument air system into the component cooling water system. The NRC's Policy Statement, "Enhancing Public Participation in NRC Meetings," effective May 28, 2002, applies to this meeting. The policy statement may be found on the NRC Web site, www.nrc.gov and contains information regarding conduct of NRC meetings.
CATEGORY:
This is a Category 1 meeting. The public is invited to observe this meeting and will have one or more opport unities to communicate with the NRC after the business portion, but before the meeting is adjourned. The NRC provides
reasonable accommodation to individuals with disabilities, where appropriate. If you need a reasonable accommodation to participate in this meeting, or need this meeting notice or the transcript or other information from the meeting in another format (e.g., braille, large print), please notify the NRC
=s meeting contact listed below. Determinations on requests for reasonable accommodation will be made on a case-by-case basis.
NRC OFFICE PARTICIPATING:
Region II OTHER ORGANIZATIONS PARTICIPATING:
None PARTICIPANTS:
NRC (partial list) L. Reyes, Regional Administrator, Region II (RII)
V. McCree, Deputy Regional Administrator for Operations, RII K. Kennedy, Director, Division of Reactor Safety (DRS), RII L. Wert, Director, Division of Reactor Projects (DRP), RII B. Desai, Chief, Engineering Branch 1, DRS, RII W. Rogers, Senior Reactor Analyst
LICENSEE (partial list) Richard Anderson, Site Vice President Bob Hughes, Plant General Manager Eric Katzman, Licensing Manager Tom Cosgrove, Engineering Manager Abdy Khanpour, Engineering Support Jim Porter, Engineering Design Manager Cheng Guey, Risk Assessment George Tullidge, Risk Assessment 2 Enclosure MEETING CONTACT:
Binoy Desai 404-562-4519 Binoy.Desai@nrc.gov AUDIO TELE-CONFERENCING Interested members of the public may participate in this meeting via a toll-free audio teleconference. Please contact the NRC meeting contact in advance of the meeting, indicating your intent to attend and to obtain teleconferencing information no later than 4:30 p.m. Wednesday, February 17, 2010.
VIDEO TELE-CONFERENCING Not Available