Rsvision 1 - 1/8/82 OPERATING DATA REPORT

. DOCKET NO. Sb-346 DATE- -Janunrv 8, 1982 CO3!PLETED 13Y Efini Snrsour TELEPilONE (Airn '59-5000, Ext. 251 OPERATING STATUS Davis-Besse tinft 1 Notes

1. Unit Name:
2. Reporting Period: September, 1981
3. Licenwd Thermal Power (31W ): 2772 _
4. Nameplate Rating (Gross $1We): 925
5. Design Electrical Rating (Net SIWE): 906 1 6. Alaximum Dependabie Capacity (Gross $1We): 918
7. Blaximum Dependable Capacity (Net SIWE): 874

. 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:

9. Power Lese! Tn Which Restricted. If Any (Net SIWE): -
10. Reasons For Restrictions,if Any:

This Sfonth Yr..to Date Cumulative

11. Ilours In Reporting Period 720 6,551 _

27.792___

12. Number OfIlours Reactor Was Critical 704.4 4,395.2 14,477. 8._

~

13. Reactor Reserve Shutdown llours 0 424.E 2.903.4
14. Ilours Generator On.Line 697.5 4,224.5 13.566.8
15. Unit Resene Shutdown llours 0 0 1.731.4
16. Gross Thermal Energy Generated (31Wil) _1,916,668 9,952,196

_. L O40.698 -

1 17 Gross Electrical Energy Generated (alWH) 637.645,_. 3.318.111 10.345.264

18. Net Electrical Energy Generated (SIWil) 605,991 3.110,737 9.644.586
19. Unit Senice Factor 96.9 64.5 48.8-20 Unit Availability Factor 96.9 64.5 55.0
21. Unit Capacity Factor (Using AIDC Net) 94.6 s3.4 39.7
22. Unit Capacity Factor (Using DER Net) 92.9 s2.4 38.3
23. Unit Forced Outage Itate 3.1 30.6 26.9,
24. Shutdowns Scheduled Oser Next 6 51onths (Type. Date.and Duration of Each):

l 1982 Refueling Scheduled Februarv 26. 1982 - m v 21. 1982 - - '

t--

~

25. If Shur Down At End Of Report Perind. Estimated Date of Startup: --

26. Units in Test Status iPrior o Commercial Operation): Forecast Achiesed INITIA L CRITICAll1 Y INITIAL ELECIRICITY CONDIf RCI A L OPER -\ TION 8211110316 820108 PDR ADOCK 05000346 (9/77; R PDR

~

- . _ . .- --