Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML17243A363 + (Updated Non-Public Security Inspection Plan for River Bend Station, Unit 1)
- ML17243A306 + (Updated Non-Public Security Inspection Plan for Grand Gulf Nuclear Station, Unit 1)
- ML17243A205 + (Updated Non-Public Security Inspection Plan for Arkansas Nuclear One, Units 1 and 2)
- ML17243A207 + (Updated Non-Public Security Inspection Plan for Columbia Generating Station)
- ML17243A355 + (Updated Non-Public Security Inspection Plan for Palo Verde Nuclear Generating Station, Units 1, 2, and 3)
- ML17243A253 + (Updated Non-Public Security Inspection Plan for Comanche Peak Nuclear Power Plant, Units 1 and 2)
- ML17243A302 + (Updated Non-Public Security Inspection Plan for Diablo Canyon Power Plant, Units 1 and 2)
- ML17243A259 + (Updated Non-Public Security Inspection Plan for Callaway Plant, Unit 1)
- ML17243A250 + (Updated Non-Public Security Inspection Plan for Cooper Nuclear Station)
- ML17243A423 + (Updated Non-Public Security Inspection for Wolf Creek Generating Station, Unit 1)
- ML17243A390 + (Updated Non-Public Security Inspection for South Texas Project Electric Generating Station, Units 1 and 2)
- ML17243A409 + (Updated Non-Public Security Inspection for Waterford Steam Electric Station, Unit 1)
- ML25080A157 + (Updated Northstar Fws Report Transmittal E-Mail)
- ML18157A137 + (Updated Notice of Appearance for Anita Ghosh)
- ML18346A365 + (Updated Notice of Appearance for Anita Ghosh Naber)
- ML18004A056 + (Updated Notice of Appearance for William B. Glew, Jr)
- ML100210905 + (Updated Notice of Appearance of Martin J. Oneill)
- ML101180116 + (Updated Notice of End-of-Cycle Meeting with Wolf Creek Nuclear Operation, to Present and Discuss Performance Results of the Wolf Creek Generating Station Facility for the Period of January 1 Through December 31, 2009)
- RS-24-049, Updated Notice of Intent to Pursue Subsequent License Renewal Applications + (Updated Notice of Intent to Pursue Subsequent License Renewal Applications)
- ASLBP 15-941-05-LA-BD01, Updated Notices of Appearance for David E. Roth, Mitzi A. Young, Catherine E. Kanatas, Joseph A. Lindell and Jeremy L. Wachutka + (Updated Notices of Appearance for David E. Roth, Mitzi A. Young, Catherine E. Kanatas, Joseph A. Lindell and Jeremy L. Wachutka)
- ML18267A298 + (Updated Notices of Appearance of Burdick, Matthews, and Lighty, and Notice of Appearance of Bessette)
- ML20133Q142 + (Updated Notification of 851031 Meeting W/Util & GE in Bethesda,Md to Discuss N-1 Safe Ends)
- ET 14-0033, Updated Notification of Readiness for Supplemental Inspection + (Updated Notification of Readiness for Supplemental Inspection)
- ML20069C444 + (Updated Nuclear Power Mgt Manual)
- ML18151A541 + (Updated Operational QA Program Topical Rept)
- ML20035H313 + (Updated Operations QA Plan)
- ML20126A674 + (Updated Operations QA Plan Table of Contents)
- ML20039E001 + (Updated Organizational Chart Including Mgt Organization, Power Group,Sys Engineering Group,Administrative Svcs Group & Controllers Group)
- ML20136A453 + (Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events (Order Number)
- ML20136A454 + (Updated Overall Integrated Plan in Response to March 12, 2012 Commission Order Modifying Licenses with Regard to Requirements for Mitigation Strategies for Bevond-Desiqn-Basis External Events)
- LR-N16-0194, Updated Owners, Officers, Directors, and Executive Personnel + (Updated Owners, Officers, Directors, and Executive Personnel)
- LR-N14-0182, Updated Owners, Officers, Directors, and Executive Personnel (Oodeps) Form + (Updated Owners, Officers, Directors, and Executive Personnel (Oodeps) Form)
- ML20214F520 + (Updated PNO-I-86-092A:on 861119,offsite Power Supplies Restored.Cause Not Determined.Monthly Full Load Surveillance of Diesel Generators Performed to Remove Carbon Deposits. Investigation Continuing)
- ML20054L521 + (Updated PNO-II-82-072A:on 820628,break Occurred in Outside Radius of Elbow 24-inch Line Which Branches Off 42-inch High Pressure Turbine Exhaust.Apparently Caused by Thinning from Steam Erosion)
- ML20055B586 + (Updated PNO-II-82-077A:on 820707,eddy Current Exam Revealed No Denting in Steam Generator Tubes.Check Valve Pin from Feedwater Regulating Valve Bypass Line Recovered from Secondary Side of Generator)
- ML20055B575 + (Updated PNO-II-82-078A:on 820707,insp of Steam Generator a Revealed That Recently Reinstalled Tube Lane Blocking Device on Secondary Side Was Loose Due to Improper Installation. Steam Generators B & C Devices Found Rigid)
- ML20155K255 + (Updated PNO-II-88-040A:on 880607,leaking Wesf Cs-137 Source at Facility & Radiation Levels Measured Represent 12 Mrem/H. Cause Not Yet Identified.Facility Quarantined & Georgia Tech Physics Professor to Develop Strategy)
- ML20126C709 + (Updated PNO-III-80-045B:licensee Ultrasonic Examination of Core Spray Piping in a & B Loops Located in Drywell Completed.Piping Will Be Replaced W/Low Carbon Steel Pipe)
- ML20040B565 + (Updated PNO-III-82-009A:,ultrasonic Testing Completed on Reactor Water Cleanup Sys & 10 Indications in Drywell Revealed.Piping from Inboard Isolation Valve to Drywell Penetration to Be Replaced)
- ML19332F303 + (Updated PNO-III-89-078A:on 891202,Augmented Insp Team Established to Investigate Spurious Opening of Relief Valve in Train B of RHR Sys & Failure of Valve to Close.Approx 30 to 50 Gallons of Water Released to Auxiliary Bldg)
- ML20211M365 + (Updated PNO-V-87-010A:on 870211,US Testing Co Notified Region V That Film Badges Indicated Two Radiographers Received 3.1 Rem & 2.65 Rem Whole Body Exposures.Extremity Exposures Being Evaluated by State of Az)
- ML20209D513 + (Updated PNO-V-87-030B:on 870421,onsite Phase of AIT Team Special Insp Into 870410 Loss of Suction to RHR Sys While in half-loop Concluded W/Meeting at Site)
- ML20009G341 + (Updated PNS-I-81-016A:intensive Investigation of 810726 Bomb Threat Underway.Polygraph Exams for Some Plant Personnel Considered.Pysical Evidence Being Examined)
- ML20080A876 + (Updated PSAR Figure 16.1-2 Re Quality Stds for ASME Boiler & Pressure Vessel Code & Reg Guide Compliance)
- ML18100A628 + (Updated Page A4-4 of Boric Acid Concentration Reduction Effort Technical Bases & Operational Analysis, Changing Figure Numbers A5-1 & A5-2 to A4-1 & A4-2 at End of First Paragraph)
- ML20032C090 + (Updated Page to NPDES Discharge Monitoring Rept for Aug 1981)
- ML20032C088 + (Updated Page to NPDES Discharge Monitoring Rept for Jul 1981)
- ML20032C082 + (Updated Page to NPDES Discharge Monitoring Rept for June 1981)
- ML20032C078 + (Updated Page to NPDES Discharge Monitoring Rept for May 1981)
- ML19322E889 + (Updated Pages 2-2 & 2-3 of Nuclear Fuel Div QA Program Plan, Revision 5A,reflecting Organizational Changes at Columbia Plant)
- ML19331C946 + (Updated Pages Re Tech Spec Change Request 91 Defining Proposed New Mgt Organization)