TAC:M85337
From kanterella
Jump to navigation
Jump to search
Request for: Approved, Closed | |
Results Other: ML17157C504, ML17158A017, ML17158A020, ML17158A024, ML17158A082, ML17158A087, ML17158A156, ML17158A164, ML17158A224, ML17158A300, ML17158A330, ML17158A670, ML17158A727, ML18017A271, ML18030A387, ML18030A574, PLA-4134, Responds to 940421 RAI Re Loss of Spent Fuel Cooling for Sses.Concludes Facility Has Multiple Means to Assure Makeup for Dba/Loca, PLA-4145, Responds to RAI Re Loss of Spent Fuel Pool Cooling Initiated by Design Basis Seismic Event | |
| From | |
MONTHYEARML17157C3941993-06-30030 June 1993
[table view]Forwards Util 930524 Response to NRC & Licensee Event Rept 93-018 & Expresses Appreciation for Both Individuals Attending 930318 Meeting Re Effects of Loss of SFP Cooling Following LOCA & LOOP at Plants ML17157C4351993-08-0404 August 1993 Forwards Meeting Summary,Including Transcript of Meeting & Slides Presented by Util & Util Re Effects of Loss of Spent Fuel Pool Cooling Following Loss of Coolant Accident & Loss of Offsite Power ML17157C4521993-08-17017 August 1993 Forwards Copy of Addl Info Requested of Util During 930708 Meeting W/Nrc Re 10CFR21 Rept on Spent Fuel Pool Cooling Issue.Meeting Tentatively Scheduled for 931001 in Rockville, MD ML17157C5041993-10-0808 October 1993 Forwards NRC Info Notice 93-83 Issued on 931007 to Keep Appraised of Developments on Spent Fuel Pool Cooling Issue ML17157C5031993-10-0808 October 1993 Expresses Appreciation Re 931001 Meeting to Provide Opportunity to Personally Present Technical Issues in 10CFR21 Rept Filed on 921127 Re Spent Fuel Pool Cooling Issue ML17157C5261993-10-20020 October 1993 Forwards Request for Addl Info Re Loss of Sfpc Events for Plants ML17158A0241993-11-17017 November 1993 Forwards Action Plan Which Systematically & Carefully Evaluates Technical Concerns Outlined in 921127,10CFR21 Rept & Subsequent Correspondence ML17158A0171993-11-22022 November 1993 Provides Correspondence Re Spent Fuel Pool Cooling Issue. Correspondence Will Be Provided on a Continuing Basis ML17158A0201993-11-23023 November 1993 Requests Addl Info Re Loss of Spent Fuel Pool Cooling Events at Plant.Reply Requested by 931203 ML17158A0821994-01-11011 January 1994 Forwards Documents Re SFP Cooling Issue at Plant.Informs That Addl Info Is Being Requested to Complete Evaluation Described in 931115 Staff Action Plan ML17158A0871994-01-14014 January 1994 Forwards Summary of Impact of Hydrodynamic Loads on Spent Fuel Cooling & Svc Water Piping ML17158A7281994-02-0101 February 1994 Informs That Staff Received Addl Info from Licensee on Certain Specific Technical Issues During Course of Staff Review of Issues Raised in 921127 Part 21 Rept.Forwards Copies of Training Matl Provided by Util ML17158A1211994-02-0101 February 1994 Responds to Issues Raised in Recipient 921127 Part 21 Rept Re Spent Fuel Cooling.Licensee Safety Evaluation for Replacement of SBGT Sys Fire Damper Fusible Links & Plant EQ List & Study Encl ML17158A7271994-02-16016 February 1994 Forwards from NRC W/Fine Copyrighted Encls. Informs That Document Cannot Be Reproduced in Whole or in Part or Released to Nudocs Until Written Permission Received from Util ML17158A1561994-02-28028 February 1994 Discusses 940207 Visit to Util Headquarters in Allentown, PA Re Spent Fuel Pooling Issues ML17158A1641994-03-0707 March 1994 Requests Addl Info Re Standby Gas Treatment Sys Performance at Susquehanna Steam Electric Station,Units 1 & 2 IR 05000387/19940041994-03-25025 March 1994 Insp Repts 50-387/94-04 & 50-388/94-04 on 940101-0226. Noncited Violations Identified.Major Areas Inspected:Plant Operation,Radiation Protection,Surveillance & Maint, Engineering & Technical Support & Safety Assessment ML17158A2241994-04-11011 April 1994 Forwards Documents Re Issues Raised in 921127 Part 21 Rept Concerning Spent Fuel Pool Cooling.Nrc Reviewing Documents & Will Continue to Pursue Addl Info as Necessary to Complete Evaluation Described in 931115 Task Action Plan ML20266G6001994-05-0404 May 1994 Inservice Inspection Isometric Hanger Identification ISI-GBC-101-24-H.Sheet 1 PLA-4134, Responds to 940421 RAI Re Loss of Spent Fuel Cooling for Sses.Concludes Facility Has Multiple Means to Assure Makeup for Dba/Loca1994-05-0505 May 1994 Responds to 940421 RAI Re Loss of Spent Fuel Cooling for Sses.Concludes Facility Has Multiple Means to Assure Makeup for Dba/Loca ML17158A2871994-05-17017 May 1994 Forwards Info Re NRC RAI Concerning Loss of Spent Fuel Pool Cooling Issues & Standby Gas Treatment Sys Performance Following Seismic Event ML17158A3001994-05-19019 May 1994 Requests Addl Info Re Util Capability to Mitigate,In Manner Consistent W/Licensing Basis of Plant,Effects of Loss of SFP Cooling Initiated by Design Basis Seismic Event PLA-4145, Responds to RAI Re Loss of Spent Fuel Pool Cooling Initiated by Design Basis Seismic Event1994-06-0101 June 1994 Responds to RAI Re Loss of Spent Fuel Pool Cooling Initiated by Design Basis Seismic Event ML17158A3301994-06-0909 June 1994 Forwards Various Documents Received by NRC Staff Re Issues Raised in Addressee Rept Filed on 921127 Per 10CFR21 Concerning Procedures for Implementation of RHR Sys Sf Pool Cooling Assist Mode.Plant Operating Procedure in Encl 1 ML18017A2711994-07-0505 July 1994 Provides Copy of Transcripts from 940506 Briefing to ACRS Re Loss of Sfpc Issues.Pages 358 Through 460 & Attachment Encl ML18030A3871994-10-24024 October 1994 Forwards Task Action Plan to Evaluate Spent Fuel Storage Pool Safety Issues Identified as Result of Problems Found at Dresden 1,issues Raised at Susquehanna & Other Issues Raised in Rept Filed,Per 10CFR21 on 921117 ML18017A2751994-10-25025 October 1994 Forwards Draft Safety Evaluation Re Spent Fuel Pool Cooling Issues,For Review & Comment ML18017A2761994-11-0303 November 1994 Informs NRC Has Completed Draft Final SE Re Spent Fuel Pool Cooling Issues at Plant.Se Submitted in Response to Rept,Dtd 921127,filed Per 10CFR21.Forwards Draft SE for Review & Comment ML17164A4701994-12-23023 December 1994 Forwards Comments to NRC on Draft SE Rept Re Potential Loss of Spent Fuel Pool Cooling at Plant,Per 941208 Briefing ML17164A4981994-12-29029 December 1994 Ack Receipt of Comments on Draft SE Re Spent Fuel Pool Cooling Issues at Plant,Per .Informs That Staff Considering Comments in Preparation to Finalize Draft SE ML18030A5741995-04-20020 April 1995 Forwards Risk Evaluation Rept Related to Loss of Spent Fuel Pool Cooling Events at Plant ML17158A6701995-05-17017 May 1995 Discusses Which Forwarded Staff, Task Action Plan for Spent Fuel Storage Pool Safety, for Sses.Forwards Completed Assessment Repts for Brunswick & Monticello Sites ML17158A7491995-06-19019 June 1995 Forwards Final SE Which Concludes That Sys Used to Cool Spent Fuel Storage Pool,Adequate to Prevent Unacceptable Challenges to Safety Related Sys Protecting Health & Safety of Public 1994-02-01 | |
Retrieved from "https://kanterella.com/w/index.php?title=TAC:M85337&oldid=5034551"