Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19031A733 + (Submit Artificial Island Radiological Environmental Monitoring Program for Period of December 11 to December 31, 1976)
- ML18227B521 + (Submit Attachment a, Annual Hourly Percent Frequency of Vertical and Horizontal Stability Categories by Wind Direction and Wind Speed)
- ML18227B007 + (Submit Attachment a, Technical Specification Changes Pages & Attachment B for Valve Test Program, Pump Test Program, & Inservice Inspection Program)
- ML18227B009 + (Submit Attachment a, Technical Specification Changes Pages, & Attachment B & B-1 for Revised Pump & Valve Test Program)
- ML18227B006 + (Submit Attachment a, Technical Specification Change Pages)
- ML19098B396 + (Submit Attachments, Remedial Program for U-Bend Cracking & Preventive Plugging Actions & Rationale to Address Question of Steam Generator Tube Integrity & Present Basis for Continued Operation of Unit 1)
- ML18227A990 + (Submit Beyond the Crises, Annual Report 1976)
- ML18228A259 + (Submit Binders Representing Secondary Financial Protection Under Nuclear Energy Liability Insurance Association (Nelia))
- NOC-AE-000494, Submit Change QA-040 to Rev 13 of Operations QA Plan. Change Consolidates NDE Function,Which Previously Resided within Quality Organization,With Reliability Engineering Organization in Systems Engineering + (Submit Change QA-040 to Rev 13 of Operations QA Plan. Change Consolidates NDE Function,Which Previously Resided within Quality Organization,With Reliability Engineering Organization in Systems Engineering)
- ML20134H048 + (Submit Comments Re Factual Correctness of Draft Rept by Impep Team for Radioactive Matls Program)
- ML19030A742 + (Submit Completed Questionnaire on Diesel Generators)
- ML18227D105 + (Submit Containment Structure Post-Tensioning System, Third Year Surveillance Report)
- ML18227A940 + (Submit Cooling Canal System Quarterly Progress Report No. 13 Covering for Period of 1/1 Thru 3/31/1975, Which Was Due in April, Apologize for Delay. Report No. 14 Will Be Submitted by July 10 as Requested)
- ML18227E198 + (Submit Drift Data Acquired on Mechanical Salt Water Cooling Devices)
- ML18227E209 + (Submit Ecological Monitoring of Selected Parameters at the Turkey Point Plant, Annual Report, 1977)
- ML18227E208 + (Submit Ecological Monitoring of Selected Parameters at the Turkey Point Plant, Semiannual Report, January - June 1977)
- ML18228A257 + (Submit Endorsements Representing Secondary Financial Protection Under Maelu for Plants)
- ML18227A958 + (Submit Environmental Monitoring Report No. 11, January 1, 1978 Through June 30, 1978)
- ML18227A957 + (Submit Environmental Monitoring Report No. 10, January 1, 1977 Through December 31, 1977)
- ML18227B172 + (Submit Environmental Report)
- ML19030B516 + (Submit Environmental Technical Specification as Requested)
- ML18348A384 + (Submit Exxon Nuclear Company, Inc. Documents in Support of Application for Power Increase to 2638 Mwt & Full-Term License)
- ML18227A991 + (Submit Financial & Statistical Report, Supplement to 1976 Annual Report)
- ML18347A528 + (Submit First Annual Report of Operation, Covering Period of January 1 Through December 31, 1975)
- ML18219E086 + (Submit First Supplement Dated 3/8/1976 to Startup Test Report Which Covers Startup Test Report Sec. 7.5.1 Shutdown from Hot Shutdown Panel)
- ML18227A983 + (Submit First Year Operation Report)
- ML18227A289 + (Submit Florida Power & Light Company, Turkey Point Nuclear Power Plant Unit 4, Containment Structure Post-Tensioning System Third-Year Surveillance Report)
- ML18347A518 + (Submit Formal Report, Evaluation of Palisades Nuclear Plant Main Steam Isolation Valve, to Additional Information Provided on 7/20/1976)
- ML18227B516 + (Submit Fracture Mechanics Evaluation of the Florida Power and Light Company, Turkey Point Unit No. 4 Reactor Pressure Vessel Subjected to Postulated Accident Transients)
- ML19030A708 + (Submit Fracture Toughness & Potential for Lamellar Tearing of Steam Generator & Reactor Coolant Pump Support Materials & Blueprints Which Were Omitted in 12/21/1977 Submission)
- ML19030A706 + (Submit Impingement Monitoring Program Report No. 9 for December 1977 for Salem Unit No. 1)
- ML19030A703 + (Submit Impingement Monitoring Program Report No. 12 for March 1978 for Salem Unit No. 1)
- 05000316/LER-2076-038, Submit LER 1976-038-00, LER 1976-039-00, LER 1976-040-00, LER 1976-041-00, & LER 1976-042-00 + (Submit LER 1976-038-00, LER 1976-039-00, LER 1976-040-00, LER 1976-041-00, & LER 1976-042-00)
- 05000316/LER-2076-048, Submit LER 1976-048-00, LER 1976-049-00, LER 1976-050-00, & LER 1976-051-00 + (Submit LER 1976-048-00, LER 1976-049-00, LER 1976-050-00, & LER 1976-051-00)
- 05000316/LER-2078-001-03, Submit LER 1978-001-03L, LER 1978-009-03L, & LER 1978-023-03L + (Submit LER 1978-001-03L, LER 1978-009-03L, & LER 1978-023-03L)
- 05000280/LER-1978-027, Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria + (Submit LER 78-027/03L-0 Re Seven Snubbers Not Meeting Inspection Criteria)
- ML19093A558 + (Submit Large Break LOCA-ECCS Reanalysis)
- ML19093A510 + (Submit Large Break LOCA-ECCS Reanalysis)
- ML15223B323 + (Submit License Amendment Request - Supplement Proposed Changes to the Technical Specifications to Address Secondary Containment Personnel Access Door Openings)
- 05000272/LER-2076-015-03, Submit License Event Report 1976-015-03L Re Inoperable No. 13 Main Steam Safety Valve + (Submit License Event Report 1976-015-03L Re Inoperable No. 13 Main Steam Safety Valve)
- L-78-191, Submit License Fee Concerning Acceptable Analysis of Unit 3 Beyond 6 Equivalent Months of Operation + (Submit License Fee Concerning Acceptable Analysis of Unit 3 Beyond 6 Equivalent Months of Operation)
- ML19095A273 + (Submit License Renewal Applications for Applicants Who Completed VEPCOs Operator Requalification Program Satisfactorily)
- 05000280/LER-1978-016, Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening + (Submit Licensee Event Report No. LER 78-016/03L-0 Re Valve MOV-RH-100 Was Not Opening)
- 05000280/LER-1978-024, Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste + (Submit Licensee Event Report No. LER 78-024/03L-0 Re No Alarm During a Planned Release of Liquid Radioactive Waste)
- 05000280/LER-1978-001, Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir + (Submit Licensee Event Report No. LER-78-001/03L-0 Re Hydraulic Shock Suppressor Found Inverted with Empty Reservoir)
- 05000280/LER-1978-007, Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98 + (Submit Licensee Event Report No. LER-78-007/03L-0 Re Leak on Body to Bonnet Joint Diaphragm Valve 1-CH-98)
- 05000280/LER-1978-015, Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces + (Submit Licensee Event Report No. LER-78-015/03L-0 Re Valve Cleanliness Inspection Found Foreign Material on Valve Seating Surfaces)
- 05000280/LER-1978-002, Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance + (Submit Licensee Event Report No. LER-78-002/01T-0 Re Additional Radial Peaking Factor Surveillance)
- 05000280/LER-1978-012, Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand + (Submit Licensee Event Report No. LER-78-012/03L-0 Re Inside Recirculation Spray Pump 1-RS-P-1A, Failure to Rotate by Hand)
- 05000280/LER-1978-003, Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24 + (Submit Licensee Event Report No. LER-78-003/03L-0 Re Failed Heat Tracing, Panel 8 Circuit 24)
- 05000280/LER-1978-006, Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping + (Submit Licensee Event Report No. LER-78-006/01T-0 Re Seismically Disqualified Two Pipe Extensions on Fire Protection Yard Piping)