Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML091170368 + (Updated Tech Spec Pages, from Licensee, License Amendment Request Lic 08-0078, Administrative Revisions to the Technical Specifications to Correct Typographical Errors and Provide Clarification)
- ML20058N173 + (Updated Tech Specs Permitting Removal of Rod Sequence Control Sys & Reducing Rod Worth Minimizer Cutoff Setpoints to 10%-rated Thermal Power)
- NG-08-0312, Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications + (Updated Technical Specification and Bases Pages Related to Technical Specification Change Request (TSCR-092): Consolidated Line Item Improvement; Adoption of Changes to Standard Specifications)
- ML13316A007 + (Updated Technical Specifications Manual and Bases)
- ML12321A321 + (Updated Technical Specifications and Response to RAI 3 for the Nuclear Science Center Reactor)
- ML19269B706 + (Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor)
- ML19269B705 + (Updated Technical Specifications for License Renewal Application for Facility Operating License R-120 for the North Carolina State University Pulstar Research Reactor)
- ML20033B539 + (Updated Testimony Re Impact of ECCS Analysis of Current NRC Position on Fuel Cladding Swelling & Rupture.Prof Qualifications Encl)
- ML20033B506 + (Updated Testimony Re Turbine Missiles.Nrc Estimated Turbine Exit Speed Was Too Low.Revised Values Do Not Change NRC Conclusions Re Turbine Missile Risks for Floating Nuclear Plant Design.Prof Qualifications Encl)
- ML20091L113 + (Updated Testimony of Cv Failla on Behalf of State of Ny Re Contention 24.F.2.Certificate of Svc Encl.Related Correspondence)
- ML20010C377 + (Updated Testimony of Gw Oprea,Jh Goldberg,Ri Moles & RA Fraza & W/Jg Dewease Testimony Added.Describes Until Mgt Organization & Plans for Operation of Facility.Related Correspondence)
- ML20050B908 + (Updated Testimony of LP Crocker Re Proposed Mgt Organization for Operations & of LP Crocker & GL Madsen Re Qualifications of Bechtel Power Corp & Ebasco Svcs,Inc.Prof Qualifications Encl)
- ML17333A289 + (Updated Thermal-Hydraulic Analysis of Spent Nuclear Fuel Pool DC Cook Nuclear Plant Indiana Michigan Power Co)
- ML20082B890 + (Updated Title Page to Inservice Insp Program.Part a: Piping Sys)
- ML20113C438 + (Updated Trac Analysis of 80% Double-Ended Cold-Leg Break for AP600)
- ML20057F163 + (Updated Trojan Nuclear Div Manual)
- ML20261H388 + (Updated UC Davis MNRC Reactor Proposed License Renewal Ipac Trust Resources Report)
- ML061800302 + (Updated UFSAR Supplement Information Supporting the Plant License Renewal Application)
- ML18151A435 + (Updated VEP-1-5A Operational QA Program Tr)
- ML20079C939 + (Updated VEP-1-5A, Operational QA Program Topical Rept)
- ML25248A066 + (Updated Vallecitos Nuclear Center Architectural History Survey Email)
- ML20078A540 + (Updated Vogtle Electric Generating Plant Unit 2 Readiness Review Module 3A Initial Test Program - Preoperational Test Phase)
- ML18038A067 + (Updated Vol 1 of Preservice Insp Plan. Eleven Oversize Sketches Encl)
- ML19312A246 + (Updated Work Plan for FAST/CR-III Fuel Vaporization & Transport Experiments)
- ML20211F344 + (Updated non-proprietary Page 2-4 of TR DPC-NE-2009)
- ML20245D324 + (Updated, Effluent & Waste Disposal Semiannual Rept,First Half 1988)
- ML20245D327 + (Updated, Effluent & Waste Disposal Semiannual Rept,Second Half 1988)
- ML041490065 + (Updated/Revised Hot List)
- ML041490063 + (Updated/Revised Hot List)
- ML041490060 + (Updated/Revised Hot List)
- ML041490059 + (Updated/Revised Hot List)
- ML041490054 + (Updated/Revised Hot List)
- ML100210904 + (Updated/Supplemental Information Concerning the Notices of Appearance of TVA Counsel Martin J.Oneill, Kathryn M. Sutton, and Lawrence J. Chandler)
- MN 12-013, Updated: 4/26/2012 - Seabrook Notice of Public Meeting No. 12-013 with NextEra Energy Seabrook, LLC + (Updated: 4/26/2012 - Seabrook Notice of Public Meeting No. 12-013 with NextEra Energy Seabrook, LLC)
- PMNS20180475, Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works)
- PMNS20180473, Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works + (Updated: Notice of Forthcoming Meeting Between the U.S. Nuclear Regulatory Commission and Honeywell Metropolis Works)
- ML17338A542 + (Updates & Clarifies Commitment to Implement Operational QA Program.Questions Status of Reg Guide & Industry Standards Re QA Program)
- ML20054J150 + (Updates & Clarifies Info Previously Submitted Re IE Bulletin 79-25, Failures of Westinghouse Bfd Relays in Safety- Related Sys. Annual Maint/Testing Program Set Up. Coils in Nbfd Relays Will Be Replaced)
- ML20237H338 + (Updates & Clarifies Info Provided in 870313 Submittal Re SPDS Isolation Device Reactor Coolant Pump Power Monitors. Computer Multiplexer Provides 120 Db of Isolation Between Inputs for 140-volt Ac Input Vault.Sketch Encl)
- PY-CEI-NRR-0339, Updates & Clarifies Info in Chapter 13 of FSAR Re Plant Organization.Revised Encl FSAR Pages Will Be Included in Future Amend + (Updates & Clarifies Info in Chapter 13 of FSAR Re Plant Organization.Revised Encl FSAR Pages Will Be Included in Future Amend)
- ML19296C890 + (Updates & Confirms 791025 Telcon.Shipment of Two Casks on 791025 from Le Harve,France Cancelled.Shipment of One Cask on 791101-02 from Le Havre Will Depart 791104)
- ML19296C878 + (Updates & Confirms 791106 Telcon Re Shipment of Pegase Cask 1.Shipment Planned for 791111 from Rotterdam)
- ML19250A734 + (Updates & Confirms Conversations Re Excavation of Unit 2. Mass Fill of Lean Concrete Will Be Required to Bring Entire Excavation Up to Design Base Foundation Elevation.Analyses Will Be Provided for NRC Prior to Taking Action)
- ML19290C645 + (Updates & Confirms Conversations Re Unit 2 Excavation Authorized Under Amend 2 of Lwa.Moss Fill of Lean Concrete Will Be Required in Order to Comply W/Design Base Foundation Elevation.Analyses Will Be Submitted Upon Completion)
- B17533, Updates & Corrects Discussion on Intervening Combustible Loads for Exemption Requested in Intake Structure. Clarification of Discussion on Intervening Combustibles in Sodium Hypochlorite Room Satisfies 10CFR50.12 + (Updates & Corrects Discussion on Intervening Combustible Loads for Exemption Requested in Intake Structure. Clarification of Discussion on Intervening Combustibles in Sodium Hypochlorite Room Satisfies 10CFR50.12)
- B15696, Updates & Revises Info Provided by Util in Response to GL 89-13 on Behalf of Millstone Unit 2 + (Updates & Revises Info Provided by Util in Response to GL 89-13 on Behalf of Millstone Unit 2)
- ML20203D203 + (Updates & Subsequent Telcon Between Rd Walker & MD Mcintosh Re Unit 2 860627 Transient Which Occurred During Loss of Control Room Test.Understands Util Will Complete Listed Items for Both Units,As Applicable)
- ML17309A180 + (Updates & Suppls 810415 Submittal Re SEP Topic II-1.C, Potential Hazards Due to Nearby Transportation,Industrial & Military Activities)
- ML19296C179 + (Updates .Loaded Cask TN-1 Scheduled to Arrive at Portsmouth Marine Terminal on 791204 Aboard Atlantic Span)
- ML19296C165 + (Updates .Two Casks Sailed from Le Havre 791019.Two Casks Scheduled to Sail from Le Havre on 791025 Have Been Cancelled.Cask Due to Sail from Le Havre 791101-02 Was Postponed Until 791104)
- ML19262B900 + (Updates .Vepco Testimony Re Probability of Generating Turbine Missiles & Turbine Overspeed Protection Sys May Be Revised.Will Provide Info Feb 1980.Will Notify of Westinghouse Analysis Results When Available)
- ML20235E843 + (Updates 711126 Rept on MSIV Problem. MSIVs Leak Tested & Repaired Per Tech Spec Limits.Causes & Repairs for Main Poppet Guide Wear,Spring Collar Tack Weld Failure & Pilot Valve Scratches During Reassembly Discussed)
- ML20084G539 + (Updates 720606 RO Re 720527 Failure of snap-lock Limit Switch SL4C-64L.Manufacturer Assures That Switches Are Most Reliable Switches Available.Vendor Recommended That Precautions Be Taken)
- ML20086D172 + (Updates 740328 Info Re RCPB Valve Thickness.Valve 1-PCV-455B Returned to Manufacturer for Body Replacement,But No Suitable Body Available.Body Repaired Using Procedures Previously Approved for Similar Valve Repairs.W/O Encl)
- ML19317D592 + (Updates 750430 Response to IE Insp Repts 50-269/75-01, 50-270/75-01 & 50-287/75-01 Re Status of Resolution of Remaining Problems Associated W/Process Radiation Monitors. Next Status Rept Expected 750801)