ML030770738
| ML030770738 | |
| Person / Time | |
|---|---|
| Site: | Point Beach |
| Issue date: | 10/09/2002 |
| From: | Nuclear Management Co |
| To: | Office of Nuclear Reactor Regulation |
| References | |
| FOIA/PA-2003-0094 0205651 | |
| Download: ML030770738 (12) | |
Text
ORIGINAL PBNP WO No: 0205651 WO Priority:
5
- UNIT 0 MWO
- UNIT 0
Equipment Name: AUX FEEDWATER MOTOR-DRIVEN PUMP Physical Location: 8/CB/AFP RM P-38A CUB Discovery Date:
04/03/02 Serial Number: 681-S-1030 Problem
Description:
WITH PUMP NOT IN OPERATION: THE INBOARD SEAL LEAKS EXCESSIVELY - ABOUT 1/2 PENCIL STREAM AND OUTBOARD SEAL ALSO LEAKS 1/2 PENCIL STREAM.
(USNRC P KROHN RESIDENT CONCERN)
Originator:
VANDYKE D D 6703 Outage ID:
Activity: T11A2 Tag/Stkr Placed: T TAG #:
185037 Tag Lctn: P-38A Job Type: CORRECTIVE MAINTENANCE ON PL Project ID:
Condition Report: E Work Function: WORK ORDER ModReq #:-
QA: Y SEIS: 1 Operability.Pre-Test: N Procedures:
SR: Y LCO: Y
- EQ: N PMT: Y Operability Post-Test: Y Procedures: IT-10 SSA: Y CIV: N MRULE: Y IT-10A A/P: -Y,---ACqC:
IT-10B RRN:
'-Tech Spec -Ref SEE-ITS8 QA Codes: 04 20 Sect XI Class: 3 Tools Needed:
06-27-02 ::
V)
Work Plan/Instructions reviewed.
Planner-CHES M D 6919 LINE SUPERVISOR: ILflEl0QIOI:jLI NAME-DATE: C/2Z/*/2 Plant Conditions:
ANY CONDITION Ignition Control Permit: N Other Conditions:
Transient Combustible Permit: N Fire Barrier Penetration Permit: N Scaffolding: N -
Heat Trace: N RWP: N IS SCREENING FOR 10 CFR 50.59 OR 72.48 REQUIRED ACCORDANCE WITH NP 10.3.1?
YES j*
NO.
IF YES ATTACH APPLICABLE PORTIONS OF FORM PBF-1515.
Equipment Isolation Required: *i t1--
FME: Y ISO Tag Series #1:
ISO Tag #2:
ISO Tag #3:
Operability Pre-Test Complete.
Equipment Isolation as requested.
Permission granted to perform Wor--k.
Ops DSS Notification Req: Y Ops DSS Signature:
/1
- ,/7-,-
Date: /__
v/
- t.
Special Notification:
VERIFY APPENDIX R FIRE ROUNDS PER OM 3.27 Number of Steps: 001 Acct #:
00 0A000
-'3000122
-0030 MFG Code: BYRONJ Tech Manual Cntl #:
00265
- WORK ORDER CLOSEOUT Group Head Signature:
Date:
//
ORIGINAL PBNP WO No: 0205651001 WO Priority:
5
- UNIT 0 MWO
- UNIT 0
- Resp Group: MM STEP DETAIL Step Print:
06/20/02 Equipment: P-038A System: AF HP Zone:
Equipment Name: AUX FEEDWATER MOTOR-DRIVEN PUMP Physical Location: 8/CB/AFP RM P-38A CUB Sequence No: 01 Need Date Short Desc: P-38A INBRD & OUTBRD SEAL LEAKS Sched Start Date: 07/29/02 PLANNED:
WORK PROCEDURES:
Crew: MM Shift: D Class: 410 Work Plan
Description:
REPACK PUMP AS PER ATTACHED WORKPLAN QC REVIEW REQUIRED: Y CURRY A S 6481 DATE: 061902 A
- o...
ACTUAL raE CREW:
WORK PRFORMED:
NUMBER OF WORKERS:_______________
TOTAL HOURS: :____
TTL EXPOSURE/STEP (MREM): :____
PARTS USED LIST AT CHED:(*/
N WO TAGS REMOVED:
CYJ/
N /fLA WORK COMPLETE DATE:
SS/:/1/
EMPLOYEE NUMBER: l _-t-lIo__I EMPLOYEe NAME:WORK
- WORK COMPLETED
- Cause Failure Code:
4 C
/
NRM /
- CL As Found-Out of Spec:
N-NA Machine History Review Required:
3 / N Failed Component:
Corrective Action NA/*RP)/Rv
/
Downtime:
hrs LINE SUPERVISOR:
NAME:
DATE:-.&/125 1.OZ
- EQUIPMENT RETURN TPS=ERVICE*
Operability Post Testing: 1-1_
EQUIP.
TAKEN OOS -
DATE:
/
/
TIME:
RETURN DATE:
/_/
TIME:
Operability Procs Performe-NON OPS SUPV: I I NAME:
,--.DATE YV/
~Iel(~
NAME:
DATE:
Work Control Document:
Equipment ID:
Equipment
Description:
Work Plan Originator:
NUCLEAR POWER BUSINESS UNIT WO WORK PLAN o205651 P-038A AUX FEEDWATER MOTOR-DRIVEN PUMP Mike Desroches x6919 UNIT: PB 0 Date: October 18, 2002 WORK SCOPE WORK SCOPE Repack I.B. and O.B. stuffing boxes for P-038A and PURPOSE INITIAL P-038A O.O.S.
CONDITIONS DANGER TAG Seal Water and Motor to P-038A is Danger Tagged SCOPE DANGER TAG REFERENCES
-"1_MlTATiONSý--
"actT{C*.riiaThs~ieadd.1Vear glovk;'"wI ier1tahdlin9gn-7ashands-Itnaedey'avtdr' i~hj I ta oid AND ingestion.
PRECAUTIONS TOOLS 1 & 1/16" Open end wrenches. Packing Tool to consolidate packing rings, might have to be fabricated AND to slightly more than the I.D. of the packing and slightly less than the O.D.
MATERIALS SIR# 17186 (packing)
QUALITY CONTROL QC REVIEW OF WORK PLAN (independent QC review required on QA classified work order only) NA if non-QA work order Date Any change in scope requires WO WP review by QC inspector.
INSP.
SUPPORT SUPPORT El Chemistry El Engineering El HP El I&C El Maintenance
[j NDE
[I Operations El ac El Security
[E Crane E-TB E] PAB El Polar E] Other El Other Page 1 of 6 PBF-9169 Revision 3 01/12/01 J S-SareOataV*rtnWORKPLANReady-A,2-02050205651 doc
Work Control Document:
Equipment ID:
Equipment
Description:
Work Plan Originator:
NUCLEAR POWER BUSINESS UNIT WO WORK PLAN 0205651 P-038A AUX FEEDWATER MOTOR-DRIVEN PUMP Mike Desroches x6919 UNIT: PBO_
Date: October 18, 2002 Page 2 of 6 PBF-9169 Revision 3 01112/01 J %SnareDataVnt\\WORKPLAN\\ReaOy-vAý02XO205\\0205651 doc PRE-JOB BRIEF Supervisor / Job Leader to conduct pre-job brief using PBF-9217 (Mtn and I&C) or OM 3.29 (OPs).
NOTE: Pre-job brief may require attendance of other workgroups involved in the work activity.
PRE-JOB BRIEF COMPLETED Su rvisor or Job Leader
/?.25-f ZDate NOTES
~-Irei*g."-ha i
ltsf-,nvaork pt,-pay'Veparformed in-any g..
FME:
Tools and equipment shall be checked for loose parts and debris and temporary covers should be installed for foreign material exclusion (FME) of system/components per Exclusion of Foreign Material from Plant components and Systems, NP 8.4.10.
NOTE:
IF inspections or discrepancies require modifications to Work Scope:
THEN STOP work, place equipment in SAFE condition, and NOTIFY Supervision.
NOTE:
The Control Room / the Work Control Center I and the watchstander (as appropriate) shall be informed of the status of jobs which:
bring in alarms, affect indications, and other work being performed on operating equipment.
NOTE:
All workers shall perform all Danger Tagging requirements as defined in NP 1.9.15 NOTE:
When replacing parts, compare the old part to the new part to verify it is an acceptable replacement.
NOTE:
If work scope changes, an R/RIM form may be required for parts replacement or repair.
NOTE:
Any pen and ink change to work plan requires initial and date by the change.
NOTE:
Write WO number on top/header of any supplemental pages added to work package, i.e., forms, procedures, checklists...
Work Control Document:
Equipment ID:
Equipment
Description:
Work Plan Originator:
NUCLEAR POWER BUSINESS UNIT WO WORK PLAN 0205651 P-038A AUX FEEDWATER MOTOR-DRIVEN PUMP Mike Desroches x6919 UNIT: PB 0 Date: October 18, 2002 Work Plan Description Worker Date Remove fasteners and gland halves.
Remove pump packing from Outboard Stuffing Box.
Record packing configuration removed below.
Dwg. shows 3 outer rings of packing, a cage ring, then 4 inner rings of packing) 5 J.
o-.
1z.
Packing configuration removed
,A-tý-
CC' 'c. rc..
3*-i, rn,'r.
MT DATE Caution
.,t.is-,*pa It
.sure~roper oerationwith a minimum of run-in and final adjustment, that each ring of packing is firmly seated with a packing tool, and inserted one at a time. Thi-re is'rfoC'ai'le'ri"om-ah-this'af t boxea;- ""
and to negate this practice, would lead to running out of room for the entire packing set. Each packing set per Stock Item No. comes with 14 rings, enough for both ends.
=*-*r.*
h, rf; nt tn allnw seal water to cool shaft.
Proper packing cun=-,Uu l, V"
,=, V 11-u 6-,,
- 2.
Check the packing configuration removed, matches 4 rings, followed by cage ring, followed by 3 rings. If the removed packing configuration was different, notify supervisor or responsible engineer.
- 3.
Inspect accessible areas for dirt and debris, and remove.
M 1--13,V&
MT DATE
- 4.
Insert one ring at a time with splits 1800 apart. Use a packing tool to seat the packing firmly, one ring at a time. Do not overtighten.
Dwg. 1 F3351 shows packing configuration to be 4 rings (3/8" packing) followed by cage ring, followed by 3 rings of (3/8" packing).
It is the mfg. Recommendation, that new packing is not tightened.
Tightened being a relative term. Firmly seated and fasteners snugged should be adequate. Final packing adjustment to be made immediately
-b._
/O.w3.
when pump is run.
MT DATE
- 5.
Record the As-Left Packing Configuration below.
.J~~~~
113).I I.4 DT Install gland halves and take up evenly on gland fasteners.
- 6.
Remove fasteners and gland halves.
Remove pump packing from Inboard Stuffing Box.
Record packing configuration removed below.
1.Dwg. shows 3 outer rings of packing, a cage ring, then 4 inner rin s of packing)
(!
Io.,3,'
Packing configuration removed 0 -*,r-rI.
, r C, 0
,,nei-e-MT DATE Page 3 of 6 PBF-9169 Revision 3 01/12/01 J %Shareaa 3v~t\\WORKPLAN*Ready-O02ND205\\(f205651 do
NUCLEAR POWER BUSINESS UNIT WO WORK PLAN Work Control Document:
0205651 Equipment ID:
P-038A Equipment
Description:
AUX FEEDWATER MOTOR-DRIVEN PUMF
, 1,21 i
tnr" Mike Desroches x6919 UNIT: PB_0_
Date: October 18, 2002 in Step I Work Plan Description Worker Worker Date Caution It is important to ensure proper operation with a minimum of run-in and final adjustment, that each ring of packing is firmly seated with a packing tool, and inserted one at a time. There is not ample room in this stuffing box area, and to negate this practice, would lead to running out of room for the entire packing set. Each packing set per Stock Item No. comes with 14 rings, enough for both ends.
Proper packing configuration is extremely important to allow seal water to cool shaft.
I I
7.
Check the packing configuration removed, matches 4 rings, followed by cage ring, followed by 3 rings. If the removed packing configuration was different, notify supervisor or responsible engineer.
MT DATE
-+
t I
I1 f-I FME 8.
Inspect accessible areas for dirt and debris, and remove.
i
~
- ~-*~
Ct~.
-1 44_, '4q4
~'
~.r-- I 4-.
1 ~.
'FA~T
- 9.
Insert one ring at a time with splits 1800 apart. Use a packing tool to seat the packing firmly, one ring at a time. Do not overtighten.
Dwg. 1 F3351 shows packing configuration to be 4 rings (3/8" packing) followed by cage ring, followed by 3 rings of (3/8" packing).
It is the mfg. Recommendation, that new packing is not tightened.
Tightened being a relative term. Firmly seated and fasteners snugged should be adequate. Final packing adjustment to be made immediately v 1_____.
when pump is run.
MT DATE
- 10.
Record the As-Left Packing Configuration below.
,,.0,.,,
r.,
,Q,* '
8 0
- o
- ,-3.
0 M T D A T E Install gland h lyves aand take up evenly on gland fasteners.
- 11.
Coordinate with Operations to clear tags and run the pump.
MT DATE CAUTION:
Monitor the stuffing boxes temperature to determine if seal water is keeping the shaft cool. Scoring of the shaft will occur is excessive temperatures of the stuffing boxes are reached, resulting from the packing being of the improper configuration or over-tightening.
This type packing is not meant to be leak tight. A small amount of leakage is needed at al times to lubricate and cool the packing. If adjustment is required, be sure that all packing gland nuts are tightened evenly and gradually.
rI iI I
HOUSE KEEPING 12.
13.
Monitor stuffing box temperatures, I.B. and O.B. and adjust packing by taking a flat at a time and evenly across the two gland nuts, until the desired packing leakage is achieved.
-t Remove all debris, tools, and materials from the area. Ensure all work areas meet PBNP housekeeping expectations.
MT DATE found to be satisfactory. (Not hot to the touch)
MtJOPý A #E Page 4 of 6 PBF-9169 Revision 3 01/12101 J,ShaeDaiawnhiWORKPLANReady-'k 2%205"205651 0Oc I.
A MT I
I i
III
Work Control Document:
Equipment ID:
Equipment
Description:
Work Plan Originator:
NUCLEAR POWER BUSINESS UNIT WO WORK PLAN 0205651 P-038A AUX FEEDWATER MOTOR-DRIVEN PUMP Mike Desroches x6919 UNIT: PB_0_
Date: October 18, 2002 Step Work Plan Description No IPm prtswtotecsielaae Nt:Sih muto Pump operates without excessive leakage. (Note: Slight amount of leage is needed to lubricate and keep packing cool)
Satisfactory Unsatisfactory t.t.,.......
+/-*.i Page 5 of 6 PBF-9169 Revision 3 01112/01 J ShateDataV'lhiWORKPLANReady A,2,0205\\205651 ooc Hold Point PMT 15.
Worker MT/OPS Date Z DA1'k m*
I I
I i
Work Control Document:
Equipment ID:
Equipment
Description:
Work Plan Originator:
NUCLEAR POWER BUSINESS UNIT WO WORK PLAN 0205651 P-038A AUX FEEDWATER MOTOR-DRIVEN PUMP
-Mike Desroches x6919 UNIT: PBO_
Date: October 18, 2002 OPERATIONS RETURN To
- 1.
SERVICE
/7 OPS IgAT/
TESTING POST-JOB BRIEF Conduct post-job debrief using PBF-9218 (Mtn and I&C) or OM 3.29 (OPs). Document lessons learned, good practices, problems encountered, etc. on feedback form.. Debrief should include all applicable work groups.
POST-JOB DEBRIEF COMPLETED Supervisor or Job Leader
,,/ Date FEEDBACK Fill out feedback form attached to work package (maintenance group use PBF-9929)
.Z,..
MT DATE Page 6 of 6 PBF-9169 Revision 3 01/12/01 J %ShfeData*.l\\WORKPLAN. lReady.,k%*,0205ý205651 doc
Point Beach Nuclear Plant FME CHECKLIST
~J~.UJU.-7 I. WORK ORDER/PROCEDURE/EVOLUTIU[N:
II. ADMINISTRATIVE CONTROL EXEMPTIONS:
Yes I No (I any are answered "YES." General requirements continue in effect and Section IV INSPECTIONS are still required.)
I. Piping/Conduit 2-Diameter or Less (nominal) or System Opening Less Than 4 Square Inches (approxcimate). See Note 1.
- 2. System Opening Less Than or Equal to 4 Inches in Diameter (i.e. waterbox drain)
Between 4 O'clock and 8 O'clock (pointing down).
- 3. Maintenance Activity Involving Compression/Threaded Fittings.
- 4. Maintenance/Operations Pump/Valve Repacking. See Note 1.
- 5. Maintenance/Operation Oil Changes. Oil Sampling, or Repacking of Grease in Components F
Inactory Installed Fill/Vent Ports.
- 6. FME Zone:
1 2
e Recommended By (Planner):
M6 "
Da Concurred By (Cognizant Supervisor):
7 Da
()
No No No No No te:
te:
ID -
I. Boundaries (Required for all Zone I FMEAs)
Required
- 2. Signs (Required for all FMEA Zone I & 2)
-Required 3.Pipe Dams Required (Record On FME Material Control Log)
- 4. FME Material Control Log (PBF-9157)
- Required
- 5. Chemical Exclusion Zone (See Dry Fuel Requirements)
NO.__T required when Temporary Covers or internal barriers are in place.
- 6. Administrative requirements implemented (Supervisor/Leadperson).
IV. INSPECTION REQUIRED:
I. Pre-System Opening Area Inspection/Cleanup Required.
- 2. Final Closeout Inspection.
'II Zý
/ 1o :ý3-31 IL),
/
O' - -
- z Complete/Reviewed By (Supervisor/Leadperson):
Date:
0?
Note 1: Continuously attend system/component when open, or cover when NOT attended.
(
Reference:
NP S.4.10)
Paue I of I I
RcI,\\ion+ll 6' l#lf
Point Beach Nuclear Plant PRE-JOB BRIEF CHECKLIST
-JOB/EVOLUTION: P-038A packing replace.
AREASWO# 0205651 TDATE:
ATTENDEES
["1BRIEFING REQUIRED DAILY I1" C[ECK.FD Conducted By:
6*1t(
L_--, >*
LUse bttcA of %heet ý/ne e.%wzri REVIEW I DISCUSS & CHECK OFF all Applicable Items SjScope of Job Hazards (4)
(4/)
Purpose. leader. resources. tools. par.-
Personnel saict%/PPE Procedure,..%ork order.,, dra\\*riie.- pernmi-Plant operation. po%%cr gencration. nuLlear :,allet%. trip Maintenance Rule Statu'i orthe affcLtcd :,'Snter aoidance Equipment Lead paint Energoy Sources Radiological Conditions (4)
Tag boundaries ALARA Energized equipment. de-energied equipment.
RWP pressurized. de-pressurized Rad',aste Considerations Protected Worker Log Communications Other Communication requirements Logistics support requirement-,
Necessar, notifications Foreign Material Exclusion Housekeeping Security notification PBNP/lndustry event Lesons learned Special Precautions Key Error Traps (4)
(4)
Industry and in-house operating experience. as applicable First time evolution Critical steps Distractive or poor environment Error-likely-situations. as applicable Inadequate mental/physical state Defenses-barriers 0
Time pressure Independent verifications and concurrent checks Imprecise communication Termination criteria-reco',ery. as applicable S *Key Barriers (4/)
- 1.
Job briefings Procedure use
"* Administratie program uwe Turnover meetinms
"* Supcrvi.-or pre-scncc Re,,icx.,crification
"* Co-vorkcr coachine el I* mmpro, e neit IttW-9217 STOP - THINK -. I CT-REV'IEW Re¢%i 3 1 I i 11'1710 1 RckrmLC "l' I I' ill
Nuclear Power Business Unit Return to Service Testing Reviews Work Order/Document No.
0205651 INITIALS & DATE Pre-Release I Post Work-RTS Specity required equipment'pldnt conditions with PMT activities.
Iforiginal work scope is unchanged. Post R'rS signoff may be N!A'd by WCC SRO or designee.
May be N/A'd by WCC SRO or designee for "S" type WOs or "C" type WOs %here a PMT is not required by procedure scope.
1ill -2114 l{.*,in I ii42-XI'L)'t)
07/23/2001
,:33:00 Warehouse Issue Tick-Not PB02-17653 r III 1111
~I I111111 illl1l1l1l1111111 IIi Ill Page 1 OL I
Required Date t 07/28/2002 Issue Poiht
- 30-PBNP SIR Number t PB02-017186 Work Order PB02-005651-000 Requestor
- Desroches, Michael Asset Deliver To a Store w WO# 0205651 Crew Line Stock Number
- 1.
919-8881 ROW/Bin NSKSP3 Description PACKING SET, 2-3/4" ID X 3-1/2" OD X 3/8" THICKNESS, 14 SLevel CMI Oty To Be Issued:
On Hand 3.00
/
&LcU N-9§ 1/$7</62 Issued ByV l K'5
-0k
/
Received By Date 62ŽC2 1.00 ST Issued S,-
Returned 4-Co 6/
ý L 7 /