Text
O<
REVISION l s'. '
i O
OPERATING DATA REPORT DOCKET NO.
50-312 DATE 82-03-31 COMPLETED BY D.
Colembo TELEPHONE
' m i 452-3211 OPERATING STATUS Rancho Seco Unit 1 Notes This is Revision 1 to
- 1. Unit Name:
the March 1982 Operating Maych topp
- 2. Reporting Period:
Data Report; only lines 18, 2772
- 3. ucensed Thermal Power (MW ):
21 and 22 have been revised.
963
- 4. Nameplate Rating (Gross MWe):
918
- 5. Design Electrical Racing (Net MWe):
917
- 6. Maximum Dependable Capacity (Gross MWe):
873
- 7. Maximum Dependable Capacity (Net MWe):
- 8. If Changes Occus in Capacity Rasmas (Items Number 3 Through 7) Since Last Report. Give Reasons:
N/A N/A
- 9. Power Level To Which Restricted. If Any (Net MWe):
N#A
- 10. Reasons For Restrictions,if Any:
[
Cumulative This Month Yr..to.Date 744 2,160 60,961
- 11. Hours In Reportug Period
- 12. Number Of Hours Reactor Was Critical 744 2.152.6 37.389.2
- 13. Reactor Reserve Shutdown Hours 0
0 6,458.6
- 14. Hours Generator on-Une 744 2,104.7 35,875.1
- 15. Unit Reserve Shutdown Hours 0
0 1,210.2
- 16. Gross Thermal Energy Generated (MWH) 1 300 785 4.622.240 90.517.352
- 17. Gross Electrical Energy Generated (MWH) 404 ME2 1.549..Z52__ _30.311.181
- 18. Net Electrical Energy Generated (MWH) 374.224 1.457.917 28,621,034
- 19. Unit Service Factor 100%
97.4%
58.8%
- 20. Unit Availability Factor 100%
97.4%_
60.8%
57.6%
77.3%
53.8%
- 21. Unit Capacity Factor iUsing MDC Net) 54.8%
73.5%
51.1%
- 22. Unit Capacity Factor (Using DER Net)
- 23. Unit Forced Outage Rate 0.0%
0.7%
29.8%
- 24. Shutdowns Scheduled Over Next 6 Months (Type. Date, and Duration of Eacht:
HPT Nn771p intnoctinn. 82-04-03. three weeks 2S. If Shut Down At End Of Report Period. Estimated Date of Startup:
- 26. Units in Test Status (Prior to Commercial Operation 1:
Forecast Achieved N/A N/A INITIAL CRITICALITY INITIAL ELECTRICITY N/A
'U A COMMERCIAL OPER AT10N 9/a N/a
~