Text
Rsvision 1 - 1/8/82 OPERATING DATA REPORT Sb-346 DOCKET NO.
DATE- -Janunrv 8, 1982 CO3!PLETED 13Y Efini Snrsour TELEPilONE (Airn '59-5000, Ext. 251 OPERATING STATUS Notes
- 1. Unit Name:
Davis-Besse tinft 1
- 2. Reporting Period:
September, 1981
- 3. Licenwd Thermal Power (31W ):
2772
- 4. Nameplate Rating (Gross $1We):
925
- 5. Design Electrical Rating (Net SIWE):
906 1
- 6. Alaximum Dependabie Capacity (Gross $1We):
918
- 7. Blaximum Dependable Capacity (Net SIWE):
874
- 8. If Changes Occur in Capacity Ratings (items Number 3 Through 7) Since Last Report. Give Reasons:
- 9. Power Lese! Tn Which Restricted. If Any (Net SIWE):
- 10. Reasons For Restrictions,if Any:
This Sfonth Yr..to Date Cumulative
- 11. Ilours In Reporting Period 720 6,551 27.792___
- 12. Number OfIlours Reactor Was Critical 704.4 4,395.2 14,477. 8._
~
- 13. Reactor Reserve Shutdown llours 0
424.E 2.903.4
- 14. Ilours Generator On.Line 697.5 4,224.5 13.566.8
- 15. Unit Resene Shutdown llours 0
0 1.731.4
- 16. Gross Thermal Energy Generated (31Wil)
_1,916,668 9,952,196
_. L O40.698 1
17 Gross Electrical Energy Generated (alWH) 637.645,_.
3.318.111 10.345.264
- 18. Net Electrical Energy Generated (SIWil) 605,991 3.110,737 9.644.586
- 19. Unit Senice Factor 96.9 64.5 48.8-20 Unit Availability Factor 96.9 64.5 55.0
- 21. Unit Capacity Factor (Using AIDC Net) 94.6 s3.4 39.7
- 22. Unit Capacity Factor (Using DER Net) 92.9 s2.4 38.3
- 23. Unit Forced Outage Itate 3.1 30.6 26.9,
- 24. Shutdowns Scheduled Oser Next 6 51onths (Type. Date.and Duration of Each):
l 1982 Refueling Scheduled Februarv 26. 1982 - m v 21. 1982 t--
~
- 25. If Shur Down At End Of Report Perind. Estimated Date of Startup:
26. Units in Test Status iPrior o Commercial Operation):
Forecast Achiesed INITIA L CRITICAll1 Y INITIAL ELECIRICITY CONDIf RCI A L OPER -\\ TION 8211110316 820108 PDR ADOCK 05000346 R
PDR (9/77;
~
--