ML18227D105
| ML18227D105 | |
| Person / Time | |
|---|---|
| Site: | Turkey Point |
| Issue date: | 08/25/1975 |
| From: | Robert E. Uhrig Florida Power & Light Co |
| To: | Rusche B Office of Nuclear Reactor Regulation |
| References | |
| Download: ML18227D105 (6) | |
Text
O NRC DISTRIBUTION FOR PART 60 DOCKET MATERIAL (TEMPORARY FORM)
CONTROL NO:
FILE FROM: Florida Power.& Light Co Miami, Pla 8-25-75 8<<29-DATE'OF'DOC DATE REC'D LTR TWX RPT OTHER TO:
Mr~ Benard C. Rusche CC OTHER ORIG-SENT LOCALPDR CLASS UNCLASS PROPINFO INPUT DESC R I PT ION:
Ltr trans the following:
A(CKÃOWLEDGP~D DO NOT RL<'MOVZ<:
NO CYS REC'D ENCLOSURES:
DOCKET NO:
50-251
.(.50 cya enc'I rec'd)
Containment Structure Post-Tensioning System Third Year Surveillance Report PLANT NAME:'Turkey Point 04 FOR ACTION/INFORMATION
" "75 JGB BUTLER (L)
W/ Copies CLARK (L)
W/ Copies PARR (L)
W/ Copies KNIEL(L)
W/ Copies SCHWENCER (L)
W/ Copies STOLZ (L)
W/ Copies VASSALLO (L)
W/ Copies PURPLE (L)
W/ Copies ZIEMANN(L)
W/ Copies DICKER (E)
W/ Copies KNIGHTON (E)
W/ Copies YOUNGBLOOD (E)
W/ Copies BEGAN (E)
I / Copies AR {L)
Wopies SPIES W/ Copies LPM W/
op(es REID(L)
W/
COPIES INTERNALDISTRIBUTION F
C PDR AGC, ROOM P-506A GOSSI CK/STAF F CASE GIAMBUSSO BOYD MOORE (L)
DEYOUNG (L)
SKOVHOLT (L)
GOLLER (L) (Ltr)
P. COLLINS DENISE
~EG OPR FILE @ REGION (2)
MIPC TECH REVIEW SCHROEDER MACCARY KNIGHT PAWLICKI SHAO STE LLO HOUSTON NOVAK ROSS IPPOLITO TEDESCO Z COLLINS LAI NAS BENAROYA VOLLMER DENTON G R IMES gAMMILL KASTNER BALLARD SPANGLER ENVIRO MULLER DICKER KNIGHTON YOUNGBLOOD EGAN PROJECT LDR LIC ASST R. DIGGS {L)
H. GEARIN (L)
E. GOULBOURNE
'. KREUTZER (E)
J. LEE (L)
M. RU383ROOK(L)
S. REED (E}
M. SERVICE (L)
S. SHEPPARD (L)
M. SLATER {E)
SMITH (L)
M TEETS (L)
G. WILLIAMS(E)
V. WILSON (L)
R. INGRAM {L)
M. DUNCAN A/T IND
~
BRAITMAN SALTZMAN (L)
MELTZ PLANS MCDONALD CHAPMAN.
DUBE (Ltr).
E. COUPE PETERSON HARTFIELD (2)
KLECKER EISENHUT WIGGINTON n~
EXTERNALDISTRIBUTION LOCAL PDR Niaml Fla
~- TIC (ABBRNATNY)
(1)(2)(10) NATIONALLABS NSIC (BUCHANAN) 1 W. PENNINGTON, Rm E-201 GT 1 ASLB 1
CONSULTANTS 1 Newton Anderson NEWMARK/BLUME/AGBABIAN
~g(
1 PD R-SAN/LA/NY 1 BROOKHAVENNAT LAB 1 G. ULRIKSON ORNL
il
~
~.
V e
J J
r r g ~ p
~
r i$
n II fP H '4
~g,'I~~
f t
- KETKD, JSNIIg A+II,~Ory FJle Cy.
P 0 SOX OI3100i MIAMIiFLORIDA 33IOI
~M+
JP FLORIDA POWER & LIGHT COMPANY RUggq Igyg~
II.S. MJCIEAR REOULATORT, COINER I SS ION M@I Sodlon Mr. Benard C. Rusche, Dir'ector Office,of Nuclear Reactor Regulation U,
S." Nuclea'r Regulatory Commission washington,
.D.,
C.
20555
Dear Mr. Rusch'e:
August 25, 1975 L'-,75-404 CQ efff It'Q o
<UGH S tele~
11 REOIIRATO+
Wl4g~g Re:
Turkey Point Unit No.
4 (Docket 'No. 50-251)
Contai'nment Structure Post-Te'nsioning System Third'. Year'urv'e'ill'anc'e:'R'eort Enclosed is the subject rep'ort prep'ared.for us by our architect-enginee'r',
Fifty (50) copies're 'transmitted her'ewith for your informati;on, Very tzuly yours, obert E.
Uhx'ig Vice President REU:nch attachment cc:
Mr. Norman C.
Mosel'ey'ack
.R.
New'man, Esquire
'192 HELPING BUILD FLORIDA
%j~
R J
1 C
Mr. Benard C. Rusche, Director Office of Nuclear Reactor Regulation U,
S. Nuclear Regulatory Commission washington, D.
C.
20555'ear ML
. Rusche:
rrii~~i%
FLORIDA POWER IIt LIGHT COMPANY August 25, 1975 L-75-40 I-"'LI'""',"Pg~
@gag oI )gg Re:
Turkey Point Unit No.
4 (Docket No. 50-251)
Containment Structure Post-Tensioning System Thiid'e'a'r" Su~eillanc'e Re 'oit Enclosed is the subj'ect report prepared for us by our architect-
- engineer, Fifty (50) copies are transmitted herewith for your information, Very truly yours,
.r.
Robert E. Uhrig Vice President REU:nch attachment cc:
ML ~.
Norman C. Moseley Jack R.
- Newman, Esquire HELPING SUILO FLORIOA
h
~ 4