Pages that link to "Narbut P"
← Narbut P
Jump to navigation
Jump to search
The following pages link to Narbut P:
Displayed 50 items.
- IR 05000333/2001003 (← links)
- ML17298A563 (← links)
- ML040510063 (← links)
- ML040060080 (← links)
- ML033100139 (← links)
- ML040270275 (← links)
- ML040510101 (← links)
- ML040510076 (← links)
- ML040510073 (← links)
- ML040060198 (← links)
- ML040060190 (← links)
- ML040060150 (← links)
- ML040060134 (← links)
- ML033100319 (← links)
- ML033100284 (← links)
- ML033100271 (← links)
- ML033100242 (← links)
- ML033100202 (← links)
- ML033100199 (← links)
- ML033100171 (← links)
- ML033100169 (← links)
- ML033100160 (← links)
- PNO-V-85-078, on 851121,unit Experienced Loss of Auxiliary Transformer C,Resulting in Loss of Control Room Lighting Due to Abnormal Breaker Lineup.Plant Shut Down (← links)
- IR 05000312/1978017 (← links)
- PNO-V-86-012, on 860327,loss of Both Shutdown Cooling Trains Experienced Due to Loss of Pump Suction & Cavitation.Caused by Reactor Vessel Water Vortexing Causing Air to Be Pulled Into Shutdown Cooling Lines (← links)
- IR 05000529/1985029 (← links)
- ML20133G379 (← links)
- IR 05000206/1985018 (← links)
- ML20127A414 (← links)
- ML20148N291 (← links)
- ML20138M530 (← links)
- ML20133E137 (← links)
- PNO-V-88-048, on 880717,unit Manually Tripped & Natural Cooldown Commenced as Result of Ground Fault in 12 Kv non- Vital Buses.Event Investigation Team Formed to Determine Location & Cause of Ground Fault (← links)
- ML20195F826 (← links)
- ML20155K519 (← links)
- PNO-V-86-032, on 860612,facility Resumed Operation After Second Refueling Outage.Outage Included Replacement of Reactor Coolant Pump Seal Packages & Testing motor-operated Valves Per IE Bulletin 86-003 (← links)
- ML20197B840 (← links)
- PNO-V-87-028, on 870403,reactor Tripped from 12% Power During Shut Down for First Refueling Outage.Caused by Flicker of High Steam Flow Bistables Coincident w/lo-lo T Average.Investigation Continuing (← links)
- PNO-V-87-025, on 870321,facility Experienced Safety Injection,Reactor Trip & Unit Trip.Caused by Coincidence of High Steam Flow & Low Steam Generator Pressure Signals Due to Closure of MSIV FCV 41.Piping & Valve Switches Inspected (← links)
- PNO-V-86-049, on 860729 & 30,pressure Transmitter 459 Failed Low Resulting in Steam Flow/Feed Flow Mismatch Trip Circuits Becoming Inoperable.Caused by Failed Electric Card in Pressure Transmitter Amplifier.Amplifier Replaced (← links)
- PNO-V-86-067, on 861001,fuel Assembly in Vessel Found W/ 10-degree Tilt & Resting Askew Against Core Baffle Plate. Cause Under Investigation.Program & Special Tools Prepared to Return Assembly to Vertical Position (← links)
- PNO-V-86-065, on 860918,reactor Tripped Due to Loss of Main Feedwater Pump 2-2 During Maint on Lovejoy Speed Controller Sys.Caused by Steam Flow/Feed Flow Mismatch Coincident W/Low Level on Steam Generators 2 & 4.Cause Under Investigation (← links)
- PNO-V-86-043, on 860715,criticality Achieved Following Eighth Refueling Outage.Unit Shutdown for 236 Days Following 851121 Loss of Power & Water Hammer Event.Unit Scheduled to Go on-line After Completion of Low Power Physics Testing (← links)
- PNO-V-91-003, on 910307,unit 1 Shutdown for Refueling Operations & Loss of Offsite Power.Licensee Personnel Manually Moved New Module,Still in Mast,Away from Reactor Vessel & Core (← links)
- PNO-V-87-002, on 870105,reactor Trip/Turbine Trip Occurred. Caused by Loss of Turbine Governor/Stop Valve electro- Hydraulic Sys Pressure,Attributed to Leak in Compression Fitting Connection to Steam Lead Stop Valve FCV-145 (← links)
- PNO-V-87-001, on 870102,licensee Shut Down Plant.Caused by Fire Near High Pressure Turbine Front Bearing.Licensee Affected Repairs & Examining Bearing Area for Any Signs of Oil Leak (← links)
- PNO-V-86-062, court Decided in Favor of San Luis Obispo Mothers for Peace & Sierra Club Re Spent Fuel Pool Expansion.Util Reinstalling Old Racks & May Use Spent Fuel Pools Prior to Completion of New Hearings (← links)
- PNO-V-86-056, on 860829,first Refueling Outage Began.Work to Include Copper Reduction & court-ordered Replacement of New High Density Fuel Racks W/Older Low Density Fuel Racks (← links)
- PNO-V-86-057, reactor Trip Occurred.Caused by Loose Wire on Shunt Coil Relay That Shorted During Surveillance Testing & Opened Reactor Trip Breaker.New High Density Fuel Racks Removed & Older Low Density Racks Reinstalled (← links)
- ML20209D513 (← links)