From: Paul Narbutd,'d To: Bruce Jorgensen Date: 1/24/02 2:30PM

Subject:

Re: UST&D Inspection plan Weld repairs can be dispositioned by fab personnel within the bounds of approved weld repair procedures.

Dimensional discrepancies, beyond drawing tolerances, require engineering approval, and must meet CoC requirements as well.

We will certainly look in these areas during our inspection. Any specifics you can give us would be a great help. Sounds like the problem may be hard to turn up if there is no documentation and if people don't fess up. We probably will only write a Form 591 for an IR,but can give you a narrative memo for the allegation file stating our findings. Do you want to send an inspector to work with us that week ? That would be an excellent cover for an allegation inspection.

>>> Bruce Jorgensen 01/24/02 01:50PM>

Paul -for yourThformation, RIIIhas been informed of a concern" (allegation) that UST&D has chronically

'dispositioned" design changes without proper utilization of required design reviews. Specifically, they are alleged to routinely allow fabrication personnel to disposition such field anomalies as weld repairs, dimensional variances, etc. without reference to the engineering and design implications. The issue is so new that we have not determined how we will conduct follow-up.

Your inspection plan appears to address both fabrication per procedures' and corrective action for deficiencies' which are right inthe area of potential interest. I am in no position to request the inspectors to look into this allegation, but I think it's appropriate for you to know what we've been told by a concerned individual.

Regards,

>>> Paul Narbut 01/23/02 03:22PM >

Team members for info and comment. Regions: any suggestions or specific problem follow-ups?

Team meeting Monday 1/28 at 1000 am CC: Charles Miller; James Pearson; Michael Tokar; Robert O'Connell; Robert Temps; Ross Landsman