Work Order (0213474) for T-24A South Condensate Storage Tank Inspection
ML030800218
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 11/04/2002
From:
- No Known Affiliation
To:
Office of Nuclear Reactor Regulation
References
0213474, FOIA/PA-2003-0094
Download: ML030800218 (5)


Text

DTUPDLICATE . PBNP WO No: 0212474
  • UNITp1
  • CalluD
  • UNIT 1
  • Callup: OT

'Resp Group:J?* ********** HEADER PAGE *****-** Need Date: 04/01/04 Equipment: O-RF-240 System: CS HP Zone:

Equip Nm: T-24A SOUTH CONDENSATE STORAGE TANK INSPECTION Freq: ZM2 Physical Location: OPS Cailu Tp P Serial Number: Callup Type: PM Callup

Description:

SOUTH CONDENSATE STORAGE TANK INSPECTION - SEE TEXT.

Outage ID: YI-,f A"' Activity:

Job Type: PREVENTIVE MAINTENANCE ACTIVITY Work Function: INSPECTION QA: N SEIS: 3 Operability Pre-Test: N Procedures:

SR: N LCO: N EQ: N PMT: Operability Post-Test: N Procedures:

SSA: N CIV: N MRULE: N A/P: P CACC:

RRN: - - Tech Spec Ref:

QA Codes: Sect XI Class:

Tools Needed:

Plant Conditions: J P) - Ignition Control Permit: N Other Conditions: Transient Combustible Permit: N Fire Barrier Penetration Permit: N Scaffolding: Heat Trace:

IS SCREENING FOR 10 CFR 50.59 OR 72.48 REQUIRED ACCORDANCE WITH NP 10.3.1? RWP: N YES jL NO. IF YES .A.TTACH APPLICABLE PORTIONS OF FORM PBF-1515.

Equipm--ent Isol*Ion Required:,XN-1 o 0 -,--q R4,06-1 FME: Y ISO Tag Series #1: ISO Tag #2: ISO Tag #3:

Operability Pre-Test Complete. Equipment Isolation as requested.

Permission granted to perform Wor-k. Et t ...

Ops DSS Notification Req: WW\Ops DSS Signature: Date:Thf*,.

Special Notification: ----

Previous Callup Comments:

Number of Steps: 001 Acct #: - _

MFG Code: Tech Manual Cntl #:

Next Task Instructions:

  • WORK ORDER CLOSEOUT
  • Group Head Signature: Date: /_/

DUPLICATE 0 A*******'*. PBNP WC No: 0213474001

  • UNIT 1
  • Callup SA((\"IV
  • UNIT 1
  • Callup: OT Resp Group: Q06 ********** STEP DETAIL Step Print: 11/04/02 Equipment: O-RF-240 System: CS HP Zone:

Equipment Name: T-24A SOUTH CONDENSATE STORAGE TANK INSPECTION Physical Location: OPS Callup Type: PM Sequence No: 001 Short Desc: SOUTH CONDENSATE STORAGE TANK Sched Start Date:

PLANNED: WORK PROCEDURES:

Crew: NP 8.4.10 Shift: 5RF-240 4-01 Class: 51 5 2 yI-o Work Plan

Description:

SOUTH CONDENSATE STORAGE TANK INSPECTION - SEE TEXT.

WORK PERFORMED:

MTE: QAR:

ACTUAL USED: CREW:

SHIFT:

WORKER CLASS:

NUMBER OF WORKERS:

TOTAL HOURS:

TTL EXPOSURE/STEP (MREM):

PARTS USED LIST ATTACHED: Y / N WO TAGS REMOVED: Y I N / NA^ WORK COMPLETE DATE: /__

EMPLOYEE NUMBER:I I I I I I I EMPLOYEE NAME:

  • WORK COMPLETED
  • Cause Failure Code: PM / SVC / NRM /

As Found-Out of Spec: Y / N / NA Machine History Review Required: Y /. N Failed Component:

Corrective Action: N Downtime: hrs LINE SUPERVISOR: I_ I I I IT NAME: DATE-- /_/I

  • EQUIPMENT RETURN TO SERVICE
  • Operability Post Testing:

Operability Procs Pertormed NON OPS SUPV: I I I I I I I NAME: -DATE: / /

DSS:I------ NAME: DATE: //

DUP:,TCAT:E PBNP WO No: 0213474 WO Priority: 4(_.

  • UNIT 1
  • MWO
  • UNIT 1
  • Resp Group: ý ********** TEXT DETAIL ** *** Step Print: 11/04/02 Equipment: O-RF-240 System: CS HP Zone:

Equipment Name: T-24A SOUTH CONDENSATE STORAGE TANK INSPECTION Physical Location: OPS Discovery Date:

TEXT ID: WO-0213474 PAGE: 001 T-24A CST TANK INSPECTION NOTE: CALLUP TO BE PERFORMED EVERY 5 YEARS BEGINNING IN 1989. of a rfCr:/.

1. ISOLATE AND DANGER TAG T-24A.
2. DRAIN REMAINING VOLUME OF TANK CONTENTS TO THE U1 TURBINE BUILDING SUMP.
3. , ESTABLISH AN FME BOUNDARY AROUND THE TANK MANWAY AREA.
4. REMOVE THE TANK LOWER M]AWAY.
5. CHECK FOR SAFE TANK ATMOSPHERE PER NP 1.9.4 "CONFINED SPACE PROCEDURE". S IT - asc d 4,o~Di cr1~SJ~~ i 1(O TEXT ID: WO-0213474 PAGE: 002
6. INSTALL BLOWER FORCED VENTILATIONJ IF NECESSARY Icfr Co(0 ý. Fryq-o?

7 ., OB *ACII ?ERZOU ENTEPTNG T'rW *hTSR.E T.**T A h"F.*_L PROCTECTION *_

7 .1 SZ IS USE D W ITH A R EDfl :A L IIA A T A Cp T

8. UTILIZE GENERAL FME PRACTICES PER NP 8.4.10 "FOREIGN MATERIALS " ruZ EXCLUSION PROCEDURE". - ,f- -O/
9. REMOVE AND IDENTIFY ANY DEBRIS FOUND IN TANK.
10. WIPE UP BOTTOM OF TANK IF NECESSARY PER SYSTEM ENGINEER DIRECTION.
11. INSPECT TANK LINER FOR RUST/PITTING/POSSIBLE NEED FOR TANK REPAIRS.
12. INITIATE WORK ORDERS FOR ANY TANK REPAIRS THAT MAY BE NEEDED.

TEXT ID: WO-0213474 PAGE: 003

13. PERFORM VISUAL CLOSEOUT INSPECTION OF THE CST AFTER ALL WORK IN THE TANK IS COMPLETE.
14. INSTALL TANK MANWAY. SKILL OF THE CRAFT TIGHTENING IS SUFFICIENT FOR THE RUBBER GASKET. 50 FT/LBS IS THE MAXIMUM TORQUE VALUE.
15. DOCUMENT INSPECTION RESULTS IN THE WORK PERFORMED SECTION OF THE TASK SHEET.
16. REMOVE AND STORE FME BOUNDARY EQUIPMENT, VENTILATION BLOWER AND TOOLS.
17. REMOVE DANGER TAGS AND RESTORE TANK TO SERVICE AFTER ALL TANK WORK IS COMPLETE.

WO 0213474 T-24A CONDENSATE STORAGE TA-NK INSPECTION PLAIN Materials needed Camera, Numerous sample bags or bottles with DD tags. Pen to mark samples, tape measure. filter sock note pad to document dimensions and other findings.

Take pictures of tank, any debris or corrosion prior to disturbing or collecting sam ples.

Note initial findings in tank.

Inspect bottom of tank for loose debris. Note location of debris (map). Evaluate if debris is stuck in slime layer or loose. Collect and save if possible all loose debris so amount can be quantified. Distinguish and Separate neutrally buoyant from non-buoyant material Inspect bottom of tank for ongoing corrosion/pitting and note locations. Evaluate whether corrosion is loose (Flaking) and can easily be removed. Obtain samples of any corrosion products which can be easily removed.

"Note any film on the bottom of the tank and obtain sample.

Inspect the sides of the tank for corrosion. Determine if corrosion easily flakes off.

Obtain samples of corrosion only if it can be easily removed (no scraping or grinding),

using care to determine and save size of flakes. Note location of the corrosion above or below the suction pipe.

Look for any paint/liner that is chipping. Determine if paint is loose and could be removed. Collect samples of any easily removable loose paint. Remove to keep samples in the size that would flake off. Note location of the loose paint, above or below suction pipe.

'Inspect dovn into the pump suction pipe if possible Note any corrosion or debris in the suction pipe. Collect samples fi'om suction pipe.

Inspect all pipe nozzles, check for coating condition and corrosion. Obtain samples of any loose material.

Take pictures of pump suction line area where it enters the tank. Measure the deflector/anti-Vortex Baffle and any pertinent information to be used to determine the likelihood of drawing debris from the bottom of the tank.

Insure a fresh sock is installed on the drainpipe.

Notify Maintenance to clean/flush the bottom of the tank to the drain.

Evaluate the results of the inspection.