ML061500174
| ML061500174 | |
| Person / Time | |
|---|---|
| Site: | Diablo Canyon |
| Issue date: | 05/26/2006 |
| From: | Plant Licensing Branch III-2 |
| To: | |
| Wang A | |
| Shared Package | |
| ML061280555 | List: |
| References | |
| TAC MC8880, TAC MC8881 | |
| Download: ML061500174 (1) | |
Text
Unit Staff Qualifications 5.3 5.0 ADMINISTRATIVE CONTROLS 5.3 Unit Staff Qualifications 5.3.1 Each member of the plant staff shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1978 for comparable positions, with the following exceptions:
- a.
The radiation protection manager shall meet or exceed the minimum qualifications of Regulatory Guide 1.8, Revision 2, April 1987 for radiation protection manager.
- b.
The operations manager shall meet or exceed the minimum qualifications as specified in TS 5.2.2.e.
- c.
The licensed Reactor Operators (ROs) and Senior Reactor Operators (SROs) shall meet or exceed the minimum qualifications of ANSI/ANS 3.1-1993 as endorsed by Regulatory Guide 1.8, Revision 3, May 2000 with the exceptions clarified in the current revision to the Operator Ucensing Examination Standards for Power Reactors, NUREG-1021, ES-202.
5.3.2 For the purpose of 10 CFR 55.4. a licensed SRO and a licensed RO are those Individuals who, In addition to meeting the requirements of TS 5.3.1. perform the functions described In 10 CFR 50.54(m).
DIABLO CANYON - UNITS 1 & 2 5.0-4 Unit I - Amendment No. 45,4146, 1 8 7 Unit 2 - Amendment No. 435,445, 1 8 9