MONTHYEARML23348A3572023-12-14014 December 2023 Application to Revise Technical Specifications to Use Online Monitoring Methodology – Slides and Affidavit for Pre-Submittal Meeting ML22342B2802022-12-28028 December 2022 Issuance of Amendments Adoption of TSTF-580, Provide Exception from Entering Mode 4 with No Operable RHR Shutdown Cooling, Revision 1 ML22104A2222022-05-12012 May 2022 Issuance of Amendments Revise Technical Specifications to Adopt TSTF 554 ML21279A2312021-10-0606 October 2021 Application to Revise Technical Specifications to Adopt TSTF-554, Revise Reactor Coolant Leakage Requirements Using the Consolidated Line-Item Improvement ML21162A2112021-07-0202 July 2021 Issuance of Amendment No. 208 to Adopt Generic Letter 86-10 Standard License Condition for Fire Protection ML21011A0482021-02-0101 February 2021 Issuance of Amendments Adoption of TSTF-566, Revision 0, Revise Actions for Inoperable RHR Shutdown Cooling Subsystems ML20244A0112020-09-28028 September 2020 Issuance of Amendment No. 202 Adopt TSTF-425, Revision 3, Relocate Surveillance Frequencies to Licensee Control- RITSTF Initiative 5b ML19357A0092019-12-31031 December 2019 Redacted - Issuance of Amendment No. 201 Change to the Neutron Absorbing Material Credited in Spent Fuel Pool for Criticality Control ML19308B1072019-12-11011 December 2019 Issuance of Amendments Adoption of Technical Specifications Task Force Traveler TSTF-564, Revision 2, Safety Limit MCPR (Minimum Critical Power Ratio) ML19175A0422019-09-11011 September 2019 Arkansas Units 1 and 2; Grand Gulf, Unit 1; Indian Point 2 and 3; Palisades; River Bend, Unit 1; Waterford Unit 3 - Issuance of Amendments to Adopt TSTF-529, Clarify Use and Application Rules ML18284A3702018-12-20020 December 2018 Renewed Facility Operating License NPF-47 Attachments and Appendices ML16224B0752016-09-19019 September 2016 NRC Response to Request for Interpretation of Technical Specifications RBG-47626, ISFSI - Correction of Technical Specification Typographical Errors2015-10-27027 October 2015 ISFSI - Correction of Technical Specification Typographical Errors ML15195A0612015-09-21021 September 2015 Issuance of Amendment No. 188 Technical Specification Task Force Traveler TSTF-523, Generic Letter 2008-01, Managing Gas Accumulation ML15138A4402015-08-14014 August 2015 Orders Approving Transfer of Facility Operating Licenses and Indirect Transfer, Draft Conforming Amendment, and Safety Evaluation RBG-47600, Request for Interpretation of Technical Specifications2015-08-0404 August 2015 Request for Interpretation of Technical Specifications ML15187A1272015-07-30030 July 2015 Issuance of Amendment Application for Changes to Technical Specification 3.8.1, AC Sources-Operating ML15117A5752015-06-0202 June 2015 Issuance of Amendment No. 186 Heavy Load Movement Over Fuel Assemblies ML14106A1672015-02-27027 February 2015 Issuance of Amendment No. 185, Adopt TSTF-423, Revision 1, Technical Specifications End States, NEDC-32988-A Using Consolidated Line Item Improvement Process ML14192A8312014-12-11011 December 2014 Issuance of Amendment No. 182, Revise Technical Specification 2.1.1, Reactor Core Sls, to Reduce Minimum Reactor Dome Pressure Associated with Critical Power Correlation ML14136A0082014-06-18018 June 2014 Issuance of Amendment No. 181, Revise Technical Specification 3.8.4, DC Sources - Operating SRs 3.8.4.2 and 3.8.4.5 to Add Acceptance Criteria to Address Non-conservative Conditions ML13322A4292014-03-0505 March 2014 Issuance of Amendment No. 180, Request to Adopt TSTF-535, Revision 0, Revise Shutdown Margin Definition to Address Advanced Fuel Designs Consolidated Line Item Improvement Process RBG-47380, Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases2013-07-25025 July 2013 Unit 1, Revisions to the Technical Requirements Manual and the Technical Specification Bases RBG-47350, License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs2013-05-28028 May 2013 License Amendment Request, Changes to Technical Specification 2.1.1, Reactor Core SLs RBG-47345, Supplement to License Amendment Request 2011-052013-03-0808 March 2013 Supplement to License Amendment Request 2011-05 CNRO-2012-00009, Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications2012-11-20020 November 2012 Entergy Responses to Request for Additional Information Regarding Changes to the Quality Assurance Program Manual & Associated Plant Technical Specifications Re Staff Qualifications RBG-47191, Changes to Technical Specification 3.8.1; AC Sources - Operating2011-12-0808 December 2011 Changes to Technical Specification 3.8.1; AC Sources - Operating RBG-47163, Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For..2011-07-27027 July 2011 Supplement to License Amendment Request Application for Technical Specification Changes Technical Specification Task Force (TSTF) Improved Standard Technical Specification Change Traveler, TSTF-427, Allowance For.. RBG-47157, License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation2011-07-27027 July 2011 License Amendment Request, Changes to Technical Specification 3.3.6.1, Primary Containment and Drywell Isolation Instrumentation RBG-47062, Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles2010-08-17017 August 2010 Unit 1, Response to Request for Additional Information on License Amendment Request 2009-05, 24-Month Fuel Cycles ML0933605812009-12-14014 December 2009 Correction of Errors in Amendment Nos. 165 and 166 RBG-46981, Correction of Technical Specification Typographical Errors2009-11-30030 November 2009 Correction of Technical Specification Typographical Errors ML0901301612009-01-23023 January 2009 Issuance of Amendment No. 161, Revise Technical Specification Surveillance Requirements Consistent with TSTF-475, Revision 1, Control Rod Notch Surveillance Frequency ML0802802302008-02-28028 February 2008 License and Technical Specification Pgs, Amendment No. 159, Revision of Required Wattage in TS 5.5.7.e, Ventilation Filter Testing Program for Control Room Fresh Air System Heater ML0804402932008-01-25025 January 2008 License Amendment Request, Main Turbine Bypass System ML0722200262007-08-30030 August 2007 Tech Spec Page for Amendment 153 Changes to the Analytical Methods Referenced in Technical Specification 5.6.5, Core Operating Limits Report (Colr) ML0709204582007-05-0303 May 2007 Tech Spec Page for Amendment 152 Leakage Rate Testing Containment Purge Valves RBG-46552, License Amendment Request, Leakage Rate Testing of Containment Purge Valves2006-09-19019 September 2006 License Amendment Request, Leakage Rate Testing of Containment Purge Valves ML0613802362006-05-17017 May 2006 Technical Specifications, Removal of Temp Note to Loss of Power ML0606004262006-02-0909 February 2006 Technical Specifications Pages Re Additional Extension of Appendix J, Type a Integrated Leakage Rate Test Interval RBG-46510, License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements2005-12-19019 December 2005 License Amendment Request Removal of Temporary Note to Loss of Power Instrumentation Requirements ML0529800692005-10-0707 October 2005 Tech Spec Pages for Amendment 148 Regarding Technical Specifications 3.8.4 Actions for Inoperable Battery Charger ML0527303232005-09-15015 September 2005 Tech Spec Page for Amendment 147 Regarding Corrections to Loss of Power Instrumentation Requirements RBG-46474, License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements2005-08-31031 August 2005 License Amendment Request Re Corrections to Loss of Power Instrumentation Requirements ML0526303962005-08-25025 August 2005 Tech Spec Pages for Amendment 146 Regarding End-of-Cycle Recirculation Pump Trip Instrumentation ML0515200962005-05-25025 May 2005 Technical Specifications, Eliminate Requirements to Provide Monthly Operating Reports and Occupational Radiation Exposure Reports RBG-46404, License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval2005-03-0808 March 2005 License Amendment Request LAR 2005-01, One-time Extension of the Integrated Leak Rate Test Interval ML0432101302004-10-15015 October 2004 Technical Specifications, Delete Shield Building Annulus Mixing System Technical Specification ML0432101402004-10-15015 October 2004 Technical Specification Pages Re One-Time Extension of Drywell Bypass Leakage Rate Test Interval ML0427902222004-10-0404 October 2004 Technical Specification Pages, Amendment Elimination of Requirements for Hydrogen Recombiners and Change of Requirements for Hydrogen and Oxygen Monitors 2023-12-14
[Table view] |
Text
D.
The licensee shall fully implement and maintain in effect all provisions of the Commission-approved physical security, guard training and qualification, and safeguards contingency plans including amendments made pursuant to the provisions of the Miscellaneous Amendments and Search Requirements revisions to 10 CFR 73.55 (51 FR 27817 and 27822) and to the authority of 10 CFR 50.90 and 10 CFR 50.54(p). The plans, which contain Safeguards Information protected under 10 CFR 73.21, are entitled: "River Bend Station Security Plan," with revisions submitted through May 25, 1995; "River Bend Station Guard Training and Qualification Plan,* with revisions submitted through December 3, 1993; and 'River Bend Station Contingency Plan,* with revisions submitted through August 17, 1990.
Changes made in accordance with 10 CFR 73.55 shall be implemented in accordance with the schedule set forth therein.
E.
Except as otherwise provided in the Technical Specifications or Environmental Protection Plan, EOI shall report any violations of the requirements contained in Section 2, Items C.(1); C.(3) through (9); and C.(11) through (16) of this license in the following manner: initial notification shall be made within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> to the NRC Operations Center via the Emergency Notification System with written followup within 60 days in accordance with the procedures described in 10 CFR 50.73(b),
(c) and (e).
F.
The licensee shall have and maintain financial protection of such type and in such amounts as the Commission shall require in accordance with Section 170 of the Atomic Energy Act of 1954, as amended, to cover public liability claims.
G.
This license is effective as of the date of issuance and shall expire at midnight on August 29, 2025.
FOR THE NUCLEAR REGULATORY COMMISSION Original signed by Harold R. Denton, Director Office of Nuclear Reactor Regulation
Enclosures:
- 1. Attachments 1-5
- 2. Appendix A -
Technical Specifications (NUREG-1172)
- 3. Appendix B - Environmental Protection Plan
- 4. Appendix C - Antitrust Conditions Date of Issuance: November 20, 1985 Revised: December 16, 1993 Amendment No. 70 79 85 119, 135
Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.2 Annual Radiological Environmental Operating Report (continued) results are not available for inclusion with the report, the report shall be submitted noting and explaining the reasons for the missing results. The missing data shall be submitted in a supplementary report as soon as possible.
5.6.3 Radioactive Effluent Release Report The Radioactive Effluent Release Report covering the operation of the unit during the previous calendar year shall be submitted by May I of each year. The report shall include a summary of the quantities of radioactive liquid and gaseous effluents and solid waste released from the unit. The material provided shall be consistent with the objectives outlined in the ODCM and process control program and in conformance with 10 CFR 50.36a and 10 CFR 50, Appendix I, Section IV.B.1.
5.6.4 Monthly OCerating Reports Routine reports of operating statistics and shutdown experience shall be submitted on a monthly basis no later than the 15th of each month following the calendar month covered by the report.
5.6.5 CORE OPERATING LIMITS REPORT (COLR)
- a.
Core operating limits shall be established prior to each reload cycle, or prior to any remaining portion of a reload cycle, and shall be documented in the COLR for the following:
- 1)
LCO 3.2.1, Average Planar Linear Heat Generation Rate (APLHGR),
- 2)
LCO 3.2.2, Minimum Critical Power Ratio (MCPR)(including power and flow dependent limits).
- 3)
LCO 3.2.3, Linear Heat Generation Rate (LHGR)(including power and flow dependent limits).
- 4)
LCO 3.2.4, Fraction of Core Boiling Boundary (FCBB)
- 5)
LCO 3.3.1.1, RPS Instrumentation (RPS), Function 2.b
- 6)
LCO 3.3.1.3, Periodic Based Detection System (PBDS)
- b.
The analytical methods used to determine the core operating limits shall be those previously reviewed and approved by the NRC, specifically those described in the following documents.
(continued)
RIVER BEND 5.-1 8 Amendment No. 81 100 106 122,135