To Monthly Operating Rept for Mar 1982,correcting Lines 18,21 & 22 of Operating Data Rept
ML20052B487
Person / Time
Site: Rancho Seco
Issue date: 04/21/1982
From: Colombo R
SACRAMENTO MUNICIPAL UTILITY DISTRICT
To:
Shared Package
ML20052B483 List:
References
NUDOCS 8204300485
Download: ML20052B487 (1)


Text

O<

REVISION l s'. '

i O

OPERATING DATA REPORT DOCKET NO.

50-312 DATE 82-03-31 COMPLETED BY D.

Colembo TELEPHONE

' m i 452-3211 OPERATING STATUS Rancho Seco Unit 1 Notes This is Revision 1 to

1. Unit Name:

the March 1982 Operating Maych topp

2. Reporting Period:

Data Report; only lines 18, 2772

3. ucensed Thermal Power (MW ):

21 and 22 have been revised.

963

4. Nameplate Rating (Gross MWe):

918

5. Design Electrical Racing (Net MWe):

917

6. Maximum Dependable Capacity (Gross MWe):

873

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occus in Capacity Rasmas (Items Number 3 Through 7) Since Last Report. Give Reasons:

N/A N/A

9. Power Level To Which Restricted. If Any (Net MWe):

N#A

10. Reasons For Restrictions,if Any:

[

Cumulative This Month Yr..to.Date 744 2,160 60,961

11. Hours In Reportug Period
12. Number Of Hours Reactor Was Critical 744 2.152.6 37.389.2
13. Reactor Reserve Shutdown Hours 0

0 6,458.6

14. Hours Generator on-Une 744 2,104.7 35,875.1
15. Unit Reserve Shutdown Hours 0

0 1,210.2

16. Gross Thermal Energy Generated (MWH) 1 300 785 4.622.240 90.517.352
17. Gross Electrical Energy Generated (MWH) 404 ME2 1.549..Z52__ _30.311.181
18. Net Electrical Energy Generated (MWH) 374.224 1.457.917 28,621,034
19. Unit Service Factor 100%

97.4%

58.8%

20. Unit Availability Factor 100%

97.4%_

60.8%

57.6%

77.3%

53.8%

21. Unit Capacity Factor iUsing MDC Net) 54.8%

73.5%

51.1%

22. Unit Capacity Factor (Using DER Net)
23. Unit Forced Outage Rate 0.0%

0.7%

29.8%

24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:

HPT Nn771p intnoctinn. 82-04-03. three weeks 2S. If Shut Down At End Of Report Period. Estimated Date of Startup:

26. Units in Test Status (Prior to Commercial Operation 1:

Forecast Achieved N/A N/A INITIAL CRITICALITY INITIAL ELECTRICITY N/A

'U A COMMERCIAL OPER AT10N 9/a N/a

~