Verification of NEDC-33173P Supplement 6 Revision 1, Licensing Topical Report Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty
ML19242D696
Person / Time
Site: PROJ0710, 99902024
Issue date: 09/19/2019
From: Dennis Morey
NRC/NRR/DLP/PLPB
To: Michelle Catts
GE-Hitachi Nuclear Energy Americas
Otto N, NRR/DLP, 415-6695
References
EPID L-2017-TOP-0040
Download: ML19242D696 (4)


Text

September 19, 2019 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780 M/C A-10 Wilmington, NC 28401

SUBJECT:

VERIFICATION OF NEDC-33173P SUPPLEMENT 6 REVISION 1, LICENSING TOPICAL REPORT APPLICABILITY OF GE METHODS TO EXPANDED OPERATING DOMAINS - REMOVAL OF THE SAFETY LIMIT MINIMUM CRITICAL POWER RATIO (SLMCPR) PENALTY (EPID L-2017-TOP-0040)

Dear Ms. Catts:

By letter dated August 22, 2019 (Agencywide Documents Access and Management System (ADAMS) Accession No. ML19234A244), GE Hitachi Nuclear Energy (GEH) submitted the accepted version of Topical Report (TR) NEDC-33173P Supplement 6 Revision 0, Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty, to the U.S. Nuclear Regulatory Commission (NRC) staff.

GEH has done so in accordance with our request to publish an approved version of this TR, as detailed in the transmittal letter of the NRC staffs final safety evaluation (SE) (public version available at ADAMS Accession No. ML19199A182) of the September 15, 2017, submittal entitled NEDC-33173P Supplement 6 - Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR) Penalty (ADAMS Accession No. ML17261A068).

The NRC staff has completed its review of NEDC-33173P Supplement 6, Revision 1. The NRC staff verified that GEH has met the requirements and determined that the submitted -A is acceptable for referencing in licensing applications for nuclear power plants to the extent specified and under the limitations delineated in the TR.

NEDC-33173 Supplement 6P-A Revision 1, Applicability of GE Methods to Expanded Operating Domains - Removal of the Safety Limit Minimum Critical Power Ratio (SLMCPR)

Penalty, is now approved for use in future licensing actions as specified in the final SE.

M. Catts Please contact Ngola Otto at (301) 415-6695, if you have any questions on this subject.

Sincerely,

/RA/

Dennis C. Morey, Chief Licensing Processes Branch Division of Licensing Projects Office of Nuclear Reactor Regulation Docket No. 99902024

M. Catts GE Hitachi Project No. 710 cc: Docket No. 99902024 Ms. Michelle P. Catts Senior Vice President, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780 M/C A-10 Wilmington, NC 28401 Michelle.Catts@ge.com Mr. Kent E. Halac Senior Project Manager, Regulatory Affairs GE-Hitachi Nuclear Energy Americas, LLC P.O. Box 780, M/C A-70 Wilmington, NC 28401-0780 Kent.Halac@ge.com Dr. Brian R. Moore General Manager, Core & Fuel Engineering Global Nuclear Fuel-Americas, LLC P.O. Box 780, M/C A-75 Wilmington, NC 28401-0780 Brian.Moore@ge.com

ML19242D696; *concurred via e-mail NRR-106 OFFICE NRR/DLP/PLPB/PM NRR/DLP/PLPB/LA NRR/DSS/SNPB/BC NRR/DLP/PLPB/BC NAME NOtto DHarrison* RLukes DMorey DATE 9/11/2019 9/13/2019 9/16/2019 9/19/2019