Submits Changes to Management Positions Affecting Util Station
ML20129E818
Person / Time
Site: Clinton Constellation icon.png
Issue date: 09/27/1996
From: Connell W
ILLINOIS POWER CO.
To: Beach A
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION III)
References
U-602642, WC-282-96, NUDOCS 9610030297
Download: ML20129E818 (2)


Text

-- - - - .- - . .-

I Pow:r CornpIny

  • Q-VV on Pow:r Stition P.O. Box 678 l

f

{ Clinton,IL 61727  ;

l g Tel 217 935-5623 l

4*~ Fax 217 935-4632

(

Wilfred Connell IRIN91S v'ca e' io at U-602642 1 A.120 I WC-282-96 i

_ PRIORITY ROUTING Se Dmber 24, 1996 Docket No. 50-461 Tirst Swed 10fFR50.54(a)

RA RC __

Mr. A. B. (Bill) Beach . DRA EIC Regional Administrator (7-j'+ / &6RP -

SGA Region III J DRS Of U.S. Nuclear Regulatory Commission DNMS PAO 801 Warrenville Road ORMA ,

Lisle, Illinois 60532-4351 FILE /v '

Subject:

Management Changes ,

Dear Mr. Beach:

i The purpose of this letter is to inform you of changes to management positions i affecting Illinois Power's Clinton Power Station. i Position Effective Date ,

Mr. Patrick D. Yocum Manager-Clinton Power Station September 21,1996 Mr. Michael W. Lyon Director-Plant Operations September 24,1996 The above individuals meet requirements for these positions as delineated in the i Updated Safety Analysis Report and standard ANSI /ANS 3.1 1978, " Standard for Selection and Training ofPersonnel for Nuclear Power Plants."

Illinois Power has evaluated these changes for impact on the Clinton Power Station quality assurance program and has concluded that the changes do not reduce any commitments contained in the quality assurance program description previously accepted by the NRC.

e n..

Sm.cerely yours, g Q f $Msd Wilfred Connell l

Vice President RSF/csm

,- NP27 g 9610030297 960924 PDR ADOCK 05000461 H PDR

. I e

    • ,"

', , i Page 2 )

I cc: Document Control Desk  !

NRC Clinton Licensing Project Manager NRC Resident Office, V-690 Illinois Department of Nuclear Safety i J. A. Caldwell, NRC Region III, Director-Division of Reactor Projects  ;

G. E. Grant, NRC Region III, Director-Division of Reactor Safety C. D. Pederson, NRC Region III, Director-Division of Nuclear Materials Safety I. P. Little, NRC Region III, Director-Division of Resource Management and  !

Administration IDNS Resident Engineer, T-31Z Z. T. Pate, President, INPO j K. A. Strahm, Executive Vice President, INPO l A. C. Tollison, Executive Vice President, INPO S. J. Anderson, Director WANO, Atlanta Center Phillip Bayne, CEO, NEI Joe Colvin, Executive VP, NEI G. L. Edgar, Morgan, Lewis & Bockius  !

)