Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML080560214 + (Transmittal of Correction to Amendment No. 251 and Associated Safety Evaluation Modify TS Requirements to Support Addition of Safety-Related Swing Inverters to 120 Volt AC Buses)
- ML061950598 + (Transmittal of Correction to Page 3 of Amendment Improved Technical Specifications)
- ML081410416 + (Transmittal of Correction to Reply to RAI for the Review of License Renewal Application, License Renewal Application Amendment No. 8 & Revised License Renewal Boundary Drawings)
- ML022120271 + (Transmittal of Crystal River 3 Revised Emergency Plan Implementing Procedure EM-104, Revision 7, Operation of Operational Support Center)
- ML031611052 + (Transmittal of Crystal River Emergency Plan Implementing Procedure EM0401, Revision 000)
- ML040790044 + (Transmittal of Crystal River Unit 3 Plant Operating Manual EM-225C, Rev. 003, Post Accident Monitoring of Reactor Building Temperature)
- ML031290261 + (Transmittal of Crystal River Unit 3 Plant Operating Manual EM0225, Revision 13, Duties of the Technical Suppor Center Accident Assessment Team)
- 3F1206-06, Transmittal of Crystal River, Unit 3 - 10 CFR 50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report + (Transmittal of Crystal River, Unit 3 - 10 CFR 50.46 Loss-Of-Coolant Accident Evaluation Model Change and Peak Cladding Temperature Change Report)
- ML061240066 + (Transmittal of Crystal River, Unit 3 - 2005 Radioactive Effluent Release Report)
- LR-N18-0066, Transmittal of Cyber Security Plan Revision 1 + (Transmittal of Cyber Security Plan Revision 1)
- BVY 16-004, Transmittal of Cyber Security Plan, Revision 1 + (Transmittal of Cyber Security Plan, Revision 1)
- JAFP-16-0001, Transmittal of Cyber Security Plan, Revision 1 + (Transmittal of Cyber Security Plan, Revision 1)
- PNP 2018-034, Transmittal of Cyber Security Plan, Revision 2 + (Transmittal of Cyber Security Plan, Revision 2)
- RA-18-0005, Transmittal of Cyber Security Plan, Revisions 0 and 1 + (Transmittal of Cyber Security Plan, Revisions 0 and 1)
- NRC-03-0038, Transmittal of Cycle 10 Core Operating Limits Report + (Transmittal of Cycle 10 Core Operating Limits Report)
- NRC-04-0065, Transmittal of Cycle 10 Core Operating Limits Report. Revision 1 + (Transmittal of Cycle 10 Core Operating Limits Report. Revision 1)
- NRC-04-0096, Transmittal of Cycle 11 Core Operating Limits Report + (Transmittal of Cycle 11 Core Operating Limits Report)
- NRC-06-0034, Transmittal of Cycle 12 Core Operating Limits Report + (Transmittal of Cycle 12 Core Operating Limits Report)
- NRC-09-0027, Transmittal of Cycle 14 Core Operating Limits Report + (Transmittal of Cycle 14 Core Operating Limits Report)
- WO 04-0010, Transmittal of Cycle 14 Core Operating Limits Report + (Transmittal of Cycle 14 Core Operating Limits Report)
- NRC-09-0032, Transmittal of Cycle 14 Core Operating Limits Report, Revision 1 + (Transmittal of Cycle 14 Core Operating Limits Report, Revision 1)
- BSEP 04-0037, Transmittal of Cycle 15 Core Operating Limits Report, Supplemental Reload Licensing Report, and Loss-of-Coolant Accident Analysis Report + (Transmittal of Cycle 15 Core Operating Limits Report, Supplemental Reload Licensing Report, and Loss-of-Coolant Accident Analysis Report)
- NRC-10-0080, Transmittal of Cycle 15 Core Operating Limits Report + (Transmittal of Cycle 15 Core Operating Limits Report)
- NRC-11-0025, Transmittal of Cycle 15 Core Operating Limits Report, Revision 1 + (Transmittal of Cycle 15 Core Operating Limits Report, Revision 1)
- ML043440275 + (Transmittal of Cycle 20 Core Operating Limits Report)
- L-2007-066, Transmittal of Cycle 21 Core Operating Limits Report + (Transmittal of Cycle 21 Core Operating Limits Report)
- ULNRC-06946, Transmittal of Cycle 28 Core Operating Limits Report, Revision 0 + (Transmittal of Cycle 28 Core Operating Limits Report, Revision 0)
- ML25132A021 + (Transmittal of Cycle 28 Core Operating Limits Report, Revision 0)
- ML020660240 + (Transmittal of DOE Letter Stating That Federal Funding Under Department of Energy University Reactor Fuel Assistance Program for Conversion of MURR to Low Enrichment Fuel Will Not Be Available During Fy 2002)
- ML073100085 + (Transmittal of DPC-NE-2012-A, Dynamic Rod Worth Measurement Using Casmo/Simulate)
- ML072150586 + (Transmittal of DPC-NF-2010-A, Nuclear Physics Methodology for Reload Design, Revision 2)
- ML052710364 + (Transmittal of DTBD-05-003, Rev 0, Soil and Structure Surface Area Factors for Use at Rsngs, Decommissioning Technical Basis Document)
- ML15148A732 + (Transmittal of Dam Inspection Report)
- ML15148A684 + (Transmittal of Dam Inspection Report)
- ML17207A122 + (Transmittal of Dam Inspection Report)
- ML22041A005 + (Transmittal of Dam Inspection Report (EPID L-2017-LNS-0015) (Public))
- ML23278A028 + (Transmittal of Dam Inspection Report (Letter)(Redacted))
- ML23346A222 + (Transmittal of Dam Inspection Report - Public)
- ML23286A322 + (Transmittal of Dam Inspection Report - Redacted)
- ML23333A087 + (Transmittal of Dam Safety Inspection Report - Public)
- L-2008-028, Transmittal of Data Required for the 2007 Annual Operating Report, Pursuant to Technical Specification 6.9.1.4 + (Transmittal of Data Required for the 2007 Annual Operating Report, Pursuant to Technical Specification 6.9.1.4)
- ML051250221 + (Transmittal of Davis-Besse - Combined Annual Radiological Environmental Operating Report and Radiological Effluent Release Report)
- ML041060404 + (Transmittal of Davis-Besse Emergency Plan Implementing Procedure RA-EP-01900, General Emergency, Revision 03)
- ML021430429 + (Transmittal of Davis-Besse Nuclear Power Station, Unit 1 Return to Service Plan)
- ML17230A090 + (Transmittal of Davis-Besse Nuclear Power Station After Action Report/Improvement Plan, Exercise Date - May 2, 2017, Radiological Emergency Preparedness (REP) Program)
- ML17230A086 + (Transmittal of Davis-Besse Nuclear Power Station After Action Report/Improvement Plan, Exercise Date - May 2, 2017, Radiological Emergency Preparedness (REP) Program)
- ML042120077 + (Transmittal of Davis-Besse Recommendation - Appendix F Report)
- ML080810287 + (Transmittal of Declartion of Stephen J. Bethay Verifying Entergys Answer, Filed 02/11/08, to the Quests.Asked by the ASLB in Its 01/31/08 Order. Declarations of W. Spataro, B. Sullivan, S. Woods & A. Cox Also Enclosed)
- CNRO-2009-00010, Transmittal of Decommissioning Funding Assurance Plans + (Transmittal of Decommissioning Funding Assurance Plans)
- ML12363A021 + (Transmittal of Decommissioning Funding Plan for Independent Spent Fuel Storage Installation)
- HBL-16-006, Transmittal of Decommissioning Funding Report + (Transmittal of Decommissioning Funding Report)