PASSPORT DOCUMENT To Facility Address
- CR3 Department :
- CR3-01242 / MAIL CODE: N/A
.5 y,-..- 77
'r 7
, Jj%-
Jur;
--
TRANSMITTAL Page:
1 11111 u Dll ull uIIIi tlli tlllllll il From
- CR3DOCSVCS Attention: DOCUMENT SERVICES -
SA2A Address
- FLORIDA POWER CORPORATION CRYSTAL RIVER COMPLEX 15760 WEST POWERLINE STREET City
- CRYSTAL RIVER State:FL Postal Code: 34428-6708 Country
- UNITED STATES Email Contact Date/Time
- 03/11/04 08:06 Transmittal Group Id:0000015578 Trans No.
- 000145404
Title:
Total Items: 00001 Item Facility Type Sub Document Number Sheet Doc Status Revision Doc Date Copy #
Media Copies 0001 CR3 POM EMG EM0225C ACTIVE 003 H
01 If a document was not received or is no longer required check the response below and return to sender.
l lDocuments noted above not received (identify those not received).
I no longer require distribution of these documents (identify those no longer required).
Date:
Signature:
I;N
0' Progress Energy I
Information Use PROGRESS ENERGY CRYSTAL RIVER UNIT 3 PLANT OPERATING MANUAL EM-225C POST ACCIDENT MONITORING OF REACTOR BUILDING TEMPERATURE EM-225C Rev. 3 Page 1 of 7
TABLE OF CONTENTS K-/ l SECTION PAGE 1.0 PURPOSE.................................
3
2.0 REFERENCES
3
-2.1 Developmental References.................................
3 3.0 PERSONNEL INDOCTRINATION.......................
3 3.1 Definitions.........................
3 3.2 Responsibilities...................
3 3.3 Limits And Precautions..............................
3 4.0 INSTRUCTIONS..............................
4 5.0 FOLLOW-UP ACTIONS..............................
5 ENCLOSURE 1
Limiting RB Temperature..............................
6 EM-225C -
Rev. 3 Page 2 of 7
1.0 2.0 2.1 2.1.1 2.1.2 2.1.3 2.1.4 2.1.5 2.1.6 2.1.7 2.1.8 2.1.9 3.0 3.1 3.2 3.3 3.3.1 3.3.2 PURPOSE The purpose of this procedure is to provide guidance to the TSC Accident Assessment Team to monitor and take action to ensure Reactor Building (RB) temperatures remain below the qualified threshold limits for envirorirnentally qualified components. If temperatures approach a predetermined limit, then actions will be taken to reduce RB temperatures to acceptable values.
REFERENCES Developmental References ITS 3.6.5 Containment Air Temperature Environmental and Seismic Qualification Program Manual IOC NOE 97-2534, Assessment to support EM-225C for SBLOCA EQ Concerns, dated 12/4/97 Calculation M-97-0072, CR-3 Containment Analysis for SBLOCA, Rev. 2 PC 97-7607 IOC NSM 98-0592, Close out of the DR/JCO related to PC 97-7607 - RB EQ Temperatures from a SBLOCA event, dated 4/2/98 Calculation M-97-0132, CR3 Containment Analysis, Rev. 6 PC 00-0830, Enclosure 1 curve in EM-225C appears to be incorrect, dated 3/16/00 Calculation M-90-0021, Building Spray and Decay Heat NPSH, Rev. 12 PERSONNEL INDOCTRINATION Definitions None Responsibilities The TSC Accident Assessment Team is responsible for monitoring RB temperatures post accident, and to provide recommendations to the Emergency Coordinator to initiate building spray if temperatures reach the limits established in this procedure.
Limits And Precautions Large break LOCAs and larger small break LOCAs will result in RB Pressures that actuate building spray automatically. Actions to manually start building spray to reduce RB temperatures will not be required in these situations.
Prior to starting any ES powered component, adequate load margin must be available if the ES 4160 volt busses are energized from the emergency diesel generators.
EM-225C Rev. 3 Page 3 of 7
3.3.3 Prior to starting a building spray pump, building spray flow control valves must be set for 1200 gpm if ECCS suction has been transferred to the RB Sump.
3.3.4 If a SGTR is in progress then ensure adequate RB sump level is available prior to transferring or starting a BS pump from the RB Sump. With a SGTR, sufficient RB sump level might not be available due to loss from the SGTR. Reference calculation M-90-0021 for BSP NPSH requirements.
4.0 INSTRUCTIONS 4.1 IF at least one building spray pump is running, THEN exit this procedure. No further action is required.
4.2 IF an RCS leak is occurring in the reactor building, THEN begin plotting average RB temperature on Enclosure 1 for at least 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> intervals in the beginning of the event. The plotting interval can be changed based on plant conditions.
4.3 RB Temperature is the average of the following four temperature elements:
TEMPERATURE CONTROL RECALL COMPUTER RB ELEV.
ELEMENT ROOM POINT POINT RECORDER AH-536-TE AH-536-TIR RECL-77 S358 102 AH-537-TE RECL-78 S359 125 AH-538-TE RECL-80 S382 180 AH-539-TE RECL-81 S383 235 AVERAGE S837 4.4 IF average RB Temperature is in the Acceptable' Region of Enclosure 1 and decreasing, THEN exit this procedure.
4.5 IF at any time average RB temperature reaches "Action Required boundary region of Enclosure 1, THEN obtain Emergency Coordinator concurrence to start at least one building spray pump.
4.6 IF a building spray pump is required and EC concurrence has been obtained, THEN perform the following:
4.6.1 Ensure load is available on the emergency diesel generators per EOP-13, Rule 5.
4.6.2 Ensure Building Spray flow controls are set at 1500 GPM and "Remote" if pumps are aligned to BWST, or 1200 GPM and "LOCAL" if aligned to the RB Sump.
4.6.3 Notify the control room to start one building spray pump.
4.7 Continue to monitor RB Temperature.
EM-225C Rev. 3 Page 4 of 7
4.8 IF RB Temperature does not lower to the acceptable region of Enclosure 1, THEN notify control room to start a second building spray pump if available.
NOTE If building spray pumps are running, Emergency Operating Procedures provide guidance to secure them. If building spray pumps are secured, begin additional monitoring of RB Temperatures until a continuing decreasing trend is achieved.
4.9 5.0 WHEN building spray pumps are running, THEN exit this procedure.
FOLLOW-UP ACTIONS None EM-225C Rev. 3 Page 5 of 7
(
(
(
ENCLOSURE 1 (Page 1 of 1)
EM-225C Limiting RB Temperature 300 250 200 0) 1o Z50 0)
)2 100 50 0
- IZ'r A 1 I W
--I,
Aoi
&+
S I iZ I -
, I ;4 -ll II k S,.-,s*1;t.
I3Wt s-A-tig I I
q I.
t j
- iI-kUnacceptable Region For EQ Action Required Boundary I I11 I I71 I I 7
_i Acceptable Region
{j{#¢{IiI LiIIIIILlvE:v
~X 0
10 20 30 40 50 60 70 80 90 100 110 120 130 140 150 160 170 180 190 200 210 220 230 240 250 260 270 280 Time (Hours)
EM-225C Rev. 3 Page 6 of 7
Summanry of Changes (PRR 120816)
SECTION CHANGE Cover sheet Changed the coversheet to Progress Energy Replaced curve with a revised format that will allow printing of the curve without causing the upper portion to turn gray. The curve parameters and values were not changed (Ref PRR 120816) 2.1.9 Updated revision level of Calc M-90-0021 to Rev. 12-no impact on procedure 4
EM-225C Rev. 3 Page 7 of 7