Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML051750712 + (To Maine Yankee Final Status Survey Release Record FR-0900 Balance of Plant Land Survey Unit 4)
- ML051750711 + (To Maine Yankee Final Status Survey Release Record FR-0200 Yard East Survey Unit 9)
- ML051750702 + (To Maine Yankee Final Status Survey Release Record FR-0200 Yard East Survey Unit 5)
- ML051750707 + (To Maine Yankee Final Status Survey Release Record FR-0200 Yard East Survey Unit 7)
- ML20053C065 + (To Manual Ultrasonic Exam Procedures for Vessel Nozzle Safe-ends & Closure Head Nozzle-Flange Welds)
- ML033350073 + (To Manual of Emergency Events)
- ML090620385 + (To Manual, Technical Specification Bases)
- ML20041F319 + (To Mark I Containment Program Load Definition Rept)
- ML20052H001 + (To Mark I Containment Program Plant Unique Load Definition,Enrico Fermi Atomic Power Plant:Unit 2)
- ML20027E824 + (To Mark I Vacuum Breaker Improved Valve Dynamic Model - Model Development & Validation)
- ML18230A333 + (To Meet Scheduled Fuel Loading on 6/1/1983 & for Other Submittals, Letter Advising Arrangements to Meet with NRC Staff to Develop Coordinated Schedule Concerning the Financial Status & Amending Environmental Report)
- ML19277B860 + (To Memorandum of Agreement Between NRC & INPO Re Exchange of Experience,Info & Data Concerning Nuclear Power Plant Safety)
- ML071370090 + (To Methodology Report DPC-NE-1005-P-A, Revision 0, Nuclear Design Methodology Using CASMO-4/SIMULATE-3 Mox)
- ML19323A052 + (To Mini Decay Heat Removal Sys Design Criteria)
- ML20141F502 + (To Mnps Unit One Operations Manual, Including Section 2.7, Control Room Protocol, Section 3.3, Licensed Operators, Section 3.5, Shift Technical Advisor, Section 4.2, Briefings & Section 2.9, Shift Turnover Policy)
- ML20066D372 + (To Monthly Operating Rept for Apr 1981)
- ML20042A730 + (To Monthly Operating Rept for Aug 1978)
- ML20042A744 + (To Monthly Operating Rept for Dec 1978)
- ML20066D319 + (To Monthly Operating Rept for Feb 1981)
- ML20066D308 + (To Monthly Operating Rept for Jan 1981)
- ML20066D388 + (To Monthly Operating Rept for Jul 1981)
- ML20066D382 + (To Monthly Operating Rept for June 1981)
- ML20066D340 + (To Monthly Operating Rept for Mar 1981)
- ML20052B487 + (To Monthly Operating Rept for Mar 1982,correcting Lines 18,21 & 22 of Operating Data Rept)
- ML20066D375 + (To Monthly Operating Rept for May 1981)
- ML20042A738 + (To Monthly Operating Rept for Nov 1978)
- ML20066D397 + (To Monthly Operating Rept for Nov 1981)
- ML20066D395 + (To Monthly Operating Rept for Oct 1981)
- ML20066D393 + (To Monthly Operating Rept for Sept 1981)
- ML20063E332 + (To Monticello Nuclear Generating Plant Single Loop Operation)
- ML18151A551 + (To NE-1187, Surry Unit 1,Cycle 16 Startup Physics Tests Rept)
- ML20203G027 + (To NEDO-32291, Sys Analyses for Elimination of Selected Response Time Testing Requirements)
- ML041680109 + (To NEDO-33144, Pressure-Temperature Curves for Energy Northwest Columbia)
- ML053480360 + (To NMC Response to GL 2004-02 Potential Impact of Debris Blockage on Emergency Recirculation During Design Basis Accidents at Pressurized-Water Reactors, for the Prairie Island Nuclear Generating Plant)
- ML20053B140 + (To NRC Property & Supply Sys Facility Security Plan)
- NUREG-0737, To NUREG-0737, Request for Extension of Time for Commission Order Dated June 14, 1984 + (To NUREG-0737, Request for Extension of Time for Commission Order Dated June 14, 1984)
- ML21104A391 + (To Naval Sea Systems Command - Decommissioning Work Plan - Surface Ship Support Barge Dismantlement and Disposal)
- NL-23-0742, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications + (To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fo Surveillance Technical Specifications)
- NL-23-0506, To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications + (To Non-Voluntary License Amendment Request: Technical Specification Revision to Adopt WCAP-17661-P-A, Improved RAOC and CAOC Fq Surveillance Technical Specifications)
- ML20065G866 + (To Nonproprietary Design Assessment Rept)
- ML100501159 + (To Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts)
- ML20054C045 + (To Notification of Contract Execution,Mod 1 to Purchase of Portable Intrinsic Germanium Detector Sys. Contractor: Princeton Gamma Tech,Inc)
- ML20032E794 + (To Notification of Contract Execution,Mod 4 to Publication Distribution Svcs. Change Made in Funding Section.Contractor:Computer Data Sys,Inc)
- ML20010H559 + (To Nuclear Energy Business Group BWR QA Program W/Errata & Addenda Sheets)
- ML19345A972 + (To Nuclear Energy Business Group BWR QA Program W/Errata & Addenda Sheets)
- ONS-2014-087, To ONS Response to Request for Additional Information Regarding Fukushima Flood Hazard Reanalysis Report (Questions Lc and 14) + (To ONS Response to Request for Additional Information Regarding Fukushima Flood Hazard Reanalysis Report (Questions Lc and 14))
- BSEP 03-0167, To OPEP-03.6.5, Reivsion 8 to OPEP-03.9.2, Revision 8 to OPEP-04.1, Revision 27 to OPEP-04.2, and Revision 25 to OPEP-04.6 + (To OPEP-03.6.5, Reivsion 8 to OPEP-03.9.2, Revision 8 to OPEP-04.1, Revision 27 to OPEP-04.2, and Revision 25 to OPEP-04.6)
- BSEP 04-0040, To OPEP-04.7, Brunswick Emergency Notification (Automated Telephone) System + (To OPEP-04.7, Brunswick Emergency Notification (Automated Telephone) System)
- ML040210794 + (To OPGP05-ZV-0007, Prompt Notification System)
- ML19340A141 + (To Oconee 2,Cycle 2 Reload Rept)
- ML20055A353 + (To Offsite Dose Calculation Manual)