JAFP-16-0001, Transmittal of Cyber Security Plan, Revision 1

From kanterella
Jump to navigation Jump to search

Transmittal of Cyber Security Plan, Revision 1
ML16005A154
Person / Time
Site: FitzPatrick Constellation icon.png
Issue date: 01/05/2016
From: Parkhurst E
Entergy Nuclear Northeast, Entergy Nuclear Operations
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML16005A153 List:
References
JAFP-16-0001
Download: ML16005A154 (5)


Text

SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390

  • ===-Entergy JAFP-16-0001 January 5, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Cyber Security Plan, Revision 1 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059

Dear Sir or Madam:

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Eric Parkhurst Information Technology Manager - JAF Entergy has revised the James A. FitzPatrick Nuclear Power Plant Cyber Security Plan (CSP) in accordance with 10 CFR 50.54(p )(2). Revision 1 is effective on January 4, 2016. This revision corrects the current wording which could be interpreted to allow, after full implementation of the CSP, replacement of one-way isolation with a firewall.

In accordance with 10 CFR 50.54(p)(2), the revised CSP (Revision 1) is in the Enclosure.

Entergy requests that the Enclosure to this letter, which contains security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Eric Parkhurst, Information Technology Manager, at 315-349-6020.

Eric Parkhurst Information Technology Manger EP/mh

Attachment:

Summary of Changes

Enclosure:

James A. FitzPatrick Cyber Security Plan, Revision 1 (Contains SRI) cc: next page Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 JAFP-16-0001 Page 2 of 2 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

cc:

NRC Regional Administrator NRC Resident Inspector (w/o enclosure)

Mr. Douglas Pickett, Senior Project Manager (w/o enclosure)

Ms. Bridget Frymire, NYSPSC (w/o enclosure)

Mr. John B. Rhodes., President NYSERDA (w/o enclosure)

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

JAFP-16-0001 Attachment Summary of Changes (1 Page)

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 JAFP-16-0001 Attachment Summary of Changes Page 1 of 1 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

Change Section Page Change in wording of Section 4.3 of the Entergy Cyber Security Plan (CSP) to be consistent with Milestone 3.

The change clarifies that Level 3 Critical Digital Assets must be isolated by data diode or air gap. The correct and more secure approach.

Section 4.3 15 and 16

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

JAFP-16-0001 Enclosure James A. FitzPatrick Cyber Security Plan, Revision 1 (25 Pages)

SECURITY-RELATED INFORMATION -WITHHOLD UNDER 10 CFR 2.390

  • ===-Entergy JAFP-16-0001 January 5, 2016 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Cyber Security Plan, Revision 1 James A. FitzPatrick Nuclear Power Plant Docket No. 50-333 License No. DPR-059

Dear Sir or Madam:

Entergy Nuclear Northeast Entergy Nuclear Operations, Inc.

James A. FitzPatrick NPP P.O. Box 110 Lycoming, NY 13093 Tel 315-342-3840 Eric Parkhurst Information Technology Manager - JAF Entergy has revised the James A. FitzPatrick Nuclear Power Plant Cyber Security Plan (CSP) in accordance with 10 CFR 50.54(p )(2). Revision 1 is effective on January 4, 2016. This revision corrects the current wording which could be interpreted to allow, after full implementation of the CSP, replacement of one-way isolation with a firewall.

In accordance with 10 CFR 50.54(p)(2), the revised CSP (Revision 1) is in the Enclosure.

Entergy requests that the Enclosure to this letter, which contains security-related information (SRI), be withheld from public disclosure in accordance with 10 CFR 2.390.

This letter contains no new regulatory commitments. If you have any questions regarding this report, please contact Eric Parkhurst, Information Technology Manager, at 315-349-6020.

Eric Parkhurst Information Technology Manger EP/mh

Attachment:

Summary of Changes

Enclosure:

James A. FitzPatrick Cyber Security Plan, Revision 1 (Contains SRI) cc: next page Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 JAFP-16-0001 Page 2 of 2 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

cc:

NRC Regional Administrator NRC Resident Inspector (w/o enclosure)

Mr. Douglas Pickett, Senior Project Manager (w/o enclosure)

Ms. Bridget Frymire, NYSPSC (w/o enclosure)

Mr. John B. Rhodes., President NYSERDA (w/o enclosure)

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

JAFP-16-0001 Attachment Summary of Changes (1 Page)

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 JAFP-16-0001 Attachment Summary of Changes Page 1 of 1 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

Change Section Page Change in wording of Section 4.3 of the Entergy Cyber Security Plan (CSP) to be consistent with Milestone 3.

The change clarifies that Level 3 Critical Digital Assets must be isolated by data diode or air gap. The correct and more secure approach.

Section 4.3 15 and 16

SECURITY-RELATED INFORMATION - WITHHOLD UNDER 10 CFR 2.390 Enclosure contains Sensitive Unclassified Non-Safeguards Information.

When separated from Enclosure, this transmittal document is decontrolled.

JAFP-16-0001 Enclosure James A. FitzPatrick Cyber Security Plan, Revision 1 (25 Pages)