ML21029A233
Person / Time
Site: Waterford Entergy icon.png
Issue date: 01/29/2021
From: Wood P
Entergy Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
W3F1-2021-0007
Download: ML21029A233 (6)


Text

Entergy Operations, Inc.

17265 River Road Killona, LA 70057-3093 Tel 504 464 3786 Paul Wood Manager - Regulatory Assurance Waterford 3 W3F1-2021-0007 January 29, 2021 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555

Subject:

Submittal of Owners Activity Report Form for Inservice Inspection Performed During Operating Cycle 23 / Refuel 23 Waterford Steam Electric Station, Unit 3 Docket No. 50-382 Renewed Facility Operating License No. NPF-38 Attached is the subject report which covers the Owners Activity Report Form, OAR-1, for Waterford 3 Operating Cycle 23 / Refuel 23, enclosed as Attachment 1. This report is being submitted in accordance with ASME Code Case N-532-5, Repair/Replacement Activity Documentation Requirements and Inservice Summary Report Preparation and Submission, which was adopted for use at Waterford 3 commencing its incorporation into Regulatory Guide 1.147 and subsequent revision to CEP-RR-001 ASME Section XI Repair/Replacement Program on September 8, 2020.

The OAR-1 form is prepared and certified upon completion of each refueling outage and submitted within 90 calendar days of the completion of the refueling outage. This OAR-1 form provides: (1) a listing of items with flaws or relevant conditions that exceeded the acceptance criteria of Division 1 and that required evaluation to determine acceptability for continued service and (2) an abstract for repair/replacement activities that were required due to an item containing a flaw or relevant condition that exceeded Division 1 acceptance criteria. A copy of this letter and the attached report is also being submitted to the office of the Louisiana State Fire Marshall.

There are no new commitments contained in this submittal.

Please contact Paul Wood, Regulatory Assurance Manager, at (504) 464-3786 should you have any questions regarding this submittal.

Respectfully, Paul Wood Digitally signed by Paul Wood Date: 2021.01.29 11:46:52 -06'00' PW/llb

Attachment:

1. Owners Activity Report for Inservice Inspection Performed During Operating Cycle 23/ Refuel 23

W3F1-2021-0007 Page 2 cc: NRC Region IV Regional Administrator NRC Senior Resident Inspector - Waterford 3 NRC Project Manager - Waterford 3 Mr. H. Butch Browning, Jr.

Office of the State Fire Marshall 8181 Independence Blvd.

Baton Rouge, LA 70806

ATTACHMENT 1 To W3F1-2021-0007 Owners Activity Report for Inservice Inspection Performed During Operating Cycle 23 / Refuel 23

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 1 ITEMS WITH FLAWS OR RELEVANT CONDITIONS THAT REQUIRED EVALUATION FOR CONTINUED SERVICE Examination Category and Item Description Evaluation Description Item Number None None None

CASES OF ASME BOILER AND PRESSURE VESSEL CODE TABLE 2 ABSTRACT OF REPAIR/REPLACEMENT ACTIVITIES REQUIRED FOR CONTINUED SERVICE Description of Date Repair/Replacement Code Class Item Description Work Completed Plan Number 2CH1-30 Misc Charging 2 2CH1-30 Pipe Repair 8/2/2019 19-RR-25 Pump Suction Drain Line