ML17157C435

From kanterella
Jump to navigation Jump to search

Forwards Meeting Summary,Including Transcript of Meeting & Slides Presented by Util & Util Re Effects of Loss of Spent Fuel Pool Cooling Following Loss of Coolant Accident & Loss of Offsite Power
ML17157C435
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 08/04/1993
From: Boyle M
Office of Nuclear Reactor Regulation
To: Lochbaum D, Prevatte D
AFFILIATION NOT ASSIGNED
References
TAC-M85337, NUDOCS 9308200224
Download: ML17157C435 (7)


Text

~gp,S AE'0y c,>

0 n

o 4 qO'>>*<<"

Docket Nos.

50-387 and 50-388 UNITED STATES NUCLEAR REGULATORY COMMISSlON WASHINGTON, D.C. 20555-000I August 4, 1993 Hr. David A. Lochbaum 80 Tuttle Road

Watchung, New Jersey 07060 Hr. Donald C. Prevatte 7924 Woodsbluff Run Fogelsville, Pennsylvania 18051 Gentlemen:

SUBJECT:

EFFECTS OF LOSS OF SPENT FUEL POOL (SFP)

COOLING FOLLOWING A LOSS OF COOLANT ACCIDENT AND LOSS OF OFFSITE

POWER, SUS(UEHANNA STEAN ELECTRIC STATION, UNITS 1

AND 2 (TAC NO. M85337)

On July 8,

1993, the NRC met with the Pennsylvania Power and Light Company (PPKL) for additional discussion of the 10 CFR Part 21 report you submitted on the above subject.

We are sorry you could not attend the meeting.

A copy of the meeting

summary, including a transcript of the meeting and the slides presented by PPKL, is enclosed (Enclosure 1).

Also, by letter dated July 6,

1993, PPKL has submitted a discussion of their perspective of the licensing basis for the spent fuel pool cooling systems (Enclosure 2).

If, after your review of the enclosed information, you feel your concerns 9308200224 930804 PDR ADOCK 05000387 P

PDR

1'q

]I aa',

all

~

'~ gp~ RE00 0

Cy ClO I

gO

++**+

Docket Nos.

50-387 and 50-388 UNITED STATES NUCLEAR REGULATORY COIVIMISSION WASHINGTON, D.C. 2055&0001 August 4, 1993 Hr. David A. Lochbaum 80 Tuttle Road

Watchung, New Jersey 07060 Hr. Donald C. Prevatte 7924 Woodsbluff Run Fogelsville, Pennsylvania 18051 Gentlemen:

SUBJECT:

EFFECTS OF LOSS OF SPENT FUEL POOL (SFP)

COOLING FOLI.OWING A LOSS OF COOLANT ACCIDENT AND LOSS OF OFFSITE

POWER, SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2 (TAC NO. M85337)

On July 8,

1993, the NRC met with the Pennsylvania Power and Light Company (PP&L) for additional discussion of the 10 CFR Part 21 report you submitted on the above subject.

We are sorry you could not attend the meeting.

A copy of the meeting

summary, including a transcript of the meeting and the slides presented by PPKL, is enclosed (Enclosure 1).

Also, by letter dated July 6,

1993, PPKL has submitted a discussion of their perspective of the licensing basis for the spent fuel pool cooling systems (Enclosure 2).

If, after your review of the enclosed information, you feel your concerns

Hr. David A. Lochbaum Hr. Donald C. Prevatte August',

1993 were not adequately addressed, you may wish to provide written comments on PPKL's proposed resolution of the issue.

At that time, we will be glad to schedule a meeting with you to personally address and resolve the concerns raised in the Part 21 report.

Sincerely,

/S/

Michael L. Boyle, Acting Director Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Summary of NRC Meeting with PP&L, dated July 8, 1993 2.

Letter to C. Hiller, NRC, from PPKL, dated July 6, 1993 cc w/o enclosures:

Mr. Robert G.

Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 DISTRIBUTION *w/enclosures

'Docket-File~

SVarga NRC

8. Local PDRs HBoyle PDI-2 Readin
  • RCl ark JCalvo MO'Brien GHubbard KEccleston LCunningham AThadani CMcCracken 54'gl+Ag@rp p J gJh]fe OFFICE PDI-,

NAME MO'B n

PD PM R

rk:rb PDI-2 D

HBoyl e DATE

/

93 93 93 OFFICIAL RECOR COPY DOCUMENT NAME:

SU85337.GEN

A l

~

k

Hr. David A. Lochbaum Hr. Donald C. Prevatte August 4, 1993 were not adequately addressed, you may wish to provide written comments on PP&L's proposed resolution of the issue.

At that time, we will be glad to r

schedule a meeting with you to personally address and resolve the concerns raised in thy Part 21 report.

Sincerely,

Enclosures:

1.

Summary of NRC Meeting with PP&L, dated July 8, 1993 2.

Letter to C. Hiller, NRC, from PP&L, dated July 6, 1993 cc w/o enclosures:

Mr. Robert G.

Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Michael L. Boy e, Acting Director Project Director'ate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

I Hr. David A. Lochbaum Mr. Donald C. Prevatte August 4, 1993 were not adequately addressed, you may wish to provide written comments on PPEL's proposed resolution of the issue.

At that time, we will be glad to schedule a meeting with you to personally address and resolve the concerns raised in the Part 21 report.

Sincerely,

Enclosures:

1.

Summary of NRC Meeting with PP&L, dated July 8, 1993 2.

Letter to C. Hiller, NRC, from PPLL, dated July 6, 1993 cc w/o enclosures:

Hr. Robert G.

Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 Michael L. Boyle, Acting Director Project Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation