Category:Report
MONTHYEARL-2023-089, Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections2023-07-24024 July 2023 Refueling Outage Owner'S Activity Report (OAR-1) Unit 2 for Inservice Inspections L-2023-028, and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications2023-03-27027 March 2023 and Point Beach Units 1 and 2, 10 CFR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications L-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2022-10-0404 October 2022 10 CFR 50.59 Evaluation and Commitment Change Summary Report L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-022022-07-29029 July 2022 Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 ML22140A1432022-05-20020 May 2022 Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models ML22140A1362022-05-20020 May 2022 Containment Isolation Valves ML22140A1382022-05-20020 May 2022 Containment Isolation Valves ML22140A1392022-05-20020 May 2022 Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes ML22140A1402022-05-20020 May 2022 Attachment 5 - Evaluation of Plant-Specific Variations ML22140A1412022-05-20020 May 2022 Attachment 6 - Point Beach RICT Program Pre-Implementation Items ML22140A1352022-05-20020 May 2022 RPS Instrumentation ML22140A1422022-05-20020 May 2022 Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting Information ML22140A1332022-05-20020 May 2022 Attachment 1 - Evaluation of the Proposed Changes NRC 2022-0007, Enclosure 11 - Monitoring Program2022-05-20020 May 2022 Enclosure 11 - Monitoring Program ML22140A1442022-05-20020 May 2022 Enclosure 8 - Attributes of the Configuration Risk Management Model ML21214A0432021-08-0202 August 2021 SLRA June 30, 2021, Public Meeting Discussion Questions ML21126A2392021-05-0606 May 2021 Subsequent License Renewal Application, Aging Management Supplement 2 ML21040A4842021-02-0909 February 2021 Fws to NRC, Point Beach Subsequent License Renewal Updated List of Threatened and Endangered Species That May Occur in Your Proposed Project Location And/Or May Be Affected by Your Project ML21040A4852021-02-0909 February 2021 Fws to NRC, Verification Letter for Point Beach SLR Under Programmatic Biological Opinion for Northern Long-eared Bat NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report ML21008A0172020-10-25025 October 2020 Revised ANS Design Report NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure2019-08-29029 August 2019 Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure L-2019-151, 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2019-08-0606 August 2019 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds NRC 2019-0002, Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations2019-01-24024 January 2019 Refueling Outage U2R36 Owner'S Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2018-0017, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2018-05-0202 May 2018 10 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2017-0045, Updated Final Response to NRC Generic Letter 2004-022017-12-29029 December 2017 Updated Final Response to NRC Generic Letter 2004-02 NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2017-08-0202 August 2017 High Frequency Seismic Evaluation Confirmation Report NRC 2017-0032, Focused Evaluation for Local Intense Precipitation2017-06-22022 June 2017 Focused Evaluation for Local Intense Precipitation ML17136A3222017-05-19019 May 2017 Staff Assessment of Response to 10 CFR 50.54(F) Information Request - Flood-Causing Mechanism Reevaluation L-2017-014, Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 20162017-04-17017 April 2017 Florida Power & Light Company - 10 CPR 50.46 Annual Reporting of Changes to, or Errors in Emergency Core Cooling System Models or Applications for 2016 ML17018A2712017-02-0909 February 2017 Flood Hazard Mitigation Strategies Assessment NRC 2016-0041, Submittal of 10 CFR 50.59 Summary Report for 20152016-08-31031 August 2016 Submittal of 10 CFR 50.59 Summary Report for 2015 NRC 2015-0072, Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan2015-12-16016 December 2015 Notification of Full Compliance with Order EA-12-049, Modifying Licenses with Regard to Requirements for Mitigation Strategies for Beyond-Design Basis External Events and Submittal of Final Integrated Plan ML15300A1402015-11-0303 November 2015 Staff Assessment of Response to 10 CFR 50.54(f) Information Request - Flood-Causing Mechanism Reevaluation ML15211A5932015-08-0303 August 2015 Staff Assessment of Information Provided Pursuant to Title 10 of the Code of Federal Regulations Part 50, Section 50.54(F), Seismic Hazard Reevaluations for Recommendation 2.1 of the Near Term Task Force NRC 2015-0043, Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 10072015-07-20020 July 2015 Spent Fuel Storage Five-Year Inspection Report Ventilated Spent Fuel Storage Cask WVSC-24-01 Certificate of Compliance 1007 NRC 2014-0041, 10 CFR 50.59 Summary Report for 20132014-08-27027 August 2014 10 CFR 50.59 Summary Report for 2013 ML14147A0342014-06-0606 June 2014 Review of the 2013 Steam Generator Tube Inspections NRC 2014-0024, NextEra Energy Point Beach, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the F2014-03-31031 March 2014 NextEra Energy Point Beach, LLC - Seismic Hazard and Screening Report (CEUS Sites), Response NRC Request for Information Pursuant to 10 CFR 50.54(f) Regarding Recommendation 2.1 of the Near-Term Task Force Review of Insights from the Fukush ML13338A5102014-01-27027 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML14006A1872014-01-10010 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Point Beach Station, Units 1 and 2, TAC Nos.: MF0725 and MF0726 NRC 2013-0069, Supporting Documentation for July 22, 2013, Regulatory Conference to Discuss Inspection Report 05000266/2013011 and 05000301/2013011, Preliminary Yellow Finding2013-07-15015 July 2013 Supporting Documentation for July 22, 2013, Regulatory Conference to Discuss Inspection Report 05000266/2013011 and 05000301/2013011, Preliminary Yellow Finding ML13193A0322013-07-11011 July 2013 Additional Equipment Height Information with Vulnerability to Flood Waters NRC 2013-0057, Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R342013-07-0303 July 2013 Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R34 NRC 2013-0061, CFR 50.59 Summary Report for 20122013-06-28028 June 2013 CFR 50.59 Summary Report for 2012 NRC 2012-0101, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic2012-11-26026 November 2012 NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic NRC 2011-0059, 10 CFR 50.59 Summary Report for 20102011-07-0101 July 2011 10 CFR 50.59 Summary Report for 2010 2023-07-24
[Table view] Category:Technical
MONTHYEARL-2022-168, and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report2022-10-26026 October 2022 and Point Beach Units 1 and 2 - 10 CFR 50.46 - Emergency Core Cooling System LBLOCA 30-Day Report L-2020-159, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2022-10-0404 October 2022 10 CFR 50.59 Evaluation and Commitment Change Summary Report L-2022-121, Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-022022-07-29029 July 2022 Exemption Request, License Amendment Request and Revised Response in Support of a Risk-informed Resolution of Generic Letter 2004-02 ML22140A1432022-05-20020 May 2022 Enclosure 4 - Information Supporting Justification of Excluding Sources of Risk Not Addressed by PRA Models ML22140A1422022-05-20020 May 2022 Enclosure 1 - List of Revised Required Actions to Corresponding PRA Functions and Additional Supporting Information ML22140A1412022-05-20020 May 2022 Attachment 6 - Point Beach RICT Program Pre-Implementation Items ML22140A1352022-05-20020 May 2022 RPS Instrumentation ML22140A1382022-05-20020 May 2022 Containment Isolation Valves ML22140A1332022-05-20020 May 2022 Attachment 1 - Evaluation of the Proposed Changes NRC 2022-0007, Enclosure 11 - Monitoring Program2022-05-20020 May 2022 Enclosure 11 - Monitoring Program ML22140A1442022-05-20020 May 2022 Enclosure 8 - Attributes of the Configuration Risk Management Model ML22140A1362022-05-20020 May 2022 Containment Isolation Valves ML22140A1392022-05-20020 May 2022 Attachment 4 - Cross-Reference of TSTF-505, Revision 2, and Point Beach Proposed Changes ML22140A1402022-05-20020 May 2022 Attachment 5 - Evaluation of Plant-Specific Variations NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report ML21008A0172020-10-25025 October 2020 Revised ANS Design Report NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0026, Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure2019-08-29029 August 2019 Relief Request 2-RR-17 Extension of the Primary Nozzle Dissimilar Metal (DM) Weld Inspection Interval. with LTR-SDA-19-071-NP Enclosure L-2019-010, Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds2019-03-19019 March 2019 Proposed Alternative for the Use of Encoded Phased Array Ultrasonic Examination Techniques in Lieu of Radiography for Ferritic and Austenitic Welds NRC 2018-0017, 10 CFR 50.59 Evaluation and Commitment Change Summary Report2018-05-0202 May 2018 10 CFR 50.59 Evaluation and Commitment Change Summary Report NRC 2017-0037, High Frequency Seismic Evaluation Confirmation Report2017-08-0202 August 2017 High Frequency Seismic Evaluation Confirmation Report NRC 2017-0032, Focused Evaluation for Local Intense Precipitation2017-06-22022 June 2017 Focused Evaluation for Local Intense Precipitation ML13338A5102014-01-27027 January 2014 Interim Staff Evaluation and Audit Report Relating to Overall Integrated Plan in Response to Order EA-12-049 - Mitigation Strategies ML14006A1872014-01-10010 January 2014 Mega-Tech Services, LLC Technical Evaluation Report Regarding the Overall Integrated Plan for Point Beach Station, Units 1 and 2, TAC Nos.: MF0725 and MF0726 ML13193A0322013-07-11011 July 2013 Additional Equipment Height Information with Vulnerability to Flood Waters NRC 2013-0057, Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R342013-07-0303 July 2013 Filing of Owner'S Lnservice Inspection Summary Report IWE Class Mc and Iwl Class CC for Point Beach Nuclear Plant Refueling Outage U1 R34 NRC 2012-0101, NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic2012-11-26026 November 2012 NextEra Energy Point Beach, LLC Response to 10 CFR 50.54(f) Request for Information Regarding Near-Term Task Force Recommendation 2.3, Seismic ML14006A3192010-03-31031 March 2010 LTR-PAFM-10-50-NP, Rev. 0, Section XI Flaw Evaluation of Indication Recorded on RC-32-MRCL-ALL-03 of the Point Beach Unit 1 Inlet Nozzle to Pipe Weld. NRC 2010-0012, License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation2010-03-0303 March 2010 License Amendment Request 261, Extended Power Uprate, Response to Request for Additional Lnformation ML0935704152009-12-31031 December 2009 WEP-09-133 Np, Point Beach Unit 1 & Unit 2 (Wep/Wis) Extended Power Uprate License Amendment Request Responses to Request for Additional Information. ML0912505662009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Introduction Through Chapter 2, Section 2.5.7 ML0912505692009-04-0707 April 2009 Attachment 5 - Point Beach, Units 1 and 2, License Amendment Request 261, Extended Power Uprate, Licensing Report, Chapter 2, Section 2.5.8 Through Appendices ML0821900132008-08-0707 August 2008 Monthly Operating Reports Second Quarter 2008 ML0822406862008-06-30030 June 2008 WCAP-16541-NP, Revision 2, Spent Fuel Pool Criticality Safety Analysis. NRC 2008-0029, Pressure and Temperature Limits Report2008-05-30030 May 2008 Pressure and Temperature Limits Report NRC 2008-0034, License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair2008-05-28028 May 2008 License Amendment Request 257, Technical Specifications 5.5.8 and 5.6.8, Steam Generator Program & Steam Generator Tube Inspection Report, Interim Alternate Repair Criteria (Iarc) for Steam Generator Tube Repair NRC 2007-0049, Supplement to License Amendment Request 251; Technical Specification 5.6.5., Reactor Coolant System Pressure and Temperature Limits Report2007-06-13013 June 2007 Supplement to License Amendment Request 251; Technical Specification 5.6.5., Reactor Coolant System Pressure and Temperature Limits Report NRC 2006-0061, LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program2006-07-11011 July 2006 LAR Public Version, License Amendment Request 248; Technical Specification 5.5.8, Steam Generator Program NRC 2006-0054, Public Version, Request for Review of Reactor Vessel Toughness Fracture Mechanics Analysis2006-06-0606 June 2006 Public Version, Request for Review of Reactor Vessel Toughness Fracture Mechanics Analysis ML0600400192005-12-14014 December 2005 Westinghouse LTR-RCDA-873-NP Attachment Point Beach, Unit 1 - Reactor Vessel Upper Closure Head Volume Best-Estimate Mean Fluid Temperature (Non-Proprietary) ML0533203122005-11-18018 November 2005 Reactor Vessel CMTRs (Non-Proprietary) NRC 2005-0117, Request for Withholding of Proprietary Information from Public Disclosure2005-09-0707 September 2005 Request for Withholding of Proprietary Information from Public Disclosure NRC 2005-0068, Submittal of Supporting Analyses Regarding Control of Heavy Loads2005-06-0303 June 2005 Submittal of Supporting Analyses Regarding Control of Heavy Loads ML0435700172004-12-14014 December 2004 from NMC Re Technical Evaluation of Proposed Method of Class 3 Pipe Leak Operability Determinations ML0514002682004-10-0808 October 2004 Enclosures V & VI Point Beach Revised EAL Submittal, Justification Matrix Reference Material NRC 2004-0004, Fitness-For-Duty (FFD) Program for Six Month Period Ending June 30, 20042004-08-30030 August 2004 Fitness-For-Duty (FFD) Program for Six Month Period Ending June 30, 2004 NRC 2004-0081, Transmittal of Point Beach Nuclear Plant, Units 1 and 2, Excellence Plan - Revision 42004-08-13013 August 2004 Transmittal of Point Beach Nuclear Plant, Units 1 and 2, Excellence Plan - Revision 4 ML0426603132004-07-31031 July 2004 BAW-2467NP, Low Upper-Shelf Toughness Fracture Mechanics Analysis of Reactor Vessel of Point Beach Units I and 2 for Extended Life Through 53 Effective Full Power Years. ML0508800622004-05-0707 May 2004 Licensee Procedure, HPIP 4.58, Issuance of Respiratory Equipment Revision 14 ML0508800432004-04-30030 April 2004 NMC Incident Response Team for Issues Encountered During Unit 1 Reduced Inventory and Nozzle Dam Installation at Pbnp 2022-07-29
[Table view] Category:Statement of Work
MONTHYEARML0308708492002-11-0505 November 2002 Work Plan for P-38B Afp Mini Recirc Orifice (Signed) ML0308003122002-11-0505 November 2002 Operations Written Work Order, Work Plan to Support Danger Tagging of T-24B North Condensate Storage Tank ML0308002702002-11-0505 November 2002 Work Plan for P-38B Afp Mini Recirc Orifice (Unsigned) ML0308002182002-11-0404 November 2002 Work Order (0213474) for T-24A South Condensate Storage Tank Inspection 2002-11-05
[Table view] |
Text
- DTUPDLICATE . PBNP WO No: 0212474
'Resp Group:J?* ********** HEADER PAGE *****-** Need Date: 04/01/04 Equipment: O-RF-240 System: CS HP Zone:
Equip Nm: T-24A SOUTH CONDENSATE STORAGE TANK INSPECTION Freq: ZM2 Physical Location: OPS Cailu Tp P Serial Number: Callup Type: PM Callup
Description:
SOUTH CONDENSATE STORAGE TANK INSPECTION - SEE TEXT.
Outage ID: YI-,f A"' Activity:
Job Type: PREVENTIVE MAINTENANCE ACTIVITY Work Function: INSPECTION QA: N SEIS: 3 Operability Pre-Test: N Procedures:
SR: N LCO: N EQ: N PMT: Operability Post-Test: N Procedures:
SSA: N CIV: N MRULE: N A/P: P CACC:
RRN: - - Tech Spec Ref:
QA Codes: Sect XI Class:
Tools Needed:
Plant Conditions: J P) - Ignition Control Permit: N Other Conditions: Transient Combustible Permit: N Fire Barrier Penetration Permit: N Scaffolding: Heat Trace:
IS SCREENING FOR 10 CFR 50.59 OR 72.48 REQUIRED ACCORDANCE WITH NP 10.3.1? RWP: N YES jL NO. IF YES .A.TTACH APPLICABLE PORTIONS OF FORM PBF-1515.
Equipm--ent Isol*Ion Required:,XN-1 o 0 -,--q R4,06-1 FME: Y ISO Tag Series #1: ISO Tag #2: ISO Tag #3:
Operability Pre-Test Complete. Equipment Isolation as requested.
Permission granted to perform Wor-k. Et t ...
Ops DSS Notification Req: WW\Ops DSS Signature: Date:Thf*,.
Special Notification: ----
Previous Callup Comments:
Number of Steps: 001 Acct #: - _
MFG Code: Tech Manual Cntl #:
Next Task Instructions:
- Group Head Signature: Date: /_/
DUPLICATE 0 A*******'*. PBNP WC No: 0213474001
- Callup: OT Resp Group: Q06 ********** STEP DETAIL Step Print: 11/04/02 Equipment: O-RF-240 System: CS HP Zone:
Equipment Name: T-24A SOUTH CONDENSATE STORAGE TANK INSPECTION Physical Location: OPS Callup Type: PM Sequence No: 001 Short Desc: SOUTH CONDENSATE STORAGE TANK Sched Start Date:
PLANNED: WORK PROCEDURES:
Crew: NP 8.4.10 Shift: 5RF-240 4-01 Class: 51 5 2 yI-o Work Plan
Description:
SOUTH CONDENSATE STORAGE TANK INSPECTION - SEE TEXT.
WORK PERFORMED:
MTE: QAR:
ACTUAL USED: CREW:
SHIFT:
WORKER CLASS:
NUMBER OF WORKERS:
TOTAL HOURS:
TTL EXPOSURE/STEP (MREM):
PARTS USED LIST ATTACHED: Y / N WO TAGS REMOVED: Y I N / NA^ WORK COMPLETE DATE: /__
EMPLOYEE NUMBER:I I I I I I I EMPLOYEE NAME:
- Cause Failure Code: PM / SVC / NRM /
As Found-Out of Spec: Y / N / NA Machine History Review Required: Y /. N Failed Component:
Corrective Action: N Downtime: hrs LINE SUPERVISOR: I_ I I I IT NAME: DATE-- /_/I
- EQUIPMENT RETURN TO SERVICE
- Operability Post Testing:
Operability Procs Pertormed NON OPS SUPV: I I I I I I I NAME: -DATE: / /
DSS:I------ NAME: DATE: //
DUP:,TCAT:E PBNP WO No: 0213474 WO Priority: 4(_.
- Resp Group: ý ********** TEXT DETAIL ** *** Step Print: 11/04/02 Equipment: O-RF-240 System: CS HP Zone:
Equipment Name: T-24A SOUTH CONDENSATE STORAGE TANK INSPECTION Physical Location: OPS Discovery Date:
TEXT ID: WO-0213474 PAGE: 001 T-24A CST TANK INSPECTION NOTE: CALLUP TO BE PERFORMED EVERY 5 YEARS BEGINNING IN 1989. of a rfCr:/.
- 1. ISOLATE AND DANGER TAG T-24A.
- 2. DRAIN REMAINING VOLUME OF TANK CONTENTS TO THE U1 TURBINE BUILDING SUMP.
- 3. , ESTABLISH AN FME BOUNDARY AROUND THE TANK MANWAY AREA.
- 4. REMOVE THE TANK LOWER M]AWAY.
- 5. CHECK FOR SAFE TANK ATMOSPHERE PER NP 1.9.4 "CONFINED SPACE PROCEDURE". S IT - asc d 4,o~Di cr1~SJ~~ i 1(O TEXT ID: WO-0213474 PAGE: 002
- 6. INSTALL BLOWER FORCED VENTILATIONJ IF NECESSARY Icfr Co(0 ý. Fryq-o?
7 ., OB *ACII ?ERZOU ENTEPTNG T'rW *hTSR.E T.**T A h"F.*_L PROCTECTION *_
7 .1 SZ IS USE D W ITH A R EDfl :A L IIA A T A Cp T
- 8. UTILIZE GENERAL FME PRACTICES PER NP 8.4.10 "FOREIGN MATERIALS " ruZ EXCLUSION PROCEDURE". - ,f- -O/
- 9. REMOVE AND IDENTIFY ANY DEBRIS FOUND IN TANK.
- 10. WIPE UP BOTTOM OF TANK IF NECESSARY PER SYSTEM ENGINEER DIRECTION.
- 11. INSPECT TANK LINER FOR RUST/PITTING/POSSIBLE NEED FOR TANK REPAIRS.
- 12. INITIATE WORK ORDERS FOR ANY TANK REPAIRS THAT MAY BE NEEDED.
TEXT ID: WO-0213474 PAGE: 003
- 13. PERFORM VISUAL CLOSEOUT INSPECTION OF THE CST AFTER ALL WORK IN THE TANK IS COMPLETE.
- 14. INSTALL TANK MANWAY. SKILL OF THE CRAFT TIGHTENING IS SUFFICIENT FOR THE RUBBER GASKET. 50 FT/LBS IS THE MAXIMUM TORQUE VALUE.
- 15. DOCUMENT INSPECTION RESULTS IN THE WORK PERFORMED SECTION OF THE TASK SHEET.
- 16. REMOVE AND STORE FME BOUNDARY EQUIPMENT, VENTILATION BLOWER AND TOOLS.
- 17. REMOVE DANGER TAGS AND RESTORE TANK TO SERVICE AFTER ALL TANK WORK IS COMPLETE.
WO 0213474 T-24A CONDENSATE STORAGE TA-NK INSPECTION PLAIN Materials needed Camera, Numerous sample bags or bottles with DD tags. Pen to mark samples, tape measure. filter sock note pad to document dimensions and other findings.
Take pictures of tank, any debris or corrosion prior to disturbing or collecting sam ples.
Note initial findings in tank.
Inspect bottom of tank for loose debris. Note location of debris (map). Evaluate if debris is stuck in slime layer or loose. Collect and save if possible all loose debris so amount can be quantified. Distinguish and Separate neutrally buoyant from non-buoyant material Inspect bottom of tank for ongoing corrosion/pitting and note locations. Evaluate whether corrosion is loose (Flaking) and can easily be removed. Obtain samples of any corrosion products which can be easily removed.
"Note any film on the bottom of the tank and obtain sample.
Inspect the sides of the tank for corrosion. Determine if corrosion easily flakes off.
Obtain samples of corrosion only if it can be easily removed (no scraping or grinding),
using care to determine and save size of flakes. Note location of the corrosion above or below the suction pipe.
Look for any paint/liner that is chipping. Determine if paint is loose and could be removed. Collect samples of any easily removable loose paint. Remove to keep samples in the size that would flake off. Note location of the loose paint, above or below suction pipe.
'Inspect dovn into the pump suction pipe if possible Note any corrosion or debris in the suction pipe. Collect samples fi'om suction pipe.
Inspect all pipe nozzles, check for coating condition and corrosion. Obtain samples of any loose material.
Take pictures of pump suction line area where it enters the tank. Measure the deflector/anti-Vortex Baffle and any pertinent information to be used to determine the likelihood of drawing debris from the bottom of the tank.
Insure a fresh sock is installed on the drainpipe.
Notify Maintenance to clean/flush the bottom of the tank to the drain.
Evaluate the results of the inspection.