ML061500252
| ML061500252 | |
| Person / Time | |
|---|---|
| Site: | Clinton |
| Issue date: | 05/26/2006 |
| From: | Office of Nuclear Reactor Regulation |
| To: | |
| Jabbour K, NRR/DLPM, 415-1496 | |
| Shared Package | |
| ML061160210 | List: |
| References | |
| TAC MC3035 | |
| Download: ML061500252 (1) | |
Text
Inverters-Operating 3.8.7 3.8 ELECTRICAL POWER SYSTEMS 3.8.7 Inverters-Operating LCO
3.8.7 APPLICABILITY
The Division 1, 2, 3,,and 4 inverters, and A and B RPS solenoid bus inverters shall be OPERABLE.
MODES 1, 2, and 3.
ACTIONS
NOTE-----------------------------------
Enter applicable Conditions and Required Actions of LCO 3.8.9, 'Distribution Systems -Operating,"
with any uninterruptible AC bus de-energized.
CONDITION REQUIRED ACTION COMPLETION TIME A.
Division 1 or 2 A.1 Restore Division 1 7 days inverter inoperable, and 2 inverters to OPERABLE status.
B.
One or more Division 3 B.1 Dpclare High Pressure Immediately or 4 inverters' Core SpraySystem inoperable.
C.
One RPS solenoid bus C.1.1 Transfer RPS bus to 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> in ertr.nopera le......
alternate-power--
source.
AND C.1.2 Verify RPS bus Supply Once per 8 hours9.259259e-5 days <br />0.00222 hours <br />1.322751e-5 weeks <br />3.044e-6 months <br /> frequency:
57 Hz.
thereafter OR 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> C.2 De-energize RPS bus.
(continued)
I CLINTON 3.8-34 Amendment No. 1 74