PNP 2018-034 July 18, 2018 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Entergy Nuclear Operations, Inc.
Palisades Nuclear Plant 27780 Blue Star Memorial Highway Covert, MI 49043-9530 Tel 269-764-2000 Jeffery A. Hardy Regulatory Assurance Manager
SUBJECT:
Report - Palisades Nuclear Plant Cyber Security Plan, Revision 2 Palisades Nuclear Plant Docket No. 50-255 Renewed Facility Operating License No. DPR-20
Reference:
- 1.
Entergy Nuclear Operations, Inc. letter, PNP 2016-039, Report - Palisades Nuclear Plant Cyber Security Plan, Revision 1, dated August 22,2016 (ADAMS Accession Numbers ML16235A018, ML16235A019, and ML16235A024)
Dear Sir or Madam:
Pursuant to Title 10 of the Code of Federal Regulations (CFR), Part 50, Section 54(p)(2), Entergy Nuclear Operations, Inc. (ENO) is submitting revision 2 of the Palisades Nuclear Plant Cyber Security Plan (CSP) along with descriptions of the changes made in revision 2. CSP revision 2 replaces revision 1, which was submitted in Reference 1. The changes in CSP revision 2 do not decrease the effectiveness of the plan.
ENO has documented in its corrective action program that CSP revision 2 was not submitted within two months of issuance as required by 10 CFR 50.54(p)(2).
ENO requests that the attachment and the enclosure to this letter, which contain security-related information (S-RI), be withheld from public disclosure in accordance with 10 CFR 2.390.
This letter identifies no new commitments and no revisions to existing commitments.
Sincerely, JAH/jse
Attachment:
Descriptions of Revision 2 Changes to the Palisades Nuclear Plant Cyber Security Plan (contains S-RI)
Enclosure:
Palisades Nuclear Plant Cyber Security Plan Revision 2 (contains S-RI)
PNP 2018-034 Page 2 of 2 cc:
Project Manager, USNRC Resident Inspector, Palisades, USNRC Regional Administrator, Region III, USNRC