ML20066D395

From kanterella
Jump to navigation Jump to search
To Monthly Operating Rept for Oct 1981
ML20066D395
Person / Time
Site: Davis Besse Cleveland Electric icon.png
Issue date: 01/08/1982
From: Sarsour B
TOLEDO EDISON CO.
To:
Shared Package
ML20066D281 List:
References
NUDOCS 8211110317
Download: ML20066D395 (1)


Text

p-Revision 2 - 1/8/82 OPERATING DATA RLPORT DOCKET NO.

50-346 D.\\T E

.lanua rv 8, 1982 C051PLETED !!Y R41n1 RnrSour TELEPilONE (419) 259-5000, Ext. 251 OPERATING STATUS

1. Ur.it Name:
2. Reporting Period:

October, 1981 2772

3. Licensed Thermal Power (MWt):

925

4. Nameplate Rating (Gross 5tWe):
5. Design Electrical Rating (Net MWe):

906 918 2

6. h!aximum Dependable Capacity (Gross AlWe):

874

7. Maximum Dependable Capacity (Net MWe):
8. If Changes Occur in Capacity Ratings (Irems Number 3 Through 7) Since Last Report. Give Reasons:
9. Power Level To Which Restricted. lf Any (Net 5!We):
10. Reasons For Restrictions. lf Any:

This Month Yr.-to Date Cumulative

11. Hours In Reporting Period 745 7,296 28,537
12. Number OfIlours Reactor Was Critical 716.1 5,111.3 15,393.9
13. Reactor Resene Shutdown flours 19.7 444.5 2,923.1
14. Ilours Generator On.Line 686.8 4.911.3 14,253.6
15. Unit Reserve Shutdown llours 0

0 1,731.4 2

16. Gross Thermal Energy Generated (MWil) 1,746,360 11,698,556 32,787,058
17. Gross Electrical Energy Generated (MW}i)
77,495 _,

3.896.036 10,923,189 IS. Net Electrical Energy Generated (MWil) 545.363 3.656.100 10,189_,949

19. Unit Senice Factor 92.2 67.3 49.9
20. Unit Assilability Factor 92.2
67. 3__

56.0

21. Unit Capacity Factor IUsing MDC Net) 82.3 56.3 40.9
22. Unit Capacity Factor (U>ing DER Net) 80.8 55.3 39.4
23. Unit Forced Outage Rate 7.8 28.2_

26.2

~

24. Shutdowns Scheduled Oser Next 6 Months (Type. Date.and Duration of Each):

1982 Refuelinn Outane Scheduled February 26, 1982 - May 21. 1982

25. If Shut Down At End Of Report Perind. Estimated Date of Startup:
26. Units In Test Status IPrior to Commercial Operation):

Forecast Achiesed INITIA L CRITICA LITY INITIAL ELECTRICITY COMMERCIA L OPER ATION 8211110317 820108 g_7 3 PDR ADOCK 05000346 R

PDR

_