ULNRC-06291, Supplement to Expedited Seismic Evaluation Process Report

From kanterella
(Redirected from ULNRC-06291)
Jump to navigation Jump to search

Supplement to Expedited Seismic Evaluation Process Report
ML16189A300
Person / Time
Site: Callaway Ameren icon.png
Issue date: 07/06/2016
From: Herrmann T
Ameren Missouri, Union Electric Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ULNRC-06291
Download: ML16189A300 (64)


Text

1r Timothy E. Herrmann, RE.

4*s i Site Vice President Ameren Missouri Ameren Callaway Energy Center F

573 676 4056 MISSOURI therrmann@ameren.com July 06, 2016 ULNRC-06291 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-000 1 10 CFR 50.54 (1)

Ladies and Gentlemen:

DOCKET NUMBER 50-483 CALLAWAY PLANT UNIT 1 UNION ELECTRIC CO.

RENEWED FACILITY OPERATING LICENSE NPF-30 SUPPLEMENT TO EXPEDITED SEISMIC EVALUATION PROCESS REPORT

References:

1.

ULNRC 0616 1, Ameren Missouri Response to NRC Request for Information Pursuant To 10 CFR 50.54(1) regarding The Seismic Aspects ofRecommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukushima Dai-ichi Accident Expedited Seismic Evaluation Process Report, dated December 22, 2014 2.

ULNRC 06239, Supplement to Expedited Seismic Evaluation Process Report, dated September 9, 2015 3.

EPRI TR-3002000704, Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2. 1 Seismic, dated May 2013 (ML13102A142)

On May 19, 2015, Union Electric Co. (dba Ameren Missouri) received a Request for Additional Information (RAI) via email related to the Expedited Seismic Evaluation Process (ESEP) Report for Callaway Plant, provided under Reference 1. Ameren Missouri transmitted responses to the RAI questions via email.

On July 1 6, 201 5, a teleconference between Ameren Missouri and NRC staff was conducted, and at that time, it was determined that additional components needed to be added to Callaways Expedited Seismic Evaluation List (ESEL). The addition ofthese components required plant walkdowns, additional engineering analysis, and submittal of a supplement to the ESEP Report. Reference 2 served as a near term supplement to Reference 1.

STARS Alliance JunctionCC [V1CCA460 Fulton, MO 65251 Am?nMissouri.com

ULNRC-0629 1 July 06, 2016 Page 2 As a result of the additional components added to the ESEL, additional plant walkdowns were performed and engineering analysis completed. This letter transmits the results of the walkdowns/analysis, and includes the following changes to the ESEP Report under Enclosure 1:

1.

Update to Section 6.2.2, Generic Screening Results, Table 6-1 : Summary of Generic Screening per NP-6041-SL, Table 2-4, 1.2g Screening Level 2.

Update to Section 6.3, Seismic Walkdown Approach 3.

Update to Section 6.6, Tabulated ESEL HCLPF Values (Including Key Failure Modes),

Table 6-3 :HCLPF Analysis Results 4.

Update to Section 9, References 5.

Update to Attachment A: Callaway Energy Center ESEL 6.

Update to Attachment B: ESEP HCLPF Values and Failure Modes Tabulation 7.

Insertion ofAttachment C: Seismic Review Team All equipment evaluated for the ESEP for Callaway Plant was found to have adequate capacity for the required seismic demand as defined by the Augmented Approach (ESEP) guidance (Reference 3), with the exception of certain relays located in Motor Control Centers (MCCs) NGO3C and NGO4C, the Condensate Storage Tank (CST), and the Refueling Water Storage Tank (RWST). The MCC relays were addressed with a procedural modification (FLEX Support Guideline revised). To address the CST, a new Hardened Condensate Storage Tank was constructed and put into service in May 2016.

Resolution of the RWST HCLEF (High Confidence of Low Probability of Failure) being less than RLGM (Review Level Ground Motion) is still in-progress.

This letter does not contain new commitments. Should you have any questions concerning the content of this letter, please contact Mr. Tom Elwood, Regulatory Affairs Supervisor, at (3 14) 225-1905.

I declare under penalty of perjury that the foregoing is true and correct.

Timothy E. Herrmann Site Vice President Executed on: 7//Zo /

EMP

ULNRC-06291 July 06, 2016 Page 3

Enclosure:

1. Updated Expedited Seismic Evaluation Process (ESEP) Report (Corrected sections only)

ULNRC-06291 July 06, 2016 Page 4 cc:

Mr. Kriss M. Kennedy Regional Administrator U. S. Nuclear Regulatory Commission Region IV 1600 East Lamar Boulevard Arlington, TX 76011-4511 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. L. John Klos Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop O-8B1 Washington, DC 20555-2738

ULNRC-06291 July 06, 2016 Page 5 Index and send hardcopy to QA File A160.0761 Hardcopy:

Certrec Corporation 4150 International Plaza Suite 820 Fort Worth, TX 76109 (Certrec receives ALL attachments as long as they are non-safeguards and may be publicly disclosed.)

Electronic distribution for the following can be made via Responses and Reports ULNRC Distribution:

F. M. Diya T. E. Herrmann B. L. Cox R. C. Wink T. B. Elwood J. T. Patterson B. E. Huhmann D. M. Stepanovic Corporate Communications NSRB Secretary STARS Regulatory Affairs Mr. John O'Neill (Pillsbury Winthrop Shaw Pittman LLP)

ENCLOSURE 1 Updated Expedited Seismic Evaluation Process (ESEP) Report (Corrected Sections Only)

The following pages identify changes to several sections of Callaway Plants original Expedited Seismic Evaluation Process (ESEP) Report (Reference 1 on the cover letter). This enclosure replaces the following sections in the original ESEP Report:

1. Update to Section 6.2.2, Generic Screening Results, Table 6-1: Summary of Generic Screening per NP-6041-SL, Table 2-4, 1.2g Screening Level
2. Update to Section 6.3, Seismic Walkdown Approach
3. Update to Section 6.6, Tabulated ESEL HCLPF Values (Including Key Failure Modes), Table 6-3:HCLPF Analysis Results
4. Update to Section 9, References
5. Update to Attachment A: Callaway Energy Center ESEL
6. Update to Attachment B: ESEP HCLPF Values and Failure Modes Tabulation
7. Insertion of Attachment C: Seismic Review Team

to ULNRC-06291 Page 1 of 59

UpdatetoSection6.2.2,GenericScreeningResults, Table61:SummaryofGenericScreeningperNP6041 SL,Table24,1.2gScreeningLevel

to ULNRC-06291 Page 2 of 59

Table 6-1: Summary of generic screening per NP-6041-SL, Table 2-4, 1.2g Screening Level Equipment Type Generic Screening Criteria Screening Result Active valves Note (f) applies Although there are no extremely large extended motor operators on 2-inch or smaller piping, valves EPHV8808A/B/C/D are large MOVs with extended, heavy operators falling outside the NP-6041-SL Figure F-26 criteria and require evaluation.

Passive valves No evaluation required.

Atmospheric storage tanks Evaluation required.

HCLPF analyses required for the atmospheric storage tanks.

Pressure vessels Notes (h), (i) apply For the pressurized tanks on the ESEL, anchorage and load path were verified by bounding calculations using qualification reports during screening. Potential failure modes of the vessel bodies were address by walkdown and design review. The Safety Injection Tanks (Accumulators) were designed satisfactorily to Note (i) requirements; however, the anchorage requires evaluation.

Batteries and racks Note (k) applies.

Batteries are in plastic shell frames braced for overturning by steel rods and are designed for seismic loads. HCLPF analyses are required for the battery rack structure and anchorage.

Horizontal pumps No evaluation required.

Although no evaluation is required for the component per se, a HCLPF evaluation for the auxiliary feedwater turbine-driven pump is required.

Active electrical power distribution panels Notes (s) and (t) apply.

Note (s) was addressed by walkdown and design review. Where bounding analysis of anchorage configurations for the RLGM could not be provided, HCLPF analyses are required.

Relays are evaluated separately per Reference 5.

Passive electrical power distribution panels Note (s) applies.

Note (s) was addressed by walkdown and design review. Where bounding analysis of anchorage configurations for the RLGM could not be provided, HCLPF analyses are required.

Transformers Notes (u) and (v) apply.

The ESEL includes dry-type transformers. A design review verified coil restraint. HCLPF analysis of anchorage is required.

to ULNRC-06291 Page 3 of 59

Battery chargers & inverters Note (w) applies.

Per walkdown and design review, the items on the ESEL are solid state units. Where bounding analysis of anchorage configurations for the RLGM could not be provided, HCLPF analyses are required.

Instrumentation and control panels and racks Notes (s) and (t) apply.

Note (s) was addressed by walkdown and design review. Where bounding analysis of anchorage configurations for the RLGM could not be provided, HCLPF analyses are required.

Relays are evaluated separately per Reference 5.

Temperature sensors; pressure and level sensors.

Note (x) applies.

Note (x) was addressed by walkdown and design review. Sensors in the scope were typically mounted in-line on piping.

Relevant notes from NP-6041-SL Table 2-4

f.

Evaluation recommended for MOVs in piping lines of 2 inches diameter or less.

h.

Margin evaluation only needs to consider anchorage and supports.

i.

For vessels designed by dynamic analysis or equivalent static analysis enveloping vessel inertial and piping loading, only the anchorage and supports require evaluation. For vessel not meeting these criteria, all potential failure modes require evaluation.

k.

Batteries mounted in braced racks designed for seismic loads or qualified by dynamic testing do not require evaluation. Rigid spacers between batteries and end restraints are required. Batteries should be tightly supported by side rails.

s.

Walkdown should be conducted to verify that the instruments are properly attached to the cabinets.

t.

Relays, contactors, switches, and breakers must be evaluated for chatter and trip if functionality during strong shaking is required.

u.

Anchorage evaluation required.

v.

Liquid-filled transformers require evaluation of overpressure safety switches. The transformer coils should be restrained within the cabinet for dry transformers.

w.

Solid state units require anchorage checks. Others require evaluation.

x.

Insufficient data are available for screening guidelines. Emphasis should be on attachments.

to ULNRC-06291 Page 4 of 59

UpdatetoSection6.3,SeismicWalkdown Approach

to ULNRC-06291 Page 5 of 59

6.3.1 Walkdown Approach Walkdowns were performed by two-person seismic review teams (SRTs) consisting of engineers with seismic experience. Walkdowns followed the guidance of Section 5 of EPRI 3002000704 and Section 2 of NP-6041-SL. The SRT used NP-6041-SL, Appendix F to evaluate item-specific equipment caveats. The SRT also recorded notes and took photographs of the items under review.

Four walkdown sessions have been performed as indicated below.

Walkdown Date SRT Plant Support Week of July 14, 2014 Hunter Young (S&A)

Samer El-Bahey (S&A)

Jim Cunningham (Callaway)

Steve Sampson (Callaway)

George Belchik (Callaway)

Week of November 3, 2014 Hunter Young (S&A)

Apostolos Karavoussianis (S&A)

David Hollabaugh (Callaway)

Week of June 29, 2015 Hunter Young (S&A Samer El-Bahey (S&A)

Various CEC Staff Week of April 11, 2016 Hunter Young (S&A Samer El-Bahey (S&A)

Various CEC Staff The walkdown findings for each item are documented in screening evaluation work sheets (SEWS). The SEWS notes also identify evaluations and reviews performed to support screening. The SEWS are included in Appendix C of Reference 10f. Also, Appendix A [10f] provides a concise summary of screening results in tabular format.

Qualifications of the SRT are provided in Appendix C.

6.3.2 Application of Previous Walkdown Information New seismic walkdowns were performed for ESEL equipment. Walkdown data ascertained in recent walkdowns of items as part of a seismic probabilistic risk assessment (S-PRA) were re-evaluated by the SRT and used for certain items. The results of the previous seismic margin evaluation, performed for the Seismic IPEEE program [11], were reviewed and used for background purposes only.

to ULNRC-06291 Page 6 of 59 6.3 Seismic Walkdown Approach

6.3.3 Significant Walkdown Findings The walkdown and screening results are summarized in Table 6-2.

to ULNRC-06291 Page 7 of 59

Table 6-2: Items Selected for HCLPF Analysis No.

ID Description Bldg Elev Basis for Selection

1.

NB001 4.16KV SWGR NB001 (Class 1E, Train A)

CB 2000

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

2.

NG001 480 V LOAD CENTER NG01 CB/CC 2000

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

Apply results to similar items NG002 and NG003.

3.

NK011 125 V BATTERY NK011 CB/CC 2016

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

Apply results to similar items NK013 and NK014.

4.

NK021 125 V BATTERY CHARGER NK021 CB/CC 2016

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

Apply results to similar items NK023 and NK024.

5.

NK025 125 V BATTERY CHARGER NK025 (Swing Battery Charger)

CB 2000

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

6.

NN001 Class 1E AC DIST SWBD NN01 (SEP GRP 1)

CB/CC 2016

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

Apply results to similar items NK043, NN003, NK051, NK041, NK001, NK003, NK004, and NN004.

7.

NN011 7.5KVA INVERTER (FED FROM BATT CHARGER NK021)

CB/CC 2016

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

Apply results to similar item NN013.

8.

PA003 CUBICLE PT FOR RCP MOTOR DPBB01A AUX 2026

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

Apply results to similar item PA004.

9.

PAL02 TDAFW Pump AUX 2000

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

to ULNRC-06291 Page 8 of 59

No.

ID Description Bldg Elev Basis for Selection

10.

RL001 REACTOR COOLANT AND SUPT SYS CONSOLE CB 2047

-06 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

Apply results to similar items RL002, RL005, RL006, and RL017 thru RL026.

11.

SB102A W CABINET FOR REACTOR TRIP SWG TRAIN-A AUX 2026

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

12.

TAP01 Condensate Storage Tank YARD 2000

-00 Perform HCLPF analysis per Appendix H of NP-6041. In addition, evaluate block wall doghouse that is adjacent for interaction hazard.

13.

TBN01 RWST YRD 2000

-00 Perform HCLPF analysis per Appendix H of NP-6041.

14.

XNG01 4.16-KV/480 V LOAD CENTER TRANSFORMER XNG01 FOR LC NG001 CB/CC 2000

-00 Anchorage could not be readily screened. Perform HCLPF analysis of anchorage.

15.

Generic Equipment 40 above grade AB/CB 2047

-06 Equipment on the Aux/Ctrl 2047.5' elevation are 40' above grade and have ISRS spectral accelerations in both horizontal directions exceeding 1.8g (with clipping) and therefore do not screen to the 2nd screening lane. HCLPF analysis for component functionality and structure (including anchorage) are required for the associated components.

Affected components include NF039A, NF039B, NF039C, NG003C, NG004C, RP053AC, RP053BC, RP053DB, RP068, RP081A, RP081B, RP289, SA036A, SA036C, SA066A, SA066B, SA075A, SB029A, SB029D, SB030A, SB032A, SB032D, SB033A, SB037, SB038, SB041, SB078, SB079, SE054A, SE054C, and SE054D.

16.

Generic BLOCK WALLS AB/ CB Var.

Per NP-6041-SL Table 2-4 seismic capacity cannot be screened and HCLPF analysis is required for block wall seismic capacity.

Affected components include NB001, NK025, NG003, TAP01, NK043, NN003, NN013, NK041, NN001, NK021, NN011, NK051, NK001, NK023, NK071, NK073, NK011, NK013, AB007, NK003, RP209, NG002, NK024, NK074, NK004, NK014, NN014, NN004, RP140, and RP334.

17.

TEP01A Safety injection tank (SIT)

RB 2000 Pressure vessel with circular skirt anchored to concrete foundation. Perform HCLPF analysis of SIT anchorage.

Additional item(s) bounded by evaluation: TEP01B, TEP01C, and TEP01D to ULNRC-06291 Page 9 of 59

No.

ID Description Bldg Elev Basis for Selection

18.

ABPV0001 Steam generator ARV AB 2046 AOV meets criteria per Figure F-25 of NP-6041-SL. However, the valve is located more than 40 feet above grade; therefore further assessment of capacity versus demand at base of component required.

Additional item(s) bounded by evaluation: ABPV0002

19.

BBHV8001A Reactor head vent valves RB 2047 SOV meets criteria per Figure F-26 of NP-6041-SL. However, the valve is located more than 40 feet above grade; therefore further assessment of capacity versus demand at base of component required.

Additional item(s) bounded by evaluation: BBHV8002A

20.

EPHV8808A Accumulator isolation valves RB 1998 Large MOV does not screen per Figure F-26 of NP-6041-SL and an evaluation showing margin against the RLGM is required.

Additional item(s) bounded by evaluation: EPHV8808B, EPHV8808C, and EPHV8808D to ULNRC-06291 Page 10 of 59

UpdatetoSection6.6,TabulatedESELHCLPF Values(IncludingKeyFailureModes),Table6 3:HCLPFAnalysisResults

to ULNRC-06291 Page 11 of 59

Table 6-3: HCLPF Analysis Results No.

ID Description Bldg Elev HCLPF1 (g, PGA)

Failure Mode Analyzed Basis Related Components

1.

NB001 4.16KV SWGR NB001 (Class 1E, Train A)

CB 2000-00 0.41 Equipment capacity and anchorage 14C4258-CAL-005 n/a

2.

NG001 480 V LOAD CENTER NG01 CB/CC 2000-00 0.41 Equipment capacity and anchorage 14C4258-CAL-005 NG002, NG003

3.

NK011 125 V BATTERY NK011 CB/CC 2016-00 2.36 Anchorage 14C4258-CAL-004 NK013, NK014

4.

NK021 125 V BATTERY CHARGER NK021 CB/CC 2016-00 1.33 Anchorage 14C4258-CAL-004 NK023, NK024

5.

NK025 125 V BATTERY CHARGER NK025 (Swing Battery Charger)

CB 2000-00 0.85 Anchorage 14C4258-CAL-004 n/a

6.

NN001 Class 1E AC DIST SWBD NN01 (SEP GRP 1)

CB/CC 2016-00 0.71 Anchorage 14C4258-CAL-004 NK043, NN003, NK051, NK041, NK001, NK003, NK004, NN004

7.

NN011 7.5KVA INVERTER (FED FROM BATT CHARGER NK021)

CB/CC 2016-00 0.75 Anchorage 14C4258-CAL-004 NN013

8.

PA003 CUBICLE PT FOR RCP MOTOR DPBB01A AUX 2026-00 0.62 Anchorage 14C4258-CAL-004 PA004

9.

PAL02 TDAFW Pump AUX 2000-00 1.75 Anchorage 14C4258-CAL-004 n/a

10. RL001 REACTOR AUX CNTRL PANEL CB 2047-06 0.71 Anchorage 14C4258-CAL-004 RL002, RL005, RL006, RL017 thru RL026
11. SB102A W CABINET FOR REACTOR TRIP SWG TRAIN-A AUX 2026-00 0.58 Anchorage 14C4258-CAL-004 n/a
12. TAP01 Condensate Storage Tank YARD 2000-00 0.30 Equipment capacity and anchorage 14C4258-CAL-002 n/a
13. TBN01 RWST YRD 2000-00 0.33 Equipment capacity and anchorage 14C4258-CAL-002 n/a
14. XNG01 4.16-KV/480 V LOAD CENTER TRANSFORMER XNG01 FOR LC NG001 CB/CC 2000-00 0.45 Anchorage 14C4258-CAL-004 1 HCLPFs based upon RLGM (PGA=0.40g) as the seismic margins earthquake with the exception of TAP01, TBN01, and the CST pipe house block walls, which are based upon the GMRS (PGA=0.50g).

to ULNRC-06291 Page 12 of 59

No.

ID Description Bldg Elev HCLPF1 (g, PGA)

Failure Mode Analyzed Basis Related Components

15. Generic Equipment >40 SE054A NIS Cabinet CB 2047-06 0.41 Equipment capacity and anchorage 14C4258-CAL-005 SE054C, SE054D SB037 7300 Series Three Bay Cabinets CB 2047-06 0.41 Equipment capacity and anchorage 14C4258-CAL-005 SB038, SB041, SB078, SB079 SA066A STATUS INDICATING SYS CB 2047-06 0.41 Equipment capacity and anchorage 14C4258-CAL-005 SA066B RP068 BOP Instrumentation Panel CB 2047-06 0.41 Equipment capacity and anchorage 14C4258-CAL-005 n/a RP053AC BOP Instrumentation Rack CB 2047-06 0.41 Equipment capacity and anchorage 14C4258-CAL-005 RP053BC, RP053DB RP081A T/C SUBCOOLING MONITOR CABINET CB 2047-06 0.41 Equipment capacity and anchorage 14C4258-CAL-005 RP081B
16. Generic Block Wall Seismic Interaction CTRL 2000 All block walls on CTRL 2000 elev CB 2000-00 1.17 Seismic interaction 14C4258-CAL-003 NB001, NK025, NG003, RP140, and RP334.

CTRL 2016 All block walls on CTRL 2016 elev CB 2016-00 0.87 Seismic interaction 14C4258-CAL-003 NK043, NN003, NN004, NN013, NN014, NK041, NN001, NK021, NN011, NK051, NK001, NK023, NK071, NK073, NK074 NK011, NK013, NK014, AB007, NK003, NK004, NK024 AUX 2000 2000 elev wall on column line AF north of Stair A-2 AUX 2000-00 0.67 Seismic interaction 14C4258-CAL-003 RP209 CST House CST Pipe house masonry walls YARD 2000-00 0.40 Seismic interaction 14C4258-CAL-003 TAP01

17. Generic Cabinets containing essential relays NG003C MCC NG03C BUS CB 2047-06 0.32 Functional capacity and host component capacity 14C4258-CAL-005 NG004C to ULNRC-06291 Page 13 of 59

No.

ID Description Bldg Elev HCLPF1 (g, PGA)

Failure Mode Analyzed Basis Related Components NG002B MCC NG02B BUS CB 2026-00 0.40 Functional capacity and host component capacity 14C4258-CAL-005 NG001A FC0219 LOCAL CONTROL PANEL FOR TD AFW PUMP AB 2000-00 0.41 Functional capacity and host component capacity 14C4258-CAL-005 n/a

18. TEP01A Safety injection tank (SIT)

RB 2000 0.60g Anchorage 15C4354-CAL-001

[6c]

TEP01B, TEP01C, and TEP01D

19. ABPV0001 Steam generator ARV AB 2046

>RLGM Equipment capacity 15C4354-CAL-001 ABPV0002

20. BBHV8001A Reactor head vent valves RB 2047

>RLGM Equipment capacity 15C4354-CAL-001 BBHV8002A

21. EPHV8808A Accumulator isolation valves RB 2000

>RLGM Equipment capacity 15C4354-CAL-001 EPHV8808B, EPHV8808C, and EPHV8808D to ULNRC-06291 Page 14 of 59

UpdatetoSection9,References to ULNRC-06291 Page 15 of 59

References

1.

Letter from E. J. Leeds and M. R. Johnson, USNRC, to M. W. Sunseri, WCNOC, Request for Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(f)

Regarding Recommendations 2.1, 2.3, and 9.3 of the Near-Term Task Force Review of Insights from the Fukushima Dai-Ichi Accident, March 12, 2012. ADAMS Accession No. ML12053A340.

2.

Letter from E. J. Leeds, USNRC, to J. E. Pollock, NEI, Electric Power Research Institute Final Draft Report XXXXXX, Seismic Evaluation Guidance: Augmented Approach for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1: Seismic, as an Acceptable Alternative to the March 12, 2012, Information Request for Seismic Reevaluations, May 7, 2013. 3002000704; ADAMS Accession No. ML13106A331.

3.

Callaway Overall Integrated Plan (OIP) in Response to the March 12, 2012, Commission Order EA-12-049.

a.

Callaway Letter ULNRC-05962, Docket No. 50-483: Callaway Plant Unit 1 Union Electric Co. Facility Operating License NPF-30 Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), February 18, 2013, (ADAMS Accession Number ML13063A459).

b.

Callaway Letter ULNRC-06024, Docket No. 50-483: Callaway Plant Unit 1 Union Electric Co. Facility Operating License NPF-30 First Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), August 29, 2013, (ADAMS Accession Number ML13242A239).

c.

Callaway Letter ULNRC-06087, Docket No. 50-483: Callaway Plant Unit 1 Union Electric Co. Facility Operating License NPF-30 Second Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), February 26, 2014, (ADAMS Accession Number ML14057A770).

d.

Callaway Letter ULNRC-06135, Docket No. 50-483: Callaway Plant Unit 1 Union Electric Co. Facility Operating License NPF-30 Third Six-Month Status Report in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design-Basis External Events (Order Number EA-12-049), August 28, 2014, (ADAMS Accession Number ML13063A459).

to ULNRC-06291 Page 16 of 59

4.

SCP-15-35, Revision 1, Transmittal of the Revised Expedited Seismic Equipment List (ESEL) Update, September 2015.

5.

S&A report 14C4258-RPT-003, Rev. 0, Callaway ESEL Relay Assessment, December 2014.

6.

CEC FSAR, Rev. OL-20, Callaway Energy Center Final Safety Analysis Report (FSAR).

December 2013.

7.

Callaway Seismic Hazard and GMRS submittal, dated March 31, 2014.

8.

Electric Power Research Institute Report, NP-6041-SLR1, Revision 1, A Methodology for Assessment of Nuclear Power Plant Seismic Margin, 1991.

9.

Electric Power Research Institute Report, TR-103959, Methodology for Developing Seismic Fragilities, 1994.

10.

S&A Calculations:

a) 14C4258-CAL-001 Rev. 0, Generation of Scaled In-Structure Response Spectra for Callaway, December 2014.

b) 14C4258-CAL-002 Rev. 0, Seismic Capacity of CST (TAP01) and RWST (TBN01),

December 2014.

c) 14C4258-CAL-003 Rev. 0, HCLPF Analyses for Block Walls, December 2014.

d) 14C4258-CAL-004 Rev. 0, HCLPF Seismic Capacity Evaluations for Selected Equipment, December 2014.

e) 14C4258-CAL-005 Rev. 0, HCLPF Analysis of Components Based on Seismic Test Data, December 2014.

f) 14C4258-RPT-002, Revision 1, Seismic Evaluation of Equipment at CEC for the Expedited Seismic Evaluation Process, December 2014.

g) 14C4254-CAL-001, Revision 0, Screening and HCLPF Evaluations for ESEP Supplemental Items, April 2016.

h) 15C4354-RPT-001, Revision 0, Seismic Evaluation of ESEP Supplemental Items at CEC, April 2016.

11.

ULNRC-3232, Callaway Plant Individual Plant Examination of External Events (IPEEE),

June 1995.

12.

Electric Power Research Institute Report, NP-5223-SL, Revision 1, Generic Seismic Ruggedness of Power Plant Equipment, 1991.

13.

Electric Power Research Institute Technical Report, TR-1019200, Seismic Fragility Applications Guide Update, 2009.

14.

Letter from A. R. Pietrangelo, NEI, to D. L Skeen, USNRC, Seismic Risk Estimates for Plants in the Central and Eastern United States, March 12, 2014. ADAMS Accession No. ML14083A584.

15.

NRC (E Leeds) Letter to All Power Reactor Licensees et al., Screening and Prioritization Results Regarding Information Pursuant to Title 10 of the Code of Federal Regulations 50.54(F) Regarding Seismic Hazard Re-Evaluations for Recommendation 2.1 of the Near-to ULNRC-06291 Page 17 of 59

Term Task Force Review of Insights From the Fukushima Dai-Ichi Accident, May 9, 2014.

16.

Seismic Evaluation Guidance: Screening, Prioritization and Implementation Details (SPID) for the Resolution of Fukushima Near-Term Task Force Recommendation 2.1:

Seismic. EPRI, Palo Alto, CA: February 2013. 1025287.

17.

Letter from A. R. Pietrangelo, NEI, to D. L. Skeen, USNRC, Proposed Path Forward for NTTF Recommendation 2.1: Seismic Reevaluations, April 9, 2013. ADAMS Accession No. ML13107B386.

to ULNRC-06291 Page 18 of 59

UpdatetoAttachmentA:

CallawayEnergyCenterESEL

to ULNRC-06291 Page 19 of 59

Attachment A: Callaway Energy Center ESEL to ULNRC-06291 Page 20 of 59

Table 1: Callaway Updated ESEL ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State SG AFW from Turbine Driven Auxiliary Feedwater Pump 1

TAP01 Condensate Storage Tank Operable Operable CST provides AFW suction for the first 17 hours1.967593e-4 days <br />0.00472 hours <br />2.810847e-5 weeks <br />6.4685e-6 months <br /> 2

PAL02 TDAFW Pump Not Operating Operating TDAFW provides pump power to move AFW to SG 3

ALHV0034 MOV Open Closed MOV required to isolate flow path 4

ALHV0035 MOV Open Closed MOV required to isolate flow path 5

ALPI0029 Suction Pressure Indicator N/A N/A TDAFW pump suction pressure indicator 6

ALFE0049 TDAFWP Miniflow Flow Element N/A N/A AFW flow related hardware 7

ALFI0049 TDAFWP Miniflow Flow Indicator N/A N/A AFW flow related hardware 8

APLV0002 Level Control Valve Open Closed Fail closed valve Turbine Driven Auxiliary Feedwater Pump Discharge to SG Feed Piping 9

ALPI0020 TDAFW Pump Discharge Pressure Indicator N/A N/A Pump discharge pressure Feed Path To SG "C" 10 ALHV0012 Air Operated Valve Open Open Valve may be operated to throttle AFW flow to SG 11 ALFE0004 Flow Element N/A N/A AFW flow related hardware 12 ALFT0004 Flow Transmitter N/A N/A AFW flow related hardware 13 ALFT0011 Flow Transmitter N/A N/A AFW flow related hardware 14 AEFV0041 Feedwater Isolation Valve Open Closed Fail closed valve Feed Path To SG "B" 15 ALHV0010 Air Operated Valve Open Open Valve may be operated to throttle AFW flow to SG 16 ALFE0003 Flow Element N/A N/A N/A 17 ALFT0003 Flow Transmitter N/A N/A AFW flow related hardware 18 ALFT0009 Flow Transmitter N/A N/A AFW flow related hardware to ULNRC-06291 Page 21 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 19 AEFV0040 Feedwater Isolation Valve Open Closed Fail closed valve Feed Path To SG "A" 20 ALHV0008 Air Operated Valve Open Open Valve may be operated to throttle AFW flow to SG 21 ALFE0002 Flow Element N/A N/A AFW flow related hardware 22 ALFT0002 Flow Transmitter N/A N/A AFW flow related hardware 23 ALFT0007 Flow Transmitter N/A N/A AFW flow related hardware 24 AEFV0039 Feedwater Isolation Valve Open Closed Fail closed valve Feed Path To SG "D" 25 ALHV0006 Air Operated Valve Open Open Valve may be operated to throttle AFW flow to SG 26 ALFE0001 Flow Element N/A N/A AFW flow related hardware 27 ALFT0001 Flow Transmitter N/A N/A AFW flow related hardware 28 AEFV0042 Feedwater Isolation Valve Open Closed Fail closed valve Steam Supply To Auxiliary Feed Water Pump Turbine "B" SG Main Steam Line 29 ABHV0005 Air Operated Valve Closed Fail Open TDAFW controls and steam flow controls. Fails open.

30 ABHV0048 Air Operated Valve Open Fail Closed TDAFW controls and steam flow controls. Fails closed.

"C" SG Main Steam Line 31 ABHV0006 Air Operated Valve Closed Fail Open TDAFW controls and steam flow controls. Fails open.

32 ABHV0049 Air Operated Valve Open Fail Closed TDAFW controls and steam flow controls. Fails closed.

Turbine Steam Supply Line 33 FCPI0311 Pressure Indicator N/A N/A TDAFW turbine inlet steam pressure 34 FCLT0010 Level Indicator N/A N/A Needed to prevent water intrusion in TDAFWP to ULNRC-06291 Page 22 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 35 FCFV0310 Level Control Valve Open Fail Closed Needed to prevent water intrusion in TDAFWP.

Valve fails closed.

36 FCHV0312 Trip and Throttle Valve Closed Operating TDAFW controls and steam flow controls.

Operation of this manual valve should be accounted for in operating procedures.

37 Speed Governor Standby Operating TDAFW controls and steam flow controls.

38 FCFV0313 Speed Governor Valve Open Operating TDAFW controls and steam flow controls.

39 KFC02 AFW Pump Turbine Not Operating Operating TDAFW controls and steam flow controls.

RCS Makeup Primary Connection Point 40 BBPV8702A RHR TO RCS Closed Open 41 EMHV8803B MOTOR-OPERATED VALVE EMHV8803B Closed Open Primary flow path, can be operated manually 42 EMHV8801B MOTOR-OPERATED VALVE EMHV8801B Closed Open Primary flow path, can be operated manually 43 EMFE0924 ECCS FLOW TO RCS COLD-LEG 1 N/A N/A ECCS flow hardware 44 EMFE0925 ECCS FLOW TO RCS COLD-LEG 2 N/A N/A ECCS flow hardware 45 EMFE0926 ECCS FLOW TO RCS COLD-LEG 3 N/A N/A ECCS flow hardware 46 EMFE0927 ECCS FLOW TO RCS COLD-LEG 4 N/A N/A ECCS flow hardware 47 TBN01 RWST N/A N/A Secondary source for core makeup after BAT exhausted 48 BNLT0930 RWST Level Transmitter N/A N/A Monitor RWST level 49 EJHCV0606 RHR Heat Exchanger A Outlet Isolation Valve Fail Open Closed Can be operated manually 50 TBG03A Boric Acid Tank N/A N/A N/A 51 BGLT0102 BORIC ACID TANK A LEV N/A N/A Monitor BAT level 52 BGLI0102 BORIC ACID TANK A LEV N/A N/A Local level indicator 53 EJFCV0610 RHR Pump A miniflow Valve Open Closed N/A to ULNRC-06291 Page 23 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State Electrical 54 NB001 4.16KV SWGR NB001 (Class 1E, Train A)

N/A N/A This component is powered by the FLEX DG in Phase 3 as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 55 NB00101 4.16 kV FDR BKR FOR RHRP-A DPEJ01A (Residual Heat Removal Pump A)

N/A N/A This component is powered by the FLEX DG in Phase 3 as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 56 NB00107 4.16 kV FDR BKR FOR CCWP-A DPEG01A (Component Cooling Water Pump A)

N/A N/A This component is powered by the FLEX DG in Phase 3 as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 57 NB00109 4.16 kV FLEX GEN (Phase 3) TIE-IN POINT (BKR) FOR TRAIN A N/A N/A This breaker position is the tie-in point for the Phase 3 FLEX diesel generator 58 NB00113 4.16 kV FDR BKR FOR XFMR XNG01 (4160 V to 480 V for LC NG001)

N/A N/A This component is powered by the FLEX DG in Phase 3 as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 59 XNG01 4.16-KV/480 V LOAD CENTER TRANSFORMER XNG01 FOR LC NG001 N/A N/A This component is powered by the FLEX DG in Phase 3 as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 60 NG001 480 V LOAD CENTER NG01 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 24 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 61 NG00101 MAIN BKR FOR LC NG01 N/A N/A This component is powered by the FLEX DG in Phase 3 as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 62 NG00103 FDR BKR FOR 125 V VITAL BATTERY CHARGER NK021 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 63 NG00112 FLEX 500 kW TIE IN BRK (Phase 2 connection point)

N/A N/A This component is powered by the FLEX DG in Phase 2 as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 64 NG00116 TIE BKR (CONNECTS NG01 AND NG03)

N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 65 NG003 480 V LOAD CENTER NG03 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 66 NG00303 FDR BKR FOR 125 V VITAL BATTERY CHARGER NK023 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 67 NK021 125 V BATTERY CHARGER NK021 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 25 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 68 NK071 TRANSFER SWITCH BUS NK01 BATTERY CHARGER NK21/NK25 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 69 NK001 125 VDC BUS SWITCHBOARD NK001 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 70 NK00102 FDR BKR FROM BATT CHGR NK021 TO NK001 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 71 NK00104 MAIN BREAKER FOR CNTRL AND DIST PNL NK041 (PART OF SWBD NK001)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 72 NK00105 MAIN BREAKER FOR CNTRL AND DIST PNL NK051 (PART OF SWBD NK001)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 73 NK011 125 V BATTERY NK011 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 74 NK00101 ISOLATION BKR FOR BATTERY NK011 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 26 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 75 NK00111 FDR BKR FOR INVERTER NN011 (PART OF SWBD NK001)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 76 NN011 7.5KVA INVERTER (FED FROM BATT CHARGER NK021)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 77 NN001 Class 1E AC DIST SWBD NN01 (SEP GRP

1)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 78 SA066A STATUS INDICATING SYS N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 79 SENY0060A NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 60A N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 80 SENY0060B NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 60B N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 81 SB038 W PROCESS ANALOG PROTECTION SET CAB-01 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 27 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 82 SE054A W NUC INSTM NIS 1 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 83 RP053AC BOP INSTRUMENTATION RACK (TERMINATION AREA)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 84 SB078 RPV LEVEL INSTR SYS (RVLIS) PROC PROT SYS CABINET N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 85 RP081A T/C SUBCOOLING MONITOR CABINET N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 86 NK041 CNTRL & INSTR DIST SWBD NK041 (CLASS 1E 125 VDC)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 87 NE107 DIESEL GEN PNL NE107 & FIELD FLASHING N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 88 RL005 TURBINE GENERATOR AND FW CONSOLE N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 28 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 89 RL006 TURBINE GENERATOR AND FW CONSOLE N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 90 RP315 DC DIST PNL RP315 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 91 RL023 TURBINE GENERATOR AND FW MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 92 RL024 TURBINE GENERATOR AND FW MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 93 RL017 ESF MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 94 RL018 ESF MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 95 RL019 ESF MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 29 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 96 RL020 ESF MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 97 RL001 REACTOR COOLANT AND SUPT SYS CONSOLE N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 98 RL002 REACTOR COOLANT AND SUPT SYS CONSOLE N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 99 RL025 TURBINE GENERATOR AND FW MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 100 RL026 TURBINE GENERATOR AND FW MCB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 101 RP317 FUSED 125 VDC DIST PNL RP317 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 102 NK051 CNTRL & INSTR DIST SWBD NK051 (CLASS 1E 125 VDC)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 30 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 103 BBPCV0455A BBPCV0455A PORV SOLENOID FAILS TO OPEN ON DEMAND N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 104 RL021 REACTOR AUX CNTRL PANEL N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 105 RL022 REACTOR AUX CNTRL PANEL N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 106 KJ0121 DIESEL GAUGE AND CONTROL PANEL N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 107 RP209 B AUXILIARY RELAY RACK N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 108 RP289 DC DIST PNL RP289 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 109 RP068 MISC BOP INSTRUMENT RACK N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 31 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 110 RP330 AUX RELAY RACK RP330 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 111 RP332 B AUXILIARY RELAY RACK N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 112 NK051A EM'CY LIGHTING DIST SWBD NK051A (SUBPNL OF NK051)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 113 NK023 125 V BATTERY CHARGER NK023 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 114 NK073 TRANSFER SWITCH BUS NK03 BATTERY CHARGER NK23/NK25 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 115 NK003 125 VDC BUS SWITCHBOARD NK003 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 116 NK00302 FDR BKR FROM BATT CHGR NK023 TO NK003 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 32 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 117 NK00304 MAIN BREAKER FOR CNTRL AND DIST PNL NK043 (PART OF SWBD NK003)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 118 NK013 125 V BATTERY NK013 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 119 NK00301 ISOLATION BKR FOR BATTERY NK013 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 120 NK00311 FDR BKR FOR INVERTER NN013 (PART OF SWBD NK003)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 121 NN013 7.5KVA INVERTER (FED FROM BATT CHARGER NK023)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 122 NN003 Class 1E AC DIST SWBD NN03 (SEP GRP

3)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 123 RP053DB BOP INSTR RACK RP053DB N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan to ULNRC-06291 Page 33 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 124 SB037 W PROCESS ANALOG PROTECTION SET CAB-03 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 125 SE054C W NUC INSTM NIS 3 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 126 NK043 CNTRL & INSTR DIST SWBD NK043 (CLASS 1E 125 VDC)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 127 AB007 Aux Relay Rack N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Plant FLEX Integrated Plan 128 NG00109 FDR BKR FOR 125 V SWING BATTERY CHARGER NK025 N/A N/A This component provides power to NK025 and, in turn, Separation Group 1.

129 NK025 125 V BATTERY CHARGER NK025 (Swing Battery Charger)

N/A N/A The A-Train swing charger will be used to power Separation Group 1.

130 NG002 480 V LOAD CENTER NG02 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Integrated FLEX Plan 131 NG00212 FLEX 500 kW TIE IN BKR from FD201 (Phase 2 connection point)

N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Integrated FLEX Plan to ULNRC-06291 Page 34 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 132 NG00203 FDR BKR FOR 125 V VITAL BATTERY CHARGER NK024 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Integrated FLEX Plan 133 NK024 125 V BATTERY CHARGER NK024 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Integrated FLEX Plan 134 NK074 TRANSFER SWITCH BUS NK04 BATTERY CHARGER NK24/NK26 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Integrated FLEX Plan 135 NK004 125 VDC BUS SWITCHBOARD NK004 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 136 NK00402 FDR BKR FROM BATT CHGR NK024 TO NK004 N/A N/A This component is powered by the FLEX DG, first Phase 2, then in Phase 3, as stated in Sect. 8 of the Callaway Integrated FLEX Plan 137 NK014 125 V BATTERY NK014 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 138 NK00401 ISOLATION BKR FOR BATTERY NK014 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan to ULNRC-06291 Page 35 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 139 NK00411 FDR BKR FOR INVERTER NN011 (PART OF SWBD NK004)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 140 NN014 7.5KVA INVERTER (FED FROM BATT CHARGER NK024)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 141 NN004 Class 1E AC DIST SWBD NN04 (SEP GRP

4)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 142 RP147B BOP Instrumentation Rack RP147B N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 143 SENY0061A NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 61A N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 144 SENY0061B NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 61B N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 145 SE054D W NUC INSTM NIS 4 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan to ULNRC-06291 Page 36 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 146 SB041 W PROCESS ANALOG PROTECTION SET CAB-04 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 147 RP053BC BOP Instrumentation Rack RP053BC N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 148 SB079 RVLIS Process Cabinet SB079 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 149 RP081B Subcooling Monitor Cabinet N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 150 SB148B W PROCESS PROTECTION (Fire Isolation)

N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 151 SA066B STATUS INDICATING SYS N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan 152 RP140 PANEL RP140 N/A N/A This component is powered during ALL phases of the FLEX strategy as stated in Sect. 8 of the Callaway Integrated FLEX Plan to ULNRC-06291 Page 37 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State Additional Items in Response to NRC Clarification Questions 153 ABPT0514 Steam Generator A Pressure Transmitter (Steam Generator Pressure)

N/A N/A Monitor S/G pressure in all three phases 154 ABPT0524 Steam Generator B Pressure Transmitter (Steam Generator Pressure)

N/A N/A Monitor S/G pressure in all three phases 155 ABPT0534 Steam Generator C Pressure Transmitter (Steam Generator Pressure)

N/A N/A Monitor S/G pressure in all three phases 156 ABPT0544 Steam Generator D Pressure Transmitter (Steam Generator Pressure)

N/A N/A Monitor S/G pressure in all three phases 157 ABPV0001 Steam Generator A Atmospheric Steam Dump (Steam Generator Atmospheric Relief Valves)

Closed Open ARV will need to cycle open as needed to remove heat from steam generators 158 ABPV0002 Steam Generator B Atmospheric Steam Dump (Steam Generator Atmospheric Relief Valves)

Closed Open ARV will need to cycle open as needed to remove heat from steam generators 159 AELT0529 Steam Generator B Narrow Range Level Transmitter (Steam Generator Water Level)

N/A N/A Monitor S/G level in all three phases 160 AELT0539 Steam Generator C Narrow Range Level Transmitter (Steam Generator Water Level)

N/A N/A Monitor S/G level in all three phases 161 BBHV8001A RCS Reactor Vessel Head Vent A Upstream Valve (Reactor Head Vent)

Closed Standby Flow limited by choked flow at RCS pressure.

Maintained for defense in depth 162 BBHV8002A RCS Reactor Vessel Head Vent A Downstream Valve (Reactor Head Vent)

Closed Standby Flow limited by choked flow at RCS pressure.

Maintained for defense in depth to ULNRC-06291 Page 38 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 163 BBPCV455A Pressurizer Power Operated Relief Valve (Pressurizer PORV)

Closed Standby PORVs operate in normal manner as conditions require. Not preferred path. Maintained for defense in depth.

164 BBPT0455 RCS Pressurizer Pressure Channel 1 (RCS Pressure)

N/A N/A Monitor RCS pressure in all three phases 165 BBTE0413A RCS LOOP 1 Wide Range Hot Leg Prot A Temperature Element (RCS Temperature)

N/A N/A Monitor RCS temperature in all three phases 166 BBTE0413B RCS LOOP 1 Wide Range Cold Leg Prot A Temperature Element (RCS Temperature)

N/A N/A Monitor RCS temperature in all three phases 167 BBTE0423A RCS LOOP 2 Wide Range Hot Leg Prot A Temperature Element (RCS Temperature)

N/A N/A Monitor RCS temperature in all three phases 168 BBTE0423B RCS LOOP 2 Wide Range Cold Leg Prot A Temperature Element (RCS Temperature N/A N/A Monitor RCS temperature in all three phases 169 EPHV8808A Accumulator Tank A Outlet Isolation Valve (Accumulator Isolation Valves)

Open Closed Valve will need to be closed when the accumulators are empty 170 EPHV8808B Accumulator Tank B Outlet Isolation Valve (Accumulator Isolation Valves)

Open Closed Valve will need to be closed when the accumulators are empty 171 EPHV8808C Accumulator Tank C Outlet Isolation Valve (Accumulator Isolation Valves)

Open Closed Valve will need to be closed when the accumulators are empty 172 EPHV8808D Accumulator Tank D Outlet Isolation Valve (Accumulator Isolation Valves)

Open Closed Valve will need to be closed when the accumulators are empty 173 GNPT0936 Containment Atmospheric Pressure Channel 2 Pressure Transmitter (Containment Pressure)

N/A N/A Monitor containment pressure in all three phases to ULNRC-06291 Page 39 of 59

ESEL Item Num.

Equipment Operating State Notes/Comments ID Normal State Normal State Desired State 174 GNPT0937 Containment Atmospheric Pressure Channel 1 Pressure Transmitter(Containment Pressure)

N/A N/A Monitor containment pressure in all three phases 175 TEP01A Safety Injection Accumulator Tank A (Accumulators)

N/A N/A Needed only for Phase 1.

Will be isolated before completely empty.

176 TEP01B Safety Injection Accumulator Tank B (Accumulators)

N/A N/A Needed only for Phase 1.

Will be isolated before completely empty.

177 TEP01C Safety Injection Accumulator Tank C (Accumulators)

N/A N/A Needed only for Phase 1.

Will be isolated before completely empty.

178 TEP01D Safety Injection Accumulator Tank D (Accumulators)

N/A N/A Needed only for Phase 1.

Will be isolated before completely empty.

to ULNRC-06291 Page 40 of 59

UpdatetoAttachmentB:

ESEPHCLPFValuesandFailureModesTabulation

to ULNRC-06291 Page 41 of 59

Attachment B: ESEP HCLPF Values and Failure Modes Tabulation HCLPF values are listed in Table B-1. These notes are applicable:

1. The listed HCLPF value is for comparison to the horizontal PGA at the surface.
2. Items covered by the NP-6041-SL rule of the box (ROB) are identified in Table A-2 [9]. In each case, the HCLPF value for the parent item applies.
3. Where an anchorage HCLPF is performed but the component per se is screened, the equipment capacity is assigned based upon the 1.2g peak spectral acceleration coinciding with the 2nd screening lane of NP-6041-SL, Table 2-4. Since the WCGS RLGM has a peak spectral acceleration of 0.93g and PGA of 0.29g [Reference 10e], the 1.2g peak spectral acceleration corresponds with a PGA of 0.38g (witness 1.2g/0.93g*0.29g=0.38g). For equipment located above 40, the equipment capacity is conservatively assigned at the RLGM level of 0.29g.
4. For the CST and RWST only (TAP01 and TBN01, respectively), the applied ground motion was based on the GMRS (PGA = 0.29).
5. As a result of the relay chatter evaluation, additional items were added to the ESEL list for evaluation.

to ULNRC-06291 Page 42 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 1

TAP01 Condensate Storage Tank YARD 2000-00 0.3 Anchorage Tank capacity evaluated in 14C4258-CAL-002. Block wall evaluated per 14C4258-CAL-003.

2 PAL02 TDAFW Pump AUX 2000-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

3 ALHV0034 MOV AUX 1988-00

>RLGM Screened SRT disposition 4

ALHV0035 MOV AUX 1988-00

>RLGM Screened SRT disposition 5

ALPI0029 Suction Pressure Indicator AUX 2000-00

>RLGM Screened SRT disposition 6

ALFE0049 TDAFWP Miniflow Flow Element AUX 2000-00

>RLGM Screened SRT disposition 7

ALFI0049 TDAFWP Miniflow Flow Indicator AUX 2000-00

>RLGM Screened SRT disposition 8

APLV0002 Level Control Valve YARD 2000-00

>RLGM Screened SRT disposition 9

ALPI0020 TDAFW Pump Discharge Pressure Indicator AUX 2000-00

>RLGM Screened SRT disposition 10 ALHV0012 Air Operated Valve AUX 2004-07

>RLGM Screened SRT disposition 11 ALFE0004 Flow Element AUX 2000-00

>RLGM Screened SRT disposition 12 ALFT0004 Flow Transmitter AUX 2016-01

>RLGM Screened SRT disposition 13 ALFT0011 Flow Transmitter AUX 2000-00

>RLGM Screened SRT disposition 14 AEFV0041 Feedwater Isolation Valve AUX 2028-00

>RLGM Screened SRT disposition 15 ALHV0010 Air Operated Valve AUX 2002-09

>RLGM Screened SRT disposition 16 ALFE0003 Flow Element AUX 2000-00

>RLGM Screened SRT disposition 17 ALFT0003 Flow Transmitter AUX 2016-00

>RLGM Screened SRT disposition 18 ALFT0009 Flow Transmitter AUX 2000-00

>RLGM Screened SRT disposition 19 AEFV0040 Feedwater Isolation Valve AUX 2027-10

>RLGM Screened SRT disposition 20 ALHV0008 Air Operated Valve AUX 2004-00

>RLGM Screened SRT disposition 21 ALFE0002 Flow Element AUX 2000-00

>RLGM Screened SRT disposition 22 ALFT0002 Flow Transmitter AUX 2016-00

>RLGM Screened SRT disposition 23 ALFT0007 Flow Transmitter AUX 2000-00

>RLGM Screened SRT disposition 24 AEFV0039 Feedwater Isolation Valve AUX 2028-00

>RLGM Screened SRT disposition 25 ALHV0006 Air Operated Valve AUX 2001-06

>RLGM Screened SRT disposition 26 ALFE0001 Flow Element AUX 2000-00

>RLGM Screened SRT disposition 27 ALFT0001 Flow Transmitter AUX 2015-00

>RLGM Screened SRT disposition 28 AEFV0042 Feedwater Isolation Valve AUX 2027-10

>RLGM Screened SRT disposition 29 ABHV0005 Air Operated Valve AUX 2027-10

>RLGM Screened SRT disposition 30 ABHV0048 Air Operated Valve AUX 2027-10

>RLGM Screened SRT disposition to ULNRC-06291 Page 43 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 31 ABHV0006 Air Operated Valve AUX 2027-10

>RLGM Screened SRT disposition 32 ABHV0049 Air Operated Valve AUX 2027-10

>RLGM Screened SRT disposition 33 FCPI0311 Pressure Indicator AUX 2000-00

>RLGM Screened SRT disposition 34 FCLT0010 Level Indicator AUX 2000-00

>RLGM Screened SRT disposition 35 FCFV0310 Level Control Valve AUX 1988-00

>RLGM Screened SRT disposition 36 FCHV0312 Trip and Throttle Valve AUX 2000-00

>RLGM Screened SRT disposition 37 Speed Governor Speed Governor AUX 2000-00 0.4 Equipment Capacity Item is ROB to PAL02.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

38 FCFV0313 Speed Governor Valve AUX 2000-00 0.4 Equipment Capacity Item is ROB to PAL02.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

39 KFC02 AFW Pump Turbine AUX 2000-00 0.4 Equipment Capacity Item is ROB to PAL02.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

40 BBPV8702A RHR TO RCS RB 2007-09

>RLGM Screened SRT disposition 41 EMHV8803B MOTOR-OPERATED VALVE EMHV8803B AUX 1975-08

>RLGM Screened SRT disposition 42 EMHV8801B MOTOR-OPERATED VALVE EMHV8801B AUX 2002-00

>RLGM Screened SRT disposition 43 EMFE0924 ECCS FLOW TO RCS COLD-LEG 1 RB 1998-06

>RLGM Screened SRT disposition 44 EMFE0925 ECCS FLOW TO RCS COLD-LEG 2 RB 1998-06

>RLGM Screened SRT disposition 45 EMFE0926 ECCS FLOW TO RCS COLD-LEG 3 RB 1998-06

>RLGM Screened SRT disposition 46 EMFE0927 ECCS FLOW TO RCS COLD-LEG 4 RB 1998-06

>RLGM Screened SRT disposition 47 TBN01 RWST YRD 2000-00 0.33 Anchorage Tank capacity evaluated in 14C4258-CAL-002.

48 BNLT0930 RWST Level Transmitter YRD 1993-00

>RLGM Screened SRT disposition 49 EJHCV0606 RHR Heat Exchanger A Outlet Isolation Valve AUX 2001-06

>RLGM Screened SRT disposition 50 TBG03A Boric Acid Tank AUX 1974-00

>RLGM Screened SRT disposition 51 BGLT0102 BORIC ACID TANK A LEV AUX 1968-01

>RLGM Screened SRT disposition 52 BGLI0102 BORIC ACID TANK A LEV CB 2047-06 0.4 Equipment Capacity Item is ROB to RL001.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

53 EJFCV0610 RHR Pump A miniflow Valve AUX 1968-01

>RLGM Screened SRT disposition to ULNRC-06291 Page 44 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 54 NB001 4.16KV SWGR NB001 (Class 1E, Train A)

CB 2000-00 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005 Block wall evaluated per 14C4258-CAL-003.

55 NB00101 4.16 kV FDR BKR FOR RHRP-A DPEJ01A (Residual Heat Removal Pump A)

CB 2000-00 0.41 Anchorage Item is ROB to NB001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

Block wall evaluated per 14C4258-CAL-003.

56 NB00107 4.16 kV FDR BKR FOR CCWP-A DPEG01A (Component Cooling Water Pump A)

CB 2000-00 0.41 Anchorage Item is ROB to NB001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

57 NB00109 4.16 kV FLEX GEN (Phase 3) TIE-IN POINT (BKR) FOR TRAIN A CB 2000-00 0.41 Anchorage Item is ROB to NB001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

58 NB00113 4.16 kV FDR BKR FOR XFMR XNG01 (4160 V to 480 V for LC NG001)

CB 2000-00 0.41 Anchorage Item is ROB to NB001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

59 XNG01 4.16-KV/480 V LOAD CENTER TRANSFORMER XNG01 FOR LC NG001 CB/CC 2000-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

60 NG001 480 V LOAD CENTER NG01 CB/CC 2000-00 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

61 NG00101 MAIN BKR FOR LC NG01 CB 2000-00 0.41 Anchorage Item is ROB to NG001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

62 NG00103 FDR BKR FOR 125 V VITAL BATTERY CHARGER NK021 CB 2000-00 0.41 Anchorage Item is ROB to NG001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

to ULNRC-06291 Page 45 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 66 NG00112 FLEX 350 kW TIE IN BRK (Alternate Phase 2 connection point)

CB 2000-00 0.41 Anchorage Item is ROB to NG001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

64 NG00116 TIE BKR (CONNECTS NG01 AND NG03)

CB 2000-00 0.41 Anchorage Item is ROB to NG001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

65 NG003 480 V LOAD CENTER NG03 CB/CC 2000-00 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

Block wall evaluated per 14C4258-CAL-003.

66 NG00303 FDR BKR FOR 125 V VITAL BATTERY CHARGER NK023 CB 2000-00 0.41 Anchorage Item is ROB to NG003.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

Block wall evaluated per 14C4258-CAL-003.

67 NK021 125 V BATTERY CHARGER NK021 CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

68 NK071 TRANSFER SWITCH BUS NK01 BATTERY CHARGER NK21/NK25 CB 2016-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

69 NK001 125 VDC BUS SWITCHBOARD NK001 CB/CC 2016-00 0.71 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

70 NK00102 FDR BKR FROM BATT CHGR NK021 TO NK001 CB 2016-00 0.71 Anchorage Item is ROB to NK001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

71 NK00104 MAIN BREAKER FOR CNTRL AND DIST PNL NK041 (PART OF SWBD NK001)

CB 2016-00 0.71 Anchorage Item is ROB to NK001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

to ULNRC-06291 Page 46 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 72 NK00105 MAIN BREAKER FOR CNTRL AND DIST PNL NK051 (PART OF SWBD NK001)

CB 2016-00 0.71 Anchorage Item is ROB to NK001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

73 NK011 125 V BATTERY NK011 CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

74 NK00101 ISOLATION BKR FOR BATTERY NK011 CB 2016-00 0.71 Anchorage Item is ROB to NK001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

75 NK00111 FDR BKR FOR INVERTER NN011 (PART OF SWBD NK001)

CB 2016-00 0.71 Anchorage Item is ROB to NK001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

76 NN011 7.5KVA INVERTER (FED FROM BATT CHARGER NK021)

CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

77 NN001 Class 1E AC DIST SWBD NN01 (SEP GRP 1)

CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

78 SA066A STATUS INDICATING SYS CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

79 SENY0060A NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 60A AUX 2026-00

>RLGM Screened SRT disposition 80 SENY0060B NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 60B AUX 2026-00

>RLGM Screened SRT disposition 81 SB038 W PROCESS ANALOG PROTECTION SET CAB-01 CB/CC 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

to ULNRC-06291 Page 47 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 82 SE054A W NUC INSTM NIS 1

CB/CC 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

83 RP053AC BOP INSTRUMENTATION RACK (TERMINATION AREA)

CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

84 SB078 RPV LEVEL INSTR SYS (RVLIS) PROC PROT SYS CABINET CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

85 RP081A T/C SUBCOOLING MONITOR CABINET CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

86 NK041 CNTRL & INSTR DIST SWBD NK041 (CLASS 1E 125 VDC)

CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

87 NE107 DIESEL GEN PNL NE107 & FIELD FLASHING DGB 2000-00

>RLGM Screened SRT disposition 88 RL005 TURBINE GENERATOR AND FW CONSOLE CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

89 RL006 TURBINE GENERATOR AND FW CONSOLE CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

90 RP315 DC DIST PNL RP315 ESW Pumphouse 2000-00

>RLGM Screened SRT disposition 91 RL023 TURBINE GENERATOR AND FW MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

92 RL024 TURBINE GENERATOR AND FW MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

93 RL017 ESF MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

94 RL018 ESF MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

95 RL019 ESF MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

to ULNRC-06291 Page 48 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 96 RL020 ESF MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

97 RL001 REACTOR COOLANT AND SUPT SYS CONSOLE CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

98 RL002 REACTOR COOLANT AND SUPT SYS CONSOLE CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

99 RL025 TURBINE GENERATOR AND FW MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

100 RL026 TURBINE GENERATOR AND FW MCB CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

101 RP317 FUSED 125 VDC DIST PNL RP317 UHS 2000-00

>RLGM Screened SRT disposition 102 NK051 CNTRL & INSTR DIST SWBD NK051 (CLASS 1E 125 VDC)

CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

103 BBPCV0455A BBPCV0455A PORV SOLENOID FAILS TO OPEN ON DEMAND RB 2070-00

>RLGM Screened SRT disposition 104 RL021 REACTOR AUX CNTRL PANEL CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

105 RL022 REACTOR AUX CNTRL PANEL CB 2047-06 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

106 KJ0121 DIESEL GAUGE AND CONTROL PANEL DGB 2000-00

>RLGM Screened SRT disposition 107 RP209 B AUXILIARY RELAY RACK AUX 2000-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

108 RP289 DC DIST PNL RP289 AUX 2047-06

>RLGM Screened SRT disposition 109 RP068 MISC BOP INSTRUMENT RACK CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

110 RP330 AUX RELAY RACK RP330 AUX 2000-00

>RLGM Screened SRT disposition 111 RP332 B AUXILIARY RELAY RACK AUX 2000-00

>RLGM Screened SRT disposition to ULNRC-06291 Page 49 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 112 NK051A EM'CY LIGHTING DIST SWBD NK051A (SUBPNL OF NK051)

CB 2016-00 0.4 Equipment Capacity Item is ROB to NK051.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

113 NK023 125 V BATTERY CHARGER NK023 CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

114 NK073 TRANSFER SWITCH BUS NK03 BATTERY CHARGER NK23/NK25 CB 2016-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

115 NK003 125 VDC BUS SWITCHBOARD NK003 CB/CC 2016-00 0.71 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

116 NK00302 FDR BKR FROM BATT CHGR NK023 TO NK003 CB 2016-00 0.71 Anchorage Item is ROB to NK003.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

117 NK00304 MAIN BREAKER FOR CNTRL AND DIST PNL NK043 (PART OF SWBD NK003)

CB 2016-00 0.71 Anchorage Item is ROB to NK003.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

118 NK013 125 V BATTERY NK013 CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

119 NK00301 ISOLATION BKR FOR BATTERY NK013 CB 2016-00 0.71 Anchorage Item is ROB to NK003.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

120 NK00311 FDR BKR FOR INVERTER NN013 (PART OF SWBD NK003)

CB 2016-00 0.71 Anchorage Item is ROB to NK003.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

to ULNRC-06291 Page 50 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 121 NN013 7.5KVA INVERTER (FED FROM BATT CHARGER NK023)

CB/CC 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

122 NN003 Class 1E AC DIST SWBD NN03 (SEP GRP 3)

CB/CC 2016-00 0.71 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

123 RP053DB BOP INSTR RACK RP053DB CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

124 SB037 W PROCESS ANALOG PROTECTION SET CAB-03 CB/CC 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

125 SE054C W NUC INSTM NIS 3

CB/CC 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

126 NK043 CNTRL & INSTR DIST SWBD NK043 (CLASS 1E 125 VDC)

CB/CC 2016-00 0.71 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

127 AB007 Aux Relay Rack CB 2016-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

128 NG00109 FDR BKR FOR 125 V SWING BATTERY CHARGER NK025 CB 2000-00 0.41 Anchorage Item is ROB to NG001.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

129 NK025 125 V BATTERY CHARGER NK025 (Swing Battery Charger)

CB 2000-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

130 NG002 480 V LOAD CENTER NG02 CB 2000-00 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005 Block wall evaluated per 14C4258-CAL-003.

to ULNRC-06291 Page 51 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 131 NG00212 FLEX 500 kW TIE IN BKR from FD201 (Phase 2 connection point)

CB 2000-00 0.41 Anchorage Item is ROB to NG002.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

132 NG00203 FDR BKR FOR 125 V VITAL BATTERY CHARGER NK024 CB 2000-00 0.41 Anchorage Item is ROB to NG002.

Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

133 NK024 125 V BATTERY CHARGER NK024 CB 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

134 NK074 TRANSFER SWITCH BUS NK04 BATTERY CHARGER NK24/NK26 CB 2016-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

135 NK004 125 VDC BUS SWITCHBOARD NK004 CB 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

136 NK00402 FDR BKR FROM BATT CHGR NK024 TO NK004 CB 2016-00 0.4 Equipment Capacity Item is ROB to NK004.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

137 NK014 125 V BATTERY NK014 CB 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

138 NK00401 ISOLATION BKR FOR BATTERY NK014 CB 2016-00 0.4 Equipment Capacity Item is ROB to NK004.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

139 NK00411 FDR BKR FOR INVERTER NN011 (PART OF SWBD NK004)

CB 2016-00 0.4 Equipment Capacity Item is ROB to NK004.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

140 NN014 7.5KVA INVERTER (FED FROM BATT CHARGER NK024)

CB 2016-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

141 NN004 Class 1E AC DIST SWBD NN04 (SEP GRP 4)

CB 2016-00 0.4 Equipment Capacity Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Block wall evaluated per 14C4258-CAL-003.

to ULNRC-06291 Page 52 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis 142 RP147B BOP Instrumentation Rack RP147B CB 2000-00

>RLGM Screened SRT disposition 143 SENY0061A NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 61A AUX 2047-00

>RLGM Screened SRT disposition 144 SENY0061B NEUTRON FLUX MONITORING SYSTEM DETECTOR AMPLIFIER SENY 61B AUX 2047-00

>RLGM Screened SRT disposition 145 SE054D W NUC INSTM NIS 4

CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

146 SB041 W PROCESS ANALOG PROTECTION SET CAB-04 CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

147 RP053BC BOP Instrumentation Rack RP053BC CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

148 SB079 RVLIS Process Cabinet SB079 CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

149 RP081B Subcooling Monitor Cabinet CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

150 SB148B W PROCESS PROTECTION (Fire Isolation)

CB 2000-00

>RLGM Screened SRT disposition 151 SA066B STATUS INDICATING SYS CB 2047-06 0.41 Anchorage Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

152 RP140 PANEL RP140 CB 2000-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

Note 5 BGLI0104 BORIC ACID TANK A LEV CB 2047-06 0.4 Equipment Capacity Item is ROB to RL002.

Component per se screened. Anchorage evaluated per 14C4258-CAL-004.

Note 5 BGLT0104 BORIC ACID TANK A LEV AUX 1974-00

>RLGM Screened SRT disposition Note 5 BNHV0003 RWST SUPPLY TO CTMT SPRAY PUMP B

AUX 1974-00

>RLGM Screened SRT disposition to ULNRC-06291 Page 53 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis Note 5 BNHV0004 RWST SUPPLY TO CTMT SPRAY PUMP A

AUX 1974-00

>RLGM Screened SRT disposition Note 5 BNHV8806A RWST TO SAFETY INJ PUMP A SUCTION AUX 1976-10

>RLGM Screened SRT disposition Note 5 BNHV8806B RWST TO SAFETY INJ PUMP B SUCTION AUX 1976-10

>RLGM Screened SRT disposition Note 5 BNHV8812B RWST TO RHR PUMP B SUCTION AUX 1968-01

>RLGM Screened SRT disposition Note 5 BNLT0933 RWST Level Transmitter YRD 1993-00

>RLGM Screened SRT disposition Note 5 FC0219 LOCAL CONTROL PANEL FOR TD AFW PUMP AUX 2002-00 0.41 Equipment Capacity Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

Relay functionality evaluated per 14C4258-CAL-005.

Note 5 NG002B MCC NG02B BUS AUX 2026-00 0.4 Relay functionality Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-004.

Relay functionality evaluated per 14C4258-CAL-005.

Note 5 NG003C MCC NG03C BUS AUX 2047-00 0.32 Relay functionality Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

Relay functionality evaluated per 14C4258-CAL-005.

Note 5 NG004C MCC NG04C BUS AUX 2047-00 0.32 Relay functionality Equipment capacity evaluated in 14C4258-CAL-005. Anchorage evaluated per 14C4258-CAL-005.

Relay functionality evaluated per 14C4258-CAL-005.

Note 5 RP334 LOCKOUT RELAY RACK CB 2000-00 0.4 Equipment Capacity Component per se screened. Block wall evaluated per 14C4258-CAL-003.

153 ABPT0514 Steam Generator A Pressure Transmitter (Steam Generator Pressure)

AUX 2026

>RLGM Screened SRT disposition 154 ABPT0524 Steam Generator B Pressure Transmitter (Steam Generator Pressure)

AUX 2026

>RLGM Screened SRT disposition 155 ABPT0534 Steam Generator C Pressure AUX 2026

>RLGM Screened SRT disposition to ULNRC-06291 Page 54 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis Transmitter (Steam Generator Pressure) 156 ABPT0544 Steam Generator D Pressure Transmitter (Steam Generator Pressure)

AUX 2026

>RLGM Screened SRT disposition 157 ABPV0001 Steam Generator A Atmospheric Steam Dump (Steam Generator Atmospheric Relief Valves)

AUX 2038

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

158 ABPV0002 Steam Generator B Atmospheric Steam Dump (Steam Generator Atmospheric Relief Valves)

AUX 2038

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

159 AELT0529 Steam Generator B Narrow Range Level Transmitter (Steam Generator Water Level)

RB 2026

>RLGM Screened SRT disposition 160 AELT0539 Steam Generator C Narrow Range Level Transmitter (Steam Generator Water Level)

RB 2026

>RLGM Screened SRT disposition 161 BBHV8001A RCS Reactor Vessel Head Vent A Upstream Valve (Reactor Head Vent)

RB 2047

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

162 BBHV8002A RCS Reactor Vessel Head Vent A Downstream Valve (Reactor Head Vent)

RB 2047

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

163 BBPCV455A Pressurizer Power Operated Relief Valve (Pressurizer PORV)

RB 2068

>RLGM Screened SRT disposition 164 BBPT0455 RCS Pressurizer Pressure Channel 1 (RCS Pressure)

RB 2026

>RLGM Screened SRT disposition 165 BBTE0413A RCS LOOP 1 Wide Range Hot Leg Prot.

A Temperature Element (RCS Temperature)

RB 2000

>RLGM Screened SRT disposition 166 BBTE0413B RCS LOOP 1 Wide Range Cold Leg Prot. A Temperature Element (RCS Temperature)

RB 2000

>RLGM Screened SRT disposition 167 BBTE0423A RCS LOOP 2 Wide Range Hot Leg Prot.

A Temperature Element (RCS RB 2000

>RLGM Screened SRT disposition to ULNRC-06291 Page 55 of 59

ESEL Item Number ID Description Bldg Elev HCLPF Failure Mode Basis Temperature) 168 BBTE0423B RCS LOOP 2 Wide Range Cold Leg Prot. A Temperature Element (RCS Temperature)

RB 2000

>RLGM Screened SRT disposition 169 EPHV8808A Accumulator Tank A Outlet Isolation Valve (Accumulator Isolation Valves)

RB 2000

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

170 EPHV8808B Accumulator Tank B Outlet Isolation Valve (Accumulator Isolation Valves)

RB 2000

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

171 EPHV8808C Accumulator Tank C Outlet Isolation Valve (Accumulator Isolation Valves)

RB 2000

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

172 EPHV8808D Accumulator Tank D Outlet Isolation Valve (Accumulator Isolation Valves)

RB 2000

>RLGM Screened Valve functionality demonstrated to screen per analysis in 15C4354-CAL-001.

173 GNPT0936 Containment Atmospheric Pressure Channel 2 Pressure Transmitter (Containment Pressure)

AUX 2026

>RLGM Screened SRT disposition 174 GNPT0937 Containment Atmospheric Pressure Channel 1 Pressure Transmitter (Containment Pressure)

AUX 2026

>RLGM Screened SRT disposition 175 TEP01A Safety Injection Accumulator Tank A (Accumulators)

RB 2000 0.60 Anchorage Capacity Tank and anchorage evaluated per 15C4354-CAL-001.

176 TEP01B Safety Injection Accumulator Tank B (Accumulators)

RB 2000 0.60 Anchorage Capacity Tank and anchorage evaluated per 15C4354-CAL-001.

177 TEP01C Safety Injection Accumulator Tank C (Accumulators)

RB 2000 0.60 Anchorage Capacity Tank and anchorage evaluated per 15C4354-CAL-001.

178 TEP01D Safety Injection Accumulator Tank D (Accumulators)

RB 2000 0.60 Anchorage Capacity Tank and anchorage evaluated per 15C4354-CAL-001.

to ULNRC-06291 Page 56 of 59

InsertionofAttachmentC:SeismicReviewTeam

to ULNRC-06291 Page 57 of 59

Attachment C: Seismic Review Team to ULNRC-06291 Page 58 of 59

The SRT consisted of seismic engineers from Stevenson & Associates. Brief resumes for team members are provided below.

Samer El-Bahey, Ph.D., P.E.

Dr. El-Bahey is a Senior Engineer and qualified SCE in the S&A Phoenix office with specialization in the dynamic analysis and design of structures and equipment for seismic, blast, fluid, and wind loads. He has performed seismic walkdowns and fragility analyses of structures and components associated with NTTF Recommendation 2.1, NTTF Recommendation 2.3, and ESEP, all including those performed at CEC. Dr.

El-Bahey has performed the seismic analyses of braced steel frames, concrete foundations, masonry walls, large storage tanks, and electrical and mechanical equipment anchorages. In addition, Dr. El-Bahey has executed the walkdown and analysis of tank structures and their associated leak path piping to assess loss of inventory in the event of beyond-design-basis seismic events using manual and finite element methods. Dr. El-Bahey has a Ph.D. and a Masters of Science in Structural Engineering from the State University of New York at Buffalo. He has received industry training as Seismic Capability Engineer (EPRI 5-day SQUG training) and completed the EPRI training for NTTF 2.3 plant seismic walkdowns. He is a licensed P.E. (civil) in California.

Apostolos Karavoussianis Mr. Karavoussianis is a senior consultant in the S&A Phoenix office. He has performed seismic walkdowns of structures and components at numerous facilities for the GIP A-46 and IPEEE programs.

Mr. Karavoussianis has also managed, led, or participated in several seismic walkdown initiatives associated with NTTF Recommendation 2.1 and NTTF Recommendation 2.3. He has also prepared, reviewed, and approved seismic evaluations for electrical and mechanical equipment. Mr.

Karavoussianis is a qualified Seismic Capable Engineer (SCE) and has completed the Seismic Qualification Utility Group (SQUG) Walkdown Screening and Seismic Evaluation Training Course.

Hunter A. Young, P.E.

Mr. Young is a Senior Engineer and qualified SCE in the S&A Phoenix office with specialization in structural dynamic analysis of structures and equipment for natural and man-made phenomena hazards. He has managed, led, or participated in over 20 seismic walkdown initiatives associated with NTTF Recommendation 2.1 (including WCGS), NTTF Recommendation 2.3 (including WCGS), EPRI NP-6695, and various S-PRA fragility endeavors. Mr. Young has a Master of Engineering in Structural Engineering from the Massachusetts Institute of Technology and Bachelors of Science in Civil Engineering (BSCE) from the University of Notre Dame. He is a licensed P.E. (civil) in California, Kansas, and Missouri and has completed the SQUG Walkdown Screening and Seismic Evaluation Training Course.

to ULNRC-06291 Page 59 of 59