n.a.vid N*ei wmpany Chnton Power Station P.O. Box 678

, Clinton, IL 61727 i

Tel 217 935 5623 Fax 217 935-4632 res den ILLINSIS P9WER u-602653 1 A.120 WC-318-96

, October 22, 1996 Docket No. 50-461 Mr. A. B. (Bill) Beach Regional Administrator, Region III U.S. Nuclear Regulatory Commission 801 Warrenville Road Lisle, Illinois 60532-4351

Subject:

Organizational Changes at Clintc: 'ower Station

Dear Mr. Beach:

This letter is to inform you of recent changes in the Clinton Power Station management organization. Mr. Paul J. Telthorst, formerly Supervisor-Operations Training, has been appointed to the position of Director-Licensing at Clinton Power Station. Mr. Telthorst replaces Mr. Richard F. Phares who was temporarily assigned to the Director-Licensing position when Mr. Michael W. Lyon (formerly Director-Licensing) was appointed to the position of Director-Plant Operations. Mr. Phares continues to hold the position ofManager-Nuclear Assessment.

IP informed the NRC that Mr. Lyon was appointed to the position ofDirector-Plant Operations in Illinois Power (IP) letter U-602642, dated September 24,1996.

However, Mr. Lyon's title has since been changed to Assistant Plant Manager-Operations.

In addition, the title of Mr. A. E. (Tony) Mueller has been changed from Director-Plant Maintenance to Assistant Plant Manager-Maintenance.

Effective immediately, please replace Mr. Lyon and/or Mr. Phares with Mr.

Telthorst on the distribution of all future correspondence related to Clinton Power Station.

l l

Sincerely yours, L ,/

9610290144 961022 /k i re bc n '

DR ADOCK0500g1 Vice President RSF/csm hf O cc: Document Control Desk l 00i))

a 4 ---41 u.<--..<t: a , ,gu-< -- m s,.m-

,- U-602653 Pago 2 l

l cc: (Cont'd) t NRC Clinton Licensing Project Manager NRC Resident Office, V-690

Illinois Department of Nuclear hfety i J. L. Caldwell, NRC Region III, Director-Division of Reactor Projects G. E. Grant, NRC Region III, Director-Division ofReactor Safety C. D. Pederson, NRC Region III, Director-Division of Nuclear Materials Safety I. P. Little, NRC Region III, Director-Division of Resource Management and Administration {

IDNS Resident Engineer, T-312

) Z. T. Pate, President, INPO K. A. Strahm, Executive Vice President, INPO A. C. Tollison, Executive Vice President, INPO l 4

S. J. Anderson, Director WANO, Atlanta Center i Phillip Bayne, CEO, NEI 8

Joe Colvin, Executive VP, NEI l G. L. Edgar, Morgan, Lewis & Bockius l

l l

i l