Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Technical Specifications, SG Tube Surveillance Program". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML050400272  + (Technical Specifications, Revises Reactor Coolant System Pressure and Temperature Limits TAC No. MC4160))
  • ML022770618  + (Technical Specifications, Revises Response Time Testing Requirements for Reactor Protection System & Primary Containment Isolation Instrumentation)
  • ML023360270  + (Technical Specifications, Revises Section 5.3.1.1, Unit Staff Qualifications, of TSs to State New Education & Experience Eligibility Requirements for Operator License Applicants, TAC MB3017)
  • ML060760486  + (Technical Specifications, Revises TS 3.6.1.7, Containment Ventilation System, to Allow Additional Corrective Actions When a Containment Purge Supply or Exhaust Isolation Valve Exceeds Leakage Limits)
  • ML062090367  + (Technical Specifications, Revises TS 3.9.3, Containment Penetrations, to Allow an Emergency Egress Door, Access Door, or Roll Up Door, as Associated with the Equipment Hatch Penetration, to Be Open, But Capable of Being Closed)
  • ML072180219  + (Technical Specifications, Revises TS 5.6.5, Reactor Coolant System (RCS) Pressure and Temperature Limits Report (PTLR) to Add the Ferret Code as an Approved Methodology for Determining RCS Pressure and Temperature Limits)
  • ML063250039  + (Technical Specifications, Revises TS Table 3.3.6.1-1, Primary Containment Isolation Instrumentation, to Eliminate the Main Steamline Radiation Monitor Trip Function)
  • ML060320072  + (Technical Specifications, Revises Technical Specification 3/4/10.2, Special Test Exceptions - Physics Tests, to Increase Allowed Time Between Flux Channel Channel Functional Tests & Beginning of Mode 2 Physics Tests from 12 to 24 Hours)
  • ML060760472  + (Technical Specifications, Revises the SSES 2 TS 3.3.8.1, Loss of Power (LOP) Instrumentation)
  • ML052500242  + (Technical Specifications, Revises the TSs in Response to an Application Requesting a One-Time Extension of the Surveillance Interval for the Reactor Vessel Internal Vent Valves)
  • ML053110044  + (Technical Specifications, Revising TS 3.5.2.6 and 3.5.3.6 to Accommodate the Replacement of the Reactor Building Emergency Sump Suction Inlet Trash Racks and Screens with Strainers)
  • ML063110558  + (Technical Specifications, Revising TS Steam Generator Tube Suveillance Program)
  • ML062290009  + (Technical Specifications, Revising a Position Title and Department Name in Technical Specification 5.0, Administrative Controls, MD1161)
  • ML082140857  + (Technical Specifications, Revision of Rod Worth Minimizer Limiting Condition for Operation During Startup)
  • ML050610222  + (Technical Specifications, Revision of TS Section 2.3(4) & TS Section 3.6(2)d.(i))
  • ML060760244  + (Technical Specifications, Revision of the Appendix B, Environmental Protection Plan (Non-Radiological),)
  • ML060170321  + (Technical Specifications, Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function)
  • ML041040493  + (Technical Specifications, Revision to Allowed Outage Time for Engineered Safety Features Actuation System Instrumentation)
  • ML030220133  + (Technical Specifications, Revision to Appendix B)
  • ML063050256  + (Technical Specifications, Revision to Reactor Coolant System Specific Activity)
  • ML051040032  + (Technical Specifications, Revision to Surveillance Requirement Frequency for Containment and Suppression Pool Spray Headers and Nozzles)
  • ML032550124  + (Technical Specifications, Revision to Technical Specification (TS) 4.2.1 to Modify TS 4.3)
  • ML042750035  + (Technical Specifications, Revisions to Technical Specifications 3.3.1, Reactor Trip System (RTS) Instrumentation and 3.3.2, Engineered Safety Feature Actuation System (ESFAS) Instrumentation)
  • ET 07-0004, Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement  + (Technical Specifications, Revisions, Changes to TS 3.3.2 for Msfis I&C Digital Upgrade and Changes to TSs 3.7.2 and 3.7.3 for MSIV and Mfiv Replacement)
  • ML031500477  + (Technical Specifications, Risk Informed Integrated Leak Rate Testing Extension)
  • ML032540688  + (Technical Specifications, SG Tube Surveillance Program)
  • ML093290299  + (Technical Specifications, Section 6.6.3, Paragraph (1), Reporting Significant Change in Own Facility Organization at Level 1 & 2)
  • ML042170371  + (Technical Specifications, Sections 3.7 and 4.7, Auxiliary Electrical Power, and Added a New Section 6.8.5, Station Battery Monitoring and Maintenance Program)
  • ML052900207  + (Technical Specifications, Steam Generator Tube Inservice Inspection Program - Technical Specifications Limiting Conditions for Operation and Surveillance Requirements)
  • ML062350198  + (Technical Specifications, Steam Generator Tube Integrity, MD0194 & MD0195)
  • ML070920378  + (Technical Specifications, Steam Generator Tube Integrity)
  • ML042800350  + (Technical Specifications, TS 3.3.a.2.B, by Extending Completion Time from 1 Hour to 24 Hours for an Accumulator That Is Inoperable for Any Reason Other than Failure to Meet Minimum Boron Concentration Requirements)
  • ML061500252  + (Technical Specifications, TS Change to Extend Completion Time for Nuclear System Protection System Inverters)
  • ML082470305  + (Technical Specifications, TSTF Change Traveler TSTF-479 & TSTF-497)
  • ML20209A123  + (Technical Specifications, Table of Contents)
  • ML23067A166  + (Technical Specifications, Table of Contents)
  • ML062500301  + (Technical Specifications, Technical Specification (TS) Changes Associated with Inservice Testing Program, Section 5.5.6, Under TS Programs and Manuals, MD0335)
  • ML051940457  + (Technical Specifications, Technical Specification 5.6.5, Core Operating Limits (COLR))
  • ML051320225  + (Technical Specifications, Technical Specification Improvement to Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports)
  • ML043350248  + (Technical Specifications, Technical Specification Change Regarding Increased Flexibility in Mode Changes)
  • ML062710272  + (Technical Specifications, Transfer of License to FPL Energy Duane Arnold, LLC)
  • ML060970519  + (Technical Specifications, Transition to Westinghouse Fuel and Minimum Critical Power Ratio Safety Limits)
  • ML071830030  + (Technical Specifications, Typographical Errors Were Inadvertently Introduced on Operating License (OL) Page 6a for Unit 1 and OL Page 6 for Unit 2)
  • ML11172A020  + (Technical Specifications, Unit 1, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant)
  • ML11172A022  + (Technical Specifications, Unit 2, Renewed Facility Operating License for Prairie Island Nuclear Generating Plant)
  • ML061500174  + (Technical Specifications, Unit Staff Qualifications Requirements)
  • ML20079F561  + (Technical Specifications, University of Maryland - Issuance of Amendment No. 10 to Renewed Facility Operating License No. R-70 for the Maryland University Training Reactor for the Use of 16 Additional Triga Fuel Elements)
  • ML041380358  + (Technical Specifications, Updated Core Limiting Operating Limits Report (COLR) Methodologies)
  • ML062080623  + (Technical Specifications, Uprate of Pressure -Temperature Curves (TAC MC5373) (TS 428))
  • ML031990175  + (Technical Specifications, for Amendment 135 to License NPF-47, Re. Reporting Requirements for Operating License Condition Violations)
  • ML020640619  + (Technical Specifications, for Amendment Nos. 250 & 256)