Search by property

Jump to navigation Jump to search

This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.

Search by property

A list of all pages that have property "Title" with value "Submit First Year Operation Report". Since there have been only a few results, also nearby values are displayed.

â§Ľshowingresultsâ§˝

View (previous 50 | next 50) (20 | 50 | 100 | 250 | 500)


    

List of results

  • ML19031A733  + (Submit Artificial Island Radiological Environmental Monitoring Program for Period of December 11 to December 31, 1976)
  • ML18227B521  + (Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed)
  • ML18227B007  + (Submit Attachment a, Technical Specification Changes Pages & Attachment B for Valve Test Program, Pump Test Program, & Inservice Inspection Program)
  • ML18227B009  + (Submit Attachment a, Technical Specification Changes Pages, & Attachment B & B-1 for Revised Pump & Valve Test Program)
  • ML18227B006  + (Submit Attachment a, Technical Specification Change Pages)
  • ML19098B396  + (Submit Attachments, Remedial Program for U-Bend Cracking & Preventive Plugging Actions & Rationale to Address Question of Steam Generator Tube Integrity & Present Basis for Continued Operation of Unit 1)
  • ML18227A990  + (Submit Beyond the Crises, Annual Report 1976)
  • ML18228A259  + (Submit Binders Representing Secondary Financial Protection Under Nuclear Energy Liability Insurance Association (Nelia))
  • NOC-AE-000494, Submit Change QA-040 to Rev 13 of Operations QA Plan. Change Consolidates NDE Function,Which Previously Resided within Quality Organization,With Reliability Engineering Organization in Systems Engineering  + (Submit Change QA-040 to Rev 13 of Operations QA Plan. Change Consolidates NDE Function,Which Previously Resided within Quality Organization,With Reliability Engineering Organization in Systems Engineering)
  • ML20134H048  + (Submit Comments Re Factual Correctness of Draft Rept by Impep Team for Radioactive Matls Program)
  • ML19030A742  + (Submit Completed Questionnaire on Diesel Generators)
  • ML18227D105  + (Submit Containment Structure Post-Tensioning System, Third Year Surveillance Report)
  • ML18227A940  + (Submit Cooling Canal System Quarterly Progress Report No. 13 Covering for Period of 1/1 Thru 3/31/1975, Which Was Due in April, Apologize for Delay. Report No. 14 Will Be Submitted by July 10 as Requested)
  • ML18227E198  + (Submit Drift Data Acquired on Mechanical Salt Water Cooling Devices)
  • ML18227E209  + (Submit Ecological Monitoring of Selected Parameters at the Turkey Point Plant, Annual Report, 1977)
  • ML18227E208  + (Submit Ecological Monitoring of Selected Parameters at the Turkey Point Plant, Semiannual Report, January - June 1977)
  • ML18228A257  + (Submit Endorsements Representing Secondary Financial Protection Under Maelu for Plants)
  • ML18227A958  + (Submit Environmental Monitoring Report No. 11, January 1, 1978 Through June 30, 1978)
  • ML18227A957  + (Submit Environmental Monitoring Report No. 10, January 1, 1977 Through December 31, 1977)
  • ML18227B172  + (Submit Environmental Report)
  • ML19030B516  + (Submit Environmental Technical Specification as Requested)
  • ML18348A384  + (Submit Exxon Nuclear Company, Inc. Documents in Support of Application for Power Increase to 2638 Mwt & Full-Term License)
  • ML18227A991  + (Submit Financial & Statistical Report, Supplement to 1976 Annual Report)
  • ML18347A528  + (Submit First Annual Report of Operation, Covering Period of January 1 Through December 31, 1975)
  • ML18219E086  + (Submit First Supplement Dated 3/8/1976 to Startup Test Report Which Covers Startup Test Report Sec. 7.5.1 Shutdown from Hot Shutdown Panel)