Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Verification of CBI Axisymmetric Shell Analysis Computer Program E07811". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML21144A027  + (Verification for Publication of Topical Report, ANP-10344P-A, Revision 0, Framatome Best-Estimate Enhanced Option III Methodology)
  • ML19211C037  + (Verification of 790619-20 Task 10/A-40 Meeting in Bethesda, MD Re Proposed Recommendations for Changes to SRP & Reg Guides.Agenda Encl)
  • ML20236A095  + (Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for Calvert Cliffs Units 1 & 2)
  • ML20011F498  + (Verification of Acceptability of 1-Pin Burnup Limit of 60 Mwd/Kg for St Lucie Unit 2)
  • ML21015A143  + (Verification of Accepted Proprietary and Non-Proprietary Versions of Framatome Topical Report BAW-10241P-A, Revision 2, Bhtp DNB Correlation Applied with Lynxt Topical Report)
  • ML21021A131  + (Verification of Accepted Proprietary and Non-Proprietary Versions of Framatome Topical Report, ANP-10323P-A, Revision 1, Galileo Fuel Rod Thermal-Mechanical Methodology for Pressurized Water Reactors)
  • ML19304B660  + (Verification of Accepted Proprietary and Non-Proprietary Versions of Revision 29 to Nede-24011-P General Electric Standard Application for Reactor Fuel (Gestar Ii), Main and United States Supplement)
  • ML21008A329  + (Verification of Accepted Proprietary and Non-Proprietary Versions of Revision 31 to NEDE-24011-P General Electric Standard Application for Reactor Fuel (Gestar Ii), Main and United States Supplement)
  • ML20099B253  + (Verification of Accepted Version of Global Nuclear Fuel - Americas Licensing Topical Report NEDE-33885P-A, Revision 1, Control Rod Drop Accident Application Methodology)
  • ML20184A158  + (Verification of Accepted Version of NEDO-11209 Revision 15, GE Hitachi Nuclear Energy Quality Assurance Program Description)
  • ML21008A441  + (Verification of Accepted Version of Topical Report, NEDO-11209, Revision 16, GE Hitachi Nuclear Energy Quality Assurance Program Description)
  • ML20126F663  + (Verification of Acceptibility of 1-Pin Burnup Limit of 60 Mwd/Kgu for C-E 16x16 PWR Fuel)
  • ML20063C993  + (Verification of Applicant Responses to Del-Aware Unlimited, Inc Interrogatories)
  • ML18234A100  + (Verification of Approval Version of Framatome Inc., Topical Report ANP-10335P-A, Revision 0, Ace/Atrium 11 Critical Power Correlation)
  • ML23138A369  + (Verification of Approved Kairos Power LLC Topical Report on Fuel Performance Methodology)
  • ML20117E759  + (Verification of CBI Axisymmetric Shell Analysis Computer Program E07811)
  • ML20073D456  + (Verification of Cecor Coefficient Methodology for Application to PWRs of Entergy Sys)
  • ML19296B298  + (Verification of Compliance W/Eccs Acceptance Criteria of Code Utilizing Conservative Cladding Rupture Strain & Assembly Flow Blockage Models)
  • ML030270345  + (Verification of Davis-Besse Technical Specification Pressure/Temperature Curves for Replacement Reactor Vessel Head)
  • ML17349A250  + (Verification of Degraded Voltage Relay Protection for Safety-Related Equipment (Coordination Between Undervoltage & Overcurrent Protection) for Unit 3)
  • ML101250570  + (Verification of Department of Energy Fuel License Contracts with University Owned Research and Test Reactors)
  • ML20033C813  + (Verification of ESF Switchgear Voltage Levels)
  • ML19209A146  + (Verification of Ee Hall Re Util 790726 Supplemental Answers to Interrogatories 5(c),5(g),5(h),6 & 8 of NRC First Set of Supplemental Interrogatories)
  • ML19209A148  + (Verification of Ef Kaprielian Re Util 790726 Supplemental Answers to Interrogatories 1(g),2(c),3(e)(ii),3(e)(viii), 3(e)(x) & 7 of NRC First Set of Supplemental Interrogatories.Certificate of Svc & Load Flow Study Encl)
  • ML18247A215  + (Verification of Egov/Lob Contribution Levels-BY2020-AITPS)
  • ML17250A571  + (Verification of Emergency Start Logic Auxiliary Feedwater Pumps)
  • ML20101A885  + (Verification of Experimental Modal Modeling Using HDR (Heissdampfreaktor) Dynamic Test Data)
  • ML20028D958  + (Verification of Fire Protection Provided for Auxiliary Feedwater Sys,Control Room Ventilation & Pressurization Sys, Safety-Related Portion of 4,160 Volt Electric Sys, Interim Technical Rept 18,Rev 0)
  • ML23221A030  + (Verification of Funds Egov and Lob Report)
  • ML19094A058  + (Verification of GE Hitachi Topical Report NEDC-33173 Supplement 5p-A, Revision 1, Applicability of General Electric Methods to Expanded Operating Domains - Supplement for GNF3 Fuel)
  • ML18155A210  + (Verification of GE Hitachi Topical Report NEDE-33005P-A, Revision 2 Tracg Application for Emergency Core Cooling Systems/Loss-of Coolant Accident Analysis for BWR/2-6)
  • ML19113A008  + (Verification of Global Nuclear Fuel Topic Report NEDC-33353P-A, Revision 1, - Application of GNF-ZIRON to Gnf Fuel Designs -)
  • ML24009A228  + (Verification of Holtecs Hi-2210161-A, Topical Report on the Radiological Fuel Qualification Methodology for Dry Storage Systems)
  • ML12326A467  + (Verification of Information in Aging Management Technical Letter Report)
  • ML091811205  + (Verification of Information on Containment Accident Pressure Used for Pump Net Positive Suction Head)
  • ML092730365  + (Verification of Information on Containment Accident Pressure Used for Pump Net Positive Suction Head)
  • ML21211A581  + (Verification of Maccs Dose Conversion to Compute TEDE)
  • ML20115F353  + (Verification of Models for Fire-Wrapped Conduits & Cable Trays Against Test Data)
  • ML20003A418  + (Verification of Multidimensional Reactor Safety Analysis Codes Developed in Group T-3)
  • ML19242D696  + (Verification of NEDC-33173P Supplement 6 Revision 1, Licensing Topical Report Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty)
  • ML20054F137  + (Verification of Natural Circulation in Crbr Plant - Update)