Technical Specifications, Transition to Westinghouse Fuel and Minimum Critical Power Ratio Safety Limits
ML060970519
Person / Time
Site: Dresden, Quad Cities  Constellation icon.png
Issue date: 04/04/2006
From:
Plant Licensing Branch III-2
To:
Banerjee M, NRR/ADPT, 415-2277
References
TAC MC7323, TAC MC7324, TAC MC7325, TAC MC7326
Download: ML060970519 (10)


Text

Control Rod Scram Times 3.1.4 Table 3.1.4-1 (page 1 of 1)

Control Rod Scram Times


NOTES -----------------------------------

1. OPERABLE control rods with scram times not within the limits of this Table are consi-dered -"slow."
2. Enter applicable Conditions and Required Actions of LCO 3.1.3, "Control Rod OPERABILITY," for control rods with scram times > 7 seconds to 90%

insertion. These control rods are inoperable, in accordance with SR 3.1.3.4, and are not considered "slow."

SCRAM TIMES(a)(b)(seconds) when REACTOR STEAM DOME PERCENT INSERTION PRESSURE 2 800 psig I 5 0.48 20 0.89 50 1.98 90 3.44 (a) Maximum scram time from fully withdrawn position based on de-energization of scram pilot valve solenoids at time zero.

(b) Scram times as a function of reactor steam dome pressure when < 800 psig are within established limits.

Dresden 2 and 3 3.1 .4-3 Amendment No. 220/211

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manual valve in 31 days the flow path that is not locked, sealed, or otherwise secured in position is in the correct position, or can be aligned to the correct position.

SR 3.1.7.7 Verify each pump develops a flow rate In accordance 2 40 gpm at a discharge pressure with the 2 1275 psig. Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem from 24 months on a pump into reactor pressure vessel. STAGGERED TEST BASIS SR 3.1.7.9 Verify all heat traced piping between 24 months storage tank and pump suction is unblocked.

AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after piping temperature is restored within the limits of Figure 3.1.7-2 SR 3.1.7.10 Verify sodium pentaborate enrichment is Prior to

> 30.0 atom percent B-10. addition to SLC tank Dresden 2 and 3 3 .1.7-3 Amendment No. 220/211

Design Features 4.0 4.0 DESIGN FEATURES 4.1 Site Location 4.1.1 Site and -E llusionifAffa--B6nddr-fes -

The site area boundary follows the Illinois River to the north, the Kankakee River to the east, a country road from Divine extended eastward to the Kankakee River on the south, and the Elgin, Joliet, and Eastern Railway right-of-way on the west. The exclusion area boundary shall be an 800 meter radius from the centerline of the reactor vessels.

4.1.2 Low Population Zone The low population zone shall be a five mile radius from the centerline of the reactor vessels.

4.2 Reactor Core 4.2.1 Fuel Assemblies The reactor shall contain 724 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide (UO2) as fuel material. The assemblies may contain water rods or other assembly bypass channels. Limited substitutions of Zircaloy, ZIRLO, or stainless steel filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used. Fuel assemblies shall be limited to those fuel designs that have been analyzed with NRC staff approved codes and methods and have been shown by tests or analyses to comply with all safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.

4.2.2 Control Rod Assemblies The reactor core shall contain 177 cruciform shaped control rod assemblies. The control material shall be boron carbide and hafnium metal as approved by the NRC.

(continued)

Dresden 2 and 3 4 .0-1 Amendment No. 2 2 0 / 21 1

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)

9. ANF-89-98(P)(A), Generic Mechanical Design Criteria for BWR Fuel Designs.
10. ANF-91-048(P)(A), Advanced Nuclear Fuels Corporation Methodology for Boiling Water Reactors EXEM BWR Evaluation Model.
11. Commonwealth Edison Company Topical Report NFSR-0091, "Benchmark of CASMO/MICROBURN BWR Nuclear Design Methods."
12. EMF-85-74(P), RODEX2A (BWR) Fuel Rod Thermal Mechanical Evaluation Model.
13. NEDE-224011-P-A, "General Electric Standard Application for Reactor Fuel (GESTAR)."
14. NEDC-32981P, "GEXL96 Correlation for ATRIUM 9B Fuel,"

September 2000.

15. NEDO-32465-A, "BWR Owners' Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
16. CENPD-300-P-A, "Reference Safety Report for Boiling Water Reactor Reload Fuel."
17. WCAP-16081-P-A, "10xlb SVEA Fuel Critical Power Experiments and CPR Correlation: SVEA-96 Optima2."
18. WCAP-15682-P-A, "Westinghouse BWR ECCS Evaluation Model: Supplement 2 to Code Description, Qualification and Application."
19. WCAP-16078-P-A, "Westinghouse BWR ECCS Evaluation Model: Supplement 3 to Code Description, Qualification and Application to SVEA-96 Optima2 Fuel."
20. WCAP-15836-P-A, "Fuel Rod Design Methods for Boiling Water Reactors - Supplement 1."

(continued)

Dresden 2 and 3 5.6 -4 Amendment No. 220/211

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)

21. WCAP-15942-P-A, "Fuel Assembly Mechanical Design Methodology for Boiling Water Reactors, Supplement 1 to CENPD-287-P-A."
22. CENPD-390-P-A, "The Advanced PHOENIX and POLCA Codes for Nuclear Design of Boiling Water Reactors."

The COLR will contain the complete identification for each of the TS referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).

c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

5.6.6 Post Accident Monitoring (PAM) Instrumentation Report When a report is required by Condition B or F of LCO 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

Dresden 2 and 3 5.6- 5 Amendment No. 220/211

Control Rod Scram Times 3.1.4 Table 3.1.4-1 (page 1 of 1)

Control Rod Scram Times


NOTES------------------------------------

1. OPERABLE control rods with scram times not within the limits of this Table are considered "slow."
2. Enter applicable Conditions and Required Actions of LCO 3.1.3, "Control Rod OPERABILITY." for control rods with scram times > 7 seconds to 90%

Insertion. These control rods are inoperable, in accordance with SR 3.1.3.4, and are not considered "slow."

SCRAM TIMES(a)(b) (seconds) when REACTOR STEAM DOME PERCENT INSERTION PRESSURE 2 800 psig I 5 0.48 20 0.89 50 1.98 90 3.44 (a) Maximum scram time from fully withdrawn position based on de-energization of scram pilot valve solenoids at time zero.

(b) Scram times as a function of reactor steam dome pressure when

< 800 psig are within established limits.

Quad Cities 1 and 2 3.1.4- 3 Amendment No. 231/227

SLC System 3.1.7 SURVEILLANCE REQUIREMENTS SURVEILLANCE FREQUENCY SR 3.1.7.6 Verify each SLC subsystem manual valve in 31 days the flow path that is not locked, sealed, or otherwise secured in position is in the correct position, or can be aligned to the correct position.

SR 3.1.7.7 Verify each pump develops a flow rate In accordance

> 40 gpm at a discharge pressure with the 2 1275 psig. Inservice Testing Program SR 3.1.7.8 Verify flow through one SLC subsystem from 24 months on a pump into reactor pressure vessel. STAGGERED TEST BASIS SR 3.1.7.9 Verify all heat traced piping between 24 months storage tank and pump suction is unblocked.

AND Once within 24 hours2.777778e-4 days <br />0.00667 hours <br />3.968254e-5 weeks <br />9.132e-6 months <br /> after piping temperature is restored within the limits of Figure 3.1.7-2 SR 3.1.7.10 Verify sodium pentaborate enrichment is Prior to

> 30.0 atom percent B-10. addition to SLC tank Quad Cities 1 and 2 3.1. 7-3 Amendment No. 231/227

Design Features 4.0 4.0 DESIGN FEATURES 4.1 Site Location 4;l.1 Site and ExclUsldn Area The site consists of approximately 784 acres on the east bank of the Mississippi River opposite the mouth of the Wapsipinicon River, approximately three miles north of the village of Cordova, Rock Island County, Illinois. The exclusion area shall not be less than 380 meters from the centerline of the chimney.

4.1.2 Low Population Zone The low population zone shall be a three mile radius from the centerline of the chimney.

4.2 Reactor Core 4.2.1 Fuel Assemblies The reactor shall contain 724 fuel assemblies. Each assembly shall consist of a matrix of Zircaloy clad fuel rods with an initial composition of natural or slightly enriched uranium dioxide (U02) as fuel material. The assemblies may contain water rods or other assembly bypass channels. Limited substitutions of Zircaloy or ZIRLO filler rods for fuel rods, in accordance with approved applications of fuel rod configurations, may be used.

Fuel assemblies shall be limited to those fuel designs that have been analyzed with NRC staff approved codes and methods and have been shown by tests or analyses to comply with all safety design bases. A limited number of lead test assemblies that have not completed representative testing may be placed in nonlimiting core regions.

4.2.2 Control Rod Assembliles The reactor core shall contain 177 cruciform shaped control rod assemblies. The control material shall be boron carbide and hafnium metal as approved by the NRC.

(continued)

Quad Cities l and 2 4.0-1 Amendment No. 231/227

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)

10. Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors/Advanced Nuclear Fuels Corporation Critical Power Methodology for Boiling Water Reactors: Methodology for Analysis of Assembly Channel Bowing Effects/NRC Correspondence, ANF-524(P)(A).
11. COTRANSA 2: A Computer Program for Boiling Water Reactor Transient Analyses, ANF-913(P)(A).
12. Advanced Nuclear Fuels Corporation Methodology for Boiling Water Reactors EXEM BWR Evaluation Model, ANF-91-048(P)(A).
13. Commonwealth Edison Topical Report NFSR-0091, "Benchmark of CASMO/MICROBURN BWR Nuclear Design Methods."
14. ANFB Critical Power Correlation Application for Coresident Fuel, EMF-1125(P)(A).
15. EMF-85-74(P), RODEX2A(BWR) Fuel Rod Thermal Mechanical Evaluation Model, Supplement 1(P)(A) and Supplement 2 (P)(A), Siemens Power Corporation, February 1998.
16. NEDC-3298IP, "GEXL96 Correction for ATRIUM 9B Fuel."
17. NEDO-32465-A, "BWR Owners' Group Reactor Stability Detect and Suppress Solutions Licensing Basis Methodology for Reload Applications," August 1996.
18. CENPD-300-P-A, "Reference Safety Report for Boiling Water Reactor Reload Fuel."
19. WCAP-16081-P-A, "lOxlO SVEA Fuel Critical Power Experiments and CPR Correlation: SVEA-96 Optima2."
20. WCAP-15682-P-A, "Westinghouse BWR ECCS Evaluation Model: Supplement 2 to Code Description, Qualification and Application."
21. WCAP-16078-P-A, "Westinghouse BWR ECCS Evaluation Model: Supplement 3 to Code Description, Qualification and Application to SVEA-96 Optima2 Fuel."

(continued)

Quad Cities I and 2 5.6-4 Amendment No. 231/227

Reporting Requirements 5.6 5.6 Reporting Requirements 5.6.5 CORE OPERATING LIMITS REPORT (COLR) (continued)

22. WCAP-15836-P-A, "Fuel Rod Design Methods for Boiling Water Reactors - Supplement 1."
23. WCAP-15942-P-A, "Fuel Assembly Mechanical Design Methodology for Boiling Water Reactors, Supplement 1 to CENPD-287-P-A."
24. CENPD-390-P-A, "The Advanced PHOENIX and POLCA Codes for Nuclear Design of Boiling Water Reactors."

The COLR will contain the complete identification for each of the TS referenced topical reports used to prepare the COLR (i.e., report number, title, revision, date, and any supplements).

c. The core operating limits shall be determined such that all applicable limits (e.g., fuel thermal mechanical limits, core thermal hydraulic limits, Emergency Core Cooling Systems (ECCS) limits, nuclear limits such as SDM, transient analysis limits, and accident analysis limits) of the safety analysis are met.
d. The COLR, including any midcycle revisions or supplements, shall be provided upon issuance for each reload cycle to the NRC.

5.6.6 Post Accident Monitoring (PAM) Instrumentation Report When a report is required by Condition B or F of LCO 3.3.3.1, "Post Accident Monitoring (PAM) Instrumentation," a report shall be submitted within the following 14 days. The report shall outline the preplanned alternate method of monitoring, the cause of the inoperability, and the plans and schedule for restoring the instrumentation channels of the Function to OPERABLE status.

quad Cities I and 2 5.6-5 Amendment No. 231/227