Work Order No. 0205651 for AFW Motor Driven Pump
ML030770738
Person / Time
Site: Point Beach NextEra Energy icon.png
Issue date: 10/09/2002
From:
Nuclear Management Co
To:
Office of Nuclear Reactor Regulation
References
FOIA/PA-2003-0094 0205651
Download: ML030770738 (12)


Text

ORIGINAL PBNP WO No: 0205651 WO Priority: 5

  • UNIT 0
  • MWO
  • UNIT 0
  • Resp Group: MM
  • Step Print: 06/20/02 Equipment: P-038A System: AF HP Zone:

Equipment Name: AUX FEEDWATER MOTOR-DRIVEN PUMP Physical Location: 8/CB/AFP RM P-38A CUB Discovery Date: 04/03/02 Serial Number: 681-S-1030 Problem

Description:

WITH PUMP NOT IN OPERATION: THE INBOARD SEAL LEAKS EXCESSIVELY - ABOUT 1/2 PENCIL STREAM AND OUTBOARD SEAL ALSO LEAKS 1/2 PENCIL STREAM.

(USNRC P KROHN RESIDENT CONCERN)

Originator: VANDYKE D D 6703 Outage ID: Activity: T11A2 Tag/Stkr Placed: T TAG #: 185037 Tag Lctn: P-38A Job Type: CORRECTIVE MAINTENANCE ON PL Project ID: Condition Report: E Work Function: WORK ORDER ModReq #:-

QA: Y SEIS: 1 Operability.Pre-Test: N Procedures:

SR: Y LCO: Y

  • EQ: N PMT: Y Operability Post-Test: Y Procedures: IT-10 SSA: Y CIV: N MRULE: Y IT-10A A/P: -Y,---ACqC: IT-10B RRN: .... '-Tech Spec -Ref SEE-ITS8 QA Codes: 04 20 Sect XI Class: 3 Tools Needed:

06-27-02  :: V)

Work Plan/Instructions reviewed. Planner- CHES M D 6919 LINE SUPERVISOR: ILflEl0QIOI:jLI NAME- DATE: C/2Z/*/2 Plant Conditions: ANY CONDITION Ignition Control Permit: N Other Conditions: Transient Combustible Permit: N Scaffolding: N - Heat Trace: N RWP: N Fire Barrier Penetration Permit: N IS SCREENING FOR 10 CFR 50.59 OR 72.48 REQUIRED ACCORDANCE WITH NP 10.3.1?

- YES j* NO. IF YES ATTACH APPLICABLE PORTIONS OF FORM PBF-1515.

  • FME: Y Equipment Isolation Required: *i _- ' t1--

ISO Tag Series #1: ISO Tag #2: ISO Tag #3:

Operability Pre-Test Complete. Equipment Isolation as requested.

Permission granted to perform Wor--k.

Req: Y Ops DSS Signature: /1 #,/7-,- Date: /__ v/ t.

Ops DSS Notification Special Notification:

VERIFY APPENDIX R FIRE ROUNDS PER OM 3.27 Number of Steps: 001 Acct #: 00 - 0A000 -'3000122 - -0030 MFG Code: BYRONJ Tech Manual Cntl #: 00265

  • WORK ORDER CLOSEOUT
  • Group Head Signature: Date: //

ORIGINAL PBNP WO No: 0205651001 WO Priority: 5

  • UNIT 0
  • MWO
  • UNIT 0
  • Resp Group: MM
  • STEP DETAIL ********** Step Print: 06/20/02 Equipment: P-038A System: AF HP Zone:

Equipment Name: AUX FEEDWATER MOTOR-DRIVEN PUMP Physical Location: 8/CB/AFP RM P-38A CUB Sequence No: 01 Need Date Short Desc: P-38A INBRD & OUTBRD SEAL LEAKS Sched Start Date: 07/29/02 PLANNED: WORK PROCEDURES:

Crew: MM Shift: D Class: 410 Work Plan

Description:

REPACK PUMP AS PER ATTACHED WORKPLAN QC REVIEW REQUIRED: Y CURRY A S 6481 DATE: 061902

! -* - o ... A WORK PRFORMED: -:

ACTUAL CREW:  : raE NUMBER OF WORKERS:_______________

TOTAL HOURS::____ ____ ____ ____

TTL EXPOSURE/STEP (MREM)::____ ____ ____

PARTS USED LIST AT CHED:(*/ N WO TAGS REMOVED: CYJ/

N SS/:/1/

/fLA WORK COMPLETE DATE:

EMPLOYEE NUMBER: l _-t-lIo__I EMPLOYEe NAME:WORK

  • WORK COMPLETED
  • Cause Failure Code: 4 / C NRM / *CL As Found-Out of Spec: N-NA Machine History Review Required: 3 / N Failed Component:

Corrective Action NA/*RP)/Rv /

  • Downtime: hrs LINE SUPERVISOR: NAME: DATE:-.&/125 1.OZ
  • EQUIPMENT RETURN TPS=ERVICE*

Operability Post Testing: 1-/ /

1_TIME: RETURN DATE: /_/ TIME:

EQUIP. TAKEN OOS - DATE:

Operability Procs Performe- -

NON OPS SUPV: I I NAME: ,--.DATE DATE: YV/

DSS~Iel(~ NAME:

NUCLEAR POWER BUSINESS UNIT WO WORK PLAN Work Control Document: o205651 UNIT: PB 0 Equipment ID: P-038A Equipment

Description:

AUX FEEDWATER MOTOR-DRIVEN PUMP Mike Desroches x6919 Date: October 18, 2002 Work Plan Originator:

WORK SCOPE WORK SCOPE Repack I.B. and O.B. stuffing boxes for P-038A and PURPOSE INITIAL P-038A O.O.S.

CONDITIONS DANGER TAG Seal Water and Motor to P-038A is Danger Tagged SCOPE DANGER TAG REFERENCES

-"1_MlTATiONSý-- "actT{C*.riiaThs~ieadd.1Vear glovk;'"wI ier1tahdlin9gn-7ashands- i~hj ta I oid Itnaedey'avtdr' AND ingestion.

PRECAUTIONS TOOLS 1 & 1/16" Open end wrenches. Packing Tool to consolidate packing rings, might have to be fabricated AND to slightly more than the I.D. of the packing and slightly less than the O.D.

MATERIALS SIR# 17186 (packing)

QUALITY CONTROL QC REVIEW OF WORK PLAN (independent QC review required on QA classified work order only) NA if non-QA work order Date INSP.

Any change in scope requires WO WP review by QC inspector.

SUPPORT SUPPORT El Chemistry El Engineering El HP El I&C El Maintenance

[j NDE

[I Operations El ac El Security

[E Crane E-TB E] PAB El Polar E] Other El Other Page 1 of 6 J S-SareOataV*rtnWORKPLANReady- A,2-02050205651 doc PBF-9169 Revision 3 01/12/01

NUCLEAR POWER BUSINESS UNIT WO WORK PLAN Work Control Document: 0205651 UNIT: PBO_

Equipment ID: P-038A Equipment

Description:

AUX FEEDWATER MOTOR-DRIVEN PUMP Date: October 18, 2002 Work Plan Originator: Mike Desroches x6919 PRE-JOB BRIEF Supervisor / Job Leader to conduct pre-job brief using PBF-9217 (Mtn and I&C) or OM 3.29 (OPs).

NOTE: Pre-job brief may require attendance of other workgroups involved in the work activity.

PRE-JOB BRIEF COMPLETED Su rvisor or Job Leader

/? .25-f ZDate NOTES

~-Irei*g."-ha i ltsf-,nvaork pt ,-pay'Veparformedin-any g..

FME: Tools and equipment shall be checked for loose parts and debris and temporary covers should be installed for foreign material exclusion (FME) of system/components per Exclusion of Foreign Material from Plant components and Systems, NP 8.4.10.

NOTE: IF inspections or discrepancies require modifications to Work Scope:

THEN STOP work, place equipment in SAFE condition, and NOTIFY Supervision.

NOTE: The Control Room / the Work Control Center I and the watchstander (as appropriate) shall be informed of the status of jobs which:

bring in alarms, affect indications, and other work being performed on operating equipment.

NOTE: All workers shall perform all Danger Tagging requirements as defined in NP 1.9.15 NOTE: When replacing parts, compare the old part to the new part to verify it is an acceptable replacement.

NOTE: If work scope changes, an R/RIM form may be required for parts replacement or repair.

NOTE: Any pen and ink change to work plan requires initial and date by the change.

NOTE: Write WO number on top/header of any supplemental pages added to work package, i.e., forms, procedures, checklists...

PBF-9169 Page 2 of 6 J %SnareDataVnt\WORKPLAN\ReaOy-vAý02XO205\0205651 doc Revision 3 01112/01

NUCLEAR POWER BUSINESS UNIT WO WORK PLAN 0205651 UNIT: PB 0 Work Control Document:

Equipment ID: P-038A Equipment

Description:

AUX FEEDWATER MOTOR-DRIVEN PUMP Date: October 18, 2002 Work Plan Originator: Mike Desroches x6919 Work Plan Description Worker Date Remove fasteners and gland halves.

Remove pump packing from Outboard Stuffing Box.

Record packing configuration removed below.

Dwg. shows 3 outer rings of packing, a cage ring, then 4 inner rings of packing) 5 J. o-. 1z. ___,_

Packing configuration removed .. ,A-tý- " CC' 'c.rc.. 3*-i, rn,'r. MT DATE Caution

.,t.is-,*pa It .sure~roper oerationwith a minimum of run-in and final adjustment, that each ring of packing is firmly seated with a packing tool, and inserted one at a time. Thi-re is'rfoC'ai'le'ri"om-ah-this'af tsetboxea;- ""

would lead to running out of room for the entire packing set. Each packing per Stock and to negate this practice, Item No. comes with 14 rings, enough for both ends.

.. . =*-*r.*

  • .. h, rf; nt tn allnw seal water to cool shaft.

Proper packing cun=-,Uu l, V" ,= , V 11-u 6-,, "" ..... .... ... .. . . . .

2. Check the packing configuration removed, matches 4 rings, followed by cage ring, followed by 3 rings. If the removed packing configuration was ,

different, notify supervisor or responsible engineer. MT DATE FME 3. Inspect accessible areas for dirt and debris, and remove. M 1--13,V&

MT DATE

4. Insert one ring at a time with splits 1800 apart. Use a packing tool to seat the packing firmly, one ring at a time. Do not overtighten.

Dwg. 1 F3351 shows packing configuration to be 4 rings (3/8" packing) followed by cage ring, followed by 3 rings of (3/8" packing).

It is the mfg. Recommendation, that new packing is not tightened.

Tightened being a relative term. Firmly seated and fasteners snugged

-b._ /O.w3.

should be adequate. Final packing adjustment to be made immediately MT DATE when pump is run.

5. Record the As-Left Packing Configuration below. ,

.J~~~~ I.4 113).I DT Install gland halves and take up evenly on gland fasteners.

6. Remove fasteners and gland halves.

Remove pump packing from Inboard Stuffing Box.

Record packing configuration removed below.

1

.Dwg. shows 3 outer rings of packing, a cage ring, then 4 inner rin s of Io.,3 ,'

packing) (! ,,, .' .

rI. , r C,0 -,.,,* ,,nei-e- MT DATE Packing configuration removed 0 -*,r-J %Shareaa3 v~t\WORKPLAN*Ready-O02ND205\(f205651 do PBF-9169 Page 3 of 6 Revision 3 01/12/01

NUCLEAR POWER BUSINESS UNIT WO WORK PLAN 0205651 UNIT: PB_0_

Work Control Document:

Equipment ID: P-038A Equipment

Description:

AUX FEEDWATER MOTOR-DRIVEN PUMF

,1,21

.* i tnr" Mike Desroches x6919 Date: October 18, 2002 inStep I Work Plan Description Worker Worker Date I.

Caution It is important to ensure proper operation with a minimum of run-in and final adjustment, that each ring of packing is firmly seated with a packing tool, and inserted one at a time. There is not ample room in this stuffing box area, set. Each packing set per Stock and to negate this practice, would lead to running out of room for the entire packing Item No. comes with 14 rings, enough for both ends.

shaft.

Proper packing configuration is extremely important to allow seal water to cool I I

7. Check the packing configuration removed, matches 4 rings, followed by cage ring, followed by 3 rings. If the removed packing configuration was MT DATE different, notify supervisor or responsible engineer. -+ t __

I I1 f- I FME 8. Inspect accessible areas for dirt and debris, and remove. i >

~****~-*~ Ct~ . 44_,

-1 '4q4

-- - . - ~' '. .. ~.r-- I 4-. - -,%.. .- ~.

1 -, 'FA~T '

9. Insert one ring at a time with splits 1800 apart. Use a packing tool to seat the packing firmly, one ring at a time. Do not overtighten.

Dwg. 1F3351 shows packing configuration to be 4 rings (3/8" packing) followed by cage ring, followed by 3 rings of (3/8" packing).

It is the mfg. Recommendation, that new packing is not tightened.

Tightened being a relative term. Firmly seated and fasteners snugged should be adequate. Final packing adjustment to be made immediatelyv 1_____.

MT DATE when pump is run.

10. Record the As-Left Packing Configuration below. DAT E
  • o r.,* * ,-3. 0 MT

, ,.0,.,,

  1. ,,,,* ,Q,* ' 8 0 Install gland h lyves aand take up evenly on gland fasteners.
11. Coordinate with Operations to clear tags and run the pump.

MT DATE CAUTION:

Scoring of the shaft will Monitor the stuffing boxes temperature to determine if seal water is keeping the shaft cool.

boxes are reached , resulting from the packing being of the occur is excessive temperatures of the stuffing improper configuration or over-tightening.

needed at al times to lubricate and cool This type packing is not meant to be leak tight. A small amount of leakage is evenly and gradually.

the packing. Ifadjustment is required, be sure that all packing gland nuts are tightened I

- rI iI

12. Monitor stuffing box temperatures, I.B. and O.B. and adjust packing by taking a flat at a time and evenly across the two gland nuts, until the MT desired packing leakage is achieved. -t I I III i HOUSE 13. Remove all debris, tools, and materials from the area. Ensure all work A KEEPING areas meet PBNP housekeeping expectations. MT DATE found to be satisfactory. (Not hot to the touch) MtJOPý A#E J ,ShaeDaiawnhiWORKPLANReady-'k 2%205"205651 0Oc PBF-9169 Page 4 of 6 Revision 3 01/12101

NUCLEAR POWER BUSINESS UNIT WO WORK PLAN 0205651 UNIT: PB_0_

Work Control Document:

P-038A Equipment ID:

AUX FEEDWATER MOTOR-DRIVEN PUMP Date: October 18, 2002 Equipment

Description:

Mike Desroches x6919 Work Plan Originator:

m*

Worker Date Step Work Plan Description muto Hold Point No IPm prtswtotecsielaae Nt:Sih I I i I PMT 15. Pump operates without excessive leakage. (Note: Slight amount of leage is needed to lubricate and keep packing cool) MT/OPS ZDA1'k Satisfactory - Unsatisfactory t.t.,....... ... -. +/-*.i - -' -'

J ShateDataV'lhiWORKPLANReady A,2,0205\205651 ooc PBF-9169 Page 5 of 6 Revision 3 01112/01

NUCLEAR POWER BUSINESS UNIT WO WORK PLAN Work Control Document: 0205651 UNIT: PBO_

Equipment ID: P-038A Equipment

Description:

AUX FEEDWATER MOTOR-DRIVEN PUMP Date: October 18, 2002 Work Plan Originator: -Mike Desroches x6919 OPERATIONS RETURN To 1.

SERVICE /7 OPS IgAT/

TESTING POST-JOB BRIEF Conduct post-job debrief using PBF-9218 (Mtn and I&C) or OM 3.29 (OPs). Document lessons learned, good practices, problems encountered, etc. on feedback form.. Debrief should include all applicable work groups.

Supervisor or Job Leader POST-JOB DEBRIEF COMPLETED

, ,/ Date FEEDBACK

.Z,..

Fill out feedback form attached to work package (maintenance group use PBF-9929)

MT DATE PBF-9169 Page 6 of 6 J %ShfeData*.l\WORKPLAN.lReady.,k%*,0205ý205651 doc Revision 3 01/12/01

Point Beach Nuclear Plant FME CHECKLIST

~J~.UJU.-7 I. WORK ORDER/PROCEDURE/EVOLUTIU[N:

Yes I No II. ADMINISTRATIVE CONTROL EXEMPTIONS:

in effect and Section IV (I any are answered "YES." General requirements continue INSPECTIONS are still required.)

Than 4 Square I. Piping/Conduit 2- Diameter or Less (nominal) or System Opening Less No Inches (approxcimate). See Note 1. No (i.e. waterbox drain)

2. System Opening Less Than or Equal to 4 Inches in Diameter Between 4 O'clock and 8 O'clock (pointing down). No Fittings. No
3. Maintenance Activity Involving Compression/Threaded 1.
4. Maintenance/Operations Pump/Valve Repacking. See Note No or Repacking of Grease in Components
5. Maintenance/Operation Oil Changes. Oil Sampling, F Installed Fill/Vent Ports.

Inactory

6. FME Zone: 1 2 e Da te: ,

Recommended By (Planner): M6 "

te: ID -

_ 7 Da Concurred By (Cognizant Supervisor):

()

I . Boundaries (Required for all Zone I FMEAs) Required

2. Signs (Required for all FMEA Zone I & 2) -Required 3.Pipe Dams Required (Record On FME Material Control Log)
  • Required
4. FME Material Control Log (PBF-9157)
5. Chemical Exclusion Zone (See Dry Fuel Requirements) in place.

NO.__T required when Temporary Covers or internal barriers are 'II

6. Administrative requirements implemented (Supervisor/Leadperson).

IV. INSPECTION REQUIRED: Zý // 1oO'- :ý3-IL), - :z31 I. Pre-System Opening Area Inspection/Cleanup Required.

2. Final Closeout Inspection.

Date:

Complete/Reviewed By (Supervisor/Leadperson):

0?

or cover when NOT attended.

Note 1: Continuously attend system/component when open, I

(

Reference:

NP S.4.10)

RcI,\ion+ll 6' l#lf Paue I of I

Point Beach Nuclear Plant PRE-JOB BRIEF CHECKLIST

-JOB/EVOLUTION: P-038A packing replace. AREASWO# 0205651 TDATE:

ATTENDEES ["1BRIEFING REQUIRED DAILY I1"C[ECK.FD Conducted By: 6*1t( L_--, >* ____, __.___.___.__

LUse bttcA of %heetý/ne e.%wzri REVIEW I DISCUSS & CHECK OFF all Applicable Items SjScope of Job Hazards (4) (4/)

  • Purpose. leader. resources. tools. par.-
  • Personnel saict%/PPE
  • Procedure,..%ork order.,, dra\*riie.- pernmi-
  • Plant operation. po%%cr gencration. nuLlear :,allet%. trip
  • Maintenance Rule Statu'i orthe affcLtcd :,'Snter aoidance
  • Equipment

_ _ Energoy Sources . Radiological Conditions (4)

  • Tag boundaries
  • Energized equipment. de-energied equipment.
  • RWP pressurized. de-pressurized
  • Rad',aste Considerations
  • Protected Worker Log

__ _ Communications _ Other Communication requirements - Logistics support requirement-,

Necessar, notifications

  • Housekeeping
  • Security notification
  • PBNP/lndustry event Lesons learned

_ Special Precautions . Key Error Traps (4) (4)

Industry and in-house operating experience. as applicable

  • First time evolution Critical steps
  • Distractive or poor environment
  • Error-likely-situations. as applicable
  • Inadequate mental/physical state
  • Defenses-barriers 0 Time pressure
  • Independent verifications and concurrent checks
  • Imprecise communication Termination criteria-reco',ery. as applicable S *Key Barriers (4/) 1.

"* Job briefings

"* Procedure use

"* Administratie program uwe

"* Turnover meetinms

"* Supcrvi.-or pre-scncc

"* Re,,icx .,crification

"* Co-vorkcr coachine

% el I*mmpro, e neit IttW-9217 STOP - THINK -. I CT- REV'IEW RckrmLC "l' I I' ill Re¢%i 31 I i11'1710 1

Nuclear Power Business Unit Return to Service Testing Reviews Work Order/Document No. 0205651 INITIALS & DATE Pre-Release I Post Work-RTS

  • Specity required equipment'pldnt conditions with PMT activities.

WCC SRO or designee.

    • Iforiginal work scope is unchanged. Post R'rS signoff may be N!A'd by "C" type WOs %here a PMT is not required by procedure
      • May be N/A'd by WCC SRO or designee for "S" type WOs or scope.

1ill -2114 l{.*,inI ii42-XI'L)'t)

Warehouse Issue Tick- Not PB02-17653 r Page 1 OL I 07/23/2001 ,:33:00 III1111

~II111111 il l1l1l1l1111111 IIi Ill Issue Poiht  : 30-PBNP Required Date t 07/28/2002 t PB02-017186 Work Order PB02-005651-000 SIR Number Requestor  : Desroches, Michael Asset a Store w WO# 0205651 Crew Deliver To Line Stock Number Description SLevel CMI Oty To Be Issued: 1.00 ST

1. 919-8881 PACKING SET, 2-3/4" ID X 3-1/2" OD X 3/8" THICKNESS, 14 On Hand Issued ROW/Bin 3.00 S,- Returned 4-NSKSP3

&LcU ý7 L/ / Co 6/ N- 9§ 1/$7</62 Issued ByV l K'5 /

-0k Received By Date 62ŽC2