MONTHYEARML23291A2962023-10-18018 October 2023 Enclosure - Callaway Cycle 27 Core Operating Limits Report, Revision 0 - August 2023 ULNRC-06750, Cycle 26 Core Operating Limits Report2022-06-13013 June 2022 Cycle 26 Core Operating Limits Report ULNRC-06616, Cycle 25 - Core Operating Limits Report2020-09-30030 September 2020 Cycle 25 - Core Operating Limits Report ULNRC-06413, Submittal of Core Operating Limits Report, Cycle 232018-01-26026 January 2018 Submittal of Core Operating Limits Report, Cycle 23 ULNRC-06299, Core Operating Limits Report, Cycle 222016-04-27027 April 2016 Core Operating Limits Report, Cycle 22 ULNRC-06156, Cycle 21 Core Operating Limits Report2014-11-17017 November 2014 Cycle 21 Core Operating Limits Report ULNRC-06039, Core Operating Limits Reports2013-09-13013 September 2013 Core Operating Limits Reports ULNRC-06021, Owners Activity Report (OAR-1 Forms) for Cycle 19 and Refuel 192013-08-21021 August 2013 Owners Activity Report (OAR-1 Forms) for Cycle 19 and Refuel 19 ULNRC-06014, Core Operating Limits Report2013-07-15015 July 2013 Core Operating Limits Report ML13156A0632013-06-0404 June 2013 Attachment - Callaway Cycle 20 Redesign: Core Operating Limits Report, Revision 1 ULNRC-05863, Cycle 18 Commitment Change Summer Report2012-05-14014 May 2012 Cycle 18 Commitment Change Summer Report ULNRC-05831, Cycle 19, Facility Operating License NPF-30, Core Operating Limits Report2011-12-0505 December 2011 Cycle 19, Facility Operating License NPF-30, Core Operating Limits Report ULNRC-05706, Cycle 18 Core Operating Limits Report2010-06-24024 June 2010 Cycle 18 Core Operating Limits Report ULNRC-05632, Core Operating Limits Report, Cycle 17, Revision 12009-05-20020 May 2009 Core Operating Limits Report, Cycle 17, Revision 1 ULNRC-05561, Core Operating Limits Report, Rev. 02008-11-12012 November 2008 Core Operating Limits Report, Rev. 0 ULNRC-05530, Core Operating Limits Report, Revision 22008-07-24024 July 2008 Core Operating Limits Report, Revision 2 ULNRC-05421, Submittal of Core Operating Limits Report2007-06-0606 June 2007 Submittal of Core Operating Limits Report ML0713103492007-03-31031 March 2007 Cycle 16, Core Operating Limits Report, Revision 0 ULNRC-05335, Core Operating Limits Report, Revision 12006-09-28028 September 2006 Core Operating Limits Report, Revision 1 ULNRC-05228, Core Operating Limits Report, Rev. 02005-11-0404 November 2005 Core Operating Limits Report, Rev. 0 ULNRC-05007, Core Operating Limits Report2004-05-24024 May 2004 Core Operating Limits Report ULNRC-04869, Core Operating Limits Report2003-06-27027 June 2003 Core Operating Limits Report 2023-10-18
[Table view] Category:Letter type:ULNRC
MONTHYEARULNRC-06890, 10 CFR 50.55a(z)(1) Requests for Relief from Inservice Inspection Requirements of ASME Boiler Pressure Vessel Code, Section XI2024-12-19019 December 2024 10 CFR 50.55a(z)(1) Requests for Relief from Inservice Inspection Requirements of ASME Boiler Pressure Vessel Code, Section XI ULNRC-06902, Application to Revise Technical Specifications to Adopt TSTF-591, Revised Risk Informed Completion Time (RICT) Program (LDCN 24-0018)2024-12-0505 December 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revised Risk Informed Completion Time (RICT) Program (LDCN 24-0018) ULNRC-06907, Supplementation Information and Response to Request for Confirmation of Information (RCI) to Resolve Callaway Plant License Renewal Commitments 34 and 35 - Perform Evaluation of Crack Initiation and Propagation of Steam Generator.2024-12-0505 December 2024 Supplementation Information and Response to Request for Confirmation of Information (RCI) to Resolve Callaway Plant License Renewal Commitments 34 and 35 - Perform Evaluation of Crack Initiation and Propagation of Steam Generator. ULNRC-06901, Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter)2024-10-0101 October 2024 Concurrent Inoperability of Control Room Air Conditioning System Train and Opposite Train Emergency Diesel Generator Results in Condition Prohibited by Technical Specifications Limiting (Letter) ULNRC-06891, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00052024-06-26026 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0005 ULNRC-06892, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00062024-06-26026 June 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0006 ULNRC-06884, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00022024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0002 ULNRC-06885, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00032024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0003 ULNRC-06886, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00042024-06-12012 June 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0004 ULNRC-06880, Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008)2024-06-0606 June 2024 Application to Revise Technical Specifications to Adopt Tstf-569, Rev. 2, Revise Response Time Testing Definition (LDCN 24-0008) ULNRC-06882, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC00122024-05-16016 May 2024 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Canister HGMPC0012 ULNRC-06877, Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 252024-05-0606 May 2024 Final Safety Analysis Report Revision OL-27 and Technical Specification Bases Revision 25 ULNRC-06856, CFR 50.59 and 10 CFR 72.48 Summary Report2024-05-0101 May 2024 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06869, Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report2024-04-30030 April 2024 Submittal of Callaway, Unit 1, 2023 Annual Radiological Environmental Operating Report ULNRC-06876, Registration of Dry Spent Fuel Storage Canister HGMPC00102024-04-25025 April 2024 Registration of Dry Spent Fuel Storage Canister HGMPC0010 ULNRC-06866, Submittal of Cycle 26 Commitment Change Summary Report2024-04-17017 April 2024 Submittal of Cycle 26 Commitment Change Summary Report ULNRC-06871, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00072024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0007 ULNRC-06872, Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC00082024-04-17017 April 2024 Independent Spent Fuel Storage Installation, Registration of Dry Spent Fuel Storage Canister HGMPC0008 ULNRC-06863, Submittal of Annual Exposure Report for 20232024-03-20020 March 2024 Submittal of Annual Exposure Report for 2023 ULNRC-06852, Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 262024-03-0505 March 2024 Owners Activity Reports (OAR-1 Forms) for Cycle/Refuel 26 ULNRC-06858, Completion of License Renewal Activities Prior to Entering the Period of Extended Operation2024-02-21021 February 2024 Completion of License Renewal Activities Prior to Entering the Period of Extended Operation ULNRC-06853, Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.7172024-01-29029 January 2024 Submittal of 2023 Fitness for Duty Performance Data Per Per 10 CFR 26.717 ULNRC-06847, Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01)2023-12-21021 December 2023 Supplement to Relief Request from Requirements of ASME BPV Code, Section XI, Subsection Iwl Regarding Examination and Testing of the Unbonded Post-Tensioning System (Relief Request C3R-01) ULNRC-06849, License Renewal Resolution for Commitments 34 and 35 – Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds2023-12-20020 December 2023 License Renewal Resolution for Commitments 34 and 35 – Perform Evaluation of Crack Initiation and Propagation in Steam Generator Divider Plate and Tube-To-Tubesheet Welds ULNRC-06844, Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification2023-12-0707 December 2023 Request for Exemption from Specific Requirements in 2023 Security Rule, Enhanced Weapons, Firearms Background Checks, and Security Event Notification ULNRC-06827, Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029)2023-11-20020 November 2023 Supplement to License Amendment Request Regarding Support System Requirements for Residual Heat Removal and Control Room Air Conditioning Systems Under Technical Specifications 3.4.8, 3.7.11, and 3.9.6 (LDCN 22-0029) ULNRC-06824, Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A2023-08-17017 August 2023 Response to Request for Additional Information Regarding Operating Quality Assurance Manual (Oqam) Revision 36A ULNRC-06830, Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak2023-08-15015 August 2023 Transmittal of Updated Technical Specification Markup and Clean Pages for License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak ULNRC-06223, Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004)2023-07-25025 July 2023 Minor Correction to License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate Test Frequencies (LDCN 2020-0004) ULNRC-06799, Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications2023-07-13013 July 2023 Submittal of Licensee Event Report 2022-003-01, Class 1E Electrical Air Conditioning System Thermal Expansion Valve Failure Resulted in Condition Prohibited by Technical Specifications ULNRC-06821, Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301)2023-06-21021 June 2023 Post-Audit Follow-Up Information in Support of Callaways License Amendment Request and Proposed Exemption to Allow Use of Framatome Gaia Fuel (LDCN 22-0002) (EPID L-2022-LLA-0150 and EPID L-2022-LLE-00301) ULNRC-06822, Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a2023-06-14014 June 2023 Additional Information Regarding Request for NRC Approval of Operating Quality Assurance Manual (Oqam) Revision 36a ULNRC-06815, Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a2023-06-0505 June 2023 Request for NRC Approval of Operating Quality Assurance Manual, Revision 36a ULNRC-06818, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate .2023-06-0505 June 2023 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specification 5.5.16, Containment Leakage Rate Testing Program, for Permanent Extension of Type a and Type C Leak Rate . ULNRC-06816, Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015)2023-05-0909 May 2023 Withdrawal of Previously Submitted Enclosures Regarding License Amendment Request for Adoption of Alternative Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06812, Submittal of 2022 Annual Radiological Environmental Operating Report2023-04-27027 April 2023 Submittal of 2022 Annual Radiological Environmental Operating Report ULNRC-06806, Submittal of Radiological Emergency Response Plan, Revision 552023-04-12012 April 2023 Submittal of Radiological Emergency Response Plan, Revision 55 ULNRC-06807, Submittal of Single Positive Test Forms2023-04-0303 April 2023 Submittal of Single Positive Test Forms ULNRC-06801, CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions2023-03-30030 March 2023 CFR 50.46 Annual Report Regarding ECCS Evaluation Model Revisions ULNRC-06798, Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan2023-03-30030 March 2023 Submittal of Status of Plant Decommissioning Funding and ISFSI Decommissioning Funding Plan ULNRC-06803, Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection2023-03-29029 March 2023 Submittal of Response to Request for Additional Information Regarding Results of Steam Generator Tube In-Service Inspection ULNRC-06751, Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control2023-03-29029 March 2023 Application to Revise Technical Specifications to Adopt TSTF-501-A, Rev. 1, Relocate Stored Oil & Lube Oil Volume Values to Licensee Control ULNRC-06804, Submittal of Nuclear Property Insurance Reporting2023-03-29029 March 2023 Submittal of Nuclear Property Insurance Reporting ULNRC-06805, Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days2023-03-21021 March 2023 Transmittal of Special Report 2023-02 Non-Functionality of Containment Hydrogen Analyzer Channel for Greater than 30 Days ULNRC-06795, Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms2023-01-24024 January 2023 Submittal of Fitness for Duty Reports for 2022, Including Single Positive Test Forms ULNRC-06794, Submittal of Fitness for Duty Program Data for 20222023-01-24024 January 2023 Submittal of Fitness for Duty Program Data for 2022 ULNRC-06787, Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015)2022-12-0808 December 2022 Response to Request for Additional Information Regarding License Amendment Request for Adoption of Alternate Source Term and Revision of Technical Specifications (LDCN 21-0015) ULNRC-06780, Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-0072022-11-30030 November 2022 Additional Supplement to License Amendment Request to Adopt TSTF-439 and TSTF-505, LDCN 20-007 ULNRC-06772, 10 CFR 50.59 and 10 CFR 72.48 Summary Report2022-11-23023 November 2022 10 CFR 50.59 and 10 CFR 72.48 Summary Report ULNRC-06777, Operating Quality Assurance Manual (Oqam) Revision 362022-11-16016 November 2022 Operating Quality Assurance Manual (Oqam) Revision 36 2024-06-06
[Table view] |
Text
AmerenUE Callaway Plant PO Box 620 Fulton, MO 05251 November 4, 2005 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Mail Station P1-137 Washington, DC 20555-0001 Ladies and Gentlemen:
ULNRC-05228 WAmeren UE CALLAWAY PLANT DOCKET NUMBER 50-483 CORE OPERATING LIMITS REPORT Attached is the Callaway Plant Cycle 15 Core Operating Limits Report (COLR), Revision 0. This report is provided to the NRC Staff for information.
It has been prepared in accordance with the requirements of Technical Specification 5.6.5.
If you have any questions concerning this report, please contact us.
Very truly yours, thD. Young Manager, Regulatory Affairs DJWN/jdg
Attachment:
Callaway Cycle 15 Core Operating Limits Report, Rev. 0 200'
a subsidiary of Ameren Corporation
ULNRC-05228 November 4, 2005 Page 2 cc:
U.S. Nuclear Regulatory Commission (Original and I copy)
Attn: Document Control Desk Mail Stop P1-137 Washington, DC 20555-0001 Mr. Bruce S. Mallett Regional Administrator U.S. Nuclear Regulatory Commission Region IV 611 Ryan Plaza Drive, Suite 400 Arlington, TX 76011-4005 Senior Resident Inspector Callaway Resident Office U.S. Nuclear Regulatory Commission 8201 NRC Road Steedman, MO 65077 Mr. Jack N. Donohew (2 copies)
Licensing Project Manager, Callaway Plant Office of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commission Mail Stop 7E1 Washington, DC 20555-2738 Missouri Public Service Commission Governor Office Building 200 Madison Street PO Box 360 Jefferson City, MO 65102-0360 Deputy Director Department of Natural Resources P.O. Box 176 Jefferson City, MO 65102
Callaway Cycle 15 COLR Rev. 0 CALLAWAY CYCLE 15 CORE OPERATING LIMITS REPORT (Revision 0)
September 2005 Reviewed By:
X
,L t-lo-Z5-05 Approved By:
/
b Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 1.0 CORE OPERATING LIMITS REPORT This Core Operating Limits Report (COLR) for Callaway Plant Cycle 15 has been prepared in accordance with the requirements of Technical Specification 5.6.5.
The Core Operating Lirnits affecting the following Technical Specifications are included in this report.
3.1.1, 3.1.4,3.1.5, 3.1.6, 3.1.8 Shutdown Margin 3.1.3 Moderator Temperature Coefficient 3.1.5 Shutdown Bank Insertion Limits 3.1.6 Control Bank Insertion Limits 3.2.1 Heat Flux Hot Channel Factor 3.2.2 Nuclear Enthalpy Rise Hot Channel Factor 3.2.3 Axial Flux Difference Curve Book Figure 1 3-1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 2.0 OPERATING IMAITS The cycle-specific parameter limits for the specifications listed in Section 1.0 are presented in the subsections which follow. These limits have been developed using the NRC-approved methodologies specified in Technical Specification 5.6.5.
2.1 Shutdown Margin (Specifications 3.1.1, 3.1.4, 3.1.5, 3.1.6, and 3.1.8) 2.1.1 The Shutdown Margin in MODES 1-4 shall be greater than or equal to 1.3% Ak/k.
2.1.2 The Shutdown Margin prior to blocking Safety Injection below P-1I in MODES 3 and 4 shall be greater than 0% Ak/k as calculated at 2000F.
2.1.3 The Shutdown Margin in MODE 5 shall be greater than or equal to 1.0% Ak/k.
2.2 Moderator Temperature Coefficient (Specification 3.1.3) 2.2.1 The Moderator Temperature Coefficient shall be less positive than the limits shown in Figure 1. These limits shall be referred to as upper limit.
The Moderator Temperature Coefficient shall be less negative than 47.9 pcm/0F.
This limit shall be referred to as the lower limit.
2.2.2 The MTC 300 ppm surveillance limit is -40.4 pcmn/CF (all rods withdrawn, Rated Thermal Power condition).
2.2.3 The MTC 60 ppm surveillance limit is -45.5 pcn/IF (all rods withdrawn, Rated Thermal Power condition).
2 Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 7
l.....-
I.,
I I-
.1.1.1.
.1, I
.11 1111-11 I I IL I I I I I I I IIII-I UNACCEPTABLE OPERATION I I I I 11 I I I f
i l l
1 1 1 1 1 1 1 1 1 1 1 I I I
r14 U
H 0
E*4 0
S III HM 11 1 1 11 1 1 (70%, 5. O)
I I I I 1
.1111 1......
.I I..
IMI! I Ill! 111 1 I I II III 11 !IMM! I I !I 1N1 MIM!
4~...
41111111111111111X
.......X T
3 __
___ __ _jACCEPTABLE OPERATION WCi 2~
~~~~~~
X~iil~iiITI 2
IITIIITTI F FH LLLII1L311D09S 3 9 0
10 20 30 40 50 60 70 80 90 100 PERCENT OF RATED THERMAL POWER Figure 1 Callaway Cycle 15 Moderator Temperature Coefficient Versus Power Level 3
Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 23 Shutdown Bank Insertion Limits (Specification 3.1.5)
The shutdown banks shall be withdrawn to at least 225 steps.
2A Control Bank Insertion Limits (Specification 3.1.6) 2.4.1 Control Bank insertion limits are specified by Figure 2.
2.4.2 Control Bank withdrawal sequence is A-B-C-D. The insertion sequence is the reverse of the withdrawal sequence.
2.43 The difference between each sequential Control Bank position is 115 steps when not fully inserted and not fully withdrawn.
4 Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rv Rev. 0 22 I..
.2&
- 25.
L (78225 DI 11 (28.225) fl (78,225) U I I I I I I I I I 1 I 1 1 1 1 1 0 1 0 0 i 07f r-i 014 0
I Y111 200 B
3.75 I
V I
7 1 1 I Y 150 I
tI BANK 125 100 -
Y Y1 75 ----
/r II 5 0 I
I I
Y 25
-TTT OL 0
10 20 30 40 5 0 60.-
70 80 90 100 PERC ENT OF RATED THERMAL POWER Figure 2 Callaway Cycle 15
.Rod Bank Insertion Limits Versus Rated Thermal Power - Four Loop Operation 5
Curve Book Figure 13-1, Rev. 44
CaUaway Cycle 15 COLR Rev. 0 2.5 Heat Flux Hot Channel Factor -FQ(Z)
(Specification 3.2.1)
FQRT FQ(Z) <
- K(Z) for P > 0.5 Up FQRTP FQ(Z) <
- K(Z) for P < 0.5 0.5 THERMAL POWER where:
P =
RATED THERMAL POWER 2.5.1 FQRIP = 2.50 2.5.2 K(Z) is provided in Figure 3.
2.5.3 The W(z) functions that are to be used in Technical Specification 3.2.1 and Surveillance Requirement 3.2.1.2 for determining FQW(z) are shown in Table A.1.
The W(z) values have been determined for several burnups up to 18000 MWD/MTU in Cycle 15. This permits determination of W(z) at any cycle burnup up to 18000 MWD/MTU through the use of three point interpolation. For cycle burnups greater than 18000 MWDIMTU, use of 18000 MWDIMTU W(z) values without interpolation or extrapolation is conservative.
The W(z) values were determined assuming Cycle 15 operates with RAOC strategy. Also included is a W(z) function that bounds the W(z) values for all Cycle 15 burnups. Use of the bounding W(z) values will be conservative for any Cycle 15 burnup; however, additional margin may be gained by using the burnup dependent W(z) values.
Table A.2 shows the burnup dependent FQ penalty factors for Cycle 15. These values shall be used to increase FQ (z) when required by Technical Specification Surveillance Requirement 3.2.1.2. A 2% penalty factor should be used at all cycle burnups that are outside the range of Table A.2.
6 Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 Table A.I W(z) versus Core Height (Top and Bottom 15% Excluded)
Height 150 1 4000 10000 18000 Bounding (feet)
MWDIMTU MWD/MTIU MWD/MTU MWD/MTU W(z) 0.00 (bottom) 1.0000 1.0000 1.0000 1.0000 1.0000 0.17 1.0000 1.0000 1.0000 1.0000 1.0000 0.33 1.0000 1.0000 1.0000 1.0000 1.0000 0.50 1.0000 1.0000 1.0000 1.0000 1.0000 0.67 1.0000 1.0000 1.0000 1.0000 1.0000 0.83 1.0000 1.0000 1.0000 1.0000 1.0000 1.00 1.0000 1.0000 1.0000 1.0000 1.0000 1.17 1.0000 1.0000 1.0000 1.0000 1.0000 1.33 1.0000 1.0000 1.0000 1.0000 1.0000 1.50 1.0000 1.0000 1.0000 1.0000 1.0000 1.67 1.0000 1.0000 1.0000 1.0000 1.0000 1.83 1.3165 1.3440 1.3502 1.2831 1.3535 2.00 1.2990 1.3215 1.3329 1.2722 1.3335 2.17 1.2809 1.2984 1.3150 1.2611 1.3150 2.33 1.2626 1.2753 1.2967 1.2499 1.2967 2.50 1.2441 1.2517 1.2781 1.2384 1.2781 2.67 1.2253 1.2291 1.2592 1.2268 1.2601 2.83 1.2064 1.2101 1.2403 1.2151 1.2422 3.00 1.1911 1.1952 1.2228 1.2039 1.2251 3.17 1.1817 1.1861 1.2105 1.1974 1.2130 3.33 1.1784 1.1829 1.2057 1.1974 1.2085 3.50 1.1768 1.1805 1.2039 1.1977 1.2072 3.67 1.1750 1.1772 1.2024 1.1988 1.2066 3.83 1.1725 1.1735 1.2001 1.2027 1.2069 4.00 1.1694 1.1693 1.1973 1.2072 1.2079 4.17 1.1657 1.1643 1.1938 1.2109 1.2110 4.33 1.1619 1.1586 1.1896 1.2136 1.2137 4.50 1.1591 1.1538 1.1846 1.2154 1.2154 4.67 1.1571 1.1498 1.1790 1.2166 1.2166 4.83 1.1548 1.1454 1.1726 1.2177 1.2177 5.00 1.1520 1.1404 1.1654 1.2178 1.2178 5.17 1.1483 1.1349 1.1576 1.2162 1.2162 5.33 1.1436 1.1290 1.1492 1.2130 1.2130 5.50 1.1421 1.1215 1.1395 1.2113 1.2113 5.67 1.1423 1.1153 1.1315 1.2108 1.2108 5.83 1.1471 1.1169 1.1324 1.2149 1.2149 6.00 1.1570 1.1211 1.1385 1.2244 1.2244 6.17 1.1698
.1.1286 1.1528 1.2369 1.2369 6.33 1.1807 1.1349 1.1652 1.2473 1.2473 7
Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 Table A.1 (continued)
W(z) versus Core Height (Top and Bottom 15% Excluded)
Height 150 4000 10000 18000 Bounding (feet)
MWDIMTU MWD/MTU MWD/MTU MWDJMTU W(z) 6.50 1.1916 1.1439 1.1762 1.2572 1.2572 6.67 1.2031 1.1560 1.1864 1.2669 1.2669 6.83 1.2141 1.1680 1.1951 1.2744 1.2744 7.00 1.2239 1.1801 1.2025 1.2800 1.2800 7.17 1.2324 1.1925 1.2082 1.2837 1.2837 7.33 1.2394 1.2046 1.2119 1.2853 1.2853 7.50 1.2448 1.2159 1.2158 1.2849 1.2849 7.67 1.2485 1.2260 1.2201 1.2824 1.2824 7.83 1.2504 1.2348 1.2229 1.2780 1.2780 8.00 1.2501 1.2424 1.2258 1.2709 1.2709 8.17 1.2481 1.2486 1.2302 1.2623 1.2706 8.33 1.2466 1.2536 1.2352 1.2553 1.2709 8.50 1.2466 1.2563 1.2385 1.2492 1.2717 8.67 1.2472 1.2582 1.2414 1.2465 1.2726 8.83 1.2478 1.2639 1.2498 1.2508 1.2746 9.00 1.2508 1.2720 1.2624 1.2584 1.2790 9.17 1.2614 1.2816 1.2762 1.2655 1.2893 9.33 1.2750 1.2945 1.2893 1.2724 1.3028 9.50 1.2883 1.3177 1.2996 1.2780 1.3216 9.67 1.3003 1.3516 1.3066 1.2820 1.3524 9.83 1.3124 1.3867 1.3125 1.2866 1.3867 10.00 1.3248 1.4220 1.3175 1.2922 1.4220 10.17 1.3392 1.4558 1.3218 1.2979 1.4558 10.33 1.0000 1.0000 1.0000 1.0000 1.0000 10.50 1.0000 1.0000 1.0000 1.0000 1.0000 10.67 1.0000 1.0000 1.0000 1.0000 1.0000 10.83 1.0000 1.0000 1.0000 1.0000 1.0000 11.00 1.0000 1.0000 1.0000 1.0000 1.0000 11.17 1.0000 1.0000 1.0000 1.0000 1.0000 11.33 1.0000 1.0000 1.0000 1.0000 1.0000 11.50 1.0000 1.0000 1.0000 1.0000 1.0000 11.67 1.0000 1.0000 1.0000 1.0000 1.0000 11.83 1.0000 1.0000 1.0000 1.0000 1.0000 12.00 (top) 1.0000 1.0000 1.0000 1.0000 1.0000 8
Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 Table A.2 FQ Penalty Factors as a Function of Cycle Burnup Cycle 15 Burnup 1351 1523 1694 1866 2038 FW(z) Penalty Factor (1o) 3.06 3.43 3.01 2.55 2.10 Note:
All cycle burnups not in the range of the above table shall use a 2.0% penalty factor for compliance with Surveillance Requirement 3.2.1.2.
For values of burnup between two of those listed in the first column, the greater of the two corresponding penalty factors shall be used for compliance with Surveillance Requirement 3.2.1.2.
9 Curve Book Figure 13 -1, Rev. 44
Callaway Cycle 15 COLR Rev. 0 1.20 1.10 1.00 0.90 0.80 N
0 am 0.70 N
i 0.70 H
1 0.60 I
0.50 W 0.40 0.30 0.20 0.10 0.00 0
1 2
3
- 4.
5 6
7 8
CORE HEIGHT (FEET) 9 10 11 12 Figure 3 Callaway Cycle 15 K(z) - Normalized Fa(z) as a Function of Core Height 10 Curve Book Figure 13-1, Rev. 44
Callaway Cycle 1S COLR Rev. 0 2.6 Nuclear Enthalpy Rise Hot Channel Factor - Fg, N (Specification 3.2.2)
FwIN < Fpt R 1 + PFAH(1-P))
THERMAL POWER where:
P =
RATED THERMAL POWER 2.6.1 FU,,RTP = 1.59 2.6.2 PFhII= 0.3 2.7 Axial Flux Difference (Specification 3.2.3)
The Axial Flux Difference (AFD) Limits are provided in Figure 4.
11 Curve Book Figure 13-1, Rev. 44
Callaway Cycle 15 COLR Rev, 0 1201 I I I I I I I 110 L00%)
7i=
(+13, :L00%)I[
100 II KIA
^=
TWA Rl 1 -
0-L 0:
0
.E g
P4 CUNACCEPTABLE OPERATION 901 OPERATION 01 H ACCEPTABLE OPERATION
-I (1 601 I
(-30. 50'
(+26, 50% )
i I
An 201 10 01 I I I I I I I I I I I I I I I I I I I I I I I I I
-50
-40
-30
-20
-10 0
.1.1 10 20 30 40 so AXIAL FLUX DIFFERENCE
(% DELTA-I)
Figure 4
- Callaway Axial Flux Difference of Rated Thermal Cycle 15 Limits as a Function Power for RAOC
- More restrictive AFD limits exist for Cycle 15 operation. Refer to Curve Book Figure 1-1 12 Curve Book Figure 13-1, Rev. 44