Technical Specifications, Revising TS 3.5.2.6 and 3.5.3.6 to Accommodate the Replacement of the Reactor Building Emergency Sump Suction Inlet Trash Racks and Screens with Strainers
ML053110044
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 11/01/2005
From: Olshan L
NRC/NRR/ADRO/DORL/LPLC
To: Rosalyn Jones
Duke Energy Corp
Olshan L N, NRR/DLPM, 415-1419
Shared Package
ML052970262 List:
References
+KBR1SISP20060130, TAC MC8125, TAC MC8126
Download: ML053110044 (2)


Text

HPI 3.5.2 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.2.3 Verify each HPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing Program required developed head.

SR 3.5.2.4 Verify each HPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.5.2.5 Verify each HPI pump starts automatically on 18 months an actual or simulated actuation signal.

S R 3.5.2.6 Verify, by visual inspection, each HPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers show no evidence of structural distress or abnormal corrosion.

SR 3.5.2.7 Cycle each HPI discharge crossover valve and 18 months LPI-HPI flow path discharge valve.

O CO N EE U NITS 1 AND 2 3.5.2-5 Amendment Nos. 348/3501

LPI 3.5.3 SURVEILLANCE REQUIREMENTS (continued)

SURVEILLANCE FREQUENCY SR 3.5.3.2 ------------------ NOTE-------------------------

Not applicable to operating LPI pump(s).

Vent each LPI pump casing. 31 days SR 3.5.3.3 Verify each LPI pump's developed head at the In accordance with the test flow point is greater than or equal to the Inservice Testing required developed head. Program SR 3.5.3.4 Verify each LPI automatic valve in the flow 18 months path that is not locked, sealed, or otherwise secured in position, actuates to the correct position on an actual or simulated actuation signal.

SR 3.5.3.5 Verify each LPI pump starts automatically on 18 months an actual or simulated actuation signal.

SR 3.5.3.6 Verify, by visual inspection, each LPI train 18 months reactor building sump suction inlet is not restricted by debris and suction inlet strainers I show no evidence of structural distress or abnormal corrosion.

OCONEE UNITS 1 AND 2 3.5.3-3 Amendment Nos. 348/350