Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Updated Operations QA Plan". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML20126A674  + (Updated Operations QA Plan Table of Contents)
  • ML20039E001  + (Updated Organizational Chart Including Mgt Organization, Power Group,Sys Engineering Group,Administrative Svcs Group & Controllers Group)
  • ML20136A453  + (Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events (Order Number)
  • ML20136A454  + (Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events)
  • LR-N16-0194, Updated Owners, Officers, Directors, and Executive Personnel  + (Updated Owners, Officers, Directors, and Executive Personnel)
  • LR-N14-0182, Updated Owners, Officers, Directors, and Executive Personnel (Oodeps) Form  + (Updated Owners, Officers, Directors, and Executive Personnel (Oodeps) Form)
  • ML20214F520  + (Updated PNO-I-86-092A:on 861119,offsite Power Supplies Restored.Cause Not Determined.Monthly Full Load Surveillance of Diesel Generators Performed to Remove Carbon Deposits. Investigation Continuing)
  • ML20054L521  + (Updated PNO-II-82-072A:on 820628,break Occurred in Outside Radius of Elbow 24-inch Line Which Branches Off 42-inch High Pressure Turbine Exhaust.Apparently Caused by Thinning from Steam Erosion)
  • ML20055B586  + (Updated PNO-II-82-077A:on 820707,eddy Current Exam Revealed No Denting in Steam Generator Tubes.Check Valve Pin from Feedwater Regulating Valve Bypass Line Recovered from Secondary Side of Generator)
  • ML20055B575  + (Updated PNO-II-82-078A:on 820707,insp of Steam Generator a Revealed That Recently Reinstalled Tube Lane Blocking Device on Secondary Side Was Loose Due to Improper Installation. Steam Generators B & C Devices Found Rigid)
  • ML20155K255  + (Updated PNO-II-88-040A:on 880607,leaking Wesf Cs-137 Source at Facility & Radiation Levels Measured Represent 12 Mrem/H. Cause Not Yet Identified.Facility Quarantined & Georgia Tech Physics Professor to Develop Strategy)
  • ML20126C709  + (Updated PNO-III-80-045B:licensee Ultrasonic Examination of Core Spray Piping in a & B Loops Located in Drywell Completed.Piping Will Be Replaced W/Low Carbon Steel Pipe)
  • ML20040B565  + (Updated PNO-III-82-009A:,ultrasonic Testing Completed on Reactor Water Cleanup Sys & 10 Indications in Drywell Revealed.Piping from Inboard Isolation Valve to Drywell Penetration to Be Replaced)
  • ML19332F303  + (Updated PNO-III-89-078A:on 891202,Augmented Insp Team Established to Investigate Spurious Opening of Relief Valve in Train B of RHR Sys & Failure of Valve to Close.Approx 30 to 50 Gallons of Water Released to Auxiliary Bldg)
  • ML20211M365  + (Updated PNO-V-87-010A:on 870211,US Testing Co Notified Region V That Film Badges Indicated Two Radiographers Received 3.1 Rem & 2.65 Rem Whole Body Exposures.Extremity Exposures Being Evaluated by State of Az)
  • ML20209D513  + (Updated PNO-V-87-030B:on 870421,onsite Phase of AIT Team Special Insp Into 870410 Loss of Suction to RHR Sys While in half-loop Concluded W/Meeting at Site)
  • ML20009G341  + (Updated PNS-I-81-016A:intensive Investigation of 810726 Bomb Threat Underway.Polygraph Exams for Some Plant Personnel Considered.Pysical Evidence Being Examined)
  • ML20080A876  + (Updated PSAR Figure 16.1-2 Re Quality Stds for ASME Boiler & Pressure Vessel Code & Reg Guide Compliance)
  • ML18100A628  + (Updated Page A4-4 of Boric Acid Concentration Reduction Effort Technical Bases & Operational Analysis, Changing Figure Numbers A5-1 & A5-2 to A4-1 & A4-2 at End of First Paragraph)
  • ML20032C090  + (Updated Page to NPDES Discharge Monitoring Rept for Aug 1981)
  • ML20032C088  + (Updated Page to NPDES Discharge Monitoring Rept for Jul 1981)
  • ML20032C082  + (Updated Page to NPDES Discharge Monitoring Rept for June 1981)
  • ML20032C078  + (Updated Page to NPDES Discharge Monitoring Rept for May 1981)
  • ML19322E889  + (Updated Pages 2-2 & 2-3 of Nuclear Fuel Div QA Program Plan, Revision 5A,reflecting Organizational Changes at Columbia Plant)
  • ML19331C946  + (Updated Pages Re Tech Spec Change Request 91 Defining Proposed New Mgt Organization)