ML022770618
| ML022770618 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 10/02/2002 |
| From: | NRC/NRR/DLPM/LPD3 |
| To: | Detroit Edison |
| References | |
| TAC MB5173 | |
| Download: ML022770618 (5) | |
Text
RPS Instrumentation 3.3.1.1 SURVFI[LANCF RFOI]IREMENTS (continued)
SURVEILLANCE SR 3.3.1.1.17 NOTES ----------------
- 1.
Neutron detectors are excluded.
- 2.
For Function 5 "n" equals 4 channels for the purpose of determining the STAGGERED TEST BASIS Frequency.
Verify the RPS RESPONSE TIME is within limits.
FREQUENCY 18 months on a STAGGERED TEST BASIS SR 3.3.1.1.18 NOTE...................
Neutron detectors are excluded.
Perform CHANNEL CALIBRATION.
24 months SR 3.3.1.1.19 Perform LOGIC SYSTEM FUNCTIONAL TEST.
24 months SR 3.3.1.1.20 Verify OPRM is not bypassed when APRM 24 months Simulated Thermal Power is Ž 28% and recirculation drive flow is < 60% of rated recirculation drive flow.
Amendment No. O],X 0
151 SURVEILLANCE REnUIREMENTS (continued)
I i
3.3-7 FERMI - UNIT 2
RPS Instrumentation 3.3.1.1 Table 3.3.1.1-1 (page 2 of 3)
Reactor Protection System Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION D.1 REQUIREMENTS VALUE
- 2.
Average Power Range Monitors (continued)
- c.
Neutron Flux - Upscale 1
3 (c) 1.2 3 (c)
F SR 3.3.1.1.2 SR 3.3.1.1.3 SR 3.3.1.1.8 SR 3.3.1.1.12 SR 3.3.1.1.18 G
SR 3.3.1.1.12 S120% RTP NA
- e. 2-out-of-4 Voter
- f.
OPRM Upscale
- 3.
Reactor Vessel Steam Dome Pressure-High
- 4.
Reactor Vessel Water Level - Low. Level 3
- 5.
Main Steam Isolation Valve-Closure
- 6.
Main Steam Line Radiation - High
- 7.
Drywell Pressure-High 1.2 2
S25% RTP 3 (c) 1.2 1.2 I
1.2 1.2 2
2 8
2 2
(c)
Each APRM channel provides inputs to both trip systems.
Amendment No.//X. W, 151
- d.
Inop G
SR SR SR SR SR SR SR SR SR G
SR SR SR SR SR G
SR SR SR SR SR F
SR SR SR SR H
SR SR SR SR G
SR SR SR SR SR 3.3.1.1.2 3.3.1.1.12 3.3.1.1.17 3.3.1.1.19 3.3.1.1.2 3.3.1.1.8 3.3.1.1.12 3.3.1.1.18 3.3.1.1.20 3.3.1.1.1 3.3.1.1.9 3.3.1.1.10 3.3.1.1.14 3.3.1.1.15 3.3.1.1.1 3.3.1.1.9 3.3.1.1.10 3.3.1.1.14 3.3.1.1.15 3.3.1.1.9 3.3.1.1.14 3.3.1.1.15 3.3.1.1.17 3.3.1.1.1 3.3.1.1.9 3.3.1.1.14 3.3.1.1.15 3.3.1.1.1 3.3.1.1.9 3.3.1.1.10 3.3.1.1.14 3.3.1.1.15 NA NA
< 1113 psig S171.9 inches
- 12V closed s 3.6 X ful1 power ba ckground e 1.88 psig (continued)
I I
3.3-9 FERMI -UNIT 2
Primary Containment Isolation Instrumentation 3.3.6.1 SURVEILLANCE REQUIREMENTS
-- NOTE...------------------------------
- 1.
Refer to Table 3.3.6.1-1 to determine which SRs apply for each Primary Containment Isolation Function.
- 2.
When a channel is placed in an inoperable status solely for performance of required Surveillances, entry into associated Conditions and Required Actions may be delayed for up to:
- a.
2 hours2.314815e-5 days <br />5.555556e-4 hours <br />3.306878e-6 weeks <br />7.61e-7 months <br /> for Function 5.a when testing non-redundant circuitry that results in loss of isolation capability associated with this Function, provided Functions 5.b, 5.c. and 5.e are OPERABLE;
- b.
6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> for Functions 1. 2, 5 (other than non-redundant circuitry of 5.a), and 6, provided the associated Function maintains isolation capability; and
- c.
8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> for Functions 3 and 4, provided the associated Function maintains isolation capability.
SURVEI LLANCE SR 3.3.6.1.1 Perform CHANNEL CHECK.
FREQUENCY 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.6.1.2 Perform CHANNEL FUNCTIONAL TEST.
92 days SR 3.3.6.1.3 Verify the trip unit setpoint.
92 days SR 3.3.6.1.4 Perform CHANNEL CALIBRATION.
I SR 3.3.6.1.5 SR 3.3.6.1.6 Perform LOGIC SYSTEM FUNCTIONAL TEST.
Perform CHANNEL FUNCTIONAL TEST.
18 months 18 months 18 months Amendment No.
X4, 151 FERMI
- UNIT 2 I
3.3-53
Primary Containment Isolation Instrumentation 3.3.6.1 THIS PAGE INTENTIONALLY LEFT BLANK Amendment No. X/#, 151 FERMI - UNIT 2 3.3-54
Primary Containment Isolation Instrumentation 3.3.6.1 Table 3.3.6.1-1 (page I of 4)
Primary Containment Isolation Instrumentation APPLICABLE CONDITIONS MODES OR REQUIRED REFERENCED OTHER CHANNELS FROM SPECIFIED PER TRIP REQUIRED SURVEILLANCE ALLOWABLE FUNCTION CONDITIONS SYSTEM ACTION C.1 REQUIREMENTS VALUE
- 1. Main Steam Line Isolation
- a.
Reactor Vessel Water Level-Low Low Low.
Level 1
- b. Main Steam Line Pressure-Low
- c.
Main Steam Line Flow High
- d. Condenser Pressure High
- e.
Main Steam Tunnel Temperature-High
- f.
Main Steam Line Radiation-High
- g. Turbine Building Area Temperature-High 1,2.3 1.2.3 I,
1.2.3
- 1.
2(a).
3(a) 2 2
2 per MSL 2
1.2.3 2 per trip string 1.2.3 1.2.3 2
4 D
SR SR SR SR SR E
SR SR SR SR SR D
SR SR SR SR SR D
SR SR SR SR SR D
SR SR SR SR SR D
SR SR SR SR D
SR SR SR SR SR 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.4 3.3.6.1.5 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.4 3.3.6.1.5 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.4 3.3.6.1.5 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.4 3.3.6.1.5 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.4 3.3.6.1.5 3.3.6.1.1 3.3.6.1.2 3.3.6.1.4 3.3.6.1.5 3.3.6.1.1 3.3.6.1.2 3.3.6.1.3 3.3.6.1.4 3.3.6.1.5 S24.8 inches S736 psig
< 118.4 psid
- 7.05 psia
- 206°F
- 3.6 x full power background
- 2060F
- h.
Manual Initiation 1.2.3 1 per valve G
SR 3.3.6.1.6 Amendment No. X/',
151 NA (continued)
(a)
Except when bypassed during reactor shutdown or for reactor startup under administrative control.
I 3.3-55 FERMI -UNIT 2