Updates 750430 Response to IE Insp Repts 50-269/75-01, 50-270/75-01 & 50-287/75-01 Re Status of Resolution of Remaining Problems Associated W/Process Radiation Monitors. Next Status Rept Expected 750801
ML19317D592
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 05/30/1975
From: Thies A
DUKE POWER CO.
To: Moseley N
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
References
NUDOCS 7912060833
Download: ML19317D592 (3)


Text

,

KE POWER COMPANY

)

Powz2 Butt.pnes 4aa SouTu Cnunca StazzT, CuAntoTTz,N.C.asaos A. c. fMiss samegn veet PasssOsnt P. o. Box 217s PRODUCTION AND TRAN9aelSSIOM May 30, 1975 Mr. Norman C. Moseley, Df, rector U. S. Nuclear Regulatory Commission Suite 818 230 Peachtree Street, Northwest Atlanta, Georgia 30303 Re:

IE:II:TNE 50-269/75-1 50-270/75-1 50-287/75-1

Dear Mr. Moseley:

In my letter of April 30, 1975 a status of the resolution of remaining pro-blems associated with the process radiation monitors at the Oconee Nuclear Station was provided. The purpose of this letter is to provide an update of this status:

1.

Waste Gas Monitors RIA-37 and RIA-38 The modification to permit an air purge to clear the monitors after a waste gas decay tank release and to install a sample line in parallel with the monitor to allow grab samples t,o be taken at tha monitor has been prepared.

It is expected that the modification will be completed by September 1, 1975, 2.

Particulate Monitors RIA-43 and RIA-47 The modification to monitors RIA-43 and RIA-47 was unsuccessful in pro-viding correlation between the monitor and the grab samples.

It is believed that short-lived gaseous activity is affecting the particulate detectors, but that this activity is not affecting the grab samples due to the time necessary for their processing. Tests are being planned to evaluate this matter.

We are continuing to actively pursue resolution of the outstanding problems associated with the particulate monitors. We are also continuing to provide appropriate monitoring to assure effluent releases are maintained within

.. p. < ' ?

e

-.cv.

e I

J a

statien limits and guid211nso while chas2 problems ara bsing raco1vad. Wa will provide another status report by August 1,1975.

Very truly yours, 5

h A. C. Thies ACT:ge

=

~

I

\\

l e

l l

[

i

+

e 4

e

3 Letter to II. C. Moseley from Duke Power Company dated May 30, 1975.

This is a supplemental response.

}

DISTRIEffTIofI:

50-269/75-1 H, D. Thorn'curg, IE 50-270/75-1 IE:1QS (3) 50-287/75-1 Office of Standards Development

.m 2 Gentral Files

' Division of Reactor Licensing (13)

PDR Local PDR ISIC TIC STATE e

l S

9 s

b

.I1

--