Forwards Documents Re SFP Cooling Issue at Plant.Informs That Addl Info Is Being Requested to Complete Evaluation Described in 931115 Staff Action Plan
ML17158A082
Person / Time
Site: Susquehanna  Talen Energy icon.png
Issue date: 01/11/1994
From: James Shea
Office of Nuclear Reactor Regulation
To: Lochbaum D
AFFILIATION NOT ASSIGNED
References
TAC-M85337, NUDOCS 9401180006
Download: ML17158A082 (4)


Text

Ep,~ RE~<'fp.0 I

O (N

/p +>>*++

Docket Nos.

50-387 and 50-388 UNITED STATES PIUCI EAR REGULATORY COMIVIISSION WASHINGTON, O.C. 20555-0001 January 11, 1994 Mr. David A. Lochbaum 80 Tuttle Road

Matchung, New Jersey 0?060 Mr. Donald C. Prevatte 7924 Woodsbluff Run Fogelsville, Pennsylvania 18051 Gentlemen:

SUBJECT:

SUSQUEHANNA STEAM ELECTRIC STATION, UNITS 1

AND 2, SPENT FUEL POOL COOLING ISSUE (TAC NO. M85337)

During the course of the staff's review of the issues raised in your November 27, 1992 Part 21 report, the staff has received additional information from the licensee on certain specific technical issues.

In addition, the staff has examined supporting documents during visits to the licensee's headquarters and the Susquehanna site.

In order to help keep you abreast of the staff's ongoing review, we are providing copies of these documents to you.

Pennsylvania Power and Light Company's (PP&L) January 4

1994 b 'tt l p

access for various spent fuel pool cooling restoration actions is ersonnel su mi a

on included as Enclosure 1.

Enclosure 2 is a handout related to the licensee's 0 tob 20 evaluation of hydrodynamic loads that was provided to the staff d 1993 visit to the licensee's headquarters.

Additional information on hydrodynamic loads was provided by the licensee in a letter dated DeceIIIber 8, 1993 (Enclosure 3).

Two additional documents are included.

The first is a copy of the licensee's Final Safety Analysis Report change documentation related to the change in standby gas treatment inlet temperature from 180 'F to 125 F (Enclosure 4).

The second document is the licensee's probabilistic risk analysis (PRA) of loss of spent fuel pool cooling events (Enclosure 5).

~3O~

. O ItIRC HI.E CIE'8fate MV 9402280006 940222 ',,

PDR ADOCK 05000387',

P PD~

e 'J sw Wt'g yr

~

I ll'

~

~

P

~ isle I

1 h

r

Hr. David A. Lochbaum Hr. Donald C. Prevatte January ll, 1994 The staff is reviewing these documents and will continue to pursue additional information as necessary to complete the evaluation described in the November 15, 1993 staff action plan.

We have received your letter dated December 6,

1993 are including it our overall review.

If you have any additional comments or questions, please do not hesitate to call me at (301) 504-1428.

Sincerely, Jo e

W. Shea, Project -Manager Proj ct Directorate I-2 Division of Reactor Projects - I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Letter from R.G.

Byram, PECo, to C. Hiller, NRC, dated January 4,

1994 2.

Handout-on Hydrodynamic Loads 3.

Letter from R.G.

Byram, PECo, to C. Hiller, NRC, dated December 8,

1993 4.

Note from J.

Kenny, PECo, to J.
Shea, NRC, dated December 21, 1993 5.

PP&L PRA analysis of loss of spent fuel pool cooling events cc w/o enclosures:

Hr. Robert G.

Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101

Hr. David A. Lochbaum Hr. Donald C. Prevatte January 11.

1994 The staff is reviewing these documents and will continue to pursue additional information as necessary to complete the evaluation described in the November 15, 1993 staff action plan.

We have received your letter dated.

December 6,

1993 are including it our overall review.

If you have any additional comments or questions, please do not hesitate to call me at (301) 504-1428.

Sincerely,

/

S

/

Joseph W. Shea, Project Manager Project Directorate I-2 Division of Reactor Projects I/II Office of Nuclear Reactor Regulation

Enclosures:

1.

Letter from R.G.

Byram, PECo, to C. Miller, NRC, dated January 4,

1994 2.

Handout on Hydrodynamic Loads 3.

~ Letter from R.G.

Byram, PECo, to C. Hiller, NRC, dated December 8,

1993 4.

Note from J.

Kenny, PECo, to J.
Shea, NRC, dated December 21, 1993 5.

PP&L PRA analysis of loss of spent fuel pool cooling events cc w/o enclosures:

Mr. Robert G.

Byram Senior Vice President-Nuclear Pennsylvania Power and Light Company 2 North Ninth Street Allentown, Pennsylvania 18101 DISTRIBUTION *w/enclosures Docket File*

JCalvo NRC and Local PDRs*

CHiller PDI-2 Reading*

HO'Brien SVar a

JShe RClark

JWhite, RGN-I*

OGC LPrividy, RGN-I*

ACRS(10)

EWenzin er, RGN-I*

OFFICE DATE PDI

e

~

'~

/94 PDI Jsh PDI-2 D

CHi

/i~ /94 OFFICIAL R CO D COPY DOCUMENT NAME:

SUDL&DP.SFP