Technical Specifications, Revision of the Allowable Value for Emergency Feedwater Initiation and Control Function
ML060170321
Person / Time
Site: Arkansas Nuclear Entergy icon.png
Issue date: 01/13/2006
From: Holland D
Plant Licensing Branch III-2
To: Forbes J
Entergy Operations
Holland D, NRR/DLPM, 415-1436
Shared Package
ML060130643 List:
References
TAC MC9437
Download: ML060170321 (2)


Text

EFIC System Instrumentation 3.3.11 CONDITION REQUIRED ACTION COMPLETION TIME E. Required Action and E.1 Reduce THERMAL 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time POWER to s 10% RTP.

not met for Function 1.a or 1.d.

F. Required Action and F.1 Be in MODE 3.

6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> associated Completion Time not met for AND Functions 1.c, 2, or 3.

F.2 Reduce steam generator 12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> pressure to < 750 psig.

SURVEILLANCE REQUIREMENTS


NOTE----------------------------------------------------------

Refer to Table 3.3.11-1 to determine which SRs shall be performed for each EFIC Function.

SURVEILLANCE FREQUENCY SR 3.3.11.1 Perform CHANNEL CHECK.

12 hours1.388889e-4 days <br />0.00333 hours <br />1.984127e-5 weeks <br />4.566e-6 months <br /> SR 3.3.11.2 Perform CHANNEL FUNCTIONAL TEST.(Notes 1 & 2) 31 days SR 3.3.11.3 Perform CHANNEL CALIBRATION.(Notesl& 2) 18 months The following notes apply only to the SG Level - Low function:

Note 1:

If the as-found channel setpoints are conservative with respect to the Allowable Value but outside their predefined as-found acceptance criteria band, then the channel shall be evaluated to verify that it is functioning as required before returning the channel to service. If the as-found instrument channel setpoints are not conservative with respect to the Allowable Value, the channel shall be declared inoperable.

Note 2:

The instrument channel setpoint(s) shall be reset to a value that is equal to or more conservative than the Limiting Trip Setpoint; otherwise, the channel shall be declared inoperable. The Limiting Trip Setpoint and the methodology used to determine the Limiting Trip Setpoint and the predefined as-found acceptance criteria band are specified in the Bases.

I I

ANO-1 3.3.11-2 Amendment No. 245, 227

EFIC System Instrumentation 3.3.11 Table 3.3.11-1 Emergency Feedwater Initiation and Control System Instrumentation APPLICABLE MODES OR FUNCTION OTHER SPECIFIED REQUIRED SURVEILLANCE ALLOWABLE CONDITIONS CHANNELS REQUIREMENTS VALUES

1. EFW Initiation
a.

Loss of MFW Pumps (Control Oil Pressure) 2 10% RTP 4

SR 3.3.11.1 SR 3.3.11.2 SR 3.3.11.3 2 55.5 psig

b.

SG Level - Low

c. SG Pressure - Low 1,2,3 1,2,3(a) 4 per SG 4 per SG SR 3.3.1 1.1 SR 3.3.11.2 SR 3.3.11.3 SR 3.3.11.1 SR 3.3.11.2 SR 3.3.11.3 2 9.34 inchescd

Ž 584.2 psig I

d.

RCP Status 2 10% RTP 4

SR 3.3.1 1.1 SR 3.3.11.2 NA

2. EFW Vector Valve Control
a.

SG Pressure - Low 1,2,3(a) 4 per SG SR 3.3.1 1.1 SR 3.3.11.2 SR 3.3.11.3 2 584.2 psig

b.

SG Differential Pressure - High 1,2,3(a) 4 SR 3.3.1 1.1 SR 3.3.11.2 SR 3.3.11.3

< 150 psid

3.

Main Steam Line Isolation

a.

SG Pressure - Low 1,23 3(a)(b) 4 per SG SR 3.3.1 1.1 SR 3.3.11.2 SR 3.3.11.3 2 584.2 psig (a) When SG pressure > 750 psig.

(b) Except when all associated valves are closed and deactivated.

(c) The SG Level - Low "Limiting Trip Setpoint" in accordance with NRC letter dated September 7, 2005, Technical Specification ForAddressing Issues Related To Setpoint Allowable Values, is 2 10.42 inches.

(d) Includes an actuation time delay of ' 10.4 seconds.

ANO-1 3.3.11-3 Amendment No. 245, 227