Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033E269 + (Work & Job Function Exposure Tabulation - 1989 Rept)
- ML20101G895 + (Work & Job Function Exposure Tabulation - 1995 Rept)
- ML20196F065 + (Work & Job Function Exposure Tabulation Rept for 1987)
- ML20154H661 + (Work & Job Function on Exposure Tabulation - 1984 Rept,Reg Guide 1.16 Info)
- ML20147B354 + (Work Control Enforcement Conference on 940201)
- PLA-6598, Work Environment Improvement Plan PPL Susquehanna - January 25, 2010 + (Work Environment Improvement Plan PPL Susquehanna - January 25, 2010)
- ML100601272 + (Work Environment Issues at San Onofre Nuclear Generating Station - Chilling Effect)
- ML090280115 + (Work Environment Issues at the Susquehanna Steam Electric Station - Potential Chilling Effect Letter to W. H. Spence from Samuel J. Collins, Dated 01/28/09)
- ML090620124 + (Work Environment Issues at the Susquehanna Steam Electric Station - Reply to Chilling Effect Letter from W. H. Spence, 2/27/09)
- PLA-6489, Work Environment Issues at the Susquehanna Steam Electric Station Supplement - Reply to Chilling Effect Letter from W. H. Spence, Dated 3/13/09 + (Work Environment Issues at the Susquehanna Steam Electric Station Supplement - Reply to Chilling Effect Letter from W. H. Spence, Dated 3/13/09)
- ML060580563 + (Work Environment Letter Qs and as with Hand Written Notes)
- PLA-6512, Work Environment Meeting + (Work Environment Meeting)
- ML091320287 + (Work Environment Meeting - Letter from W. Spence May 7, 2009)
- ML040630052 + (Work Environment for Raising and Addressing Safety Concerns at the Salem and Hope Creek Generating Stations (to: Commissioner Assistants; from: W M Dean))
- ML040280476 + (Work Environment for Raising and Addressing Safety Concerns at Salem and Hope Creek)
- LR-N11-0267, Work Hour Controls Before and After a Hurricane Emergency Declaration + (Work Hour Controls Before and After a Hurricane Emergency Declaration)
- ML20100M588 + (Work Hour Controls Exemption Request)
- ML103640241 + (Work Hour Controls for Cumulative Fatigue Management)
- NRC-20-0049, Work Hour Limits Exemption Request Due to COVID-19 Revised Second Supplement + (Work Hour Limits Exemption Request Due to COVID-19 Revised Second Supplement)
- NRC-20-0024, Work Hour Limits Exemption Request Due to COVID-19 + (Work Hour Limits Exemption Request Due to COVID-19)
- NRC-20-0070, Work Hour Limits Exemption Request Due to COVID-19 + (Work Hour Limits Exemption Request Due to COVID-19)
- NRC-21-0027, Work Hour Limits Exemption Request Due to COVID-19 + (Work Hour Limits Exemption Request Due to COVID-19)
- NRC-21-0057, Work Hour Limits Exemption Request Due to COVID-19 + (Work Hour Limits Exemption Request Due to COVID-19)
- ML21004A195 + (Work Hour Limits Exemption Request Due to COVID-19 - Supplement)
- NRC-20-0048, Work Hour Limits Exemption Request Due to COVID-19 Second Supplement + (Work Hour Limits Exemption Request Due to COVID-19 Second Supplement)
- NRC-20-0045, Work Hour Limits Exemption Request Due to COVID-19 Supplement + (Work Hour Limits Exemption Request Due to COVID-19 Supplement)
- L-20-140, Work Hour Rule Exemption Request Due to Pandemic (L-20-140) + (Work Hour Rule Exemption Request Due to Pandemic (L-20-140))
- 05000456/FIN-2018002-02 + (Work Instruction Error Results in Reactor Coolant System Pressure Transient)
- 05000331/FIN-2011003-01 + (Work Instructions did not Include Reactivity Impact Evaluation for Preventive Maintenance Activity)
- ML20148A312 + (Work Is Continuing to Reserve the Sundesert Site & Water Supply for Future Use in Meeting Elec Energy Need of Ca. Staffs Interim Safety Eval Rept & Final Site Environ Statement Were Pub in October.Cert of Svc Encl)
- ML030800218 + (Work Order (0213474) for T-24A South Condensate Storage Tank Inspection)
- ML053070481 + (Work Order 00-001846-001)
- ML060960638 + (Work Order 00769127, Circ Water Blowdown & Makeup Vacuum Breaker Annual Inspection)
- ML051460507 + (Work Order 0407919)
- WO 97-0859, Work Order 97-0734, 09/24/1997 + (Work Order 97-0734, 09/24/1997)
- ML070670415 + (Work Order 98-1108, 04/29/1998, Torus Seam Repair)
- ML053070439 + (Work Order 99-00320-00 (Rx Vessel) Examination Record)
- ML19270H559 + (Work Order AF-812.Requests Reporting Svc for 730828 Prehearing Re TMI-1 at State Capitol in Harrisburg,Pa)
- ML030770738 + (Work Order No. 0205651 for AFW Motor Driven Pump)
- ML030770744 + (Work Order No. 9945610 for P-38A AFW Discharge Control Operator)
- ML030770731 + (Work Order No. 9949098 for P-38A Afwp Suction Drain Valve)
- ML102710189 + (Work Order Package 00321405 01)
- ML050840490 + (Work Order Work Plan MCC 1B42 Bus Bracing Installation Cr/Pab for Realignment)
- ML050840464 + (Work Order Work Plan MR-01-128*E: MCC 1B42 Bus Bracing Installation-CR/PAB Fan Realignment)
- ML20098A291 + (Work Plan & Performance Appraisal for a & M-Grade Employees)
- ML20138K803 + (Work Plan Description)
- ML20138K773 + (Work Plan Description)
- ML20138K819 + (Work Plan Description,Removal & Installation of Conduit Near Unit 2 26 Elevation Containment Hatch Third Door (Door 235))
- ML20058P295 + (Work Plan Phase II Ground-Water Study Siemens Nuclear Power Corp Richland,Wa)
- ML15062A030 + (Work Plan for Completing a Once Through Cooling Water Study for Total Dissolved Solids, Chlorides, and Sulfates)
- ML20135B975 + (Work Plan for Dismantlement & Removal of Filter Baghouse & Conveyor Assembly Located in G-1 Bldg at 1000 Harvard Ave, Cleveland,Oh, Sept 1996,Rev 0)