ML17243A250

From kanterella
Jump to navigation Jump to search
Updated Non-Public Security Inspection Plan for Cooper Nuclear Station
ML17243A250
Person / Time
Site: Cooper Entergy icon.png
Issue date: 08/28/2017
From: Jeremy Groom
Plant Support Branch-1
To: Dent J
Nebraska Public Power District (NPPD)
References
Download: ML17243A250 (3)


Text

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION UNITED STATES NUCLEAR REGULATORY COMMISSION REGION IV 1600 E. LAMAR BLVD ARLINGTON, TX 76011-4511 August 28, 2017 Mr. John Dent Vice President-Nuclear and CNO Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321

SUBJECT:

UPDATED NON-PUBLIC SECURITY INSPECTION PLAN FOR COOPER NUCLEAR STATION

Dear Mr. Dent:

This letter informs you of the NRCs plans for future security-related inspections at your Cooper Nuclear Station facility. The enclosed inspection plan lists the security-related inspections scheduled through June 30, 2019. The NRC provides the inspection plan to allow for the resolution of any scheduling conflicts and personnel availability issues. The inspections listed during the last twelve months of the inspection plan are tentative and may be revised. The NRC will contact you as soon as possible to discuss changes to the inspection plan should circumstances warrant any changes.

In accordance with Title 10 of the Code of Federal Regulations (10 CFR) 2.390 of the NRCs Rules of Practice, a copy of this letter will be available electronically for public inspection in the NRC Public Document Room or from the Publicly Available Records (PARS) component of NRC's document system (ADAMS). ADAMS is accessible from the NRC Web site at http://www.nrc.gov/reading-rm/adams.html (the Public Electronic Reading Room). However, the enclosed Security-Related Inspection Plan contains Security-Related Information, so the enclosed report will not be made publically available in accordance with 10 CFR 2.390(d)(1).

Enclosure transmitted herewith contains SUNSI. When separated from enclosure, this transmittal document is decontrolled.

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

OFFICIAL USE ONLYSECURITY-RELATED INFORMATION J. Dent 2 Please contact me at (817) 200-1527 with any questions you have regarding this letter.

Sincerely,

/RA/

Jeremy R. Groom Chief, Plant Support Branch 1 Division of Reactor Safety Docket No. 50-298 License No. DPR-46 Nonpublic

Enclosure:

Security-Related Inspection Plan cc w/enclosure:

Mr. Jerry Bebb Security Manager Nebraska Public Power District Cooper Nuclear Station 72676 648A Avenue P.O. Box 98 Brownville, NE 68321 cc w/o enclosure:

Electronic Distribution OFFICIAL USE ONLYSECURITY-RELATED INFORMATION

ML17242A264 Entire Report: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review: JGroom Yes No Publicly Available Sensitive _______MD 3.4 A.3 ADAMS ACCESSION NUMBER: ML17243A250 Cover Letter Only: ADAMS: Non-Publicly Available Non-Sensitive Keyword:

SUNSI Review: JGroom Yes No Publicly Available Sensitive NRC-002 OFFICE C:PSB1 C:DRP/C C:PSB1 NAME JGroom JKozal JGroom SIGNATURE /RA/ /RA/ /RA/

DATE 8/22/17 8/24/17 8/28/17