ATTACHMENT A Technical Specification change pages.

TABLE 4.1-2 (Sheet 1 of 3)

MINI>IUH FREQUENCIES FOR EQUIPHENT AND SAMPLING TESTS Hax. Time Check ~Fee uenc Between Tests (Days)

1. Reactor Coolant Samples Radiochem. (Tl/2 30 Hin) Hon thly 45 Cl 6 02 5/Week 3 Tritium. Activity Weekly lo Gross g,7 Activity(pCi/cc) 5/Week 3 Boron Concentration 2/Week 5 E Determination Semi-annually 30 Wks
2. Refueling Water Storage Boron Concentration Weekly g 10 Tank Water Sample
3. Boric Acid Tank Boron Concentration 2/Week
4. Boron Injection Tank Boron Concentration Monthlyj'5
5. Control Rods Rod drop times of For all rods at NA all full length rods least once per 18 months and following each removal of the reactor vessel head. For specifically affected individ-ual rods following maintenance on or modification of the control rod drive system which could affect the drop time of those specific rods.

Partial movement of Biweekly while 20 full length rods critical

6. Pressurizer Safety Valves Set Point Each ref'ueling NA (Unit 3 only) shutdown
7. Main Steam Safety Valves Set Point Each refueling NA (Unit 3 only), shutdown
8. Containment Isolation Trip Functioning Each refueling NA shutdown
9. Refueling System Interlocks Functioning Prior to each re-'A fueling
10. Accumulator Boron Concentration At least once per 31 days and within 6 hours6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br /> atter each solution volume in-crease of > 1% of tank volume.g

Unit 3 4.2 REACTOR COOLANT SYS~f IN-SERVICE INSPECTION Applies to pre-operational and in-service structural suzveillance of the reactoz coolant system boundazy.

~OU ective: To assure the continued integrity of the reactor coolant system boundary.

4.2. 1

a. Prior to initial unit operation, a survey, using ultrasonic, visual, and surface techniques, shall be made to establish pre-operational system in-tegrity and establish baseline data.
b. 'Post-operational nondestructive inspections listed in Table 4.2-1 shall be performed as specified. The. results obtained from compliance with this specification shall be evaluated after five years and the conclusions of this evaluation shall be reviewed with the AZC.

t Ce The structural integrity of the reactor coolant system boundary shall be maintained at the level required by the original acceptance standards throughout the life of the unit. .Any evidence as a result of the inspections listed in Table 4.2<<1, that defects have initiated or grown shall be investigated, including evaluation o' comparable areas of the reactor coolant system..

d. Detailed records of each inspection shall be

-maintained to allow comparison and evaluation of future inspections.

'.2 The inspectign interval shall be 10 years.

Unit 3 4. 2-1

Unit 3 4.2.3 The following definitions shall apply to the inspection methods employed in Table 4.2-1.

a. UT Volumetric examination using ultra-sonic techniques p RT - Radiographic examination. Ultrasonic testing is an acceptable alternate for RT.
c. HT - Examination of the component surface using magnetic particle method.
d. PT Examination of the component surface using dye penetrant.
e. V Visual examination directly by the eye or assisted by remote viewing devices equal to or better than direct observation.
f. Code << ASME Section XI 1970 and 1970 Winter Addenda; 4.2.4 Examinations which reveal unacceptable structural defects in a category shall be extended to in-clude an additional number'(or areas) of system components or piping in the same category ap-proximately equal to that in'tially examined.

In the'vent further unacceptable structural defects are revealed, all remaining system com-ponents or piping in the category shall be ex-amined to the extent specified in that exzmin-category. 'tion Unit 3

ThgLE 4.2-1 (Uni.e 3 only)

Extent of Examination Extent of Examinations Examination Components snd Parts (Percent in 10 Year- (Percent in 5 Year Item No. ~coro or To Be Examined Hethod Interval Interval Remarks Reactor Vessel and Closure Nead-lo1 Longitudinal. and circumferential Volumetric Longitudinal - 10Z Longitudinal. - OX In accordance uith shell Melds in core region Circumferential - 5X Circumferential - OZ Section XI of the 1970 hSHE Code 1~ 2 Longitudinal and circumferential Volumetric Longitudinal - 10Z Longitudinal - OZ Ia accordance Mith uclds in shell (other than those of Circumferential >> 5Z Circumferential - OX Section XI of the Category h and C) and meridional 1970 hSHE Code and'ircumferential seam Molds in bottom head and closure head (other than those of Category C) lo3 Vessel-to-flange and head-to- Volumetric 100X 33X flange circumferential welds Nozzle-to-vessel welds and Volume tr ic ~

100X OX In accordance with nozzle-to-vessel inside radiused Section XI of the section 1970 hSHE Code .

1.5 Vessel penetrations, including con- Volumetric OZ OX No meaningful volumetric trol rod drive penetrations and examinations can be per-control rod housing pressure bound- formed on these uelds.

ary Molds 1.6 Vessel penetrations, including ~

Visual 25X. OX The examination Mill be control rod drive penetrations and a visual examination for control rod housing pressure bound- leakage during the system ary Molds hydrostatic test at or near the end of thc ten-year inspection interval.sa

  • The results of these inspections are to be revieMed uith the hEC at the end of 5 years.
  • > CRDH housing and bottom instrument nozzle areas uill bc observed for boric acid crystal deposits during the first re~>>")fne

TABLE 4.2-1 (cont'd) (Unit 3 only)

Extent of Examination Extent of Examination

~ Examination Components and Parts (Percent in 10 Year (Percent in 5 Year ltr llo ~toto or To Bc Exnmfned Method totorr~ot Interval R oorko F Norrles to safe-cnd Melds Volumetric 100X 33X In accordance Mith Section XI of the 1970 hSHE Code C-I Closure studs and nuts Volumetric and 100X 33X Visual or Surface 1.9 Ligsmints betucen threaded stud Volume tric 100X 33X holes

l. 10 Closure uaahers, bushings Visual 100X 33X Pressure retaining bolting Not applicable Not applicable Not applicable
l. 12 Integrally Mclded vessel supports See Remarks See Remarks This inspection is covered by Item 1.4 1.13 Closure head cladding . Visual ancf 6 Patches 3 Patches Surface Vessel cladding Visual 6 Patches 0 Patches 1.15 N Interior surfaces and internals Visual Sce Remarks See.Remarks Items made accessible by and integrally Molded internal the removal of components supports during normal refueling operations Mill be examined nt the first refueling outage and during subsequent refuel-ing outngcs at approximately 3-year intervals.

TABLE 4 ~ 2-1 (cont'd) (Unit 3 Op>y)

Extent of Examination Extent of Examination Examination Components and Parte (Percent in 10 Year (Percent in 5 Year Item No. ~Core or To Se Examined Hotbed 'Int e r vnl Interval Remarks Pressurizer 2.1 Longitudinal and circumferential Sco Remarks See Remarks In accordance uith uelds t Section XI of the 1970 ASHE Code 2e2 Nozzle-to-vessel uelde See Remarks See Remarks Instrument and sample nozzles are included in Item 2.4 2e3 Heater connections See Remarks Sce Remarks These connections are considered in Item 2.4 2.4 E 2 Heater connections and Visual See Remarks See Remarks Visual inspections for instrument nnd sample nozzlca leakage uill be performed on nozzles at each re-fueling.

2.5 rl Pressure retaining bolting Not Applicable Not Applicable 2.6 C-2 Pressure retaining bolting Visual 100X 33X 2.7 H 'ntegrally uclded vessel supports 4 Sea Remarks See Remarks Same as 2el (skirt ueld) 2.8 I-f Vessel cladding Visual 1 Patch . . 0 Patches

~ ho knoun technique piesently exists to examine these uclds (Refer to Code Forcuord page j) ~

TARE 4.2-1 (cont'd) (Unit 3 only)

Extent of Examination Extent of Examination Examination Components and Parts (Percent in 10 Year (Percent in S Year ttes Ãe. ~Cata et To Re Examined Methst Interval Interval Re saks Meet Exel~Nn a~ra Ctsss~Aslld Steam Gener.wturs 3.1 Longltudlna1 and circumferential Volumetric 5X OZ The inspection is limited uelds, including tube-sheet-to- See Remarks See Remarks to the circumferential ueld head or shall uclds on the primary attaching the tube sheet to sic.u the channel head.

3.2 Nozzle-to-vessel head Sea Remarks See Remarks The primary nozzles are ueLds and nozzle-to-head inside cast uith the head. No radiused section inspections are planned 3.3 Nozzle to saf e-end uelds Visual, Surface 25X 8X and volumetric 3.4 Pressure-. retaining bolting Not Applicable Not Applicablo 3.5 C-2 Pressure-retaining bolting Visual 100X 33X 3.6 Integrally-ueldcd vessel supports Not Applicable Not Applicable 3.7 I-2 Vessel cladding Visual I Patch 0 Patches One (1) patch -(36 square inches) in each primary side uill be exa=incd during thc ten-year interval.

ThBLE.4 ~ 2-1 (cont'd) (Un<C 3 pygmy)

Extent of Examination Extent of Examination Examine tion Components and Parts (Percent in 10 Year (Percent in 5 year Item No. ~Care e To Be Examined . Method Interval Interval Remarks Pi in Pressure Bounder 4.1 Vessel, pump and valve safe-ends to Visual and 100X OX This examination covers only primary pipe uelds and safe-ends in Surface and the pressurizer safe-ends.

branch piping uelds Volumetric 4.2 Circumferential and longitudinal Visual and 25X 1) Exception is taken to pipe uelds Volumetric inaccessible uelds

2) Exception is taken to electroslag uelded elbous
3) Exception is taken for socket welds.

4.3 Pressure-retaining bolting Not hpplicable Not hpplicable 4.4 Pressure-retaining bolting Visual 100X 33X 4 ' Integrally-Melded supports Not hpplicable Not hpplicable 4.6 K-2 Piping support and hanger Visual 100X 33X Exception is taken for those supports uhich are not accessible.

Pum Pressure Bounder 5.1 L-1 Pump casing uelds OX OX No meaningful ultrasonic examinations can be per-formed on these uelds.

,~

a TABLE 4o2<<1 (cont'd) (0 it 3 p>]y)

Extent of Examination Extent of Examination Examination Components and Parts (Percent in 10 Year (Percent in 5 Year Itea No, ~Cate or To Bc Examined Hathod Interval Interval Reaarho 5.2 L-2 Pump casings Visunl Sec Remarks See Remarks Examination vill be made only vhen pump internals

.are removed for other reasons.

S.3 Notate-to-safe-end uelds Not Applicable Not hpplicabla 5.4 C-l Pressure-retaining bolting Visual and 100X 33X Bolting vill. be inspected Volumetric only uhen pump is disaseo scmbled for other reasons.

5.5 Prcssure-retaining bolting Visunl See Remarks Sce Remarks Bolting vill bc inspected only vhen pump is disas-sembled for other reasons.

5.6 K-1 Integrally~elded supports Visual and Surface ~

25X Same as 5.1 5.1 K 2 Supports and hangers Visual ,100X 33X Valve Prcssure Bounder 6 1 Valve-body uelds Not Applicable Not Applicable 6.2 Vnlvc bodies Visual See Remarks Sce Remarks Exception taken ior valves uhich are not accessible or vhlch nre not disasse=bled for maintenance purposes during the inspect)on interao Vale 6a3 Valve-to-safe-cnd uelds . Not Applicable Not Applicable 6.4 Pressureotrctaining bolting Not Applicable Not Applicable

TABLE 6 ~ 2 1 (cont 4)

I (UQQ C 3 prf] y)

Extent bE Examination of Examf nstf on Examination Components and Parts (Percent in 10 Year (Percent in 5 Year Item Hoi ~Cat ~ 0 To ge Examined Hethod Interval Interval Reaarks 6.5 Pressure-retafnfng bolt Visual and 100X 33X Exceptfon is taken for Volumetric valves ubich are not accessible.

6.6 Integral 1y-uelded supports Hot Applicable Hot hpplicable 6.7 X-2 Supports and Hangers Visual 100X 33Z Exception is taken for supports and hangers uhich are not accessible.

Reactor coolant pump V6UT 100X Eor (2) In place at bore, The flywheels shall be visually Flyuheel Keyuay, and tapped examined at the first refueling holes for (1). an4 at the end of each 10 year fnterval. Thc outsfdc surface shall be examined by ultra sonfc methods on the follouing schedule: (1) Durfng second re-fueling>> all 3, (2) At thc seventh, eighth and ninth re-fueling one different fly-uhecl each refueling (3) Re-peat (2) uithfn 10 years.

1.2 Irradiation Specimen Schedule Tensile an4 See Remarks See Remarks Capsule 1 shall be rcaoved Charpy V and examined at thc first Hotch (Hedge region replacement. Capsule Open Loading) 2 shall be removed and examfned at the Eourth regfon replacement. Capsule 3 shall be removed and ex-amfned after tucnty years of operation. Capsule 4 shall be removc4 and examined after thirty years of opcratfon.

Capsule 5 shall be removed and examined after forty years of operation

4 Unit 4 4.2 INSERVICE INSPECTION AND TESTING Applicability: Applies to inservice structural surveillance of ASME Code Class 1, Class 2, and Class 3 components.

Objective: To ensure the continued integrity of ASME Code Class 1, Class 2, and Class 3 compo-nents (and their supports) and boundaries.

Implementation: Implementation of this specification will begin no later than September 1, 1977.

Specification: 1., Inservice inspection of ASME Code Class 1, Class 2, and Class 3 components shall be performed in accordance with the Turkey Point Unit 4 Inservice Inspection (ISI)

Program. The ISI Program is developed and updated in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50. 55a(g), except where specific written relief has been granted by the NRC pursuant to 10 CFR 50.55a(g)(6)(i).

i

2. Inservice testing of ASME Code Class 1, Class 2, and Class 3 pumps and valves shall be performed in accordance with the Turkey Point Unit 4 Pump and Valve Test, Programs. The Programs are developed and updated in accordance with Section XI of the ASME Boiler and Pressure Vessel Code and applicable Addenda as required by 10 CFR 50.55a(g), except where specific written relief has been granted by the, NRC pursuant to 10 CFR 50.55a(g)(6)(i).
3. In cases where, during the process of inspection and testing, certain require-ments are found to be impractical due to unforeseen circumstances, relief may be requested at that time.

Unit 4 4.2-1a

4 ~ 4.2 LOCAL PENETRATION TESTS Test Procedure and Freouenc Local leak detection tests of the followirg components'hall be performed at a pressure not less than 50 psig using pressure decay, soap bubble, halogen detection or equivalent methods at the frequency. listed:

'I Containment purge valves (pressure applied in connecting duct) each refueling. (Unit 3 only)

2. Personnel and emergency air locks (pressure applied between gaskets) each four months if used periodically, annually if not used.

3 Equipment access opening (pressure applied

-.between gaskets) annually and after use.

4. Fuel transfer tube flange (pressure applied.

between gaskets) - each refueling.

5. Electrical penetrations (pressure applied to canister) prior to integrated leak tests.

Acce tance Criteria Repairs and tests shall be made whenever the sum of the local leak rate tests, including the isolation valves discussed in .4.4.4, exceeds sixty per cent of the total containment allowable 3.eak rate.

~ -4,4.3 REPORT OF TEST RESULTS Each integrated leak rate test vill be the sub-ject of a summary technical report, including 4.4-2

method used, test procedure, test results and analysis used to verify that allo~able leakage rates mere not exceeded.

4~4+4 ISOLATION VALVES (Unit 3 only)

a. Isolation valves shall be tested for operability at each refueling.
b. Isolation valves which are part of the containment boundary shall be leak tested

'annually or during refueling operation, at a pressure of at least 50 psig.

c. Acceptance criteria are stated in 4.4.2.

4 4.5 RESIDUAL HEAT REMOVAL SYSTEM

a. The portion of the Residual Heat Removal System that is downstream of the first isolation valve outside the containment shall be tested either by use in normal operation or hydrostatically tested at 350 psig at the interval specified below.,

Visual inspection shall be made for excessive leakage from components of the system.. Any visual leakage that cannot be stopped at test conditions shall be measured by collection and weighing or by 'anothe equivalent method.

c The acceptance criterion is that maximum allovable leakage from'the. Residual Heat Removal System components (w%ich inc)udcs valve stem, flanges and pump seals) shall not exceed tow gallons per hour.

d Repairs shall be made as required to maintain leakage with the acceptance criterion in (c) above.

e Tf repairs are not completed vithin 7 days, the reactor

~ shall be shut do~a and depressurized until repairs arc effected and the acceptance c iterion in (c) above is satisfied.

f. Tests of the Residual Heat Removal System shall be conducted on a 12-tenth interval. ,

4.4-3

4.5 SAFETY INJECTION Applies to testing of the Safety Injection System.

will respond e

~Ob ective: To verify that the subject systems promptly and perform their design functions.

Specifications: 1. SYSTEM TESTS

a. System tests shall be performed at each refueling shutdown. The test shall be performed in accordance with the follow-ing procedure:

With the Reactor Coolant System pressure equal to or less than 350 psig and temperature equal to or less than 350F, a test safety. injection signal will be applied to initiate operation of the system. The breakers for the residual heat removal pump motors will be tested either in the test position or by actual resi'dual heat removal pump motor operation resulting from the test safety injection signal.

b. The test will be considered satisfactory if con-trol panel indication and visual observations indicate that all components have received the safety injection signal in the proper 'sequence and timing, appropriate breakers shall open and close, and all" automatic valves shall complete their travel.
2. CO%'ONENT TESTS
e. ~Pum e (Unit 3 only)
1. The safety injection pumps and residual heat removal pumps shall be started at intervals not greater than one month.

4.5-1

e

2. Pumps shall start and reach required head for normal or recirculation flow, whichever is applicable to the operating condition; the

~

Instruments and visual observations shall indicate proper functioning. Test operation shall be foz a least 15 minutes.

b. Valves (Unit 3 only)
1. The boron infection tank isolation valves receiving a Safety En)ection signal shall be cycled monthly.tt
2. The containment, recirculation sump suction valves shall be cycled monthly.t
3. Accumulator check valves shall be checked for operability during each refueling shut-down.
4. The refueling water storage tank outlet valves shall be tested in performing the respective pump tests.i t -"N.A. during cold or refueling shutdowns. The specified tests, ho~ever, surveillance interval prior to reactoz shall be performed within one staztup.

A- H.A. during cold or refueling shutdowns. The specified tests, howeve shall be performed within one suzveillance interval prior to heatup above 200 F.

4. 5-2

2a COMPONENT TESTS Pum s and Pans The containment spray pumps and the Emergency Contain-ment Cooling fans shall be started at intervals not

~

greater than one (1) month. t,"

Accepta'ole levels of performance shall be that the pumps reach their rated shut off heads, the fan motors reach their'noadnal operating current for the containment at-mosphere duHmg the test, and both operate for at least fifteen minutes.

Valves The systems motor operated isolation valves will be tested for operation during syst m tests.

N- N.A. during cold or refueling shutdowns. The specified tests, however, shall be performed within one surveillance interval prior to heatup above 200,P.

e Note: Specification 4.6.2 pump and valve tests are applicable to Unit 3 only.

4. 6-2

3 LABORATORY TESTS aztezly, a charcoal surveillance specimen which had been located in a representative part of the containment will be withdrawn and laboratory tested for iodine zemoval capability. The charcoal shall

. demonstrate a removal efficiency of 99.97 for elemental iodine. Failing this, the chare'oal within the containment filter system shall be replaced by charcoal which meets or exceeds original specifications.

4 7 2 POST-ACCIDENT CONTA1%KHT VENT SYSTEM OPERATING TESTS

~

A system test shall be performed during.each scheduled refueling period. For Unit 3, this shall consist o'.

usual inspection and operation of all valves.

Visual inspection shall include search for any foreign

~terial, gasket deteziozation in HEPA filters, and cessive dust cake on demister.

2 PERFORYWICE TESTS

-~ring each refueling operation, "in-place" DOP and freon tests shall be conducted at design zlow on Che filters. 99.5Z DOP and 99.0% freon removal shall constitute acceptable performance. The hydrogen concentration me'asuring instrument shall be calibrated with proper considezation to humidity

~

during each refueling period.

4.7-2

Unit 3 4.9 HAIN STEAH ISOLATION VALVES Applies to periodic testing of the main steam isolation valves.

~6b ective: To verify the ability of'he main steam isolation valves to close upon signal.

The main steam isolation valves shall be tested, at each re-fueling shutdown. Closure time of five seconds or less

.shall be verified. The valves are tested under no flow and at no load conditions at temperature ove- 500F.

Unit 3 4.9-1

Unit 3 melo hUXILIARY FEEDVATER SYS~

Applies to periodic testing requirements of the auxiliary feedwater system.t

~Ob ective: To verify the operability of the auxiliary feedwater system and its ability to respond properly when required.

S ecifications:. 1. Each turbine-driven auxiliary feedwater pump shall be started at intervals not greater than one month; run for 15 minutes and a flow rate of 600 gpm es-tablished to the steam gene ators.

2. The aux'.liary feedwater discharge valves shal1 be tested by operator action during pump tests.
3. Steam supply and turbine pressure valves shall be tested during pump tests.
4. These tests shall be considered satisfactory if control panel indication and visual observation of the equipment demonstrate that all components "have operated properly.

t- N.A. during cold or refueling shutdowns (only for the Unit at cold or refueling shutdown). The specified tests, however, shall be performed within one surveillance interval prior to starting the turbine.

Unit 3 4.10-1

ATTACHMENT B Turkey Point Unit 4 (l) Valve Test Program (2) Pump Test Program (3) Inservice Inspection Program

I '

ABSTRACT The planned inservice inspection and testing programs were developed employing the R. G. 1.26, Revision 2, criteria for quality group classifications and standards (Quality Group A is the same as ASSAM Class 1, etc.) .

Section I. Valve Test Pro ram Outline The valve test program shall be conducted in accordance with Subsection IWV of Section XI of the 1974 Edition of the ASME Boiler and Pressure Vessel Code thru Summer 1975 Addenda, except for specific relief requested in accordance with 10 CFR 50.55a(g) (5) (iii) which is identified in Sections I.G. 'and I.H. The period for this valve test program starts January 7, 1977 and ends September 7,'978.

Section II. Pum Test Pro ram Outline The pump test program shall be conducted in'accordance with Subsection IWP of Section XI of the 1974 Edition of the ASNE Boiler and Pressure Vessel Code thru Summer 1975 Addenda.

The period for the pump test program starts January 7, 1977 and ends September 7, 1978.

Section III. Inservice Ins ection Pro ram Outline The inservice inspection program shall be conducted in accordance

Section III. (Continued) with Subsection IWB, IWC and IWD of Section XI of the 1974 Edition of the ASME Boiler and Pressure Vessel Code thru Summer 1975 Addenda, except for specific relief requested in accordance with 10 CFR 50.55a(g) (5) (iii) which is identified in the appropriate code class of the ISI Table under Remarks in Section III.A. The period for the inservice inspection (ISI) program starts January 7, 1977 and ends i>lay 7, 1980.

TABLE OF CONTENTS Valve Test Program I.A. List of Drawings Z.B. List of Valve Categories I.C. List of Definitions Z.D. List of Valve Table Symbols I.E. List of Category (A-B-C-E) Valves:

Table I Tests to Code I.F. List of Category (A) Valves:

Table I.A. Seat Leakage Rates Z.G. List of Category (A-B-C) Valves:

Table II Exce tions to Code I.H. List o f Category (B-C-E) Valves:

Table ZZ.A. Exce tions to Code I.I. List of Exclusions:

Table ZII Exem tions to Code ZI. Pump Test Program ZI.A. Table IV Test Parameters II.B. Exceptions IZI. Inservice Inspection Program IIZ.A. Introduction to Tables A.l. Table I Class I Components and Systems A. 2. Table ZZ Class II Components and Systems A.3. Table ZII Pressure Tests, Class I, Zl, and IXI Components and Systems III.B. 40-Month Period III.C. Exceptions

1 4'

Z.A. LIST OF DRAWINGS FPL NO. F-503184, REV. 7 CHEMICAL & VOLUME CONTROL SYSTEM FPL NO. E-503185, REV. 7 SAFETY INJECTION SYSTEM FPL NO. F-503186, REV. 8 CHEMICAL & VOLUME CONTROL SHEET 2 FPL NO ~ F 503 187 i REV 7 AUXILIARY COOLANT SYSTEM COMPONENT COOLING FPL NO. E-503188, REV. 7 AUXILIARY COOLANT SYSTEM COMPONENT COOLING FPL NO. F-503189', REV. 8 WASTE DISPOSAL SYSTEM FPL NO. F-503190, REV. 6 WASTE DISPOSAL SYSTEM FPL NO ~ F 503191 i REV 6 REACTOR COOLAiNT SYSTEM FPL NO. F-503193, REV. 7 SAMPLING SYSTEM FPL NO. F-503194, REV. 6 AUXILIARY COOLANT SYSTEM RESIDUAL HEAT REMOVAL FPL NO ~ F 5031 95 g REV ~ 4 AUXILIARY COOLANT SYSTEM SPENT FUEL PZT COOLING SYSTEM FPL NO. F-502027, REV. 14 STEAM SYSTEM FPL NO. F-502028, REV. 15 CONDENSATE AND FEEDWATER SYSTEMS FPL NO F 502030 i REV 14 LUBE OIL SERVICE AiND INSTRUMENT AIR FPL NO. F-50203'1, REV. 14 CIRCULATING WATER SALT WATER AND CHLORINATION SYSTEMS FPL NO. F-502033, REV. 8 DIESEL OZL FPL NO. F-502036, REV. 14 PRIMARY MAE(E-UP CONTAINMENT COOLING WATER AND CHEMICAL ZNJECTIOVi SYSTEMS

a I. A. LIST OF DRAWINGS (COND)

FPL NO. F-502037, REV. 10 CONTAINMENT VENTILATION SYSTEM FPL NO. F-502038, REV. 10 CONTAINMENT AND RADWASTE DRAINS AND VENTS

I\

0

I.B. LIST OF VALVE CATEGORIES CATEGORY A '- Valves for which seat leakage is limited to a specific maximum amount in the closed position for fulfillment of their function.

CATEGORYl B Valves for which seat leakage in the closed position is inconsequential for fulfillment of their function.

CATEGORY 1 C Valves which are self-actuating in response to some system characteristic, such as pressure (relief valves) or flow direction (check valves).

CATEGORYl D Valves which are actuated by an energy source capable of only one operation, such as rupture disks or explosive actuated valves.

CATEGORYl E Valves which are normally locked (or sealed) open or locked (or sealed) closed to fulfill their function.

FOOTNOTE:

lCombination of categories, such as categories AC are to be used when more than one distinguishing category characteristic is applicable. In such cases, all requirements of each of the individual categories are applicable, although duplication or repetition of common testing requirements is not necessary.

I.C. LIST OF DEFINITIONS:

1) Essential systems and components Class 1, 2 and 3 valves, as applicable, in systems that are relied upon to fulfillthe safety-related function of safe-ly shutting down the, reactor, or of mitigating the consequences of an accident.
2) Valve is not. essential to fulfillsafety-related function (10.CFR50.2(v).
3) Valve is protected by double valve (or more) isolation.
4) ACTIVE VALVES are required to change position either by opening, closing, or opening and reclosing during the course of accomplishing a safety-related function.
5) PASSIVE VALVES are "not required to change position E * ** '

~

function.

6) Test procedures for valves in various categories.

CATEGORY VALVE CODE, CODE CODE FUNCTION LEAK TEST EXER. TEST "

POSIT. VERIF.

ACTIVE IWV-3420 IWV-3 410 NONE PASSIVE IWV-3420 NONE NONE ACTIVE NONE IWV-3410 NONE C (S/R) ACTIVE NONE IWV-3510 NONE C (CHK) ACTIVE NONE I~rPT-3 5 20 NONE E PASSIVE NONE NONE IWV-3700

0 l!

4

I.D. LIST OF VALVE TABLE SYMBOLS VALVE NUMBER: IDENTIFICATION SIZE: INCHES TYPE: GATE-GLOBE-CHECK-PLUG 3-WAY, 4-WAY, BUTFY BUTTERFLY DIAPH DIAPHRAGHM NEDL - NEEDLE REGU, REGULATOR NOZL NOZZLE (RELIEF/SAFETY)

ACTUATOR: MOTOR, SO SOLENOID OPERATED SA/SELF- SELF ACTUATED MAN MANUAL CODE CLASS: 1-2'-3 CODE CATEGORY: A B C E (OR COMBINATION OF)

ACTIVE/PASSXVE: A P NORMAL POSITION: OPN/NO OPEN-,

CLSD/NC- CLOSED FAILURE MODE: FO - FAIL OPEN FC FAIL CLOSE FAX FAIL AS IS REMOTE POSITION INDICATION: YES NO TEST PERIOD: 1 REFUELING (R.V. HEAD OFF) 2 COLD SHUT DOWN (1 YEAR) 3 OPERATION 4 TWO YEARS (CODE )

XNSERVICE INSPECTION: SEE APPROPRIATE LIST OF (ISI) TESTS CATEGORY LEGEND

X.E. L1ST OF CATEGORY (A-B-C-E): LEGEND FOR TABLE I TEST PARAMETERS TO (CODE) I EXCEPT AS OTHERWXSE NOTED (FPL)

CATEGORY A-B VALVES EF-1 Exercise valve (full stroke) for operability every 3 months (Code).

EF-2 Exercise valve (full stroke) for operability during cold shutdown (Code).

EF-3 Exercise valve (full stroke) for operability during operation (Code).

EF-4 Exercise valve (full stroke) for operability prior to return to service (Code).

EF-5 Exercise valve (with Remote Position Indicator and inaccessible for direct observation) for verifi-cation of valve position during refueling but less than every 2 years (Code).

EF-6 Valves that are exercised to plant procedure (FPL) .

EF-7 Exercise valve (with Fail-Safe Actuators) to observe failure mode every 3 months (Code).

EF-8 Exercise valve (with Fail-Safe Actuators) to observe failure mode during cold shutdown (Code).

EST-1 Exercise valve power operated (full stroke) i4ax.)

and measure time (Code) (5 seconds (FPL).

EST-2 Exercise valve power operated (full stroke) and measure time (Code) (10 seconds Max.) (FPL).

EST-3 Exercise valve power operated (full stroke) and measure time (Code) (60 seconds -'%ax.) (FPL) .

EST-4 Exercise valve power operated (full stroke) and measure time (Code) (120 seconds i4ax. ) (FPL) .

SLT-1 Seat leakage test valve during refueling but less than every 2 years (Code).

I. E. LIST OF CATEGORY (A-B-C-E):

t LEGEND FOR TABLE I (COND)

SLT-3 Seat leakage test valve to plant procedure (FPL).

CATEGORY "C" VALVES EF-1 Exercise valve (full stroke) for operability every 3 months (Code).

EF-2 Exercise valve (full stroke) for operability during cold shutdown (Code).

EF-3 Exercise valve (full stroke)" for operability every 9 months (Code).

Safety and relief valve tests (Set Point) to Table IWV-3510-1 (Code).

CATEGORY "E" VALVES Operational check of valve (verification of position) before and after operation (Code).

NOTE:

(1) ISI Test Column: Unique code letters denote test requirement (2) Test Period - Column: Denotes test frequency (Ref. I. C.)

(3) Test Period Column: Where test frequency is denoted as 1 and/or 2, tests may be performed during either period dependent upon plant conditions.

0 I.F. LIST OF CATEGORY A- TABLE I.A- SEAT LEAKAGE TEST PARAMETERS TO FPL REQUIREMENTS.

SEAT LEAKAGE RATES BASED ON AIR TESTS 50 PSI dZ at Pa WHERE:

Pa = ACCIDENT PRESSURE

I.G. LIST OF CATEGORY (A-B-C): LEGEND FOR TABLE II EXCEPTIONS TO CODE REQUIREMENTS DETERMINED TO BE IMPRACTICAL....PARAGRAPH 50.55a(g)(5)(iii).

E-1 The exercising of valves, whose failure in a non-conservative position during the cycling test would cause a 1oss of system function.

E-2 The exercising of valves whose failure to close during a cycling test would result in a loss of containment integrity.

E-3 The exercising of valves which could subject a system to pressures in excess of their design pressures.

E-4 Valves which cannot be seat leak tested due to their design and their physical location, arrangement, alignment, and orientation in the system.

E-5 Valves which cannot be exercised (verification of full stroke) due to their design and their physical location, arrangement, alignment, and orientation in the system.

E-6 Valves in systems which cannot be tested (exer-cised) within the required test period.

E-7 Valves in systems which cannot be tested (seat-leakage) within the required test period.

E-10 Valves whose access may be restricted due to a high radiation area coupled with its physical location and arrangement in the system. No tests shall be conducted on valves where the radiation level is 1000 MR/HR or reater.

E-ll Valves (pressure regulating) used for operating convenience for system control.

Z ~ G. LZST OF CATEGORY (A-B-C): LEGEND FOR TABLE ZZ (COND)

NOTE:

(l) ZSZ Test/Test Period Column:

Dash(s) in column denotes exception(s)

(2) Test Period Column:

Nhere tests test frequency is may be denoted as l and/or performed during either period 2,

dependent upon plant conditions.

(3) Remarks - Column:

Unique code letter(s) denotes reason(s) for exception and/or tests to be conducted in lieu of.

Absence of unique code letter(s) adjacent to ZSZ Tests column denotes test to be conducted.

GENERAL NOTE:

(l) All valves in Table ZZ are either (a) Tested partially (b) Taken exception to partially or totally

I. H. LIST OF CATEGORY (B-C-E): LEGEND FOR TABLE II,.A EXCEPTIONS TO CODE REQUIREMENTS BASED ON SIZING IN NON-ESSENTIAL SYSTEMS.

Valves in class 1 non-essential systems l-inch and under nominal pipe size.

E-9 Valves in class 2 and class 3 non-essential systems 2-inch and under nominal pipe size.

LIST OF EXCLUSIONS: TABLE III EXEMPTIONS TO CODE (INV-1300) .

Vent Valves Drain Valves Instrument Valves Test Valves Maintenance Valves This table of valves is not included in this report. They are identified and included in the plant records.

II. PUMP TEST PROGRAM II.A. Table IV Test Parameters This subsection outlines the pumps which are provided with an emergency power source.

Pumps whose access may be restricted due to a high radiation area coupled with its physical location and arrangement in the system. No tests shall be conducted on um s where this radiation level xs 1000 MR HR or reater.

III. ZNSERVICE INSPECTION PROGRAM III.A. Introduction to the Tables The following pages list the components and systems that are required to be examined during the life-time of the plant and give the allocations for the nondestructive examinations to be performed during this, particular 40-month period. There are three tables organized to follow, as closely as practi-cable, the format of Section XI Code, Tables IWB-2600 and IWC-2600.

Table I lists the required examination areas of Class 1 components (and their supports) and systems; Table ZI lists the required examination areas of Class 2 components (and their supports) and systems; and Table XZZ lists the required examination areas

.of Class 1, Class 2, and Class 3 components during pressure tests. The tables list the examination areas and the allocation of examinations in each of the three outages of the plant anticipated during this period. They are separated into sections according to major systems or components and further subdivided to list the actual component, area, or weld to be examined.

The Appendices and figure numbers noted at the top of the table pages are those of the 10-year plan.

III.B. 40-Month Period The column titled "Inspection Interval" is subdivided into 3-1/3 year periods which correspond to the inspection program as defined in Paragraph IWA-2400 of Section XI. The 10-Year Inspection Interval is also subdivided into nine "outages." Within of the 3-1/3- to 6-2/3-years, an Z is placed each'utage adjacent to those components or welds to be examined during that outage. Although some categories are not required to be examined during this 40-month period, all components or welds are listed to ensure a complete accounting of all systems. Although the 3-1/3- to 6-2/3-years interval starts with outage No. 4, in reality, this is the 3rd outage of the plant.

XET.. Introduction to the Tables (Continued)

The "Remarks" column is used to provide pertinent information about the examination area (such as limitations, explanations, and percent of the weld to be examined), etc.

Examinations whose access may be restricted due to a high radiation area coupled with its physical location and arrangement in the system. No exami-nations shall be conducted on corn onents and s s-tems where the radiation level is 1000 MR/HR or greater.

1 of 42 FLORIDA POYIER 5 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAXL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS. PER., TESTS, MODE XND.

MOV-4-1411 2 GLOBE MOTO A NO FAI YES 2 EF2 2 EST2 1 SLT3 MOV-4-1412 2 GLOBE MOTO A NO FAX YES EF2 EST2 SLT3 MOV-4-1425 1 GATE MOTO A NO FAI YES EF2 EF8 EST2 SLT3 MOV-4-1426 1 GATE MOTO A NO FAI YES 2 EF2 2 EF8 2 EST2 1 SLT3 MOV-4-1427 1 GATE MOTO A NO FAI YES EF2 EF8 EST2 SLT3 PROGRAM 5Y5TKM TITLE CONDENSATE 6 FEEDWATER VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE F-502028

0 0

2 of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE IND.

FCV-4-479 6 GATE A/0 NC FC NO 2 EF 4'F2 2

2 EST3 FCV-4-489 6 GATE A/O NC FC NO 2 EF4 2 FF2 2 EST3 FCV-4-499 6 GATE A/0 2 B NC FC NO 2 EF4 2 EF2 2 EST3

-CV-4-2900 14 CHECK AO A NO FC NO EF2 ASST CV-4-2901 14 CHECK AO NO FC NO EF2.

ASST CV-4-2902 14 CHECK . AO NO FC NO EF2 ASST

'ABLE MOV-4-1410 2 GLOBE MOTOR 2 A NO FAI YES 2 EF2 2 EST2 1 SLT3 SYSTEM PROOllAM sixie CONDENSATE & FEEDWATER VALVE TEST PROGRAM I CH4At ~

TESTS TO CODE F-502028

0 3 of 42 FLORIDA POWERS LIGHT COMPANY VALVE SIKE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS, MODE IND.

CV-4-2816 4 PLUG AO NC FC YES 3 EF3 3 EF7 3 EST3 CV-4-2817 4 PLUG AO 2 B NC FC YES 3 EF3 3 EF7 3 EST3 CV-4-2819 4 . PLUG AO 2 B NC FC YES EF3 EF7 EST3 CV-4-2831 4 PLUG. AO 2 B 'NC FC YES 3 EF3 3 EF7

. 3 EST3 CV-4-2832 4 PLUG AO NC FC YES EF3 EF7 EST3 CV-4-2833 4 PLUG AO 2 B A NC FC YES 3 EF3 3 EF7 3 EST3 SYSTEM PROGRAM TENT(.E CONDENSATE & FEEDWATER VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE F-502028 l

0 4 of 42 FLORIDA POWER 8, I IGHT COMPANY VALVE SIZE ACTU. CODE CODE ACT/ NORM. FAlL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS. PER., TESTS r

MODE IND, 4-40-336 CHECK SELF AC A NC NA NO 2 EF2 l1

~

- EF4 SLT3 4=.'40-204 GATE MAN AE P NC FAI. NO OCa.

SLT3 5Y5TEM PAOGAAM LUBE OIL & INSTR. AIR VALVE TEST PROGRAM TABLE I CHAfl TESTS TO CODE F.-502030

5 of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE -TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER., TESTS .

MODE IND.

FCV-4-605 12 BFLY A/0 B A NO FC YES 2 EF2 2 EF8 2 "EST3 4-757C 10 GATE MAN 2 B A NC FAI NO EF2 4-757D 10 GATE MAN 2 B A NC FAI NO EF2 4-7 60 2 PLUG MAN B A NC FAI. NO EF2 5Y5TEM AUX. COOL. RES. HEAT REM.

PROCRAM (RH J' VALVE TEST PROGRAM TABLE I TESTS TO CODE F-5031 4

0 6 of 42 FLORIDA POIER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER., TESTS, MODE IND.

HV-4-1 DIAPH AE P CLSD FAI NO 1 OC-1 1 SLT-3 HV-4-3 DIAPH MAN P CLSD FAI NO OC-1 SLT-3 SYSTEM PROGRAM CONTAINMENT VENTILATION VALVE TEST PROQ TABLE I CHARY TESTS TO CODE F-502037

7 of 42 FLORIDA POYIER 8, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.~ TESTS.:

MODE IND.

CV-4-956B 3/8 GATE A/0 A A NC FC YES EF2 EF8 EST2 SLT3 CV-4-956C 3/8 GATE A/0 A A NC FC YES 2 EF2 2 EF8 2 EST2 1 SLT3 CV-4-956D 3/8 GATE A/0 A A NC FC YES 2 EF2 2 EF8 2 EST2 1 SLT3 SYSTEM PROGRAM SAMPLING (SS) TITLE VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE F-503193

8 of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE IND.

CV-4-955C 3/8 GATE A/0 A NC FC YES 2 EF2 2 EFS 2 EST2 1 SLT3 CV-4-955D 3/8 GATE A/0 A NC FC YES 2 EF2 2 EF8 2 EST2 1 SLT3 CV-4-955E 3/8 GATE A/0 A NC FC YES 2 EF2 2 EFS 2 EST2 1 SLT3 CV-4-956A 3/8 GATE A/0 A -NC FC YES 2 EF2 2 EFS 2 EST2 1 SLT3 PROGRAM SYSTEM SAMPLING (SS) TiTia VALVE TEST PROGRAM TABLE I CMART TESTS TO CODE F 5P3193

9 of 42 FLORIDA POSER 8 LIGHT COMPAHY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.- TESTS MODE IND.

CV-4-951 3/8 GATE A/0 NC FC YES 2 EF2 2 EF8 2 'ST2 1 SLT3 CV-4-953 3/8 GATE A/0 2 A NC FC YES 2 EF2 2 EF8 2 EST2 1 SLT3 CV-4-955A 3/8 GATE A/0 2 A NC FC YES EF2 EF8 EST2 SLT3 CV-4-955B 3/8 GATE A/0 2 A NC FC YES 2 EF2 2 EF8 2 EST2 1 SLT3 PROGRAM 5Y5TKM TITLK SAMPLING (SS )

TITLK VALVE TEST PROGRAM TABLE I G HART TESTS TO CODE F-503193

10 of 42 FLORIDA POSER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.. TESTS-;.

MODE IND.

NO TABLE I VALVES 5Y5ZEM PROCAAM WASTE DISPOSAL GAS VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE F-503190

ll of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM, FAIL- REM. TEST ISI REMARKS NUMBER CL. CAT. PAS POS ~ URE POS. PER. TESTS ..

MODE IND.

CV-4-4668B 3 DIAPH A/0 A NO FC- YES 3 EFl 3 EF7 3 'EST2 l SLT3 SYSTEM PflOCAAM WASTE DISPOSAL-LI UID VALVE TEST PROGRA TABLE I CMAA TESTS TO CODE F-503l89

12 of 42 FLORIDA POWER 8, LlGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL., CAT. PAS POS URE POS. PER.. TESTS MODE IND.

CV-4-4658A 3/4 DIAPH A/0 2 A NO FC YES 3 EFl 3 EF7 3 EST2 1 SLT3 CV-4-4658B 3/4 DIAPH A/0 2 A NO FC- YES 3 EFl 3 EF7 3 EST2 1 SLT3 CV-4-4659A 3/4 DIAPH A/0 2 .A NO .FC YES 3 EFl 3' EF7 EST2 1 SLT3 CV-4-4659B 3/4 DIAPH'/0 A A NO FC YES 3 . EFl 3 EF7 3 EST2 1 SLT3 CV-4-4668A 3 DIAPH A/0 NO FC YES 3 EFl 3 EF7 3 EST2 1 SLT3 SY57CM PAOOflhM sixie WASTE DISPOSAL LIQUID VALVE TEST PROGRAM TABLE I SHAB TESTS TO CODE F-503189

13 of 42 FLORIDA POlHER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.1 TESTS MODE IND.

NO TABLE I VALVES 5Y5TEM PROGRAM AUX. COOLANT SPENT FUEL TITI K VALVE TEST 'PROGRAM TABLE I CHART TESTS TO CODE F-50319S

14 of 42 FLORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.1 TESTS2 MODE IND.

LCV-4-460 2 PLUG A/0 NO FO YES EF8 EST3

'EF5 CV-4-200A 2 PLUG A/0 NC FC YES EF8 EST2 SLT3 CV-4-200B 2 PLUG A/0 1 A NC FC YES EF8 EST2 SLT3 CV-4-200C 2 PLUG A/0 1 A NO FC YES EF8 EST2 SLT3 CV-4-204 2 PLUG A/0 2 A NO FC YES EF8 EST2 SLT3 4-205B 2 GLOBE MAN 3 B. NC FAI NO EF2 PROGRAM 5YSTKM CHEM. VOL. CONT. (CVCS ) VALVE TEST PROGRAM TABLE I CHAflT TESTS TO CODE F-503184

15 of 42 FLORIDA POWER 8, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER., TESTS.

MODE IND.

CV-4-3 03C 2 PLUG A/0 A NO FO YES EF2 EFS EST3 CV-4-3 07 3/4 GLOBE A/0 A NC. FC YES 2 EF2 2 EFS 2 EST2 1 SLT3 4-306A 2 GLOBE MAN P NC FAI NO EF2 4-306B 2 GLOBE MAN NC FAX NO EF2 4-306C- 2 -GLOBE MAN P NC FAX NO EF2 CV-4-387 3/4 PLUG A/0 A NC FC YES 2 EF2 2 EFS 2 EST3 HCV-4-137 3/4 .PLUG A/0. .A NC FC YES EF2 EFS EST3 5YSTKM PROGRAM CHEM. VOL. CONT. (CVCS) TITLE VALVE TEST PROGRAM TABLE I CH RT TESTS TO CODE F-503] 84

16 of 42 FLORIDA POYfER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU ~ CODE CODE ACT/ NORM. FAIL- REM. TEST ISI REMARKS NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS.,

MODE IND ~

4-312C 3 CHECK SELF AC A NO NA NO 2 EF2 1 SLT3 4-298A 2 CHECK SELF A NO NA NO 2 EF2 1

SLT3'-298 B 2 CHECK SELF AC A NO NA NO EF2 SLT3 4-298C 2 CHECK SELF .AC A NO NA NO 2 EF2 1 SLT3 SYSTEM PROGRAM CHEM. VOL. CONT. (CVCS )-

TITI E VALVE TEST PROG TABLE I CHART TESTS TO CODE TI TLE F-5Q3 18 4

17 of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE, ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS. PER. TESTS MODE IND.

4-356 1 DIAPH MAN A NC FAI NO EFl TCV-4-143 3 3-WAY A/0 B A NO *FAIL YES EFl *Normal Failure Mode is TO EF7 to Volume Control VCT EST3 Tank (VCT).

CV-4-389 3/4 3-WAY A/0 A NO *FAIL YES EF2 *Normal Failure Mode is TO EFS to Volume Control VCT EST3 Tank (VCT).

MOV-4-381 3 GATE MOTO A NO FAI YES EF2 EFS EST2 SLT3 FCV-4-113A 1 PLUG A/0 A NC FO YES EFl EF7 EST3 PROCRAM 5YSTKM nvl-c 'HEM. VOL. CONT. (CVCS) VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE F-503184

18 of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CL'ODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CAT. PAS POS. URE POS. PER. TESTS NODE IND.

CV-4-311 PLUG A/0 1 B A NO FC YES EF2 EF8.

'EST2 4-297A 1 NEDL A A NO FAI NO EF2 SLT3 4-297B 1 NEDL MAN 2 A A NO FAX NO 2 EF2 1 SLT3 4-297C 1 NEDL A A FAI ~ NO EF2 SLT3 CV-4-303A 2 PLUG A/0 B A NO FO YES EF2 EFS EST3 CV-4-303B 2 PLUG A/0 1 B A NO YES EF2 EFS EST3 5Y5TEM PROGRAM TITI K CHEN. VOL. CONT ~ (CVCS ) T'T"~ VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE TITI K F-503184

19 of 42 Fl ORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI-NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS.

MODE IND.

MOV-4-350 GATE MOTO 2 B A NC FAI YES 2 EF2 2 EF8 2 EST3 4-358 BUTFY MAN B A NC FAI NO EF2 HCV-4-121 PLUG A/0 2 A A NO FO NO EF2 EF8 EST2 SLT3 4-333 GLOBE MAN 2 A P NC FAI NO SLT3 CV-4-310A PLUG A/0 1 B A NO FO YES 2 EF2 2 EF8 2 EST2 CV-4-310B PLUG A/0 1 B A NC FO YES EF2 EF8 EST2 5TSTEM PROCRAM CHEM. VOL. CONT ~CVCS) Ti Tie VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE F-503184

20 of 42 FLORIDA POWER 8, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS, MODE IND.

4-215C 3 DIAPH MAN A NO FAI NO EFl CV-4-244 3 3-WAY A/0 B A NO *FAIL YES EFl *Normal Failure Mode TO EF7 is to Volume Control VCT EST3 Tank (VCT).

HCV-4-142 2 PLUG A/0 ~ A NC FC NO EF2 EFS EST3 LCV-4-115A 3 3-WAY A/0 A NO *FAIL ,YES EFl *Normal Failure Mode TO EF7 is to Volume Control VCT EST3 Tank (VCT).

LCV-4-115C 4 GATE MOTO A YES 2 EF2 2 'EF8 2 EST3 LCV-4-115B 4 BUTFY A/0 A NC FC YES 2- EF2 2 EFS 2 EST3 5Y5TKM ROGRAM TITLK CHEM. VOL. CONT. (CVCS )

r VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE TITLK F-503184

21 of 42 FLORIDA POWER 8, LlGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. ,FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS. PER. TESTS .

MODE IND.

4-518 . 3/4 CHECK SELF AC A NC NA ~

NO 2 EF2 1 SLT3 SYSTEM REACTOR COOLANT (RCS)

PROORAM VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE TITLE

I 22 of 42 FLORIDA POWER 8. LIGHT COMPANY VALVE SIKE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER 1 TESTS2 MODE IND.

'I PCV-4-455A 4 PLUG A/0 B A NC FC YES EF2 EFS EST3 P'CV-4-455B 4 PLUG A/0 1 B A NC FC YES EF2 EFS EST3 CV-4-519A DIAPH A/0 2 A A NC FC YES EF2 EF8 EST2 SLT3 CV-4-519B 3 DIAPH A/0 2 A A NC FC YES EF2 EF8 EST2 SLT3 CV-4-522A 3/4 DIAPH A/0 2 A NC FC YES EF2 EFS EST2 SLT3.

InoonAM SYSTEM REACTOR COOLANT (RCS) TITLIt VALVE TEST PROG TABLE I CHART TESTS TO CODE F-503191

23 of 42 FLORIDA POYlFR It LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL-'AS REM. TEST ISI NUMBER CL. CAT. POS. URE POS. PER.1 TESTS2 MODE IND.

CV-4-522B 3/4 DIAPH A/0 A NC FC YES EE2 EFS EST2 SLT3 CV-4-522C 3/4 DIAPH A/0 A NC FC YES EF2 EFS EST2 SLT3 PCV-4-473 3/4 REGU A/0 A NC FC NO EF2 EFS EST3 SLT3 CV-4.-516 3/8 GLOBE A/0 A NC FC YES 2 EF2 2 EFS 2 EST2 1 SLT3 CV-4-54 9 3/4 DIAPH A/0 NC FC YES EST3 SLT3 PROGRAM 5Y5TKM vivcE REACTOR COOLANT (RCS) VALVE TEST PROGRAM= TABLE I CH RT TESTS TO CODE F -503191

0 0

24 of 42 FLORIDA POWER L LIGHT COMP ANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. ISI NUMBER CL. CAT. PAS POS. URE IN'EST POS. PER. TESTS MODE 4-10-567 CHECK SELF 2 AC A NC EF2 SLT3 4-10-.00L GATE A P NC FAI 'O SLT3 5Y5TEM PIIOCRAM RE: PRIMARY WATER TITI K TABLE I CHAR TESTS TO CODE

>>T<<- F.-502036

0 25 of 42 FLORIDA POlHER It, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. ISI NUMBER CL. CAT. PAS POS. URE IN'EST POS. PER. TESTS .

Y MODE 4-311 24 CHECK SELF OPN 4-321 24 CHECK SELF C, OPN EFl 4-331 24 CHECK SELF 3 C OPN EFl SYSTKM PROGRAM RE. INTAKE COOL. WATER

'tlTLK ROG TABLE I CHAR TESTS TO CODE F-502031

26 of 42 FLORIDA POWER 8, LIGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM ISI NUMBER CL. CAT PAS POS ~ URE MODE IN'EST POS ~ PER TESTS CV-4-2202 30 BUTFY A/0 OPN FO YES EF2 EFS EST3 4-307 36 BUTFY MAN OPN FAX NO EF2 4-309 36 BUTFY MAN OPN FAI NO EF2 4-314 30 BUTF Y MAN 3 B OPN FAI. NO EF2 4-334 30 BUTFY MAN OPN FAI NO EF2 4-406 24 BUTFY MAN CLSD FAI NO EF2 SY~' PllOOAAM RE. INTAKE COOL ~ WATER TITI E VALVE TEST PROGRAM TABLE I CIIAfl TESTS TO CODE F 5P2P31

0 27 of 42 FLORIDA POWER II LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT ~ PAS POS. URE POS. PER. TESTS MODE IND.

CV-4-851B 1 GLOBE A/0 A NC FC YES EF2 EFS EST3 CV- 4-8 51C 1 GLOBE A/0 A NC FC YES 2 EF2 2 EFS 2 EST3 MOV-4-860A 14 GATE MOTO A NC FAI YES 2 EF2 2 EFS 2 EST3 1 SLT3 MOV-4-860B 14, GATE MOTO NC FAI ~

YES 2 EF2 2 EFS 2 EST3 1 SLT3 MOV-4-861A 14 GATE MOTO A NC FAI YES 2 EF2 2 EF8 2 EST3 1 SLT3 PROGRAM SYSTEM SAFETY INJECTION, SYSTEM (SIS) ' VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE E-503185

28 of 42 FLORIDA POYlER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE IND.

MOV-4-880A 6 GATE MOTO NC FAI YES 3 EF-1 3 EF7 3 'EST2 1 SLT3 MOV-4-880B 6 GATE MOTO NC FAI YES 3 EFl 3 EF7 3 .EST2 1 SLT3 MOV-4-863A 8 GATE MOTO NC FAI YES EF2 EF8 EST3 MOV-4-863B 8 GATE MOTO 2 B NC FAI YES EF2 EF8 EST3 MOV-4-861B 14 GATE MOTO 2 A NC FAI YES 2 EF2 2 EF8

,2 EST3 1 SLT3 4-883R 1 GLOBE MAN 2 A NC FAI NO" EFl SLT3 5Y5TKM TITLE SAFETY INJECTION SYSTEM (SIS)

PROCRAM VALVE TEST PRO TABLE I CHART TESTS TO CODE E-503185

~

29 of 42 FLORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.. TESTS MODE IND.

MOV-4-869 GATE MOTOR 2 A A NC FAI . YES 2. EF.2 2 EF8 2, 'EST2 1 SLT3 MOV-4-867A GATE MOTOR 2 B A NC FAI YES EF2 EF8 EST2 MOV-4-8 67B GATE MOTO B A NC FAI YES EF2 EF8 EST2 CV-4-855 GLOBE A/0 2 A A NC FC YES 1 EF4 2 EF8 1 EST2 1 SLT3 CV-4-851A GLOBE A/0 2 .A NC FC YES EF2 EF8 EST3 CV-4-841A GLOBE A/0 2 B A NC FC NO 2 EF2 2 EF8 2 EST2 SYSTEM nocnAM TITLE SAFETY INJECTION SYSTEM (SI s

VALVE TEST PROGRAM TABLE I CHAnT TESTS TO CODE TITLE E-503185

~,

30 of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE IND.

MOV-4-878A GATE MOTO 2 B A NO FAI YES 2 EF-2 2 EF8 2 EST4 MOV-4-878B GATE MOTO 2 B A NO FAI YES 2 EF2 2 EF8 2 EST4 4-875A 10 CHECK SELF 1 AC A NC NA NO 3 EF3 2 SLT3 4-875B 10 CHECK SELF 1 AC A NC NA NO 3 EF3 2 SLT3 4-875C 10 CHECK SELF 1 AC A NC NA NO EF3 SLT3 4-895V 3/4 GLOBE MAN 2 AE P NC FAI NO SLT3 4-875D 10 CHECK SELF 1 AC A NC NA NO 3 EF3 2 SLT3 4-875E 10 CHECK SELF 1 AC A NC NA NO 3 EF3 2 SLT3 SYSTEM SAFETY INJECTION SYSTEM (SI PROGRAM J'E VALVE TEST PROGRAM TABLE I GHAA TESTS TO CODE TITLE E-503185

31 of 42 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE IND.

MOV-4-866A GLOBE MOTO 1 A A NC FAI YES 2 EF2 2 EFS 2 'ST2 1 SLT3 MOV-4-866B GLOBE MOTO 1 A A NC FAI YES EF2 EFS EST2 SLT3 MOV-4-843A GATE MOTO 2 A A NC FAI YES EF2 EF8 EST2 SLT3 MOV-4-843B 4 GATE MOTO 2 A A NC FAI, YES EF2 EFS EST2 SLT3 4-875F 10, CHECK SELF 1 AC A NC NA NO EF3 SLT3 5Y5TEM SAFETY INJECTION SYSTEM (SIS)

PROORAM

""~ VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE E-503185

32 of 42 FLORIDA POWER 8 LIGHT COMPANY VALVE ACTUS CODE CODE ACT/ NORM. FAIL- REM .. ISI NUMBER CL. CAT. PAS POS ~ URE IN'EST POS. PER. TESTS MODE NO TABLE I VALVES SYSTKM PROORAM DIESEL OIL VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE F-502033

33 of 42 FLORIDA POSER 8, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. ISI NUMBER CL. CAT. PAS POS. URE IN'EST POS. PER. TESTS MODE 899 GLOBE .B A NO FAI NO EF2 SYSSKM PROCAAM "c SAFETY INJECTION SYSTEM SISl C VALVE TEST PROGRAM TABLE I g H*R TESTS TO CODE E-503185"

34 of 42 FLORIDA POYIFR 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE IND.

CV-4-3705 PLUG A/0 NC FC YES 3 EF3 3 EF7

3. EST3 CV-4-3706 PLUG A/0 3 B NC FC YES 3 EF3 3 EF7 3 EST3 CV-4-3707 PLUG A/0 NC FC YES 3 EF3 3 EF7 3 EST3 CV-4-1606 PLUG A/0 2 B NC FC YES 3 'EF 2 3 EF8 3 EST2 CV-4-1607 PLUG A/0 2 B NC FC YES 3 EF2 3 EF8 3 EST2 CV-4-1608 PLUG A/0 2 NC FC YES 3 EF2 3 EF8 3 EST2 PAOCIIAM SYSTEM STEAM SYSTEM VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE TITLE

35 of 42 FLORIDA POYtER 8, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST IS I REMARKS NUMBER CL. CAT. PAS POS. URE POS. 'ER.:

TESTS (

MODE IND.

MOV-4-7 49A 16 GATE MOTOR 3 B NC FAI YES 2 EF2

.2 EF8 2 EST4 MOV-4-749B 16 GATE MOTOR 3 NC FAI YES 2 EF2 2 EFS 2 EST4 CV-4-739 GLOBE A/0 NO FC YES 2 EF2 2 EFS 2 EST2 1 SLT3 MOV-4-716A GATE MOTO 3 NO FAI YES 2 EF2 2 EFS 2 EST2 MOV-4-716B GATE MOTO 3 A NO FAI YES 2 - EF2 2 EFS 2 EST2 1 SLT3 SY5TEM PROGRAM AUX. COOL. COMP. COOL. (ACCC) VALVE TEST PROGRAM TABLE I CH R TESTS TO CODE F-503187 E-503188

36 of 42 FLORIDA POWER It LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE IND.

MOV-4-1400 GATE MOTO 2 B A NC FAI YES 2 EF.2 2 EF8 2 EST3 MOV-4-1401 GATE MOTO 2 - B NC FAI YES EF2 EF8 EST3 MOV-4-1402 GATE MOTO 2 B A NC FAI YES EF2 EF8 EST3 MOV-4-1403 GATE MOTO 3 8 A NC FAI YES EF3 EF7 EST3 MOV-4-1404 GATE MOTO 3 B A NC FAI YES EF3 EF7 EST3 MOV-4-1405 GATE MOTO 3 B NC FAI YES EF3 EF7 EST3 PAOGAAM SYSTEM STEAM SYSTEM TITLE VALVE TEST PROGRAM TABLE I CH*RT TESTS TO CODE F-502027

~ '

37 of 42 FLORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM; FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.H TESTS MODE IND.

MOV-4-1418 10 GATE MOTO A A NO FAI YES 2 EF2 2 EF8 2 EST2 1 SLT3 TCV-4-144 6 BUTFY A/0 3 B A NO FO YES EFl EST4 4-724D 3 GATE B A NC =FAI NO EFl 4-787E 16 GATE MAN 3 B A NO FAI NO EF1 4-787F 16 GATE MAN 3 B A NO FAI NO EF1 4-787G 16 GATE B A NO FAI'O EFl 4-787H 16 GATE MAN 3 B A NO FAI NO EF1 4-63 5G 12 GATE MAN B A NC FAI NO EFl 4-635H 12 GATE B A NO FAI NO EFl PROGRAM 5YSTKM AUX. COOL. COMP. COOL. (ACCC)i""~ VALVE TEST PROGRAM TABLE I CHAHT TESTS TO CODE F-503187, E-503188 F-502036

r 38 of 42 FLORIDA POWER 8, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.,I TESTS,.

MODE IND.

CV-4-2903 10 BUTF Y A/0 2 A NO FO YES 2 EF2 2 EF8 2 'ST2 1 SLTl CV-4-2904 10 BUTFY A/0 2 NO FO YES EF2 EF8 EST2 SLTl CV-4-2905 10 BUTFY A/0 2 A A NO FO YES 2 EF2 2 EF8 2 EST2 1 SLT1 CV-4-2810 6 PLUG A/0 2 NO FO YES 2 EF2 2 EF8 2 EST2 1 SLT1 CV-4-2906 10 BUTFY A/0 2 A A NO FO YES EF2 EF8 EST2 SLT1 PROCRAM 5Y5TEM AUX. COOL. COMP. COOL. (ACCC) T'T"~ VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE F-503187 E-503188 F- 2

39 of 42 FLORIDA POYIER II LIGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI REMARKS NUMBER CL. CAT. PAS POS. URE POS . PER~" TESTS .

MODE IND.

4-770A GATE MAN B A NO FAI 'O EFl'-770B GATE MAN A NO FAI NO EFl 4-770C GATE MAN B A NO FAI NO EFl 4-770D GATE MAN B A NO FAI NO EFl 4-835E. 12 GATE MAN NO FAI NO EFl 4-835F 12 GATE MAN B A'C 'FAI NO 3 EFl 4- 787A 16 GATE MAN B A NO FAI NO EFl 4-787B 16 GATE MAN B A NO FAI NO EFl 4-787C 16 GATE MAN 3 B A NO FAI NO EFl 4-787D 16 GATE MAN B A NO FAI NO EFl MOV-4-832 GATE MOTOR B A NC FAI NO EF1 EST3 SYSTEM AUX. COOL. COMP. COOL. (ACCC TABLE I CHAR REV. e TESTS TO CODE TITLE

40 of 42 FLORIDA POYIER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER., TESTS .

MODE IND.

MOV-4-1418 10 GATE MOTO 2 A NO FAX YES 2 EF2 2 EF8 2 EST2 1 SLT3 4-835H 12 GATE MAN NO FAI NO EFl 4-835G 12 GATE MAN NC FAI NO EFl 4-717 CHECK SELF 2 AC NO NA NO 2 EF2 1 SLT3 SYSTEM PROGRAM AUX. COOL. COMP. COOL. (ACCC) ' VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE F-503187 E-503188 F-

0 41 of 42 FLORIDA POWER 8. LIGHT COMPAMY VALVE SIKE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. 'I TESTS ",

MODE IND.

. CV-4-2812 6 PLUG A/0 A NO FO YES 2 EF2 2 EFS 2 EST2 1 SLT1 CV-4-2907 10 FUTFY. A/0 A NO FO YES 2 EF2 2 EF8

'2 EST2 1 SLT1 CV-4-2814 6 PLUG A/0 A NO FO YES 2 EF2'FS 2

2 EST2 1 SLT1 CV-4-2908 10 . BUTFY A/0 A NO FO YES 2 EF2 2 EFS 2 EST2 1 SLTl MOV-4-1417 10 GATE MOTOR' NO FAI YES 2 EF2 2 EFS 2 EST2 1 SLT3 5Y5YKM CHARY AUX. COOL. COMP. COOL. (ACCC) 'ALVE TEST PROGRAM PROGR TABLE I TESTS TO CODE Y ITIC F-502036

42 of 42 FLORIDA POWERS LIGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI TESTS'EMARKS NUMBER CL. CAT. PAS POS. URE POS. PER.I MODE IND.

MOV-4-730 6 GATE MOTO 2 A NO. FAI YES 2 EF2 2 EF8 2 'ST2 1 SLT3 FCV-4-626 = 3 GATE MOTO 2 A NO FAI YES 2 EF2 2 EF8 2 EST2 1 SLT3 4-738 3 CHECK SELF 2 AC NO NA NO 2 EF2 1 SLT3 4-737 3 GATE MAN 2 A NO FAI NO 2 EF2 1 SLT3 SY~' " "K TITLE 'UX. COOL. COMP. COOL. (ACCC)

PROGRAM VALVE TEST PROGRAM TABLE I CHART TESTS TO CODE F-503187, E-503188 F-5P2P36

l of lP FLORIDA POSER 8 LIGHT COMPANY VALVE SERE TXPE ACTUA CODE CODE ACT/ NORM. FAIL- REM TEST XSI NUMBER CL. CAT ~ PAS POS ~ URE POS ~ PER TESTS MODE IND 4-143 6 CHECK SELF 3 C NC NA NO EF3 4-243 6 CHECK SELF NC NA NO EF3 4-'343 6 CHECK SELF 3 C NC NA- NO EF3 PROGRAM CONDENSATE 6 FEEDWATER TI TLK TABLE I CHAR TESTS TO CODE F-5P2P28

I t

2 of 10 FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. i TESTS ~

I.

MODE IND.

RV.-4-1444 NOZL SELF 2 C NC NA NO TF-1 SYSTKM PROCRAM T'Tic LUBE OIL & INSTR AIR TITLE VALVE TEST PROGRAM TABLE I CHAR REV 0 TESTS TO CODE nTic F-S02030

I F

3 of 10 FLORIDA POKIER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI REMARKS NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS.,

MODE IND.

4-753A 10 CHECK SP. 2 C NC NO, EFl 4-753B 10 CHECK SA NC NO EF1 RV-4-706 2 NOZL SA 2 C NC NO TFl AUX. COOL. RES+ HEAT REM.(RHR) ' -VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE 03194

. ~

=4 of 10 FLORIDA POWER 8 L1GHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. ISI REMARKS NUMBER CL ~ CAT. PAS POS. URE IN'EST POS. PER.. TESTS.,

MODE 4-298D CHECK SELF 1 C A NA .

NO EF2 4-298E CHECK SELF 1 C A NO NA NO EF2 4-298F CHECK SELF C A NO NA 'O EF2 RV-4-257 NOZL SELF 2 A NC NA NO, . TFl RV-4-203 NOZL SELF 2 A- NC NA NO TFl RV-4-209 NOZL SELF 2" C A 'NC NA NO TFl 4-281 CHECK SELF 3 ,C A NO NA . NO 3 EFl

.RV-4-382 NOZL SELF 2 C NC NA NO TFl SYSTEM PROGRAM CHEM. VOL. CONT. (CVCS )

TITLE VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE F-503184

0 5 of lP FLORlDA POWER 8 LlGHT COMPANY VALVE SIZE TYPE ACTU ~ CODE CODE ACT/ NORM. FAXL- REM TES T ISX NUMBER CL o CAT~ PAS POS ~ URE POS ~ PER>> TES TS J

MODE XND RV 5 5 1 A 4 NOZL. SELF 1 C NC NA . NA TF 1 RV-4-551B 4 NOZL SELF C NC NA NA TFl RV-4-55lc 4 NOZL SELF NC NA NA TF 1 5Y5TEM PROORAM REACTOR COOLANT .(RCS TITI C VALVE TEST PROGRAM TABLE X

)

CHAR TESTS TO. CODE TITLc F 5P3] 91

6 of 10 FLORIDA POWER 8, LIGHT COMPANY VALVE. SIZE TYPR ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL CAT ~ PAS POS ~ URE POS. PER. ~ TESTS, MODE IND.

RV-4-859 '/4 NOZL, SELF 2 C A NC NA. NO 4-876A CHECK SELF C . A NA NO EF2 4-876B CHECK SELF NA 'O EF2 4-876C CHECK SELF 1 C A NC NA NO EF2 4-876D CHECK . SELF 1 .C. A NC NA NO 2 EF2 4-876E CHECK SELF I C 'NC NA NO EF2 4-890A CHECK SELF NC ,NA NO EF2 4-890B CHECK SELF NC NA NO EF2 4-879A CHECK SELF NA NO EFl 4-879B CHECK SELF 2 NA NO EF1 5Y5T% M PROCRAM SAFETY INJECTION SYSTEM {SIS) ' VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE ave.c E-503185

7 of 10 FLORlDA POWER 8, LlGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.- TESTS MODE IND.

4-879C CHECK SELF C ~ A NC NO NO EF1 4-879D CHECK SELF A NC NO NO EFl 5YSTS:M PROGRAM TITLC CHAR TITLE L T T PROG TABLE I TiTLa E-503185 TESTS TO CODE

8 of 10 FLORIOA POWER 8, LIGHT COMPAHY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS ~ PER TESTS MODE IND.

RV-'4-1400 6 RELIEF SELF 2 C NC NA NO TFl RV-4-1401 RELIEF SELF C NC NA NO TFl RV-4-1402 6 RELIEF SELF C

  • NC NO TFl RV-4-1403 6 RELIEF SELF 2 C NC NA NO TFl RV-4-1405 RELIEF SELF NC NA NO TFl RV-4-1406 6 RELIEF SELF C NC NA NO TFl RV-4-1407 6 RELIEF SELF 2 C NA .VO TFl RV-4-1408 6 RELIEF SELF 2 C . NC NA NO TFl RV-4-1411 6 .RELIEF SELF 'NC NA NO TFl RV-4-1413 6 RELIEF SELF 2 C NC NA NO TFl RV-4-1410 6 RELIEF SELF 2 C NC NA NO TF1 SYSTKM STEAM SYSTEM PBOOIIAM TITI P. TABLE I CHAR TESTS TO CODE TITI K F -5P2P27

9 of 10 FLORIDA POSER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. ISI REMARKS NUMBER CL. CAT. PAS POS. URE IN'EST POS. PER.. TESTS..

MODE RV-4-1412 RELIE SELF 2 C NC NO RV-4-3440 RELIE SELF C NO. TFl RV-4-3441 RELIE SELF NC NA NO TF1 RV-4-3442 RELIE SELF 3 C NO TF1 10-085 CHECK SELF 3 ~ C NC EF3 10-087 4 CHECK SELF C 'C NA 'O EF3 10-083 CHECK SELF NC .NA EF3 10-004 26 CHECK SELF 2 C NO NA NO EF2 10-005 26 CHECK SELF NO NA NO EF2 10-006 26 CHECK SELF NO NA NO EF2 SYSTEM InaanAM STEAM SYSTEM TITLE VALVE TEST PROG TABLE I CHAA TESTS TO CODE TITLE F-502027

10 of 10 FLORIDA POWER 8, LIGHT COMPAHY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS ~ PER... TESTS-MODE IND.

RV-4-729 NOZL SELF 2 C NC NA 'O TFl RV-4-7 07 NOZL SELF C NC NA NO TFl RV-4-747A NOZL SELF 3 C NC NA NO TFl RV-4-7 4 7B NOZL SELF 3 C NC NA NO TFl RV-4-715 NOZL SELF 2 C NC NA NO TFl 4-731 CHECK SELF 3 C NC NA NO EF2 4-735 CHECK SELF 3 C NC NA NO EF2 4-702A 16 CHECK SELF 3 C NO NA NO EFl 4-702B 16 CHECK SELF 3 C NO NA NO EFl 4-702C 16 CHECK SELF 3 C NO NA NO EFl SY5TEM AUX. COOL. COMP. COOL. (ACCC) ~'~"~ VALVE TEST PROGRAM .TABLE I CNART TESTS TO CODE.

F-503187 E-503188 F-5020

FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL>> REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.. TESTS MODE IND.

4-40-203 GATE MAN 2 E P NC FAI NO SYSTEM PROGRAM LUBE OIL & INSTR. AIR VALVE TEST PROG TABLE I CHAR TESTS TO CODE TiTiE F-502030

2 of 6 FLORlDA POYIER L LlGHT COMPAHY VALVE SIZE ACTU ~ CODE CODE ACT/ NORM. FAIL- REM. ISI REMARKS NUMBER CL. CAT. PAS POS. URE IN'EST POS. PER.,TESTS MODE

.HCV-4-758 12 BFLY AO NO FO YES OC1 4-741A GLOBE MAN NO NO OC1 4-741B GLOBE MAN 2 E P NO NO OC1 5Y5TCH AUX. COOL- RES. HEAT REM- (RHR PAOORAM

' VALVE TEST PROGRAM TABLE I CHAR RCV A TESTS TO CODE F-503194

3 of 6 FLORIDA POWERS LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS, MODE IND.

HV-4-2 DIAPH . MAN 2 E CLSD FAX -

NO 1 HV-4-4 DIAPH MAN 2 E P CLSD FAI NO 1 OC-1 SYSTEM CONTAINMENT VENTILATION PAOGAAM TITLE TABLE I CHART TESTS TO CODE TiTiE F-502037

4of6 FLORIDA POWER 8'IGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT PAS POS. URE POS. PER., TESTS, MODE XND.

MOV-4-864A 16 GATE MOTOR NO FAI YES Ocl MOV-4-864B 16 GATE MOTOR NO FAI YES Ocl MOV-3-864A 16 - GATE MOTOR 2 E NO FAI YES Ocl MOV-3-864B 16 GATE MOTOR 2 E NO FAI YES Ocl MOV-4-865A 10 GATE MOTOR 2 E P NO FAI YES OCl MOV-4-865B 10 GATE MOTOR E P. NO FAI YES Ocl.

I MOV-4-865C 10 GATE MOTOR NO FAX .YES Ocl MOV-4-862A 14 GATE MOT.OR 2 E ,. NO FAI YES Ocl MOV-4-862B 14 GATE MOTOR 2 E NO FAI YES OC1 4-2915 2 GATE MAN E NO FAI NO Ocl 4-2916 2 GATE 2 E NO FAI NO OC1 4-2917 2 GATE MAN 2 E NO" 'FAI NO OCl SYSTEM SAFETY. INJECTION SYSTEM PROGRAM VA V TABLE I CHAR TESTS TO CODE E-503185

5of 6 FLORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT ~ PAS POS ~ URE POS ~ PER.. TESTS.

MODE IND.

464C 8 GATE E P NO FAI NO OC1 SYSTEM PRQORAM SAFETY INJECTION SYSTEM (SIS) . VAL TABLE I CHAR TESTS TO CODE E-503185

0 6 of 6 FLORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS.

t MODE IND.

'4-710A GATE MAN NO NA NO OCl 4-710B GATE MAN E NO NA NO OC1 SYS' PROGRAM AUX. COOL. COMP- COOL. (ACCC) '

VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE F-503187 E-503188 F-502036

0 Fl.ORlDA POWER 8 t.lGHT COMPANY PENE. VALVE LEAKAGE PENE. VALVE LEAKAGE PENE. VALVE LEAKAGE NO. NUMBER CC/MIN NO. NUMBER CC/MIN NO. NUMBER CC/MIN MOV-4-750 10,000 CV=4-522B 500 14 CV-4-200B 1,000 MOV-4-751 10,000 CV-4-522C 500 14 CV-4-200C 1,000 MOV-4-744A 5,000 CV-4-951 1,000 14 CV-4-204 1,000

.2 MOV-4-744B 5,000 CV-4-956A 1,000 ,15 HCV-4-121 2,000 4-734 5,000 4-989A 1,000 15 4-333 . 2,000 MOV-4-716A 1,000 CV-4-953 1,000 15 CK-4-312C 4,000 MOV-4.-716B 1; 000 CV-4-956B . 1,000 16 HV-4-1 1;000 CK-4-717 6,000 9 4-989B 1,000 16 HV-4-2 1, 000 MOV-4-730 5, 000 10 . CK-4-4657 1,000 17 4-895V 500 4-732 5,000 10 CV-4-4658A 500 18 MOV-4-866A 1,000 CV-4-516 500 10 CV-4-4658B 500 18 MOV-4-866B 1,000 4-552 500 MOV-4-872 7 ,'0 0'0 18 MOV-4-869. 2,000 4-550 500 12 4-737A 2 , 000 19A MOV-4-880A 5,000 CK-4-518 2,500 12 CK-4-738 2 , 000 19A CK-4-890A 6,000 CV-4-519A 2,000 4-737B 2 , 000 19B MOV-4-880B 5,000 13'3 CV-4-519B 2,000 CV-4-739 2 , 000 19B- CK-4-890B 6,000 CV-4-522A 500 14 CV-4-200A 1,000 20 CV-4-955A 1,000 5YSTEM s noenaM VARIOUS VALVE TEST PROGRAM C: lfA R Y TABLE I.A VALVE LEAKAGE RATES VARIOUS

FLORIDA POWER 8 LIGHT COMPANY PENE. VALVE LEAKAGE PENE. VALVE LEAKAGE PENE. VALVE LEAKAGE NO. NUMBER CC/MIN NO. NUMBER CC/MIN NO. NUMBER CC/MIN 20 CV-4-956C 1,000 29 CV-4-2803 2,000 47 4-10-.567 4,000 4-989C 1,000 29 CK-4-336 4,000 52 CV-4-4668A 2,000 20 CV-4-955B 500 31 CV-4-4659A 500 52 CV-4-4668B 2,000 21 MOV-4-1417 5,000 31 CV-4-4659B 500 51 HV-4-3 1,000 MOV-4-1418 .5,000 32 CK-4-11-00 2,000 51 HV-4-4 1,000 23 CV-4-2821 2,000 32 SV-4-2912 . 2,000 54A MOV-4-860A 7,000 23 CV-4-2822 2,000 33 -SV-4-2913 2,000 54A MOV-4-861A 7,000 24A 4-297A 1,000 33 ~

SV-4-2911 2,000 54B MOV-4-860B 7i 000 24A CK-4-298A 2,000 34 4-203 1,000 54B MOV-4-861B 7,000 24B 4-297B 1,000 34 4-204 1,000 55 LV-4-955C 1,000 24B CK-4-298B 2,000 35 POV-4-2600 15,000 .

55 CV-4-9550 1,000 24C 4-297C 1,000 35 POV 4 2601 15i 000 55 CV-4-955E 1,000 24C CK-4-298C 2,000 36 POV-4-2602 15,000 55 CV-4-956D 1;000 25 MOV-4-381 2i000 36 POV-4-2603 15,000 58 CK-4-873A 2,000 25 CV-4-307 2, 000 42 CV-4-855 500 59 CK-4-873B 2,000 28A MOV-4-1410 000 42 PCV-4-,846 500 60 CK-4-873C 2, 000 28B MOV-4-1411 5,000 43 FCV-4-626 2,000 58 59 MOV-4-843A 2,000 28C MOV-4-1412 5i000 43 4-736 2,000 60 SY5TEM PROOR*M VARIOUS VALVE TEST PROG CHART . TABLE I A VARIOUS VALVE LEAKAGE RATES

~ i FLORlDA POWER 8 LlGHT COMPANY PENE. VALVE LEAKAGE PENE. VALVE LEAKAGE PENE. VALVE LEAKAGE NO NUMBER CC/MIN NO. NUMBER CC/MIN . NO. NUMBER CC/MIN 58

59. MOV-4-843B 2,000 60 61B 4-570 500 CV-4-2819 2, 000

'2,000 63 64A CV-4-2826 MOV-4-1425 ', 000 64B MOV-4-1426 1,000 64C MOV-4-1427 1,000 5Y5TEM PROCRAM VARIOUS VALVE TEST PROGRAM TABLE I.A CHART ~

. VARIOUS VALVE LEAKAGE RATES

FLOR(DA POWER 8 L(GHT COMPANY VALVE SIKE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS ~ PER. TESTS MODE IND.

Definition 6 CV-4-2605 10 PLUG A/0 3 B A CLSD FC NO Definition 2 SYSTEM CHAR CONDENSATE 6 FEEDWATER VALVE TEST PROGRAM TABLE II EXCEPTIONS TO CODE F 5PZP28

(

2 of 15 FLORIDA POWfR & L(GHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.; TESTS MODE IND.

4-20-14 0 CHECK SA .C A'LSD NO, E-5 4-20-240 3 CHECK SA A CLSD NO E-5 4-20-34 0 3. CHECK SA A CLSD NO E-5 I

4-20-4 01 8 CHECK SA -C OPN E-5 I

4-20-131 6 CHECK SA A CLSD NO E-5; Control valve, FCV-4-479, will be tested in lieu of .

~ testing this check

'alve.

4-20-231 CHECK SA A CLSD NQ E-5; Control valve, r FCV-4-489, will be tested in lieu of testing this check

,valve.

4-20-331 CHEC SA CLSD NO E-5; Control valve, FCV-4-499, will be tested in lieu of testing this check valve. r S YS Ta.'N PllOCllAM CHAA CONDENSATE 6 FEEDWATER TITL C VALVE TEST PROGRAM TABLE II TITLC EXCEPTlONS TO CODE

3 of 15 FLORlDA POWER 8, LlGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS. PER., TESTS..

MODE IND.

4-4 0-205 2 CHECK SA 2 A CLSD Definition 6 Definition 3 5YSTEM PflOOAAM mimic SHART LUBE OIL & INSTR. AIR, VALVE TEST PROGRAM TABLE II TIT" EXCEPTIONS TO CODE F-502030

, I 4of 15 FLORlDA POY(ER L LtGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL ~ CAT. PAS POS ~ URE POS. PER'1 TESTS2 MODE IND CV-4-2803 2 PLUG A/0 2 A/E P OPN FO NO EST.3 E-l h SLT3 SVSTEM PIIOQRAM CHAR LUBE OIL li INSTR. AIR T IT I.C VALVE TEST PRO TABLE II EXCEPTIONS TO CODE F-502030

5 of 15.

FLORIDA POWER L LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.1 TESTS2 MODE IND.

MOV-4-751 14 GATE MOTOR 1 A CLSD FAI YES 1 EF5 1 EST2 E-l, E-3 1 SLT3-SYSTFM T>TLK AU+ -COOL ~ RES ~ HEAT REM o VALVE TEST PROGRAM TABLE I CHAR TESTS TO CODE TITLc F 5P3 194

6 of 15 FLORIDA POWERS LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAXL- REM. TEST IS I REMARKS NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS MODE XND.

4-734 GATE ~N 2 CLSD . NO E-4i Definition 6 I

MOV-4-744A 10 GATE MOTOR 2 A; A CLSD FAX YES EF-4 E-1 EF-5 EF-8 E-1 ~

EST-2 E-1 SLT-3 MOV-4-744B 10 GATE MOTOR 2 A. CLSD FAX YES EF-4 E-l.

EF-5 EF-8 E-1 EST-2 E-1 SLT-3 MOV-4-750 14 GATE MOTOR CLSD FAI YES EF-4 E-l, E-3 EF-5 EF-8 E-l, E-3 EST-2 E-l, E-3 SLT-3 PAOQAhM

~'~"~ AUX. COOL. RES. HEAT REM. VALVE TEST PROGRAM TABLE IX CHAA EXCEPTIONS TO CODE F-503194

7 of 15 FLORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER.1 TESTS2 MODE IND.

SV-4-2913 PLUG SO A A OPN FC YES 1 EF5 1 EF8 E-l, E-6 1 EST2 E-l, E-6 1 SLT3 4-11-003 CHECK SA A/C A OPN NO 1 EF5 1 EFS E-l, E-6 1 EST2 E-l, E-6 1 SLT3 PROGRAM SYSTKM CONTAINMENT VENTILATION SYSTE ' VALVE TEST PROGR~ TABLE I CHART TESTS TO CODE F-502037

1 8 of 15 FLORlDA POSER'lGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER., TESTS MODE IND. J' POV-4-2600 48 BFLY AO P CLSD FC YES SLT-3 Definition 6 POV-4-2601 48 BFLY AO A P CLSD FC YES 1 . SLT-3 Definition 6 POV-4-2602 54 BFLY AO P CLSD" FC YES SLT-3 Definition 6 POV-4-2603 54 BFLY AO P CLSD FC .YES SLT-3 Definition 6 CV-4-2819 2 PLUG AO P CLSD FC YES SLT-3 Definition 6 CV-4-2826 2 PLUG AO P -

CLSD FC YES SLT-3 Definition 6 SV-4-2912 1 PLUG SO A OPN FC YES EF-4 E-1 1 . EF-5 EF-8 E-l, E-6 EST-2 -E-l, E-6 SLT-3 SY5TKM PAOCAAM NT I M V L TION SYSTEM PROGR TABLE II ICHABOD EXCEPTIONS TO CODE 20 7

0 9 of 15 FLORIDA POSER 8. LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS ~ PER. TESTS MODE IND.

CV-4-1014 1 GLOBE SELF NO NO E-ll SLT3 SYSTEM PROORAM CHAR WASTE DISPOSAL LIQUID VALVE TEST PROGRAM TABLE II EXCEPTIONS TO CODE F-503189

10 of 15 FLORIDA POWER 8, LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. <<TESTS-MODE IND.

PCV-4-145 PLUG . AO 3 B OPN FO ~

NO. E-ll, Definition 6 4-239A CHECK SA C'PN NO E-5 Definition 2 PCV-4-117 3 GLOBE AO A CLSD FC NO E-ll, Definition .6 4

4-266 CHECK SA 2 C A OPN NO E Definition 2 4-312A SA OPN NO E-5 CHECK

'efinition 3 4-312B CHECK SA 1 C CLSD 'NO E-5 Definition 3

'4- 313 CHECK SA'LSD NO E-5 Definition 3 4-357 CHECK SA 2 CLSD NO E-5 Definition 2 SYSTEM CHEM. VOL. CONT. CVCS PROCAAM TITLC TABLE II CHAR EXCEPTIONS TO CODE F-503184

FLOR(DA POSER L LtGHl'OMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS. PER.l TESTS2 MODE IND.

MOV-4-535 3 GATE A/0 OPN FAI YES EF5 EST4 E-3, E-6 MOV-4-53 6 3 GATE A/0 OPN FAI YES EF5 EST4 E-3, E-6 PCV-4-456 3 PLUG A/0 A CLSD F.C YES EF5 EST4 E-3, E-6 PCV-4-455C 3 PLUG A/0 .B CLSD FC - YES EF.5 EST4 E-3 I E-.6 SYSTEM PROGRAM II

~

REACTOR COOLANT SYSTEM (RCS) VALVE TEST PROGRAM TABLE CHAR EXCEPTIONS TO CODE TITLC

12 of 15 FLORIOA PONER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. PER. TESTS.

MODE IND.

SV-4-2905 2 GATE SO A CLSD FAI. NO E-5, Definition 6 SV-4-2906 2 GATE SO B .A CLSD FAI NO E-5, Definition 6 SV-4-2907 2 GATE SO CLSD FAI NO E-5, Definition 6 SV-4-2908 2 GATE SO Ci SD FAI NO E-5, Definition 6 I

SV-4-2909 2 GATE SO A CLSD - FAZ NO E-5, Definition'6 SV-4-2910 2 . GATE SO 2' B' CLSD FAI NO E-5, Definition 6

~

SYSTEM RROQRAM QHAR SAFETY INJECTION SYSTEM (SIS) ' VALVE TEST PROGRAM TABLE II EXCEPTIONS TO CODE E-'503185

1 13 of 15 FLORIDA POWER & LIGHT COMPAHY VALVE SIKE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE POS. PER.- TESTS-,.

MODE IN'O E-6 4-873B CHECK ~

SA A/C A CLSD EF-2 E-l, E-3 SLT-3 E-6 4-873C CHECK SA A/C A CLSD EF-2 E-l, 1

E-3 SLT-3 4-2918 CHECK SA C A CLSD E-5, Definition 6 4-2919 CHECK SA 2 A CLSD NO E-.5, Definition 6 4-2920 CHECK SA . 2 C- ,A CLSD NO E-5, Definition 6 4-2921 CHECK SA 2 A CLSD NO E-5, Definition 6 4-2922 CHECK SA 2 A CLSD E-5, Definition 6 4-2923 CHECK SA 2 CLSD E-5, Definition 6 avSTCM PROGflAM CHAR SAFETY INJECTION SYSTEM TITLC VA PR TABLE II EXCEPTIONS TO CODE E-503185

14 of 15 FLORIDA POWER 8 LIGHT COMPANY VALVE SIZE TYPE ACTU. CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS. URE POS. 'ER.

TESTS.

MODE IND.

CV-4-853B GLOBE PO 2 A CLSD FC YES E-4 ~

Definition CV-4-853A GLOBE AO 2 A CLSD F,C YES E-4 Definition 2-6 CV-4-853C GLOBE AO 2 A P CLSD FC YES E-4 Definition 2-6 4-874B CHECK SA 1 C CLSD NO E-5 Definition 3-6 HCV-4-936 GLOBE AO 2 A CLSD FC YES E-4 Definition 2-6 4-874A CHECK SA 1 C CLSD NO E-5 Definition 3-6 3

4-849 CHECK SA 2 A/C A CLSD NO E-5 4

Definition 3 4-873A CHECK SA 1 A/C A CLSD NO EF-2 E-l, E-3, E-6 SLT-3 SYSTEM PflOGAAM T'AFETY INJECTION CHAflT SYSTEM VALVE TEST PROGRAM TABLE II EXC,'EPTIONS TO CODE E-503185

e 15 of 15 FLORlDA POWER L LlGHT COMPANY VALVE SIZE TYPE ACTUS CODE CODE ACT/ NORM. FAIL- REM. TEST ISI NUMBER CL. CAT. PAS POS ~ URE MODE POS.

IND.

PER i TESTS2 POU-4-2604 GATE A/CYL 2 A A NO FC - YES 2 EF 2.

2 EF8 ESTl 1 SLT1 E-4 POV-4-2605 26 GATE A/CYL 2 A PC , YES 2 EF2 2 EF8 2 ESTl 1 SLT1 POV-4-2606 26 GATE A/CYL 2 A NO FC YES 2 EF.2 2 EF8

2. EST%.

1 SLTl E-4'YSTKM PAOCAAM CHA A STEAM SYSTEM VALVE TEST PROGRAM TABLE II EXCEPTIONS TO CODE F- 202

1 of 8 FLORIDA POSER 8 LIGNT COMPANY V E MBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMB R 20-137 1 1/2 20-237 1 1/2 20-337 1 1/2 5Y5TCM PROORAM CONDENSATE 6 FEEDWATER TITI K VALVE TEST PROGRAM CIIART 'ABLE II.A F-502028 EXCEPTIONS TO CODE

e,

.2 of 8 FLORIDA POSER 8 LIGHT COMPANY MBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMB R 771E 3/4 771F 3/4 5T5TEM PAOCAAM AUX. COOL. RES.,HEAT .REM. (RHR) TITLE VALVE TEST PROGRAM 'ABLE CHANT II.A F-S03194 EXCEPTIONS TO CODE

3 of 8 FLORIDA POYtER 8 LIGHT COMPANY MBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE N MB R 4636A- 4639A 4643A 4636B 4639B 4643B 4636C 4639C 4643C 4636D 4639D 4643D 4636E 4639E 4643E 4636F 4639F 4643F 4637A 4640A PCV.-1036A 4637B 4640B PCV.-1036B 3/8 4637C 4640C PCV-1037A 4637D 4640D PCV.-1037B 3/8 4637E 4640E PCV.-1038A 4637F 4640F PCV-1038B 3/8 4638A 4642A PCV;1039A 4638B 4642B PCV.-1039B 3/8 4638C 4642C PCV.-1052A 4638D 4642D POV.-1052B 3/8 4638E 4642E KCV-1053A 4638F 4642F PCV.-1053B i 3/8 YS TKM PROOllAM WASTE DISPOSAL-GAS tltLK VALVE TES T PROGRAM CHAAT TABLE lI.A F-503190 EXCEPTIONS TO CODE

4 of 8 FLORIDA POWERS LIGHT COMPANY A " BER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE N MBER 104 271 308 3/4 282A 105 272 329 3/4 282B 110 274A 3/4 344 3/4 282C FCV 113B 274B 3/4 370 282D FCV 114B 274C 3/4 397A 398A 202C 275A 3/4 397B 398B 216A 275B 3/4 397C 398C 216B 275C 3/4 351 398D 216C 283A 3/4 352 223 283B 3/4 353A 225 283C 3/4 302C 232B 293A 228B 232C 2. 293D 263 239 293C 802B 246 302A 3/4 264 247A 302B =3/4 263 215B 293B 368 245B 302C 5Y5TKM PAOCAAM HEM. VOL. CONT. (CVCS ) VALVE TEST PROGRAM 'ABLE II.A CHART F-503184 EXCEPTIONS TO CODE

1 5 of 8 FI.ORIDA POWER 8 LIGHT COMPANY BER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE N B R 837 3/4 883C 877A.

850A 3/4 883E RV-4-871 3/4 850C 3/4 883F 850B 850E 3/4 883G 850D

-852A 883H 1 850F 852B 883J 1 877D 3/4 852C 884A 3/4 882A . 2 857 3/4 884E. 3/4 898S 3/4 858A 893E, 3/4 884B 858B 8 93F. 3/4 858C 895K 3/4 871 3/4 895M 3/4 877B 3/4 895T 3/4 877C 3/4 895U '3/4 882B 898N 3/4 882C 898P '3/4 883B 898R 3/4 PAOORhM SAFETY INJECTION SYSTEM (SIS) viviE VALVF~ TEST PROGRAM CHAAJ 'ABLE II-A E-503185 EXCEPTIONS TO CODE

li 0 6 of 8 FlORIDA POYfER 8 LIGHT COMPANY V MBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE N MBER 70-003 7 0-0 06A 70-006B 70-026A 1-1/2 026B 1-1/2 CV-2046A CV-2046B SV-3522A 1-1/2 SV-3522B 1-1/2 70-008 SYSTKM PAOQAAM TITLK TITLK HAI4 T L OIL V 'ABLE II.A C

F-502033 EXCEPTIONS TO CODE

7 of 8 FI.ORIDA POWER 8 LIGHT COMPANY MBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE N MB R RV-1414 1 1/2 RV-1442 1 1/2 RV-1443 1 1/2 SY5TEM PAOQBAM STEAM SYSTEM VALVE TEST PROGRAM 'ABLE II.A CHART TITI K EXCEPTIONS TP CODE F-502027

8 of 8 FLORIDA POYIER It LIGHT COMPANY V ~

BER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE NUMBER SIZE VALVE N MBER 705A 722C 3/4 705B 705C 721A 1-1/2 721B 1-1/2 721C 1-1/2 RV-791C 3/4 RV-791E 3/4 RV-791F 3/4 RCV-4-609 707 108F 708E 705G 705H 722A 3/4 722B 3/4 SYSTEM P II0 IIR AM TITLE AUX. COOL. COMP . COOL. (ACCC) VALVE TEST PROGRAM 'ABLE II.A CHART

'TITLC EXCEPTIONS TP CODE F- E-503188 F-502036

,I FLORIDA POWER L LIGHT COMPANY TEST PUMP PUMP 'NO. TEST PARAMETERS INTERVAL Speed, Inlet Differential Flow Vibration Bearing Pressure, Pressure, Rate, Amplitude, Temperature, N P. AP Q V Tb (1)

Auxiliary Feed P2A Yes Yes ~ Yes Yes Yes Yes Monthly P2B Yes Yes Yes Yes Yes Yes Monthly P2C Yes Yes Yes Yes Yes Yes Monthly Intake Cooling 4-P9A No Yes No Yes Yes Monthly Water 4-P9B No . Yes Yes No Yes- Yes Monthly 4-P9C No Yes Yes No Yes Yes Monthly Residual Heat 4-P210A No Yes Yes No Yes No Monthly Removal 4-P210B No Yes Yes No Yes No Monthly Component Cooling 4-P211A No Yes . Yes No Yes .Yes Monthly 4-P211B No Y.es Yes No Yes Yes Monthly 4-P211C No Yes Yes ~

No Yes Yes Monthly Containment Spray 4-P214A No Yes Yes No Yes Yes Monthly 4-P214B No Yes Yes Yes Yes Monthly PAOGFlAM PUMP .TEST PROGRAM TABLE IV

I C

0 0

~a

~

0%

Q g og A C4 5 8 0 0 0

X 0N CX R R ld W C O

IJ 6 8 I

8 Vlf' NO 8 8 4$

W Ck LQ A

O a' L ~

Cl 8 5 IO NA

'r{

O C H 8 0 0 Z R 0 Lll Lfl C4 I I 0

0 8

n 4 M 8

A 8 tnW

~ Q Q M

Table I- Nondestructive Examinations - Class 1 TABLE I. TURKEY POINT PLAVI'NIT 4 CLASS 1 COMPONENTS AND SYSTEMS Title ~Pa e No.

Reactor Pressure Vessel . 13 e

Pressurizer . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 16 Steam Generators . . . . . . . . . . . . . . . . . . . . . . . . 18 Regenerative Heat Exchanger . 21 Main Reactor Coolant Loops 25 Reactor Coolant System 32 Chemical and Volume Control System ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 74 Safety Injection System . 110 Auxiliary Coolant System ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 130 Reactor Coolant Pumps . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 132 Valves ~ ~ ~ e ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 135

o 0

+I TURKEY POINT PLANT UNIT 4 IHSERVICE EXAHIHATION PLAN FOR 'lllE SECOND 40-IIOHTII PFRIOD OF IIIE FIRSf 10-YEAR INSPECTION INTERVAI, - CI~S I REACTOR PRL'SSURE VESSEI (Sce Appendix A, Figures A-I and A-2)

'NSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-31/3 YEARS 3.l/3-62/3YEARS 6.2/3-IOYEARS SEC. XI SEG XI AREA IDENTIFICATION METIIOD OUTAGES REMAIIKS ITEM NQ. CATGY.

I 2 3 4 6 7 Bl.l 8-A RPV-8 Hcch Uf 100% of thc veld length to bc cxanincd.

Upper Shell-to-Inter-ecdiate Shell 81.1 RPV-C Ilcch lff 100't of thc weld length to be examined.

Intermediate Shell-to-Lowcr Shell 81.2 8-8 RPV-G Mech Uf Essentially 100% of thc veld length to bc Lower Shell-to-Lower examined.

llcad Ring 81.2 8-8 RPV-F Hcch UT Essentially 100% of thc weld length to hc Lower llcad Ring-to-Lower cxaiined.

llcad Disc 81.3 8-C RPV-A Uf 33-1/3% of the veld length to bc examined.

Vessel Flange-to-Upper Hoch lfl' Shell 81.3 8-C RPV-C.II.-E 33-1/3% of the weld length to be cxanlncd.

Closuro llcad-to-Flange 81.4 8-D RPV-I-A lech Uf Inlet Nozzle-to-Shell (Loop A) 81.4 '8-D RPV-I-A-IRS Hcch Uf Inlet Hozzlo Inner Radius (Loop A) 81.4 B-D RPV-0-A Hcch UT Outlet Nozzle-to-Shell (Loop A) 81.4 B-D RPV-0-A-IRS Hcch lff Outlet Nozzle Inner Radius (Loop A) 81.4 8-D RPV-1-8 Hcch Uf Inlet Nozzlo-to-Shell (Inop 8) 81.4 8-n RPV-I-B-JRS ~lech Ur Inlet Nozzlo Inner Radius (l,oop 8)

TURKPY I'OINT PlANT I)HIT 4 INSERVICD BXAMINATION PLAN FOR 'llIE SECOND 40-)X)Nll PERIOD OF TIID FIRST 10-YEAR IHSPFXZIOH IHTERVAI. - CIJLSS I REACTOR. PRLSSURD VIISSEL (Sce Appendix, Figures A-I and A-2) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAZIL 0-3 I/3 YEARS 3 I/3-0 2/3 YEAIIS 0.2/3-)0 YEA)IS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES IIEMAFIKS ITEM NO. CATGY.

4 5 0 7 81.4 D-D RPV-0-0 Mech Uf Outlet Hozzle-'to-Shell (Loop 8) 01.4 D-D RPV-O-B-IRS thch UT Outlet Nozzle Inner Radius (lx)op D) 01.4 D-D RPV-I-C Mech UT Inlet Nozzle-to-Shell (Loop C)

I 81.4 B-D RPV- I-C- IRS Mech I Inlet Nozzle Inner Radius (Loop C)

D-D RPV-0-C Mech UT Outlet Nozzlo-to-Shell (Loop C) 01.4 B-D RPV-0-C-IRS tlcch Outlet Nozzle Inner Radius (Loop C) 01.5 B-E RPV Instrunentation Penetration (50 Nozzle Pcnctrations on tho Lo<<er ltcad) 01.5 RPV-C.II. Control Rod Drive Pcnctrations (65 Pcnctrations) 0l. 0 8-r RPV Nozzle-to-Safe End Sce s, The dissia<liar motal <<olds arc being cxa<<<lncd as Ifclds part of thc thin Reactor Coolant IA)cps (RCC).

81.8 0-C-I RPV Closure Studs 20 studs to be exanined.

(58 Studs) nl.n 0-C- I RPV Closuro Huts Iff X 20 nuts to bc cxanlne<l.

(58 Huts) PT X 01.9 0-C-i RPV l,iga<ments 20 linc<lent areas between the thrca<Ic<l stud holes to be oxamincd.

TUINEY POINT PLANT UNIT 4 INSERVICE BXAHIHATIOH PLAN FOR TIIB SECOND 40-IXINTII PERIOD OF TIIB FIRST 10-YEAR IHSI'FCTIOH INTERVAL - CLASS I REACTOR PRESSURE VESSEL Sce A cndix A Fi ures A-I and A-2 Cont'd INSPECTION INTEIIVAL ASME ASME SEC. XI SEC. XI EXAMINATION EXAM. 03.I/3 YEAIIS 3 I/3-8 2/3 YEAFIS 0.2/3-10YEAAS AREA IDENI'IFICATION METIIOO OUTAG ES 4 REMARKS ITEM NO. CATGY.

3 4 7 8 81.10 8-G-I RPV Closure Ifashcrs 20 large washcrs .to bc exawlncd.

(58 Large Ifashcrs) 81.10 B-G-I RPV Closure lfashers 20 small wishcrs to bc cxawlncd.

(58 Small Ifashers) 81.11 8-G-2 RPV Prcssure Retaining Sc Rema s Nonexistent.

Bolting

81. 12 8-I I RPV Integrally lfelded. Sc Rema< ks Integral noxxle support pads exclude<l frow Supports examination pcr Section XI.

8'3 B-l-l RPV-C.II. Cladding 2 6" x 6" patches to bb examined.

81.14 8-1-1 RPV Cladding R.VT 6 6" x 6" patches to bc examined.

81.15 8-N-I RPV Interior 81.17 8-N-3 RPV Removable Core R.VT Support Structures 81.18 8-0 RPV-C.II. Control Rod Dr 1ve llouslng (24 Pcriferal Control Rod Drive Ilousing) 81.19 8-P RPV Monitoring Taps (I Inner and I Outer).

81.19 8-P RPV-C.II. Vent

TUIIKEY POINT PIJLNT UNIT 4 INSERVICE BXANINATION PliAN FOR Illn SECOND 40-ID%i! PERIOD OF TIIE FIRST IO-YEAII INSPECTION INTERVAL - CIJLSS I PRESSUltlZER (Scc Appendix A, Figures A-3 and A-4)

INSPECTION INTERVAL ASME ASME EXAhUNATION EXAM. 0-3.1/3 YEARS 3 I/3-6 2/3 YEARS 6-2/3-10 YEARS SEC. XI SEG XI AREA IDENTIFICATION METI IOD OUTAGES AEMARKS ITEM NO. CATOY.

3 4 6 7

02. I PRZ-L-I

'cldShell Lower Longitudinal 02.1 0-0 PRZ-I-2 10% of the wold length to bc examined.

Upper Shell Longitudinal Kc id i

02.l 0-0 PRZ-C-I Lower Ilcad-to-Lower Shell Circumferential Kaid 02, I PRZ-C-2 5\ of thc weld length to bc oxamincd.

Iiower Sholl-to-Upper Shell Circumferential Kaid 02.l n-0 PRZ-C-3 Upper Shell-to-Upper

!Iced Circumferential Ifcld

02. 2 Relief Nozzle Inner

'RZ-8-IRS Radius I w

02. 2 0-U PRZ-SPR-IRS Spray Nozzle Innor Radius 02.2 O-D PRZ-SFA-IRS Safety Nozzle A Inner I\adius 02.2 O-D PltZ-SFD-IRS Safety Nozzle 8 Inner Radius

'2.2

~ D-D Safety Nozzle C Inner Radius 0-L'RZ-SFC-IRS i ~

n2.2 PRZ-SRU-IRS Surge Nozzle Inner Ri1dius 02.3 I'Rz Ilcatcr Penetratlons (78 I'cnctrations)

~ 'URKEY POINT PLANT UNIT 4 INSERVICE EXlNIHATION PLAN FOR TIIE SECOND 40-IIDHTII PERIOD OF THE FIRST 10-YEAR INSPECTION INTFRVAL - CITS I PRI!SSURIZER (See Appendix A, Figures A-3 and A-4) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEAIIS 3-I/3-8 2/3 YEAIIS 8-2/3-10 YEAIIS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGFS REMARKS ITEM NO. CATGY.

8 7 82.4 8-F PRZ Hozxlc-to-Safe End Sec tcmar Thc dissintlar xetal selds are being examined ns Nelds part of tho Reactor Coolant Systcn (RC).

82.5 8-G-I PRZ Pressure Retaining Bolts and Studs Sco Rema Nonexistent.

82.8 B-II PRZ-SS Bottom Head-to-Support Skirt 82.9 8-I-2 PRZ Cladding I 6" x 6" patch to be examined near thc IL1nMay.

82.10 8-P PRZ Instruncnt Hassles (8 Penctrations) 82.10 8-P PRZ Sanplc Ho@sic (I Penetration) 82.11 8-0-2 PRZ IIanway Bolting 5 bolts to bo exanincd in this designated outage.

TURKEY POINT PLANT IINIT 4 INSERVICE EXANINATION PUN FOR IIIE SECOND 40-IIONTII PERIOD OF TIIE FIRST 10-YEAR INSPI<CTION INTERVAI. - CLASS I STEAN GENERATORS (Scc Appendix A, Figure A-5)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6 2/3-IO YEARS SEC. XI SEC. XI REMARKS AREA IDENTIFICATION. hIETNOO OUTAGES ITEMNO CATGY.,

I 2 3 5 6 7 6 6 Stcam Generator Loo A 83.1 SG-A-TS Primary Ilcad-to-Tubo Sheet

83. 2 8-n SG-A-I-IRS Inlet Nozzle Inner Radius
83. 2 D-D SG-A-0-IRS Outlet Nozzle Inner Radius 83.3 SG Horzlc-to-Safe Pnd Sce tcmar The dissimilar metal welds for the 3 SGs arc Ifc1ds being cxamlncd as part of tho Ibin Reactor Coolant Loops (RCC).

83.4 D-I-I SG I'rcssuro Retaining See cmar Noncxistcnt on all 3 SGs.

Bolts and Studs 83.7 8-II SG Integrally Ifeldcd Scc Icmar .Nonexistent. Thc integral parts on all 3 SGs arc Supports not inspcctable due to their configuration.

83.8 D-1-2 SG-A-Cladding Patch ll Inlet Nhnway 83.8 D-1-2 SG-A Cladding Patch l2 Out lct ILanway D3. 10 8-G-2 SG-A-IIanway-Bolting Inlet Ilanway 83.10 8-G-2 SG-A-Hanway, Bolting Outlet IIanway Stcam Gcncrator Loo 8 83 ~ I SG-8-TS 5% of thc weld length to bo examined.

Primary Ilcad-to-Tube Sheet 83.2 8-D SG I- IllS Inlot Nozzle Inner Radius

TIIRKIP/ POINT PLANT UNIT 4 INSBRVICE BXANINATION PLAN FOR TIIE SECOND 40->KMITII I'BRIOD OF TIIB FIRST lo-YEAR INSPECTION INTERVAL - CrASS I SKAH GlJIBRATORS (Scc Appendix A, Figure A-5) (Cont'd)

INSPECTION INTEIIVAL ASM E ASME EXAMINA'TION EXAM. 0-3 I/3 YEAIIS 3.1/3-6 2/3 YEARS 6 2/3-10 YEAIIS SEC. XI SEC. XI AAEA IDENTIFICATION METHOD OUTAGES IIEMAIIKS ITEM NO. CATGY.

I 2 5 6 7 8 Stcam Generator Loo 0 (Cont )

03.2 0-D SG-0-O-IRS Outlot Nozzle Inner Radius 83.8 0-1-2 SG-8-Cladding Patch II If radiation levels permit and thc manway is inlet khnway opcncd for other reasons, n G" x G" patch will hc cxamincd near thc manway.

03.8 0-1-2 SG-0-Cladding Patch Outlet Ihnway l2 If radiation levels permit and thc manway ls opcncd for other reasons, a G" x 6" patch will hc examined near tho manway.

83.10 0-G-2 SG-0-hhnway Bolting All IG bolts to bc cxamlncd.

Inlet ihnway 03.10 B-G-2 SG-0-Hanway Bolting All 16 bolts to be examined.

Outlet hhnway Stcam Gcncrator Loo C 03.1 SG-C-Ts Primary ilcad-to-Tube Sheet

03. 2 0-D SG-C-I-IRS Inlet Nozzle Inner Radius 03.2 SG-C-0-IRS Outlet Nozzle Inner Radius 8-1-2 SG-C-Cladding Patch Inlet II lf radiation levels permit and thc manwav is Runway opened for other reasonsi a G" x 6" patch will ho examined near the manway.

03.8 0-1-2 SG-C-Cladding Patch l2 Outlet ihnway lf radiation levels permit nnd thc manway is opened fnr other reasons, a G" x G" patch will bc examined near thc manway.

TURK!!Y POINT PIAHT UNlT 4 INSI:.IIVICB rm)INATION PION POII T!u! SECOV0 40-WNIII Pgg!OO OP T!!B PIBST'o-Yrw!I INSPECTION !NTEIIVA!. - CuSS I STEAN GENERATORS (Sco Appcnti!x A, Piguro A-5) (Cont'd)

! NSPECTION! NTEBVAi ASME ASME 0-3.1/3 YEA!IS 3.I/3-6.2/3 YEAIIS 0 2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI REMAOKS AIIEA IDENTIFICATION METIIOO OUTAGES ITEM NO. CATGY.

8 9 Steam Generator Loo C

~Cant' 03.10 B-G-2 SG-C-1!anyway Bolting Inlet 1!anyway 03.10 B-G-2 SG-C-5!an@ay Bolting Outlet ilanway

0 TURKEY POINT PLANT UNIT 4 INSLRVICB EXQIINATION PLAN FOR TIIE SECOND 40-IIONTII PERIOD OF TIIB FIRST 10-YL>AR INSPECTIOII INTERVAL - CLASS I RLGENERATIVE IIEAT EXCIIANGER See A cndix A Fi ure A-6)

INSPECTION INTERVAL ASM E ASME EXAhllNATION EXAM. 0-3-1/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGY.

I 2 3 4 7 8 Circux>fcrential Nclds Shell I 83.1 RGX-(I)-1 llcad-to-Shell 8-8 RGX-(I)-2 Shell-to-Tube Sheet 83.1 8-8 RGX-(I) -3 Tube Shcct-to-Tube Sheet 83.1 8-8 RGX-(1)-4 Tube Shcct-to-llcad Shell II

83. I RGX-(II)-1 llcad-to-Shell 83.1 RGX-(II)-2 Shell-to-Tube Sheet 83.1 8-8 RGX-(II)-3 Tube Sheet-to-Tube Sheet 83.1 RGiX-(11)-4 Tube Sheet-to-llead Shell III RGiX-(III)-l 5% of thc weld length to be exa>>>lncd.

Ilead-to-Shell 83.1 '-8 RGX-(III)-2 Shell-to-Tube Sheet 5't of thc wold length to bc cxa>>>ined.

8-8 RGX-(III)-3 5% of thc weld length to bc examined.

Tube Shcct-to-Tube Sheet

83. I RGX-(111)-4 5% of thc weld length to l>c cxa>>>incd.

Tube Sheet to-tlcad

TURKEY POINT PLANT UNIT 4 IHSERVICQ EXANIHATION PLAN FOR TIIB SECOND 40-NNTII PERIOD OF TIIE FIRST 10-YIPAR INSPECf ION IIffERVAL - CIDEAS I RL'GENERATIVII IIL'AT EXCIIANGEIR (Sec Appendix A, Figure A-6) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6.2/3-IO YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES REMARKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

2 3 5 6 7 Nozzle Ifclds Shell 1 83.2 8-D RGX-(1)-D Shell-to-Nozzle 2" Letdown Line 83.2 RGX- (I) - IO vr Nozzle-to-Shell 3" Charging Line

83. 2 8-8 RCX- (I) -11 Nozzle-to-Shell 2" I.etdown Line 83.2 8-8 RGX- (I) -12 Shel I-to-Nozzle 3" Charging Lino Shell II
83. 2 8-D RGX-(II)-9 Shell-to-Hozzlc 2" Letdown Linc
83. 2 8-D RGX-(11)-10 Hozrle-to-Sholl 3" Charging Line 83.2 8-8 RGX- (II) -11 Nozzle-to-Shell 2" Letdown Linc 83.2 D-D RGX-(11)-12 "

Shel I-to-Nozzle 3" Charging Line Shell III 83.2 D-D RCX-(iir)-D Shell-to-Nozzle 2" LctJew~ Lino

~

83.2 RGX-(111) -IO Nozzle-to-Shell 3" Charging l.inc

TURKEll'OINT PLANT UNIT 4 1HSERVICE EXANINATION PLAN FOR TIIE SECOND 40-IKINTll PERIOD OF TIIE FIRST IO-VAIR INSPECTION INTERVAL - CIASS I Rl!GENERATIVE IIEAT EXCIIANGER (Sec Appendix A, Figure A-6) (Cont'd)

INSPECTION INTERVAL ASME ASME 0<<3.I/3 YEAfIS 3 I/3-6 2/3 YEARS 6.2/3-IO YEARS EXAMINATION EXAM.

SEC. XI SEG XI REMARKS AREA ID EN TIP ICATION METHOD OUTAGES IfEM NO. CATOY.

3 4 6 7 Nozzle Ifclds Cont'd 83.2 8-D RGX-(Ill)-11 Nozzle-to-Shell 2" Letdown Line B-D RGX-(ill)-12 Shell-to-Hozzle 3" Charging Line 83.2 8-II RGX Nozzle Inner Rona> ks Honcxistcnt. The nozzles are wold-o-lct type Radius Sections fittings.

83.3 8-F RGX Nozzle-to-Safe Fnd Sco Rcea Nonexistent.

Ifc lds 83.4 8-G-I RGX Pressure Retaining Scc Rcaas Nonexistent.

Bolting Intc rail Ifeldcd

~su orts 83.7 RGX-'(I)-Support 83.7 B-II RGX-(Il)-Support

83. 7 8-II RGX-(III)-Support UT is not feasible. The weld is a fillet weld.

Intcrsta c Pl in Shell I B-J RGX-(r)-7 1'ipc-to-Nozzle 2" l.etdown Llno 84.5 RGX-(I)-8 UT Nozzle-to-Pipe 3" Charging Linc

TIIRKEY POINT PLANT IINIT 4 INSL'RVICB I!XANIHATIOH PIDGIN FOR TIIR SECOHO 40-IXIIffll PERIOH OF TIIE FIRST IO>>YEAR IILSPECTIOH INTL'RVAL - CLASS I REGEHI!NATIVE IIIPAT EXCIIAHGI!R (Scc A cndix A, Figure A-6) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3-1/3 YEARS 3 I/3-6 2/3 YEARS 6 2/3-IO YEAAS SEC. XI SEG XI AREA IOENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

3 4 Intcrsta c Pi in Cont'd Shell II 04;8 0-J RGX-(II)-S Hoxxle-to Pipe 2" l.etdown Linc 0-J RGX-(II)-G Pipe-to-Noule 3" Charging Line 04.8 0-J RGX-(rl)-7 Pipe-to-Noulc 2" Letdown Linc 04.5 RGX-(II)-8 Nozzle-to-Pipe 3" Charging l.ine Shell III 04.8 0-J RGX-(III)-S Nozzle-to-Pipe 2" Letdown I.ino 04.5 0-J RGX-(III)-G Pipe-to Holtlc 3" Charging IAno

TURKEY POINT PLANT UNIT 4 INSERVICE EXANIHATIOH PLAN FOR IIIE SECNID 40-WNTII PERIOD OF TIIE FIRST 10-YEAR INSPECTIOH INTERVAL - CLASS I PIPING (2501R Class) - IIAIN REACTOR COOLANT LOOPS (Sce Appendix A, Figures A-7 through A-9)

INSPECTION INTERVAL ASME AS ME 0-3 I/3 YEARS EXAMINATION EXAM. 3 I/3-6.2/3 YEARS 6.2/3-IO YEARS SEC. XI SEG XI AREA IDENTIFICATION METIIOO OUTAG ES REMARKS ITELI NO. CATGY.

7 8 33"-IIC-I

84. 1 8-F I Iccli Nozzle-to-Pipe lech UI 84 ~ 5 2 Pipe-to-Pipe M.7 8-J 2/2"-RC-111 Branch Connection 84.0 Ba 2/14"-RC-23 Branch Conncctlon M. 1 I 8-P 2-Kl VT 3/4"-RC-91 Branch Connection M. I I 8-P 2-K2 I"-RC-81 (I.cft Sldo)

Branch Connection M. I l. 8-P 2-K3 1"-RC-81 (Rlpht Side)

Branch Conncctlon M. I I 8-P 2 BC4 I"-RC-81 (Top Side)

Branch Conncctlon M.S B-d 3 Pipe-to-Elbow 84 ~ 1 8-F Elbow-to-Nozzle 33"-IIC-I M. I 8-F 5 PT Nozzle-to-Elbow UT

84. 11 8-P 5-Kl 3/4"-RC-41 (I)

Branch Connection

TURKEY POINT PIJINT UNIT 4 rNSERYICE EmNINATION PI.AN FoR mIE SECoND 40->IONTN IERIon or TIIE FIRST Io-YEAR INSPL'CTION INTERYAL - CLASS I IIAIN RIIACTOR COOLANT LOOPS (Sce Appendix A, Figures A-7 through A<<g) (Cont'd)

INSPECTION INTERVAL ASM E ASME 0-3 I/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. Xl SEC. XI ournGES REMARKS AREn IDENTIFIGATIDN METIIOD ITEM NO. CATGY.

2 3 7 6 g 31"-RC-I (Cont tl) 84.11 8-P 5-BC2 3/4u RC 4 I (2)

Branch Connection 8 I. I I 8-P 5-BC3 3/4"-RC-41 (3)

Branch Connection 84.11 8-P 5-BC4 3/4"-RC-41 (4)

Branch Connection

84. 5 B-J 6 , UT Elbow-to-P1po
84. 5 8 I 7 Pipo-to-Elbow
84. 5 8-J 8 Elbow-to-Plpc 84 ~ 7 8/3"-RC-121 Branch Conncctlon
84. 7 8/2"-RC-151 Branch Connection 8 I. 5 9 Pipe-to-Elbou
84. 5 8-J 10 Elbow-to-RCP (Loop A) 27 I/2"-RC-I 81.5 ll RCP (loop A) to-Pipe 84.7 B-.r II/2"-RC-101 Branch Connection 84.5 B-.l 12 Pi pc-to-I'I pc

~ ~

TURKEY POINT PLANT UNIT 4 INSERVICE EKANINATION PLAN rOR TIIE SECOND 40-NONTII I ERIOU OF TIIE FIRST IO-YEAR INSPECTION INTERVAL - CLASS I IIAIN RI!ACFOR COOLANT LOOPS (Seo A endix A Pl urea A-7 throu h A o Cont'd INSPECTION INTEnVAL ASME ASME 0>>3.1/3YEAAS 3.1/3-6.2/3YEAAS EXAMINATION EXAM. 62/3-IOYEABS SEC. XI SEG XI IIEMARKS AIIEAIDENTIFICATION IIETHOU OUTAGES ITEM NO. CATGY.

I 2 7 ~ 8 27 I/2"-RC-1 (Cont'd 84 ~ G BM 12/10"-RC-Gl Branch'onnect ion 84.7 BM 12/3"-RC-21 Branch Connection M.S 8-J 13 Pipe-to-Elbow M.l 14 Icch PT Elbow-to-Noxxlc fcch UT 29"-RC-2 84 ~ I 8-F I Icch PT No axle-to-Pipe Icch UT

84. 5 2 Pipe-to-Pipe M. 11 8-P 2-BC I 3/4"-RC 92 Branch Conncctlon M. 11 8-P 2-BC2 3/4"-RC-242 Branch Connection M. 11 8-P 2-BC3 I"-RC-82 (Left Sldo)

Branch Connection 84.11 8-P 2-BC4 I"-RC-82 (Ripht Side)

Branch Connection M. I 1 8-P 2-BCS VT I"-RC-82 (Top Side)

Branch Connection M.G 8-J 2/12"-RC-19 Branch Connection 81,7 8-J 2/2"-RC-112 Branch Conncctlon

TIMEY POiIIT Pmm IBIn 4 TNSEWlCE EXAIITNATrON PuW FOR TIIE SECOIIII 4O-IIONTII 1 ERTOO OF TIIE Flm'O-YEAR TNSPIICrlON iNTERVAt. - CESS 1 IIAIN REACTOR COOLAIA'AMPS (Sce Appendix A, Fignres A-7 through A-9) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. OW.I/3 YEARS 3.1/3-6.2/3 YEARS 6.2/3-IO YEARS SEC. XI SEG XI AREA IDENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

3 4 29"-RC-2 (Cont'd 84.5 3 Plpc 'to Elbow

84. 1 8-F Elbow-to-Nozz1 o 31w-RC-2 M,l 8-F 5 Nozzle-to-Plbow M. 11 5-Kl 3/4"-RC-2422 (1)

Branch Connection

84. 11 5-K2 3/4"-RC-2422 (2)

Branch Conncctlon

84. 11 8-P 5-K3 3/4"-RC-2422 (3)

Branch Connection 84 ll 5-K4 3/4"-RC-2422 (4)

Branch Connection

84. S 8-J G Elbow-to-Plpo 84 ~ 5 B-,I 7 Pipe-to-Elbow 84.5 8 Elbow-to-Pipo
84. 7 8-J 8/2"-RC-152 Branch Connection M.7 8/3"-RC-122 Branch Connection 84 ~ 5 9 Pipe-to-Elbow

0

'URKEY POINT PLANT INIT 4 INSERVICF. EXAHINATION PLAN FOR TIIB SECOND 40-IIONIII PERIOD OF IIIB FIRST 10-YEAR INSPECTION INTERVAL CLASS I IIAIN REACI'OR COOLANT LOOPS (Seo Appendix A, Fignrcs A-7 throngh A-9) (Cont'd)

INSPECTION NTERVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEAIIS 3 I/3-0 2/3 YEARS 8.2/3-10 YEARS SEC. XI SEC. XI IIEMARKS AIIEAIDENTIFICATION METIIOO OUTAGES ITEM NO. CATGY. '

1 7 8 31"-RC-2 (Cont'd) 84,5 8& 10 Elbow-to-RCP (Loop 8) 27 I/2"-RC-2 84 5 ll RCP (Loop 8)-to-Pipe 84.7 8-J 11/2"-RC<<102 Branch Connection 84.5 12 UT Pipe-to-Plpo 81.7 12/4"-RC-112 Branch Connection 84 7 B-J 12/2"-RC-4 Branch Connection 84.6 12/10"-RC-62 UT Branch Connection 84 ~ 5 DW 13 UT Plpc-to-Elbow 84,1 8-F 14 Hech I" Elbow-to-Notsie Ncch U 29"-RC-3

84. I 8-F I Ncch I Noxxlc-to-PIpc Ilech N 84.5 8-J 2 Pipe-to-Pipe BI ~ 11 8-P 2-BC I I"-RC-83 (I.cFt Side)

Branch Connection Bi ~ 11 8-P 2 BC2 I"-RC-83 (Right Side)

Branch Connection

TURKEY I'OINT PLANT UHIT 4 1HsEwlcE EKAHIHATlOH Puw roR TIIE 40-NOIfni PERTOO OF TIIE PiRST 10-YEAR iHSPIICTTOH 1HTERUAL SFCOHo - cuss 1 IIAIH RL'ACTOR COOllQff llNI'8 (Scc Appendix A, I:Igurcs A-7 through A-9) (Cont'd)

INSPECTION INTEllVAL ASME ASME EXAMINATION EXAM. OM I/3 YEARS 3 I/3-0 2/3 YEARS 6 2/3-10 YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

I 2 3 4 7 8 29u-RC-3 (Cont'd) 81 ~ 11 8-P 2 K3 I"-RC-83 (Top Sldo)

Branch Conncctlon 84.7 B~I 2/3"<<RC-23 Connection

'ranch 84 5 8-J 3 Pipo-to-Elbow 84 ~ 1 8-r Elbow-to-ttoaxlo 3P-RC-3 84 ~ 1 8-r 5 PT Nozzle-to-Elbow Iff 84 ~ 11 8-P 5-BC 1 3/4"-RC-3 (1)

Branch Connection 8-P 5-K2 3/4"-RC-3 (2)

Branch Connection

'1 ll 8-P 5-K3 3/4"-RC-3 (3)

Branch Connection

84. 1 1 8-r 5-K4 VT 3/4n-RC-3 (4)

Branch Connection G.

Elbow-to-Plpc 84.5 7 UT Pipe-to-Elbow 84 ~ 5 8-J 8 UT r 1 bow-to-Pl pc

TURKEY POINT PLANT UNIT 4 IHSERVICE EXAHIHATION PLAN FOR TIIE SECONO 40-NMITII PERIOD OF 'HIE FIRST 10-YEAR IHSPECfIOH INTERVAL - CLASS I IIAfN REACIOR COOIJST LOOI'S (Seo Appendix A, Figures A-7 through A-9) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3.I/3-0.2/3 YEARS 82/3-IO YEARS EXAMINATION EXAM.

SEC. XI SEC. XI REMARKS ITEM NO. CATGY. AREA I DENT IF ICATION METIIOO OVTAGES 3 4 7 8 31"-RC-3 Cont'd B4 ~ 7 8-J 8/3"-RC-123 Branch Connection

84. 7 8-J 8/2"-RC-153 Branch Connection B4.5 9 Pipe-to-Elbow B4 ~ 5 8-J 10 L'lbow-to-RCP (Loop C) 27 1/2" RC-3 84.5 Ba ll RCP (Loop C)-to-Pipe B4 ~ 7 ll/2"-RC 3 Branch Connection B4. 5 8-J 12 Plpc-to-Pipo B4. 7 12/4"-RC-113 Branch Connection B4. G 12/10"-RC G3 Branch Connection 84 ~ 5 8-J 13 Pipe-to-Elbow 84 ~ I B-F 14 Icch Ellew-to-Nor z1 e lech

TURKEY POINT PLAWf UNIT 4 INSERVICE EXAMINATION PLAN FOR TIIE SECOND 40-N/fl1! PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAl. - CLASS I RISC'fOR COOIJIIff SYS'fBI-(Scc A cndix A Fi urcs A-10 throu h A-34 INSPECTION INTEIIVAL ASME ASh'IE EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6 2/3-10 YEAIIS SEC. XI SEC. XI REMARKS AIIEAIDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

3 4 6 7 14"-RC-23 (tetdown Cool-

~1n F ~ IO A l0) 0-J I Branch Connection-to-Elbow 0-J 2 Elbow-to-Pipe 04.5 0-J 3 Pl pc- 'to- L' bow 04.5 D-J 4 UT Elbow-to-Pipe B-.l 5 ripe-to-WSO I2"-RC-ID PRZ Sur e,

~Fure h-1 )

04.5 0-J l Branch Connection-to-Dcnd 01.5 0-J 2 Bend-to-Bend 0-J 3 Bend-to-Bend 04.5 Bend-to-Elbow 04.5 5 Elbow-to-Safe Fnd 04,i 0-r 0 I"f Safe End-to-Nozzle Uf

TVRXEV VOre PLANT 10IIT 4 INSERVICB BXAHIHATIOH PLAN FOR TIIE SECOND 40-HOHlll PBRIOD OF OIB FIRST 10 YEAR INSPECTION ItflBRVAL - CIJ55 1 RMCrOR COOIANT SYSTrdt (Sce Appendix A, Figures A-10 through A-34) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. OM. I/3 YEARS 3 I/3-6.2/3 YEARS 6 2/3-10 YEARS SEC. XI SEC. XI AREA ID ENTI F I CAT ION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

6 7 8 10"-RC-Gl (Shutdown Cool n , Fi ure A-12

04. 5 0-J I vr CV875A-to-Elhow 04.5 0-J 2 Elbow-to-Pipe 04.5 '0-J 3 Pipe-to-Elbow 6-J 4 Elbow-to-Elbow 04 ~ 5 0-J 5 Elbow-to-Branch Connection 10"-RC-G2 (Shutdown Cool n , F ure A-13) 1 CV8758-to-Elbow 04.5 2 vr Elbow-to-Elbow 0-.J 3 Elbow-to-Pipe 84.5 0-J Pipe-to-Branch Connection Cool n , 're 10"-RC-G3 (Shut. down A-14)

D-.J CV4-875C-to-Elbow

TIIRKEY POINT PLANT INIT 4 INSERVICE EXAMINATION PLAN FOR 1lIE SECOND 40-NIAII, PERIOD OF 1IIB FIRST 10-YEAR INSPECTION INTERVAL - CLASS 1 RIPACTOR COOIANT SYSTEH (Scc A cndix A Fi ores A-10 throu h A-34 INSPECTION INTERVAL AShlE ASME EXAMINATION EXAM. 0-3 I/3YEARS 3 I/3-62/3YEARS 62/3-IOYEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOO OUTAGES REMARKS ITEIA NO. CATGY.

2 3 5 6 7 8 6 04.5 0-J 2 8 lboM-to-Elbow 84.5 0-J 3 Flbou-to-Pipe 04.5 0-J 4 Pipe-to-Branch Connection 4"-RC-112 PRZ S ra

~rure n-is 04.5 0-J 1 Branch Conncctlon-to-Pipc 04.5 2 Pipe-to-Elbow 04.5 0-J 3 ElboM-to-Pipe 04.9 0-K- I 3PI.-I through 4 Integrally Wcldcd Lugs

04. 10 D-K-2 3PIS-I through 4 Support Components 04.5 0-J 4 Pipe-to-Elbow 04.5 5 Elbow-to-Pipe 04.9 0-K-I 5PI.-I through 4 Integrally Woldcd Lugs

TBRKEY PO1NT PLANT IIN1T 4 INSERVICE EXATIINAT10N PLAN FOR 'IIIB SECOND 40<<lIONTII PERIOD.OF TIIB FIRST 10-YEAR INSPLCTION INTERVAL CIASS 1 REACTOR COOLANT SYSTEH (Sec Appendix A, Figures A-lO through A-34)'Contfd)

INSPECTION INTERVAL ASME, ASME EXAMINATION EXAM. 0-3.I/3 YEARS 3 I/3-6.2/3 YEAIIS 6 2/3-10 YEAIIS SEC. XI SEC. XI ITEM NO. CATGY. AREA I DENT IF ICATION METIIOD OUTAGES AEMAAKS 6 6 4"-RC-112 (Cont'd

84. 10 8-K-2 SPLS-1 through 4 Support Components 84.5 G Pipe-to-Elbow 84.5 '8-J 7 Elbow-to-Pipe 8-K-1 7PI;1 throuRh 4 Integrally Ifeldcd l.ugs, 84.10 8-K-2 7PI$ -1 through 4 Support Components 84.10 8-K-2 7PR-1 (4-RCII-21)

Pipe Restraint 84.10 8-K-2 7PR-2 (4-RCII-20)

Pipe Rcstralnt 84.9 8-K-I 7PI-5 through &

Integrally Ifeldcd Lugs 84.10 8-K-2 7P1$ -5 through 8 Support Components 84.5 8 Pipe-to-Pipe 84.10 8-K-2 BPR-1 Pipe Restraint 8-K-1 SPt.l-l through 4 integrally lfcldcd Lugs

84. 10 8-K-2 SI'1$ -1 through 4 Support Components 84.10 8-K-2 SPR-2 Pipe Restraint

TURKEY POINT PLANT UNIT 4 IHSERVICE BXAHINATIOH PLAN FOR TIIB SECOND 40-1QHIII PERIOD OF llIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS 1 RIIACTOR COOIANT SYSTBI Scc A cn<3Ix A Fi urea A 0 INSPECTION INTERVAL ASME ASME 0-3 I/O YEARS 3 I/3-6 2/3 YEARS 6 2/3<<10 YEARS EXAMINATION EXAM.

,SEC. XI SEC. XI OUTAGES REMARKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

2 3. 5 . 6 I"-RC-112 (Cont'd) 8PI,-S through 8 Integrally Ifeldcd Lugs 84.10 8-K-2 8PI.S-S through 8 Support Components 0-J 9 I'ipc-to-Pipe 03.5 0-J 10 Pipe-to-Elbow 03.9 0-K-I IOPL-I through 4 lntcgra I ly Ifcldcd Lugs 84.10 0-K-2 103'IS-I through 4 Support Components 04.S 0J . 11 Elbow-to-Pipe 04.10 0-K-2 IIPR-1 (4-RCII-19)

I'ipe Restraint 0-K-I IIPI.-I through 4. - ~

Integrally Ifclded Lugs 04.10 8-K-2 IIPLS-I through 4 Support Components 04.10 8-K-2 I IPR-2 (4-RCII-18)

Pipo Restraint 0-K-I I IPI.-S through 8 Integrally Ifelded Lugs 04.10 33-K-2 IIPLS-5 through 8 Support Components M.9 0-K- I IIPL-9 through 12 Integrally Ifcldcd Lugs 04.10 0-K-2 IIPIS-9 through 12 .

Support Components

TURKEY POINT PLANT UNIT 4 INSHRVICE HXAl4INATION PLAN FOR IIIH SECOND 40-WNTN PERIOD OF lllE FIRST 10-YEAR INSPECTION INTERVAL - CLASS I REACTOR COOLANT SYSrrJ4 (Sco Appendix A, Fl ures A-10 throu h A-34 Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-6 2/3 YEARS 6 2/3-10 YEARS SEC, XI SEG XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGY.

'I' 3 04;5 0-J 12 Pipo-to-Elbow 04.5 13 Elbow-to-Pipe 84.10 0-K-2 13PR-I Pipo Restraint

84. IO 8-K-2 '3PR-2 .

Pipe Restraint 04.5 14 I'ipc-to-Elbow 04.5 0-J 15 Elbow-to-Pipe 84.5 0-J 16 Pipe 'to Pipe 04.0 0-K-I 16PL-I through 3 vr Integrally Ifeldcd Lugs 84.10 0-K-2 l6PI.S-I through 3 Support Components 04.5 0-J 17 I'ipc-to-Elbow 04.5 0-J 18 Elbow-to-Pipe 04.10 0-K-2 18PR-I (4-RCN-6)

Pipe Restraint

04. 10 0-K-2 ISPR-2 Pipe Restraint

TURKEY POIIIT FIANT UNIT 4 INSERYICE EXWINATION PIJIII FOR VIE SECOND 40-Ieml I'ERIOO OF mlE FIRST IO-YEAR INSPI:CTIOII IIITERVAL - CLASS I RL'ACTOR COOIJINT SYSTIJI (Sce Appendix A, Figures A-10 through A-34) Cont<d INSPECTION INTEIIVAL ASME ASME EXAMINATIOII EXAM. O-D.I/3 YEAAS 3 I/3-6.2/3 YEAIIS 0 2/3-10 YEARS SEC. XI SEC. XI AIIEAIDENTIFICATION METIIOD OUTAGES BEMAAKS ITEM NO. CATGY.

I 2 3 4 04.11 18-BC 3/4w-RC-I72 Branch Connection 04 ~ 5 0-J 19 Pipe-to-PCV4550 4"-RC-113 (PRZ S ra,

~r> pro n->6) 04.5 I Drench Connection-to-Elbow 04.5 0-J 2 Elbow-to-Pipo 01.5 3 Pipe- to-Elbow

04. 5 0-J Flbow-to-Pipe 04.9 0-K-I 4PI.-I through 4 Integrally Ifcldcd I.ugs 04.10 8-K-2 4PLS-I through 4 Support Coaponcnts 0-K- I 4PS UT Integrally Ifcldcd Support 04.10 0-K-2 4PSS Support Components 04.5 0-J 5 Pipo-to-Pipe

TIIRKBY POIIff PLANT UNIT 4 INSBRVICF. EXANINATIOH PLAN FOR TIIB SECOND 40-NKIII PERIOD OF TIIB FIRST 10-YEAR IHSPECTIOH IHTERVAL - CLASS 1 REACTOR COOLANI'YSTL'H (Scc A pendlx A, Flgurcs A-10 through A~A)

INSPECTION INTERVAL ASME ASME 0-3 EXAMINATION EXAhl. I/O YEAIIS 3 I/3-6 2/3 YEAIIS 6 2/3-10 YEAIIS SEC. XI SEC. XI REMARKS AREA IDENTIFICATION METIIOD OUTAGES ITEh1 NO. CATGY.

I 2 4"-RC-113 Cont'd 84.10 8-K-2 SPR-1 Pipe Restraint

84. 10 8- K-2 5PR-2 Pipe Restraint 84.5 6 Pipe-to-Plpo 84 ~ 9 8-K-1 GPL-1 through 4 integrally lfelded Lugs 84.io 8-K-2 6PLS-1 through 4 Support Components
84. 9 8- K-1 6PS Integrally Ifclded Support
84. 10 8- K-2 6PSS Support Components 84.5 8-J 7 Pipe-to-Pipe
84. 10 8- K-2 7PR-1 Plpc Restraint 84.10 8-K-2 7PR-2 Pipe Restraint
84. 10 0- K-2 7PR-3 Pipe Restraint 84.5 8 Ilpc-to-Pip M.lo 8-K-2 8PR-1 Pipe Restraint

TIIRKEY POIIIT PLANT UNIT 4 liisERvrco EueltNATTON 1uN roR oiE srcoND 48-TKINTII PERlon oF TIIE rlosT lo-YrAR 1NSPrcTTON limovAL - CLAss 1 REAI."FOR COOIAI/I'YSTFJI (Sco Appendix A, Fionres A. 10 throngh A-34) Cont~d INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-6.2/3 YEARS 6.2/3-10 YEARS SF.C. XI SEC. XI ITEM NO. CATGY. AREA I DENT IF ICATION METHOD OUTAGES REMARKS 3 4 6 7 4"-RC-113 (Cont'd t~

04. 10 8-K-2 Si'R-2 (4-RC-3G)

Pipe Restraint o4.s D-,I 9 Pipe-to-Elbow 04.5 0-J 10 Elbow-to-Pipe 04.10 8-K-2 1OPR-1 I'ipc Restraint

04. 1O 8-K-2 10PR-2 Pipe Restraint 04.5 0-J ll Pipo-to-Elbow 04.s 0-J 12 Elbow" to Pipe 84,S 13 Pipe-to-Elbow 04.S 8-J 14 Elbow-to-Pipe 04.10 0-K-2 14PR I'ipe Restraint 04.s 15 Pipe-to-Elbow 04.10 0-K-2 ISPR Pipo Rostraint 04.5 0-J IG Flbow-to-Pipe 04.5 D-.i 17 Pipe-to-Pipe

. ~

'IIRKEY POINT PLANT UNIT 4 INSERVICE EXANINATION PLAN FOR TllE SLCOND 40-IQIlill PERIOD OF IIIE FIRST 10-YEAR INSPECTION INKRVAL - CLASS I REACTOR COOLANT SYSFDI (See Appendix A, Figures A-10 throngh A-34) Cont>d INSPECTION INTEIIVAL ASME ASME 0-3 I/3 YEAAS 3 I/3-8-2/3 YEARS 0.2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES AEMAnKS ITEM NO. CATGY.

AREA IDENTIFICATION METIIOO 4"-RC-113 (Cont'd

84. 11 8-P 17-BC 3/4"-RC-173 Branch Conncctlon 84.5 8-J 18 Pipe-to-Elbow 84.5 B-J 19 Elbow-to-PCV455A 4"-RC-19 PRZ S ra

~ui ure A.IS) 84.5 8-J 1 PCV4558-to-Elbow 84.5 8-J 2 Elbow-to-Tce:

84.11 8-P 2-BC 3/'4w-RC-172 Branch Connection

84. 5 3 PCV4SSA-to-Pipe 84.11 3-BC 3/4"-RC-173 Branch Connection 8-J 4 Pipe 'to-Tcc 4"-RC-ll PRZ S ra

~Pure A-SS 84.5 B-.l I Tcc-to-Tcc 2

Tcc-to-Pipe

TURKEY POINT PAINT UNIT 4 INSERVICE EXANIHATIOH PIN FOR TIIE SECOHD no-NNTII PERIOD OF TIIE FIRST 10-YFAR IHSI'ECTION IHTERVAl - CPS I RIFACTOR COOLANT SYSTBI (Scc Appcndlx A, Figures A-10 through A-34) (Cont'd)

INSPECTION INTER VAI.

ASME ASME 0-3.1/3 YEARS 3 I/3-82/3 YEARS 6.2/3-IO YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES REMARKS AREA IDENTIFICATION METIIOD ITE)n NO. CATGY.

2 3 4 7 8

.4"-RC-ll {Cont'd)

84. 5 8-J 3 Pipe-to-Elbow 84.5 4 Elbow-to-Dcnd 84.5 5 Bend-to-Safe End 84.1 8-F 6 Safe End-to-Nettle 4"-RC-221 PRE 'Safet, I're A-17 D4.1 8-P 1 PT Hozz.lc-to-Safe End I/f 84.5 2 Safe End-to-Elbow 84.5 8-J 3 Elbow-to-Pipe Dn.s 4 Pl pc-to-Elbow 8-J 5 Elbow-to-Pipe 84.5 D-.I 6 I'ipe-to-Elbow 8' 8-J 7 Elbow-to-Pipe Dn.s 8-J 8.

Plpc-to-Dcnd

TURKEY POINT PLANT UNIT 4 INSHRVICE HXAI4INATION PLAN FOR 1llH SECOND 40-tlOtI111 PERIOD OP 11tH FIRST IO"YEAR ItISPECTION ItrrERVAL - CLASS 1 REACIOR COOLANI'YSTHN (Scc A cndix A Fi ures A-10 throu h A-34 Cont>d INSPECTION INTERVAL ASM E ASME EXAMINATION EXAM. 0-3.1/3YEAIIS 3.1/3-62/3YEARS 6.2/3-IOYEAIIS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES IIEM*RKS ITEM NO. CATGY.

5 4"-RC-221 (Cont'd 84.11 8-P 8-BC 3/4"-RC-221 Branch Connection 84.5 8-J 9 Bend-tp-Pipe 10 Pipe-to-RV4-SSIA 4"-RC-222 PRZ Safct

84. 1 B-r. 1 Noxxle-to-Safe End 84.5 8-J 2 vr Safe End-to-Elbow 84.5 8-J 3 vr Elbow to-Pipe 84.5 I'ipe-to-Elbow, 84.5 8-J 5 L'lbow-to-Pipe 84.5 8-J 6 Pipe-to-Elbow 84.5 8-J 7 Elbow-to-Pipe 84.5 B-.I 8 I'ipo-to-Bend 84.11 8-BC 3/4"-RC-222 Branch Connection

TURKEY POINT PLANT UNIT 4 IHSERVICE EXAIIIHATIOH PLAN FOR Tlln SECOND 40-IS/ml PERIOD OF 'llln FIRST 10-YEAR INSI'ECTIOH INTERVAI. - CLASS I RQfg) C 8 S S Ji See 8 d I INSPECTION INTEAVAL ASh'IE ASME EXAMINATION EXAM. 0-3 I/O YEARS 3 I/3-6-2/3 YEARS 0 2/3-10 YEARS SEC. XI SEC XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGY.

3 4 8 v 4"-RC-222 (Cont'd) 84.5 8-J 9 Dcnd-to-I'I po 84.5 IO Pipe-to-RVSSID 4"-RC-223 (PRZ Safet Fl ufo A-l7) 84.1 8-F I Nozzle-to-Safe End 84.5 8-J 2 Safe Fnd-to-Elbow 84.5 8-J 3 Elbow-to-Pipe 81.5 n-J 4 Pipe-to-Elbow 84.5 5 Elbow-to-Pipo n4.s 8-J G Pipe-to-Elbow 8-J 7 Elbow-to-Pipe 84.5 8-J 8 Pipo-to-Rend

84. l l 8-P 8-DC 3/4"-RC-223 Dranch Connection
84. s 8-J 9 IFf Dcnd-to-I'i pc

0'URKEY POINT PIANT UNIT 4 INSERVICE EXANIHATION PLAN FOR TIIF. SECOND 40-HONIII PERIOD OF 'lllE FIRST 10-YEAR INSPECTION INTERVAL - CMSS I REAmIR COOLA YSTDI Sce endi I ure -10 t ou I -34 C INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/O YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEAIIS SEC. XI SEC. XI AREA I 0 ENTI F ICATION METIIOD OUTAGES IIEMARKS ITEM NO. CATGY.

5 6 0-J 10 Pipe-to-RV551C 4"-RC-7 (PRZ Rcllcf

~Pure - S) 04.1 0-F 1 ~

PT Hemic-to-Safe End UT 04.5 0-J 2 Safe End-to-Elbow 04.5 8-J 3 Elbow-to-Elbow 84.5 4 Elbow-to-Pipo 04.11 0-P 4-BC 3/4w-RC-21

'Branch Connection 04.5 0-J 5 Pipe-to-Elbow 04.5 0-J =G Elbow-to-Tco

04. 5 B-.l 7 Tec-to-Elbow 04.5 0-J 8 Elbow-to-Reducer 04.5 0-J 9 Tcc-to-Elbow

TURKEY POINT PIJINT IINIT 4 INSHRVICH EaWINATION I LAN FOR TIIH SECOND 40-IKINTII PHRIOII OF TIIH FilLST 10-YPAR INSPECTION INTERVAI. - CLASS I REACTOR COOIJL SYSTHH See A cndix Fi urcs -10 t rou h -34 Co t'd INSPECTION INTERVAL ASME ASM E EXAMINATION EXAM. 0-3 II3 YEARS 3.II3-6.2/3 YEAns 62a-Io YEARS SEC. XI SEG XI AAEA IOENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

I 2 3 5 6 7 8 0 4"-RC-7 (Cont'd) 84;9 8-K-I 9PL-I and 2 integral.ly Ifcldcd Lugs 84.10 8-K-2 9PIS-I Support Components

84. 10 8- K-2 9PR- I Pipe Restraint 84.9 8-K-I 9PL-3 and 4 Integral ly ITclded Lugs 84.10 8-K-2 9I'LS-3 and 4 Support Components
84. 10 8- K-2 9PR-2 Pipo Restraint 84.9 8-K-I 9PL-5 and 6 Integrally Welded Lugs 84.10 8-K-2 9PLS-5 and 6 Components

'upport 84.10 8-K-2 9PR-3 Pipe Restraint 84.5 10 Hll>ow-to-Reducer

~HIIM A l8 84.5 8-J I Reducer-to-IIV535 84.5 8-J 2 IIV535-to-L'Ibou

TURKEY POINT PLANT UHIT 4 IHSERVICE EXAMINATION PLAN FOR TIIE SECOND 40-IIOWIN PERIOD OF '11tH FIRST 10-YEAR INSPECTION INTFRVAL - CLASS I R A R SYSTEM Sec end I c - 0 tb u -3 INSPECTION INTEIIVAL ASME ASh'IE 0-3.1/3 YEAAS 3 1/3-6.2/3 YEAIIS 6 2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI IIEMARKS AREA IDENTIFICATION hIETIIOD OUTAGES ITEM NO. CATGY.

I 2 3 4 7 8 3"-RC-221 (Cont'd)

84. 5 8-J 3 Flbow-to-Elbow 8-J 4 Elbow-to-PCV456 3"-RC-222 (PRE Relief

~p,ure e-18

84. 5 1 Reducer-to-HV536 8-J 2 NV536-to-Elbow 8-J 3 vr Elbow-to-Elbow 8-J 4 Elbow-to-PCV455C 3"-RC-121 (RTD Return

~rr ure n-ru>

84.5 1 vr Reducer-to-Tce 84.5 8-J 2 vr Reducer-to-Tce 8-J 3 Tce-to-FL'490

84. 12 8-0-2 F8490 Rol ting 8 Studs, 16 Nuts

TURKEY POINT PLANT UNIT 4 INSBRVICB BXANINATION PLAN POR 'llIB SECOND 40-tIDtml PERIOD OP IIIE FIRST 10-YEAR INSPECTION It/TERVAL - CITS I REACTOR COOLANT SYS'IL'H Sce A endix A Pi urcs A-10 throu h A-34 Cont'd INSPECTION INTERVAL ASME ASME 0-3.'I/3 YEARS EXAMINATION EXAM. 3 'I/3-8.2/3 YEARS 8 2/3-10 YEARS SFC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGY.

I 2 8 7 3"-RC-121 (Cont'd) 4 PE490-to-Pipe 84;5 B-.l 5 I'ipc-to-V560A 84.5 8-J 6 .

V560A-to-Pipe 84.5 8-.1 7 Pipe-to-Elbow 84.5 8-J 8 Elbow-to-Pipe 84.9 8-K-1 8PL-I through 8 Integrally Ifclded Lugs

84. lO 8- K-2 8PLS-I through 8 Support Components 84.10 8-K-2 8PR Pipe Restraint 84.5 8-J 9 Pipe-to-Branch Connec-tion 3"-RC-122 RTD Return, Pi urc A-20 84.5 I Rcduccr-to-Tce 81.5 2 Reducer-to-Tce

TURKBY POINT PLANT UNIT 4 INSERVICE EX/6IINATION PLAN FOR lllB SECOND 40-IKINTll PL'RIOD OF lllB FIRST 10-YEAR INSPECTION IHTERVAI. - CITS I RFACTOR COOLANT SYSTEII Sec A endkx A Fi ores A-10 throu h A-34 Cont~d INSPECTION INTERVAL ASME ASM'E 0-3 E'XAMINATION EXAM. I/O YEARS 3 I/3-G-2/3 YEARS 0.2/3-10 YEARS SEC. XI SEC. XI OUTAGES REMARKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

5 ~

G 7 3"-RC-122 (Cont'd)

D-.l 3 Tcc-to-F0491 04.12 0-C-2 F049) Bolting 8 Studs, 16 Nuts

'4.5 F 0491- to-Pipe 04.5 5 Pipe-to-V5600 04.5 6 V5600-to-Pipe

04. 5 7 Pipe-to-Blho~

04.5 8 Elho~-to-Pipe 04.9 0-K-1 DPl.-l through 8 Integral ly ITcldcd Lugs

84. l0 D-K-2 SPY-I through 8 Support Components 04.10 0-K-2 DPR Pipe Restraint 04.5 0-J 9 Pipe-to-Drench Connec-tion 3"-RC-123 (RTD Return, j~ufc II.2I) 0-J I Rcduccr-to-Tcc

TURKEY POINT PLAIJT UNIT 4 INSERVICE EXANIHATIQN PLAII FOR TNE SECOND 40-fIOttilt PERIOD OF lllE FIRST 10-YEAR INSPECTIOH INTERVAL - CIASS 1 REACTOR COOLA S~YSTBll See A r 8 x urc -10t rub -34 C ItJSPECTI ON INTERVAL ASME ASME 0-3 I/3 YEAIIS 3 I/3-6 2/3 YE'ARS 6.2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI AREA 10 ENT IF ICATION METI IOD OUTAGES ITEM NO. CATGY.

I 2 3 7 8 9 84.5 8-J 2 Rcduccr-to-Tcc 3

Tec- to- F8492 84.12 8-G-2 FE492 Bolting 8 Studs, 16 Huts 84.5 8-J 4 FE492-to-Plpo 84.5 8-.1 5 Pipe-to-V560C 84.5 8-J 6 V560C-to-Pipe 84.5 8-J 7 Pipe-to-Elbe>>

84.5 8 Elbow-to-Pipe 84.9 8-K-I BPI.-I through 8 Integrally Ifeldcd Lugs 84.10 8-K-2 BPLS-I through 8 Support Components 84.10 8-K-2 BPR (4-RCN-22)

Plpc Restraint 84.5 9 UT Pipe-to-Branch Connec-tion

TIIRKrv POJNr PLANT IJNJT 4 lNsrnvrce exeuNATTON l LAN pon Tile secoND 4o->IOIJTII penloo or Ttte pinsT io-TBAR wspecrioN iNTERVAL - CLAss i RECTOR COOLAITr SYSTehl (Scc Appendix A, Figures A-10 through A-34) (Cont Pd)

INSPECTION INTEIlVAL ASME ASME EXAMINATION swnl 0-3 I J3 YEARS 3.l/3-6 2)3 YEARS 6.2I3-IO YEARS EXAKL SEC. XI SEC. XI pAocEDUAE AAEA IDENTIFICATION METIIOII OUTAGES IlEMAIIKS ITEM NO. CATGY. NOJBEV.

I 2 3 ~

~P) uru A-22)

84. 5 B-.J l CV3l 2A- to- Pipe 84.5 8-J 2 Pipe-to-Branch Connec-tion

~P) uru A 23)

84. 5 8-J l CV3J 28- to-Pi pc 8-K-l lPt,-l through 4 Integrally Itctdcd Lugs 84ulO 8-K-2 iriS-> through 4 Support Coa)poncnts 84.5 8-J 2-Pipe-to-elbow 84.5 8-J 3 elbOw-to-Pipe 84.5 8-J 4 I'lpe-to-elbow 5

L)tbow-to-Pipe 84.5 8-J 6 Pipe-to-elbow 84.5 8-J 7 tllbow-to-Pipe 84.5 8-J 8 I' pc- to- elbow

TURKEY POINT PLANT UNIT 4 INSrRVICE EXANINATION PLAN FOR TIIE SVCONO 40->IOImi PERIOn OP TIIE piner Io-YEAR INSPECTION IIffERVAL - CuSS I REACfOR COOLAtff SYSTBI (Sec.Appendix A, pigures A-10 through A-34) (Cont'd)

INSPECTION INTERVAI.

ASME ASME Swn I 0-3 I f1 YEARS EXAMINATION EXAKI. 3 I f3-6 2fJ YEARS 6 2/3-10 YEARS SEC. XI SEC. XI AREA IDENTIFICATION PROCEDURE METIIOD OUTAGES REMARKS ITEM NO. CATGY. NOJREV.

I 2 3 4 6 7 3"-RC-23 (Cont'd) 8-J 9 Elbow-to-Pipe tionn 84.5 8-.1 10 Pipe-to-L'lbow 84.5 11 L'lhow- to-Eranch Connec-2"-RC-1011 RTD Ilot Lc

'l 8-J I I" Tcc-to-Pipo '.

8-J 2 Pipe-to-Tee 84.8 3 L'lbow-to-Tcc 848 8J '

Tec-to-Pipe 84 ~ 8 8-J 5 Pipe-to-Elbow 8-J G Elbow-to-Pipe

84.8 7 Pipe-to-V554A 8-J 8 VS54A-to-Pipe

TURKEY POINT PLANT IIIT 4 INSERVICE EXAHINATION PLAN FOR llIB SECOND 40-NNTII PERIOD OF IIIB FIRST 10-YEAR -

INSPECTION INTERVAI. CLASS I REACTOR COOLANT SYSTFJI See A cndix A Fi urcs A-10 throu h A-34 Cont'd INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6-2/3-IO YEARS SEC. XI SEG XI AREA IDENTIFICATION METIIOD OuTAGES REMARKS ITEM NO. CATOY.

7 2"-RC-1011 Cont'd

04. 10 0-K-2 SPR Pipe Restraint
04. 8 . 0-J 9 Pipe-to-VSSSA 10 V555A-to-Pipe 04.8 ll Pipe-to-Tee 04.8 12 Tec-to-3/4" Pipe 04.8 13

'Tcc-to-Pipe 04.8 14 Pipo-to-Elbow 0-J 15 Elbow-to-Pipe 84.8 8-J 16 Pipe-to Elbow 04.8 17 Elbow-to-Hani fold 04.8 0-J 18 Hanifold-to-Tco 19 Tee-to-3/4" Pipe 04.8 20 PT Tcc-to-Pipe

TURKEY POINT PLANT UNIT 4 IHSERVICE EXAIIIHATION PIAf FOR 1TIE SECOND 40-IWII PERIOD OF lllE FIRST 10-YEAR IHSI'ECTIOH INTERVAI. - CLASS I REACTOR COOING'YSTFA (Scc Appendix A, Figures A-10 through A-34) (Cont,>d)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0&.I/O YEARS 3 I/3-6 2/3 YEARS 0.2/3-10 YEARS SEC. XI SEC. XI AIIEAIDENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

3 4 D4.8 8-J 21 Pipe-to-I>1 ange D4.12 8 I 2 Flange (Codo 8-D) Dolt-ing 8 studs, 16 nuts 8-J 22 Flango-to-Pl po 8-J 23 Pipe-to-Eibo>>

D-J 2l ElboM-to Pipe 84.8 8-J 25 Pipe-to-V55GA 8-J 26 V556A-to-Pipe 8-J 27 Pipe-to-Elbow 84.s n-.r 28 llll>o>>-to-Pipe 84.10 8-X-2 2SI'R (Type E)

Pipe Restraint n4.s 29 Pipe-to-l>ll>o>>

8-J 30 Ell>ow-to-Pipe 84.8 D-.l 31 Pi pc-to-I'>Ibad

TUNEY POINT PLAHT UNIT 4 IHSERVICE EXANIHATION PLAN FOR 11IE SECOHD 40-NNIII PERIOD OF IIIE FIRST IO-YEAR IHSPECTIOH INTERVAL - CLASS I REACTOR COOLANT SYSTBI Sce A) cndix A Fl u c I INSPECTION INTERVAL AS ME ASMF 0-3-'I/3 YEARS 3 I/3-0.2/3 YEARS 8 2/3-IO YEARS EXAMINATION EXAM.

SEC. XI SEC XI OUTAGES REMARKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

5 ' 7 8 8 2"-RC-1011 Cont'd 84.8 52 Elbow-to-Pipe 84.8 8-J 53 Pipe-to-Reducer 2"-RC-101 RTD Cold Lc Loo A F ure A-25)

84. 8 1 Branch Connection-to-Plpe 84.8 8-J 2 Pipe-to-Elbow
84. 8 8-J Elbow-to-Pipe 8-J Pipe-to-V557A 84.8 5 V557A-to-Pipe 84.8 6 Pipe-to-Elbow 84.8 B-.l 7

'lbow-to-Pipe 84.8 8-J 8 P}pc-to-Elbow 8-J 9 Elbow-to-Pipe

TURKEY POINT PLANT, UNIT. 4 INSHRVICE HXANINATION PI,AN FOR TIIH SECOND 40-IIONTll I'ERIOD OF 'll!F. FIRST 10-YEAR INSPHCI'ION INTERVAL - CLASS l REACTOR COOIJLNT SYSTEN Scc A endix A Fi ores A-10 throu h A-34 Cont'd INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6.2/3-10 YEAAS SEC. XI SEC. XI AIIEAIDENTIFICATION METIIOD OUT*6ES AEMARKS I I'EM NO. CATGY.

6 7 2"-RC-lnl (Cont'd) 84.8 ln Pipe-to-Coupling 84.8 ll Coupling-to-Pipo 84.8 I2 Pipe-to-VSSSA 84.8 13 VSSSA-to-Pipo 84.8 l4 Pipe-to-Elbow 84.8 8-J IS Elbow-to-Pipe 04.8 l6 Pipe-to-Tcc 84.8 8-J 17 Tcc-to-3/4" Pipe 84.8 l8 Tec-to-hhni fold 04.8 ID Nanifold-to-Tce 20 Tec-to-3/4" Plpc 04.8 2I Pipe-to-Flango 04.l2 0-0-2 I'lange (Codo 8-8) Doltinl 8 Studs, l6 Nuts 84.8 8-J 22 Flange-to-Pipe

4 TURKEY POINT PLANF UNIT 4 INSERVICE EXAhlINATION PLAN FOR TIIH SECOND 40-hKINIll PERIOD OF 'llIE FIRST 10-YEAR INSPFCTION IN'HRVAL CLASS I ClTIR 00 Y.

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3.I/3-6-2/3 YEARS 6 2/3-10 YEAIIS EXAMINATION SEC. XI SEC. XI PROCEDURE OUTAGES nEMARVS AIIEAIDENTIFICATION IT EM NO. CATGY. NO./IIF V.

3 4 6 6 7 2"-RC-101 (Cont'J 84.8 8-J 23 Pipe-to-VS59A 8-J 24 VSS9A-to-ripe 25 PT Pipe-to-Fiber 8-J 26 Elbow-to-Pipe 27 PT Pipe-to-Elbov 28 HlboM-to-Pipe 29 Pipe-to-Elbow 84.8 30 I:.lb'-to-Pipe 8-J 3l Pipe-to-Elbow 8-J 32 Elbow-to-Pipe 84.8 8-J 33 Pipe-to-Elbow 8-J 34 Elbow-to-Pipe 84.S 8-J 35 P I pc- to-p.ibaw 84.S 8-J 36 Elbo~- to-I'lpc

TURKEY POINT PLANT UNIT 4 INSERVICE EKAIIINATION ILAN POR TIIE SrCONO 4O-TIONTtt t ERIOn OP TNE PtRST IO-YEAR INSPECTlmI INTERVAL - CLASS I RPACTOR COOLANT SYSTDI (Sce A cndix A Fi urcs A-10 throu h A-34) (Cont'd)

INSPECTIO INTEIIVAL ASME ASME EXAMINATION EXAM. OM I/3 YEAIIS 3 I/3-6.2/3 YEARS 6 2/3-IO YEARS SEC. XI SEC. XI IIEMAIIKS AIIEAIDENTIFICATION METIIOO OUTAGES ITEM NO CATGY.

7 8 2"-RC-IOI (Cont'd

~ ~

8-J 37 Pipe-to-Elbow 8-J 38 Elbow-to-Pipe 84.8 38 Pipe-to-ElboM 84.8 8-J 4O Elbow-to-Pipe 84.8 8-J 41 Pipe-to-Elbow 84.8 8-J 42 Ethos-to-Pipe 84;8 8-J 43 Pipe-to-Rcduccr loc 8:

2"-RC-102l (RTD llot urc A-26 Lc

84. 8 '-J l l" Pipe-to-Tco 84.8 8-J 2.

l" Pipe-to-Tce D4.8 8-J 3 Tcc-to-Pipo 8-J 4 Pipe-to-Tco 84.8 D-.l 5 l" Pipe-to-Tcc

TURKEY POINT PLANT UNIT 4 INSERVICE DXAI)IHATION PLAN FOR llIE SECOND 40-HONIll PERIOD OF Illo FIRST 10-YEAR INSPECTION IHTERVAl, - CLASS I REACTOR COOLANT SYSTEM Sec A cndix Fi ures A-lo throu h -34 Cont'd INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3.'I/3 YEARS 3- I/3-6.2/3 YEARS 6 2/3-10 YEARS SEC. XI SEC. XI AAEA IOENTIFICATION METIIOD OUTAGES IlEMAOKS ITEM NO. CATGY. 0 3 4 6 PT Tec-to-Pipe 8-J 7 Pipe-to-V5548 8

V5548-to-Pipe 84.s 8-J 9'ipe-to-V5558 8-J 10 V5558-to-Pipe 8-J 11 Tcc-to-3/4" Pipe 8-J 12 Tce-to-lhni fold 84.8 8-J 13 Hani fold-to-Elbow 84.s 14 Elbow-to-Pipe 84.s 15 Pipe-to-Tcc 16 Tee-to-3/4" Pipe 17 Tco-to-Pipe 84.s 8-J 18 Pipe-tn-Flange 84.12 8-G-2 Flange (Code 8-8) Dolt-ing 8 Studs, 16 Hots

TURKEY POINT PLANT UNIT 4 INSERVICB BXANINATION PLAN FOR Illn SECOND 40-IIONTII PERIOD OF 'll!B FIRST 10-YL'AR INSPECTION INTERVAL - CLASS 1 RI'.AIIR COOI WT SYSTEN See A cndix A 1 ures - 0 INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-0.2/3 YEARS 8 2/3-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION h1ETIIOO OUTAGES REMARKS ITEM NO. CATGY.

I 2 19 Flange-to-Pipe 04.8 0-J 20 Pipe-to-Elbow 04.8 0-J 21 Elbow-to-Pipe 04.8 0-J "

22 Pipe-to-V5560 04.8 23 V5560-to-Plpo 04.8 24 Pipe-to-Elbow 04.8 0-J 25 Elbow-to-Pipe 04.8 0-J 26 Pipe-to-Elbow 04.s 0-J 27 Elbow-to-Pipe n4.s 0-J 28 Pipe-to-L'lbow n4.s 0-J 29 Elbow-to-Plpo n4.s 0-J 30 Pipe-to-Elbow 0-J 3I Elbow-to-Pipe 04.8 32 Pipe-to-L'lbow

TIIRXEV POINT FL'ANT ENIT 4 EXAHINATION PLAN FOR 'llIH SECOND 40-HOiml PERIOD OF Ilm FIRST 10-YEAR INSPECTION INTERVAL -- CLASS I

'NSERVICE U3W INSPECTION INTERVAL ASME ASME 0-3 'I/3 YEARS 3.1/3-6 2/3 YEARS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES IlEMABKS AREA IDENTIFICATION METIIOO ITEM NO, CATGY. 6' 2 3 8 g 2"-RC-1021 (Cont')

8-J 33 Elbow-to-Pipe 8-J 34 Pipe- to'-Reducer 2"-RC-102 (RTD Cold Le Loo II, Fi urc A-2 8-J 1 Branch Connection-to-Pipc B-.l 2 Pipe-to-Elbow 8-J 3 PT Elbow-to-Pipe 84.8 8-J 4 Pipe-to-VS578 84.8 8-J 5 VS578-to-Pipe 8-J G Pipe-to-Flange 84.12 8-0-2 Flange (Code 8-8) Bolt- vr ing 8 Studs, 16 Nuts 8-J 7 I'langc-to-Pipe 8-J 8 Pipe-to-Flbow 8-J . 9 Elbow-to-Pipe

TURKEY POINT PLANT IINiT 4 iNSERVIC8 8KAIIINATiON PLAN FOR T118 SECOND 40-WNTII PERioo OF TIIF. FiRST 10-YrAR iNSPECTION iNTERVAL - CLASS 1 REAmIR COOLANT SYSTEH (Sec A endix A Fi urcs A-10 throu h A-34 Cont'd INSPECTION INTEIIVAL ASME ASME E XAh1I NATION EXAh'I. 0-3 I/3 YEARS 3.1/3-6 2/3 YEAIIS 6 2/3-10 YEAIIS SEC. XI SEC. XI REMAAKS AREA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

5 6 7 84.8 8-J 10 Pipe to 8140M 84.8 Il BlboM-to-Pipe 04.8 8-J 12 Pipe-to~V5588

. 8-J 13 VS588-to-Pipe 84.8 8-.l 14 Pipe-to-Tec 84.8 8-J 15 Tee-to-3/4u Pipe 8-J 16 Tce-to;Pipe

84. 8 8-J 17 Pipe-to-Ifanifold 81.10 0- K-2 17PR Pipe Restraint
84. 8 18 EL~ni fold-to-Pipe 84.8 I9 Pipe-to-Tcc 84.8 8-J 20 Tec-to-3I4u Pipe 0-J 21 Tcc-to-Pipe 0-J 22 Pipe-to-Flange

TURKEY POINT PLANT UNIT 4 INSERVICE EXAMINATION PLAN 1'OR ITIE SECOND 40-NNTll PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS I RL'ACTOR COOLANT SYSTEM (See Appendix A, Figures A-10 through A-34) (Cont'd)

ASME ASME SEC. XI SEC. XI ITEM NO. CATGY.

EXAMINATION AREA IDENTIFICATION EXAM.

METIIOO

'3 I/3 YEARS INSPECTION INTERVAL 3 I/3-6.2/3 YEARS OUTAGES 6 2/3-IO YEARS REMARKS 1 2 3 7 8 0 2"-RC-102 Cont'd 84.12 8-G-2 Flange (Code B-B) Bolting 8 studs, 16 nuts 84.8 8-J 23 Flange-to-Pipe 24 Pipe-.to-VSS98 84,8 25 PT VSS98-to-ripe 84.8 8-J 26 Pipe-to-Elbow 84.8 8-J 27 PT Elbow-to-Pipe 84,8 28 PT Pipe-to-Elbow 84.8 8-J 29 Elbow-to-Pipe

84. 8 8-J '30 PT Pipe-to-Elbow 84.8 8-J 31 Fibow-to-Pipe 84.8 8-J 32 PT Pipe-to- Elbow 84 ~ 8 8-J 33 PT Elbow-to-Pipe 84,8 34 PT Pipe-to-Elbow

TURKEY POINT PIJQIT UNIT 4 INSERVICP. EZANIHATIOH PLAN FOR Tt!E SECOIID 40-NRITlt I'L'RIOD OF IIIE FIRST 10-YEAR INSI'ECTIOH IIITL'RVAL <<CLASS 1 REACTOR COOLANT SYSTDI (Sce Appendix A, Figures A-10 through A-34) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAht 0-3.1/3 YEARS 3 I/3-6 2/3 YEAfIS 6 2/3-10 YEARS SEC. XI SEC. XI IIEhlAIIKS AREA IDENTIFICATION hIETIIOO OUTAGES ITEMNO CATGY.

I 2 2"-RC-102 Cont'd 35 Elbow-to-Pipe 04.8 0-J 36 Pipe-to-Reducer 2"-RC-103 RTD llot Le Loo C F ure A-04,8 0-J I PT 1" Pipe-to-Teo 04 ~ 8 8-J 2 I" Pipe-to-Tec 04,8 0-J 3 PT Tcc-to-Pipe 04 ~ 8 0-J Pipe-to-Tce 04,8 8- I gJ I" Pipe-to-Teo 04,8 B-.l 6 Tcc-to-Pipe 04,8 7 PT Pipe-to-Elbow 04,8 8 PT Elbow-to-Pipe 04.8 9 PT Pipe-to-V554C 04 ~ 8 0-J 10 PT VSS4C-to-Pipe 04,8 0-J 11 PT Pipo-to-VSSSC

TURKEY POIttT PLANT UNIT 4 INSERVICE EKANINATION I'LAW FOR 'tllE SECOtID 40-NttTII PERIOD OF lllH FIRST 10-YEAR IttSPECTION INTERVAL - CLASS 1 REACTOR COOLANT SYSTFA (Sce Appendix A~ Flgurcs A-10 through A-34)(Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES REMARKS ITEM NO. CATGY. AREA IDENTIFICATION METIIOD I 2 7 8 2"-RC-103 Cont'd 04 ~ 8 8-J 12 VSSSC-to-Pipe 04.8 13 Pipe-to-Tce

84. 8 14 PT Tcc-to-3/4" Pipe 04.8 15 Tcc-to-Manifold 04,8 8-J 16 hlanifold-to-Tee 04.8 0-J 17 Tcc-to-3/4" Pipe 04.8 0-J 18 PT Tce-to-Pipe 0' 19 PT Pipe-to-Flange 04.12 8-G-2 Flange (Code 0-0) Bolting 8 studs, 16.nuts 04 ~ 8 0-J 20 Flange-to-Pipe 04.8 21 Pipe-to-Elbow 04 ~ 8 0-J 22 Elbow-to-Pipe
04. 8 8-J 23 PT Pipe-to-V556C

TURKEY POINT PLANT UNIT 4 INSERVICP. EXAHINATION PLAN FOR ITIH SL'COND 40-IIONTll PERIOD OF lllB FIRST 10-YEAR INSPEI:TION INTERVAL - CLASS 1 REACTOR COOLANT SYSTEN (Sce Appendix A, Figures A-10 through A-34) (Cont'd)

INSPECTION INTEllVAL ASME ASMC 0-3 I/3 YEARS 3 I/3-8.2/3 YEAIIS 0.2/3-IO YEARS EXAMINATION EXAM.

SEC. XI SEC. XI REMARKS AREA IDENTIFICATION MET IIOD OUTAGES ITEM NO. CATGY.

I 2 3 4 p 0 2"-RC-103 Contrd 84,8 8-J 24 V556C-to-Pipe 84.8 8-J 25 PT Pipe-to-Elbow 84 ' 8-J 26 PT Elbow-to-Pipe 84 ~ 8 27 PT Pipe-to-Elbow 84,8 8-J 28 PT Elbow-to-Pipe 84,8 29 PT Pipe-to>>Elbow 84 ' 30 PT Elbow-to-Pipe 84 ~ 8 8-J 31 P lpc-to-Elbow 84.8 32 Elbow-to-Pipe 84,8 33 PT Pipe-to-Elbow 84 ~ 8 8-J 34 PT Elbow to Pipe 84,8 35 PT Pipe-to-Reducer 2"-RC-3 (Rm Cold Le Loo C F urc -29 84 ' PT Branch Connection-to-Pipe

TURKEY POINT PLANT UNIT 4 INSFRVICE EXAHINATION PLAN FOR llIE SECOND 40-IIMIITI PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAI. - CLASS I REACMR COOLANT SYSTBI (See Appendix A, Figures A-10 through A-34)(Cont'd)

INSPECTION INTEBVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.l/3-6 2/3 YEARS 6.2/3-IO YEABS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES BEMABKS ITEM NO. CATGY.

'I 2 3 4 7 8 2"-RC-3 Cont'd) 04.8 2 PT Pipe-to-Elbow 84 8 0-J 3 PT Elbow-to-Pipe 04.8 0-J 4 PT Pipe-to-Elbow 04 ~ 8 8-J 5 PT Elbow-to-Pipe 04.8 6 Pipe-to-Elbow 04.8 0-J 7 Elbow-to-Pipe 04.8 8 Pipe-to-V557C 04,0 0-J 9 V557C-to-Pipe 04.8 8-J 10 PT Pipe-to-Pipe 04.8 8-J 11 PT Pipe-to-Elbow 04.8 0-J 12 Elbow-to-Pipe 0' 0-J 13 PT Plpc-to-Coupling 04,.S 0-J 14 Coupling-to-Pipe I4 ~ S 0-J 15 Pipe-to-VSSSC

TURKEY POINT PLANT UNIT 4 liISERVICE EKANINATloN PuN roR mlE srcoNR 40->IOIml rrRlon oF mlE rlRsr lo-YEAR lNSI ECTloN lNTERVAb - cuss.>

REACTOR COOLANT SYSTBI (See Appendix A, Figures A-10 through A-34) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.l/3-6 2/3 YEARS 6.2/3-IO YEARS SEC. XI SEG XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGY.

3 4 2"-RC-3 Cont'd) 04 ~ 8 IG PT X VSSBC-to-Pipe 04.8 D-.J 17 PT Pipe-to-Tce 04 ~ 8 18 PT Tec-to-3/4" Pipo 04.8 0-J 19 Tee-to-Pipe 04.8 0-J 20 PT Pipe-to-Elbow 04.8 21 Elbow-to-Pipe 04.8 0-J 22 PT Pipe-to-Elbow 04.8 23 PT Elbow-to-Pipe 04 ~ 8 0-J 24 Pipe-to-Teo 04,8 0-J 25 Tee-to-3/4" Plpo 04,8 0-J 2G PT Tce-to-Pipe 84.8 0-J 27 PT Pipe-to-Flange 04.12 0-G-2 Flange (Code 0-0) Doltin 8 studs, 16 nuts I4 ~ 8 0-J 28 Flange-to-Pipe

, TURKI!Y POINT PISWr IINIT 4 INSERVICE EXAHINATIOH PlAN FOR.TIIF. SECOHD 40-ISNTII PERIOD OF 'lllE FIRST 10-YEAR INSPECTIOH INTERVAL <<CLASS I REAmIR COOLANT SYSTEH (Sec Appendix A, Figures A-10 through A-34)(Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEAIIS 3 I/3-6 2/3 YEAIIS G 2/3-IO YEAII8 SEC. XI SEC. XI AREA I 0ENTIF ICATION MET I ION OUTAGES nEMAnxs ITEh1 NO. CATGY.

3 4 G 7 2"-RC-3 Cont'd) 84.8 29 Pipe-to-V559C 84,8 8-J 30 PT V559C-to-Pipe 84.8 8-J 31 PT Pipe-.to-Elbow 84,8 8-J 32 PT Elbow-to-Pipe 84.8 8-J 33 Pipo-to-Elbow 84.8 8-J 34 PT Elbow-to-Pipe 84.8 8-J 35 PT Pipe-to>>Elbow 84.8 8-J 36 PT Elbow-to-Pipe 84.8 8-J 37 PT Pipe-to-Elbow 84.8 8-J 38 PT Elbow-to-Pipe 84,8 D-.J 39 PT Pipe-to-Reducer 2"-RC-ill (Shutdown Cool n F ure - 0) 84 ~ 8 8-J I CV874A-to-Pipe

TURKEY POINT PLhHT UNIT 4 INSERVICE EXhNINhTION PLhN FOR TIIE SECOND 40-IaNTII PERIOD OF TIIE FIRST Io-YEAR INSI ECTION INTERVAL - CLASS I REhCTOR COOLANT SYSTEII (Sce hppcndix h, Figures h-10 through h-34) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEAIlS 3 I/3-6.2/3 YEAIIS 6.2/3-IO YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI IIEMARKS AIIEAIDENTIFICATION METI IOD OUTAGES ITEM NO. CATGY.

7 8 2"-RC-lll Cont'd) 84.8 8-J 2 PT Pipe-to-Elbow 84 8 8-J 3 PT Elbow-to-Pipe 84.8 4 Pipe-to-Elbow 84.& 5 Elbow-to-Pipe 84.8 D-J 6 PT Pipe-to-E'lbow 84.8 7 Elbow-to-Pipe 84,& 8 PT P lpo-to-Elbow M,& 8-J 9 Elbow-to-Pipe 84,& 8-J 10 PT Plpc-to-Branch Connection 2"-RC-112 Shutdown Cool n F uro h-31 84.& I CV&748-to-Pipe 84.& D-J 2 PT Pipe-to-Branch Connection 2"-RC-4 Letdown,

~Purr A-84,8 8-J I Branch Connection-to-Pipe

TIIRKEV I OINT PLNIT INIIT 4 INSERVICE EZhHINATION PLAN FOR IIIE SECOllD 40-)IONTll PERIOD OF TTIE FIRST IO-YEAR INSPECTION INTERVAL - CLASS 1 REACTOR COOLANT SYSTEN (See A cndix A, Fi ures A-10 throu h A-34 Cont'd INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/O YEARS 3 'I/3-6.2/3 YEARS 6 2/3-10 YEAIIS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES IIEMAIIKS ITEM NO. CATGY.

2"-RC-4 Cont'd 84.8 8-J 2 Pipe-to-Elbow 84.8 3 Elbow-to-Pipe 84 ' 8-J 4 PT Pipe-to-Elbow 84.8 8-J 5 PT Elbow-to-Pipe 84.8 6 Pipe-to-V309D .

2"-RC-151 Drain

~Px ure - 3 84.8 I PT Branch Connection-to-Pipe 84 8 2 PT Pipe-to-Elbow 84,8 8-J 3 PT Elbow-to-Pipe 84.8 8-J 4 PT Pipe-to-Tee 4.8 8-J 5 PT Tcc-to-3/4w Pipe 4 ' 8-J 6 Tee-to-Pipe 4.8 8-J 7 Pipe-to-VSOSA

TlmKEV. PO1HT PLANT DHiT 4 IHSERVICE EIDOIIHATIOH PIP( FOR TIIE SECOND 40-TIOHTll PERIOD OF TIIE FIRST 10-TIDIER IHSPECTIOH INTERVAL - CLASS 1 REACTOR COOIAHT SYSTEM! (See Appendix A, Figures A-10 through A-34) (Cont'd)

INSPECTION INTERVAL ASM E ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3. I/3-0 2/3 YEARS 0 2/3-10 YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOO OUTAGES AEMAOKS ITEM NO. CATGY.

3 4 le 2"-RC-151 (Cont'1 04.8 0-J 8 PT YSOSA-to-Pipe 84 ~ 8 9 PT Pipe-to-V5088 2"-RC-152 Drain

~Fr <<re A-33 04.8 1 PT Branch Connection-to-Pipe 04.8 8-J 2 Pipe-to-Elbow 04.8 0-J 3 PT Elbow-to-Pipo 04,8 0-J 4 Pipe-to-V515A 04.8 0-J 5 PT V515A-to-Pipe 04.8 G Pipe-to-V5158 2"-RC-153 Drain

~ri <<re A- 3 04 ~ 8 8-J 1 Branch .Connection-to-Pipe 04 ~ 8 2 PT Pipe-to-Elbow 04.8 3 PT Elbow-to-Pipe 04 ~ 8 0-J Pipe-to-YSOSA

3 TURKEY POINT PLANT lNIT 4 INSERVICB BRQIINATION PLAN FOR llIB SECOND 40-WNIII PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAL - ClASS 1 REACTOR COOLANT SYSTEH (See Appendix A, Figures A-10 through A-34) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OuTAGES IIEMARKS ITEM NO CATOY.

3 4 6' 7 2"-RC-153 (Cont'd) 84.8 8-J 5 VSOSA-to-Pipe 84.8 8-J 6 PT Pipe-to-V5058 2"-RC-5 (Auxilier S ra F urc 84.8 1.

CV313-to-Pipe 84,8 8-J 2 PT Pipe-to-Tee

TIIRKBY POINT PLANT I!NIT 4 IHSBRVICE BXAHIHATIOH PM) FOR 'illB SECOHD 40-IKIN!ll PB'RIOD OF TIIB FIRST 10-YEAR ItISPBCTION ItriBRVAL - CLASS I CIIIDIICAI AND VOIAINB COtfTROI, SYSTrdI (Sce A >cndix A, Figures A-22, 23, 32 and 34 through 30)

~

INSPECTION INTEAVAL ASMI ASMF 0-3 I/3 YEAAS 3.1/3-6 2/3 YEAflS 6 2/3-10 YEARS EXAMINATION EXAhl.

SECXI SEC. XI OUTACES AEh'IAIIKS AREA IDENTIFICATION METI'OD ITEMNO, CA ICY.

I 2 4 6 8 9 3"-CII-2 2502R Class Ciar n I. ne, F ure A-35 84.5 1 CV312C- to-Pipe

84. 10 8-K-2 I PR (4-VC-60)

Pipe Restraint 8-J 2 Pipe-to-rlbow 84.S 8-J 3 Elbow-to-Pipe

84. IO 8-K-2 3PR-I (4-VC-61) vr I'ipc Restraint
84. 10 8-K-2 3PR-2 Pipe Restraint 84.5 8-J Pipe-to-Pipe 84.10 8-K-2 4PR (4-VC-63)

Pipe Restraint

84. 5 B-.l 5 Pipe-to-Elbow 84.5 8-J 6 Elbow-to-Pipe 84.5 8-J 7 Pipe-to-Elbow 8-J 8 Elbow-to-Pipe
84. 10 8- K-2. 8I'R (4-VC-65)

Pipo Rostraint 84.0 8-K-1 8I'l.-l through 4 Integral ly !Tel dcd Lugs

~ 'URKEY POINT PLANT UNIT 4 INSERVICE EXAHINATION PLAN 1'OR llIE SL'COND 40-lKIIrlll PERIOD OF llIE FIRST 10-YEAR INSPL'CrlON INTERVAL - CLASS I CIIEfllCAL AND VOLUNE CONTROL SYSfEH (See A cndix A Fi urcs A-22 23 32 and 34 throu h 39 Cont'd INSPECTION INTEIIVAL ASMI ASMF.

EXAMINATION 'EXAM. 0-3.l/3 YEARS 3 I/3-6-2/3 YEARS 6-2/3-10 YEAIIS SEC. XI S'FC. XI QUTAGES IIEMAIIKS AAEA IDENTIFICATION METI!OO ITEM NO. CATGY.

5 6

84. 10 8- K-2 81'IS-I through 4 Support Conponents 84.5 9 Pipe-to-Elbow 04.5 8-J 10 Elbow-to-Pipe 04.10 8-K-2 10PR Pipe Restraint
84. 5 8-J 11 Pipe-to-Elbow.

04.5 0-J 12 Elbow-to- P 1 pc.

84.5 8-J 13 Pipe-to-Elbow 84.5 0-J 14 Elbow-to-Pipe 0-J 15

. Pipe-to>>Elbow 04.5 B-J 16 Elbow-to-Pipe 84.10 8-K-2 1GPlt (4-VC-68)

Pipe Restraint 84 ~ 5 17 Pipe-to-Pipe

84. 10 0- K-2 17PR-I (4-VCII-17)

Pipe Rcstralnt 84.10 0-K-2 l 7PR-2 (4-VCII-16)

Pipe Restraint 8-K-2 "

04.10 17PR-3 vr Pipe ltestraint

TINKEY POINT PLANT IINIT 4 INSERVICE BK/NINATION FIJI FOR TIIE SECONII 4O-NINTII PERIOO OF TIIB FIRST lo-YEAR INSPECTION -

INTERVAL CLASS I CIIBIICAL ANI) VOI.I8IE COITTROL SYST021 (Sce Appendix A, Flgurcs A-22, 23, 32 and 34,through 39) (Cont'd)

INSPECTION INTEnVAL ASM I ASMF EXAMINATION 0-3 I/3 YEAAS 3 I/3-6.2/3 YEARS 6 2/3-IO YEARS EXAM.

SEC XI SEC. XI REMARKS AflEA IOENTIF ICATION METVOIT Ou TAGES ITEM NO. CATGY.

6 7 84.9 0-K- I 17PL Integral ly Ifcldcd Lug

04. 10 0-K-2 171'LS Support Components 04.5 18 Pipe- to-Pipe
04. 10 0-K-2 18PR Pipe Restraint 04.5 19 Pipe-to-Pipe 04.5 B-.l 20 Pipe-to-Elbow 04.5 21 Elbow- to- Pl pc 04.1 I 0-P 218C 3/4>>-OI- I Branch Connection 04.5 0-J 22 I'ipc-to-Elbow 04.5 0-J 23 Elbow-to-Pipe 04.5 0-J 24 Pipe-to-Nozzle 3>>-CII-3 Char In Line,

~<<2 <<2u<<A-23 04.5 0-J I Tec-to-Pipe 04.5 B-.I 2 I'Ipc- to-Elbow

TURKEY POINT PIJINT UNIT 4 INSERVICE EXAHINATION PLAN FOR llIB SECOND 40-NNTII PERIOD OF IllE FIRST 10-YEAR INSPECTION 1NTERVAL - CLASS I CIIEIIICAL AND VOIJNIE CONTROL SYSTEH (Sec Appendix A, Figures A-22, 23, 32 and 34 through.39) (Cont'd)

INSPECTION INTERVAL ASME ASMF 0-3 I/3 YEARS 3 I/3-6.2/3 YEAllS 6 2/3-10 YEARS EXAMINATION EXAhl.

SEC. XI SEC. XI OUTAGES REhlARKS AREA IDENTIFICATION METVOO ITEM NO. CATGY.

3 4 6 6 7 6 9 3"-CII-3 (Cont'd) 04.9 0-K-I 2PS (4-VCII-2)

Intqgrally Ilclded Support 84.10 0-K-2 2PSS Support Components 84.5 0-J 3 Elbow-to-Pipe 04.11 0-P 38C 3/4"-Cll-2 Dranch Connection 84.10 0-K-2 3PR Pipe Restraint 04.5 0-J 4 Pipe-to-Tee 04.9 0-K-I 4PS (4-VCII-3)

Integrally Ifelded Suppo'rt 04.10 0-K-2 =4FSS Support Components 04.5 0-J 5 Tcc- to-Pipe

04. 5 0-$ 6 Pipe-to-Elbow 04.5 0-J 7 Elbow- to- Pipe D-.I 8 Pipe-to-Pipe 04.5 0-J 9 I'ipe-to-V311 84.5 0-J -

-10 Tcc-to-Pipe

TIIRKEY POINT PLANT VNIT 4 INsrnvlcp EKAHINATION PLAN FoR TIIE SECONO 40-IIOI1111 I'ERI00 Or TIIE FIRSr IO-YEAR rNSPrcrION INTERVAL - class I CIIEHICAI, ANO VOIJIHI! CONTROI SYSTEH (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASMI AQHF 0-3 I/3 YEAns EXAMINATION EXAII. 3.II3-6213 YEAns 6 2I3-Io YEAns SEC. XI SEC. XI nEMANKS ARE* IOENTIFICATION METI'00 OVTAGES ITEM NO. CATOY.

3 4 5 6 6 9 3"-Cll-3 Cont'd 04.5 0-J -11 Pipe-to-'Reducer 04.5 12 Reducer-to-V310A 04.5 13 V310A- to-Reducer 04.5 0-J 14 Rcduccr-to-Pipo

04. 5 0-.1 15 Pipe-to-Elbow 0-K- I 15PS Integral ly Ncldcd Support 04.10 0-K-2 15PSS Support Components 04.5 0-J IG Elbow-to-Pipo 16PL-I through 4 vr Integrally Molded Lugs.

04.10 0-K-2 16PLS-I through 4 vr Support Components

04. 10 0-K-2 IG PR Pipe Restraint 04.5 0-.1 17 Pipe-to-Elbow 04.5 0-J 18 Elbow-to-Pipe 04.5 0-J 19 Pipo-to-Elbow

TINKEY POINT FIANT UNIT 4 0

INSERVICE EXAHINATION PLAN FOR IIIE SECNID 40-HONII PERIOD OF 1IIE FIRST 10-YEAR INSPECTION INIERVAL - CLASS I CIIENICAL AND VOI.UNE COITIROL SYSTEH (Scc A cndlx A, Fi urcs A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INT6 AVAL ASM f ASME 0-3.1/3 YEAAS 3 I/3-6 2/3 YEAAS 6.2/3-10 YEAAS EXAMINATION EXAM.

SEC. XI SEC. XI AEMAAKS AAEA IDENTIFICATION METI'OO OUTAGES ITEM NO. CATGY.

I 2 8 0 3"-Cll-3 (Cont'd) 84.5 20 Inside wall. No examination can bc conducted.

Elbow-to-Pipe 84.5 8-J 21 Inside wall. No exam>ination can bc conducted.

Pipe- to-Elbow 84.5 8-J 22 Inside wall. No cxa>>>ination can bc cond>>ctcd.

Elbow-to-Pipe 8-J. 23 Pipe-to-Pipe 84.5 8-J 24 Pipe-to-Elbow 8-J 25 Elbow-to-Pipe 84.5 2G Pipe-to-Elbow 84.5 27 Elbow-to-Pipe 84.9 27PL-1 through 4 (4-VCII-12)

Integrally lfeldcd Lugs 84.10 8-K-2 27PIS-I through 4 Support Components 8-J 28 Pipe-to-Elbow 84.5 29 Ell>ow-to-Pipe 8-<<-1 2911.-I through 4 Integral ly lfcldcd Lugs 84.10 8-K-2 29PIS-I through 4 Support Components 84.9 8-K--I 29PI.-S through 8 (4-VCII-13)

In'tcgrally lfcldcd Lugs

TURKEY POINT PLANT UHIT 4 INSERVICE EXAlIIHATION PLAN FOR IIIE SECOND 40-IIOIml PERIOD OP 'IIIE FIRST 10-YEAR IHSPECTIOH INTERVAL - CLNS I CIIENIIAI. AND VOI.UNE CONT'ROL SYSTI84 (Sec Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASMI ASMF 0-3 I/3 YEARS EXAMINATION 3 I/3-6.2/3 YEARS 6 2/3-10 YEARS SFC XI SFC,XI EXAM.'lETV.OD REMARKS AREA IDENTIFICATION ODTAOES 11Eh1 NO. CA II'Y.

I 2 4 5 6 6 9 3"-CII-3 (Cont'd) 04.10 0-K-2 '29l'I,S-S through 8 Support Components 04.5 0-J 30 Pipe-to-Pipe 04.10 0-K-2 30PR Plpo Restraint 049 'K I 301'l.-l through 4 Integrally Ifcldcd Lugs 04.10 0-K-2 30PLS-1 through 4 Support Components 04.9 0-K-1 30PL-5 through 8 (4-VCII-14)

Integrally lfolded Lugs

04. IO 0-K<<2 30PLS-5 through 8 Support Components 04.5 31 Pipe-to-Pipe
04. IO 0- K-2 31PR I'ipc Restraint 32 Pipe- to-CV3120 3"-Cll-5 (Char in Linc,

~Fs urc A 2 0-J I Hou I c-to-Pipe 04.5 0-J 2 Pipe-to-Lll>ow 04.5 3 UT liI bow- to-Pipe

4 TURXHY POINT PLANT UNIT 4 iNSHRViCH EX/9ITNATiON PLAN FOR TIIE SECONO 4O-FXINTII r Hgioo OP TIIE FiRST io-TEAR iNSPECTiON 1ITTERVAL - CLASS i CIIENICAI, AND VOLUhlE CONTROL SYSTB4 (Scc Appendix A, Figures A-22,'3, 32 and 34 through 39) (Cont'd)

INSPECTION INTEAVAL ASMF O-3.1/3 YEARS 3 I/3-6.2/3 YEARS G.2/3-10 YEANS EXAMINATION EXAhl.

SEC XI SFC. XI AEMARKS AIIEAIOENTIF ICATION METVOO OUTAGES IT EM NO. CATGY, I 2 4 ~

84. 11 38C 3/'4w-CII-3 Branch Connection 84.5 8-J 4 Pipe-to-Elbow 84.5 8-J 5 Elbow to Pipe 8-J 6 I'ipc-to-Pipe~

84.5 7 Pipe-to-Elbow 84.5 8-J 8 Elbow-to-Pipe 84.5 8-J 9 Pipe-to-Elbow 10 Elbow- to-Pipe

'l 84.5 8-J Pipe-to-Elbow 84.5 12'lbow-to-Pipe 84.11 128C 3/4u-Ol-4 Branch Connection 84.5 8-J 13 Pipe-to-Elbow 84.9 8-X-I 13PI (4-VCII-1)

Integrally Ifclded Lug

84. I O 8- X-2 13PIS Support Components

TURKEY POINT PIJQIT UNIT 4 INSHRVICH HKAIIINATION PMN FoR IIIH SECOND 40-JIONTII PHRIOD OF TIIH FIRST 10-YHAR INSPFcrION IITIHRVAL - CLASS I CIIBIICAI. AN) VOLUND CONTROL SYSTBI (Sce Appendix A, Figures A-Z2, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEAVAL ASMI ASME 0-31/3 YEAns 3 I/3-6-2/3 YEAAS 62/3-ID YEARS EXAMINATION EXAhI.

SEC. XI SEC. XI IIEMAIIKS AIIEAIDENTIFICATION MFTVOD OUTAGES ITEM NO. CATGY.

I 2 4 6 6 7 6 9 04.5 0-J 14 Hlbow-to-Pipe 84.5 0-J 15 Pipe-to-Tee 04.5 0-J 16 Tcc-to-Pipo 04 ~ 5 17 Pipe-to-Reducor 04.5 18 Reducer-to-V3100 04.5 8-J 19 V3100-to-Reducer 04.5 8-J 20 Reducer-to-Pipe 04.5 B-.J 21 Pipe-to-8lbow 04.5 8-J 22 J!Ibow-to-Pipe 04.9 0-K- I 22PL-I through 4 Integrally Ifeldcd Lugs

04. 10 0-K-2 22PLS-I through 4 Support Co>>>poncnts 0-J 23 Pipe to Hlbow 0-J 24 Hlbow-'to-Pl pc 04.10 0-K-2 24PR (4-VCII-4) YI' Pipe Restraint 0-K- I 24I'l.-l through 4 Integral ly Ifcldcd l.ugs

TURKEY I'OINT PLANT INIT 4 INSLRVICB EXAI4IIIATION FIJI FOR '1IIB SBCOtlD 40-IIOtml PERIOD Ol'ITIB FIRST IO-YEAR INSPECTION INTERVAL - CLASS I CIIWICAL AHD VOLTE COHrROL SYSTEM (See Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASMI AShIF 0-3.I/3 YEABS EXAMINATION EXAM. 3 I/3-6.2/3 YEAIIS 6.2/3-IO YEAIIS SEC. XI SFC. XI AREA IDENTIFICATION OUTAOES REMARKS METVOO ITEM NO. CATOV.

3 4 84.10 8-K-2 24PLS-I through 4 Support Components 84.5 25 Pipe-to-Elbow 84.5 8-J 26 Elbow-to-Pipe

84. 11 8-P 2GBC 3/4"-OI-5 Branch Connection 84.9 26l'L-I through 4 Integrally Ifcldcd Lugs 84.10 8*K-2 2GPIS-I. through 4 Support Components 8-J 27 Insido wall. Ho examination can hc conductc<l.

Pipe-to-Elbow 84.5 8-J 28 Insido wall. No examination can bc conducted.

Elbow-to-Pipe 84.5 29 Inside'wall. Ho examination can bc con<luctcd.

Pipe-to-Elbow 84.5 8-J 30 vr Inside wall. No examination can bo conducted.

Elbow-to-Pipe 84.5 8-J 31 Pipe-to-Elbow 84.9 8-K-1 31pt (4-VCII-6)

Integral ly lfolded Lug 84.10 8-K-2 31 PIS Support Components 84.5 8-J , 32 rlbow to I 1 pc 8-K-I 32pl,-l through 4 vr Integral ly Ifcldcd Lugs

TURKEY POINT PLNIT UNIT 4 INSERVICE EKANINATION PuN FoR TIIE srcoND 40->KINTII mRIoo or mlE FIRST Io-YEAR INsmcTION INTERVAL - cuss I CIIIINICAI AND VOI.IINII CONTROI. SYSTEN (See Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEAVAL ASM I ASMF 0-3 I/3 YEARS EXAMINATION EXAlt 3.3/3-6-2/3 YEARS 6.2/3-10 YEARS SEC. XI SEC. XI AEhIAAKS AREA IDENTIFICATION hlETI!OD OUTAGES ITEMNO. CATCY.

3 4 3"-CII-5 Cont'd M. 10 0-K-2 32PI$ -I through 4 Support Components 04.5 0-J 33 Plpc-to-Elbow 04.5 0-J 34 Elbow-to-I'lpe 0-K-I 34PL-I through 4 Integrally lfeldcd Lugs M. 10 0-K-2 34PLS-I through 4 Support Components M. Io 0-K-2 341'R Pipo Rcstralnt l34.9 0-K- I 34l'1.-5 through 8 (4- VCII-7)

Integrally Ifcldcd Lugs

'-K-2 04.10 34PI$ -5 through 8 Support Components D4.5 35 Pipe-to Elbow 04.5 3G Elbow-to-Pipe 04 9F 0-K-I 3GPI.-I through 4 Integrally Ifeldcd Lugs M. 10 0-K-2 3GPIS-I through 4 Support Components 37 Pipe-to-Elbow 04.5 D-.l 38 Elbow-to-Pipe 0-K-I 38I'L-I through 4 ur (4-VCII-8)

Integrally Ifcldcd Lugs

0'URKEY POINT PLANT UNIT 4 INSERVICE BXAHINATION PLAN FOR TIIB SECOND 40-HONlll PERIOD OF 'IIIB FIRST 10-YEAR INSPECI'ION INTERVAL - CITS' Clll>IICAL AND VOIAJHI) CONTROL SYSTEH (Scc Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTER VAL ASMI ASMF 0 -3 I/3 YEAAS 3 1/3-G 2/3 YEAIIS 8.2/3-10 YEAAS EXAMINATION EXAh1.

SECXI SFC. XI DEh'IABKS AREA IDENTIFICATION METHOD OUTAGES 11EM NO. CATGV.

I 2 5 B 8 8 84.10 8- K-2 38PLS-I thorough 4 Support Components 8-K-I 38PL-5 through 8 Integrally Welded Lugs

84. 10 8-K-2 3$ PLS-5 through 8 Support Components
84. 10 8- K-2 38PR Pipe Restraint 8-K-I 38PL-9 through 12 Integrally Wcldcd Lugs 84.10 8-K-2 38PIS-9 through 12 Support Components 8-K-1 38PL-13 through 16 UI'r (4-VCII-9)

Integrally Wcldcd Lugs 84.10 8-K-2 381'IS-13 through 16 Support Components 84.5 8-J ,39 Pipe-to-Elbow 40 Elbow-to-Pipe 8-K-I 40l'l.-l through 4 (4-VCII-10)

Intogrally Welded Lugs

84. 10 8-K-2 40PLS-I through 4 Support Components
84. 10 8-K-2 40PR Pipe Restraint 84.5 B-.I 4l Pipe-to-Elbow

TURKEY POINT Pl,ANT UNIT 4 INSERVICE EXAHIHATIOH PLAN FOR Illg SECS/D 40-110Ãlll PERIOD OF IIIE FIRST 10-YFAR IIISPECTION IHTERVAI - CLASS I CIIEHICAL AND VOllll!E CONTROI, SYSTIRI (Sco Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASMI ASMF 0-3 1/3 YEAIIS 3.1/3-6 2/3 YEARS 6.2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI AEMAIIKS AIIEA IDENTIFICATION METI!00 OUTAGES ITEM NO, CATGY.

3 4 3w-GI-S Cont'd 04.5 0-J '42 Elbow-to-Pipe 04.5 43 Pipe-to-Elbow 04.5 44 Elbow-to-Pipo 0-K- I 44PI.-I through 4 Integrally lfcldcd Lugs

04. 10 0- K-2 through 4 04.5'4PLS-1 Support Components 45 Pipe-to-V312A 2"-Cll-4 Auxiliar S ra ,

~Pure II-54 04.8 0-J 1 V311-to-Pipo 0-J 2 Pipe-to-Flbow 04.8 0-J 3 Elbow-to-Plpo 04.8 4 Pipo-to-Plbow 04.0 0-J 5 Elbow- to- Pi pc 04.9 SPL-I through 6 Intogrally lfcldcd Lugs

04. 10 0-K-2 SPLS-I through 6 Support Coaponents 04.8 0-J 6 Pipo-to-Elbow

TURKEY POlNT PLANT UNlT 4 1NSERvlCE FKANTNATlON I LAN rOR vIE SECONII 40->IOIrIII PERlon OF mIE FlRST 10-TEAR INSPECTlON wrERVAL - CLASS 1 CIII3IICAI. AND VOLUND CONTROL SYSTEM (Sce Appendix A, Flgurcs A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASMI ASMF 0-3 I/3 YEARS EXAMINATION EXAM. 3 I/3-6-2/3 YEARS 6.2/3-IO YEAAS SEC. XI SEC. XI IIEMAIIKS AREA IDENTIFICATION METVOO OU TAGES ITEM NO. CATO Y.

3 4 6 7 2"-CII-4 Cont'd 84.8 7 Elbow-to-Pipe 84.8 8 Pipe-to-Elbow 84.6 8-J 9 Elbow-to-Bend 84.8 10 Bend-to-Elbow 84.8 8-J 11 L'lbow-to-Pipe 84.8 8-J 12 Pipe 'to Elbow 84.8 8-J 13 Elbow-to-Bend 84.10 8-K-2 13PR-1 Pipe Restraint 84.10 8-K-2 13PR-2 vr Pipo Restraint

84. 10 8-K-2 13PR-3 Pipe Restraint 8-J 14 Bend-to-Coupling 84.8 15 Coupling-to-Bend 84.10 8-K-2 1SPR-1 Pipe Restraint 84.9 8-K-1 lSI'L-1 through 4 Integrally Nclded Lugs 84.10 8-K-2 ISI'IS-I through 4 vr Support Colponcnts

TURKEV POINT PLANT UNIT 4 INSERVICB BXAHIHATION PLAN FOR 'ills SECOND 40-WNTll PERIOD OF TIIB FIRST 10-TEAR INSPECTION INTERVAL - CI.ASS 1 CIIIJIICAL AND YOGIN! CONTROL SYSTEM (Scc Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INT EA VAL ASM! ASMF EXAMINATION EXAM. 0-3 I/3 YEAIIS 3.I/3-6 2/3 YEAIIS 6-2/3-IO YEAAS SEC XI SEC. XI AREA IDENTIFICATION METVOO OVTAGES nEMAIIKS ITFMNO. CAT GY.

3 4 6 7 04.9 0-K- I ~ lSPL-5 through 8 X Integrally Ifelded Lugs 04.10 0-K-2 ISPIS-5 through 8 Support Coaponcnts

04. IO 0-K-2 ISPR-2 Pipe Restraint
04. S IG Bend-to-Coupling 04.9 1GPt-I through 4 Intogrally Nelded Lugs 04.10 0-K-2 lGPLS-1 through 4 Support Col>poncnts 04.s 0-J 17 Coupling-to-Bend 04.10 0-K-2 17PR Pipe Restraint 04.S 0-J 18 send-to-Coupling
04. 8 B-.l 19 Coupl ing-to-Pipe
04. 10 0-K-2 19PR-I Pipo Restraint 04.10 0-K-2 19PR-2 Pipe Restraint 04.8 0-J 20 Pipe-to-Elbow
04. 8 0-J 21 Elbow-to-Pipe 04.10 0-K-2 21PR Pipo Restraint

TURKEY POINT PLANT UNIT 4 INSERVICE EXAhlINATION PLAN FOR TlIE SECOND 40-hKIN1ll PERIOD OF TIIE FIRST 10-YEAR INSPECTION INERVAL - CLASS I OIEhllCAL AND VOLUhIE CONfROL SYSTEhi (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEAVAL ASMr ASM E EXAMINATION EXAM. 0-3.1/3 YEARS 3 'I/3-8 2/3 YEARS 8 2/3-10 YEARS SEC XI SEC. XI AEMAIIKS AIIEAIDENTIFICATION METNOD OUTAGES ITEM NO. CATGY

'I 2 04.8 8-J 22 Pipe-to-Elbow 04.8 8-J 23 Elbow-to-Pipe

04. 10 0-K-2 23PR-1 Pipe Restraint 04.10 8-K-2 23PR-2 Pipe Restraint 04.8 0-J 24 Pipe-to-Elbow 04.8 0-J 25 Flbow-to-Pipe
04. 8 0-J 26 Pipe-to-Elbow 84.8 0-J 27 Elbow-to-Pipe 04.8 0-J 28 I'ipe-to-Elbow 04.8 0-J 29 Elbow-to-Pipe 0-J 30 Pipe-to-CV313 2"-CII-6 I,ctdown Linc

~Fure A-32) 1 PT V309D-to-Pipe 0-J 2 Pipe-to-L'lbow B-.f 3 8 lbow- to- Pi pc

TIDIKEY POINT PLANT INIIT 4 INSERVICE EXAHINATIOH I'LAN FOR IIIE SECOND 40-IKhITII PERIOD OF 1llF. FIRST 10-YEAR INSPECTIOH INTERVAL - CLASS I CIIIDIICAI. ANO VOIAIID! CONTROI. SYSTFJI (Sco Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASME ASMF EXAMINATION EXAIL 0-3 I/3 YEARS 3 I/3-6 2/3 YEAIIS 6 2/3-10 YEARS Sfc XI SEC, XI REhlhnKS AREA IDENTIFICATION METRON OUTAGES ITEM NO. CATGY.

I 2 4 5 6 7 8 9 2"-Cll-G Cont'd 84.10 8- K-2 .3PR Pipe Restraint 84.8 8-J Plpo-to-Elbow 5

Elbow-to-Pipe 84.10 8-K-2 SPR Pipe Rostralnt 84.8 8-J G Pipo-to-LCV460 84.8 7

'CV4GO-to-Pipe

84. 10 8-K-2 7PR Pipe Rostralnt 84.8 8 Plpc-to-Elbow 84.8 9 Elbow-to-Pipe 84.8 10 Pipe-to-Elbow 84.8 11 Elbow-to-Pipe 8-J 12 Pipe-to-Hassle 2"-CII-7 RGX Olschar e,

~Fi uro A-3G D4.8 8-J I Hoar.lc-to-l'ipe 84.8 8-J 2 I'ipc-to-Pipe

TURKEY POINT PLAm UNIT 4 IHSL'RVICE EXAHIHATIOH PLAN FOR lllE SECOND 40-HDHTll PERIOD OF 'IllE FIRST IO-YMIR INSPECTION INTERVAL - CLASS 1 CHL'HICAI. AND VOIAOIE CONTROL SYSTEH (Sco Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEAVAL ASMI ASME 0-3 I/3 YEARS 3.1/3-6 2/3 YEARS 6 2/3-10 YEAIIS EXAMINATION EXAM.

SEC XI SEC. XI OUTAGES nEMAIIXS AAEA IDENTIFICATION METVOD ITEM NO..CATGY.

6 9 84.8 8-J 3 Pipe-to-Elbow 84.8 8-J 4 Elbow-to-Bend 84.8 8-J 5 Bend-to-Elbow

.6 Inside wall. Ho examination can hc conducted.

. Elbow-to-Pipe 84.8 8-J 7 Inside wall. Ho examination can be conducted.

Pipe-to-Elbow

84. 8 8-J 8 Inside wall. No oxamination can bc conducted.

Elbow-to-Pipe 84.)0 8-K-2 BPR Pipe Restraint 84.8 9 Pipe-to-Elbow 8-J 10 Elbow-to-Pipe 84.8 ll Pipe-to-Tcc, 8-J 12 Tce-to-Pipe 13 Pipe-to-Orifice F205A 84.10 8-K-2 13PR Pipe Restraint 84.8 14 OriEicc F205A-to-Plpo 84.8 B-.I 15 Pipe-to-V200h

TURKEY POINT PLANT UNIT 4 INSERVICE EXAIIINATION PLAN FOR TIIE SECOND 40-IIOI/III PERIOD OP TllE FIRST 10-YEAR INSPECTION INTERVAL - CMSS I CIIIDIICAI. ANI) VOLIDII! CONTROL SYSTDI (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEIIVAL ASM I AshIF 0-3.1/3 YEAIIS 3.1/3-6 2/3 YEAIIS 6 2/3-10 YEARS EXAhllNATION EXAM.

SEC. XI SFC. XI OUTAGES IIEhIAIIKS AIIEA IOENTIF ICATION METIjOO II EM NO. CATGY.

3 4 6 6 7 6 9 2"-C!1-7 Cont'd 8 l. 8 8-J IG Tcc- to- Pipe 8-J 17 Pipe-to-Tco 84.8 18 Tec-to-Pipe l34. 8 19 Pipe-to-Orifice F2058 84 ~ 8 20 Orifice F2058-to-Pipe 84.10 8-K-2 20PR Pipo Restraint 84.8 21 Pipe-to-V2008 84.8 22 Tcc-to-Pipe 84.8 8-J 23 Pipe-to-Elbow 84.9 D-K-I 23PS Integrally Neldcd Support 84.10 8-K-2 23PSS Support Cooponents 84.8 8-J 24 Elbow-to-Pipe 84.11 8-P 24DC 3/4u-C!l-G Drench Connection 8-K- I 24I'l.-l through 4 integrally lfeldcd Lugs

TURKL'Y POIIff PLANT UHlT 4 lHSrRVICE ExeiHATIOH PLAN FOR 'IIIE SECOND 40-NHIII PERIOB OF 'IIIE FIRST 10-YEAR IHSPECTION INTERVAL - CLASS 1 CIIL'HICAI, AHII VOLIBIE CONTROL SYSfEN (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASM I ASM F 0-3.1/3YEAAS 3.I/3-6.2/3YEABS 62/3-IOYE*ns EXAMINATION EXAKI.

SEC XI SEC. XI OUTAGES nEMAllKS AIIEAIOENTIF ICATION METVOO ITEM NO. CATGY.

3 4 5 7 8 2"-QI-7 Cont'd

84. 10 8- K-2 24PLS-I through 4 Support Cosyonents 25 X g Pipe-to-Orifice I'205C 84.8 8-J 2G Orifice F205C-to-Pipe 84.8 27 Pipe-to-V200C 2"-CII-11 Seal In ectio

~Pura A-37 84.8 8-J I CV298A-to-Pipe 84.11 8-P IBC 3/4" Test Connection Branch Connection 84.8 8-J 2 Pipe-to-V298G 8-J 3 V298G-to-Pipe 84.8 8-J Pipe-to-Elbow 84.8 8-J S Elbow-to-Pipe 84.10 8-K-2 SPR Pipe Restraint 8-J 6 I'lpc-to-Elbow 8-J 7 Elbow-to-Pipe 8

Pipe-to-Elbow

TURKEY POIIIT PLANT UNIT 4 INSERVICE EK/NINATINI I LAN FOR VIE SECOND 40-IKIml PERIOD OF TIIE FIRST IO-YEAR INSPECTION INTERVAL - CLASS I CIIBIICAI. AND VOIlINE CONTROL STSfEII (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3-1/3-6.2/3 YEARS 6.2/3-10 YEARS SEC. XI SEC XI REMARKS AREA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY

'I 2 3 4 2n-Ql- I I Cont'd 84.8 8-J 9 Elbow-to-Pipe 81.8 8-J 10 Pipe-to-Elbow M.8 8-.1 11 Elbow-to-Pipe M .10 8-K-2 IIPR Pipe Restraint 84.8 12 Pipe-to-Elbow 84.8 13 Elbow-to-Pine

84. 8 8-J 14 Plpc-to-Elbow 84.8 8-J 15 Elbow-to-Pipo M. 10 8- K-2 ISPR Pipe Restraint 84.8 8-J IG Pipe-to-Elbow 84.8 8-J 17 Elbow-to-I'ipo 84.8 8-J 18 Pipe-to-L'Ibow 84.8 8-J 19 Elbow-to-Pipo 84.10 8-K-2 19PR (Type "An) vr.

Pipe Restraint

84. 8 R-.l 20 I'ipc-td-Elbow

0

'llIRKEY POINT PLANT UNIT 4 IHSERVICE EXAHINATION PLAN FOR TIIE SECOND 40-HOHlll PERIOD OF =TIIE FIRST 10-YEAR INSPFCTION INTERVAL - CLASS I CIIEHICAL AND VOLINE CONTROL SYSTEH (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEARS 3.1/3-6.2/3 YEAIIS 6 2/3- IO YEAIIS SEC. XI SEC XI IIEMAAKS AIIEAIDENTIFICATION METIIOD OUTAGES II'EM NO. CATGY.

3 4 6 1 84.8 21 Elbow-to-Pipe 84.8 22 Pipe-to-Elbow 84.8 8-J 23 L'Ibow-to-Pipe 84.10 8-K-2 23I'R Pipo Rcstralnt 84.8 8-J 24 Pipe-to-CV29SD 84.8 25 CV298D-to-Bend 84.8 8-J 26 Bend-to-Tee 84.8 8-J 27 Tec-to-3/4" Pipe 84.8 8-J 28 Tcc-to-Flange 84 F 12 8-G-2 Plange (Code 8-8) Bolting 8 studs, 16 nuts 8-J 29 Flange-to-Pipe

84. 8 8-J 30 Pipe- to- F lbow, 84.8 B-,l 31 Elbow-to-Pipe 84.8 8-J 32 Pipe-to-Elbow 84.8 8-J 33 Elbow-to-Pipe

TURKEY POINT PIJOIT IIHlT 4 INSERVICE EXANINATION PI.AN FOR 1IIE SECOND 40-IQITII PERIOD OF TIIE FIRST 10-YEAR INSPFCTIOH INTERVAL - CLASS 1 CIII9IICAL AND VOI,IINE COITITIOI, SYSTEN (Sce Anncndix A. Figures A-22, 23. 32 and 34 through 39) (Cont'd)

INSPECTION INTEIIVAL ASME ASME 0-3 I/3 YEAIIS 3 I/3-6-2/3 YEARS 6.2/3-10 YEAIIS EXAMINATION EXAM.

SEC. Xl SEC. XI nEMAnxs AREA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY. ~

3 4 7 8 9 2"-CII-il Cont'd 04.8 0-J 34 Pipe-to- Flange 04.12 0-G-2 Flango (Code 0-0) Bolting 4 studs, 8 nots

04. 8 35 Fiango-to-Pipe 04.8 0-J 36 Pipe-to-RCP"A" 2"-CII-111 Ho. 1 Seal Leak Off, Fi ure A-37 04.8 0-J 1 RCI"'A"-to-Pipo 2

Pipe-to-Flange 04.12 B-G-2 Flange (Code 8-0) Bolting 4 studs, 8 nuts 0-J 3 Fiango-to-Pipe 8-J 4 Pipe-to-Elbow 04.8 S Elbow-to-Pipe 04.8 0-J 6 Pipe-to-Elboo 04.8 0-J 7 I;IboM-to-Pipe 0-J 8 Pipe-to-Elbov 04.8 B-,l 9 L'lboM-to-Pipe

TURKEY POINT PLANT UNION 4 INSERVICB EXQIIHATION PUQI FOR 'IIIB SECOHD 40-IKINll PERIOD OF TIIB F1RST 10-YEAR INSPECTION 1NTERVAL - CITS 1 CIIIPIICAI. ANO VOI4IHH CONTROI. SYSTFJI (See Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEAVAL ASME ASME 0-3-I/3 YEAIIS 3 I/3-6.2/3 YEAIIS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES IIEMARKS ITEM NO. CATGY.

AAEA IDENTIFICATION METIIOO 7 8 9 2"-CII-111 Cont'd 0-J 10 Pipe-to-Elbow 04.8 0-J ll Elbow-to-Pipe

04. 8 0-J 12 Pipe-to-Elbow 04.8 13 Elbow-to-Pipe
04. 8 0-J 14 Pipe-to-Elbow
04. 8 0-J 15 Elbow-to-Pipe 04.8 B-J 16 Pipe-to-Flange 04.12 0-G-2 Flange (Code 0-0) Bolting 8 studs, 16 nuts 04.8 0-J 17 Flange-to-Pipe 04.10 8-K-2 17l'R (Type A)

Pipe Restraint 04.8 0-J 18 Pipe-to-Tcc 04.8 19 Tcc-to-3/4" Pipe 04.8 0-J 20 Tcc-to-Pipe 0-J 21 Pipe-to-Tec 0-J 22 Tcc-to-3/4" I'ipc

TURKRY POIIIT PLANT UNIT 4 INSERVIC8 8XeWATINI PLAN FOR TII8 SEOND 40-semi PERIOD Or TII8 FIRST IO-VUAR IIISPRCTINI INTERVAL - CVSS I CIII3IICAL AND VOLU]IE CONTROL SYSI'Dl (Sco Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3.l/3 YEAIIS 3. I/3-6 2/3 YEARS EXAMINATION EXAM. 6 2/3-10 YEARS SEC. J(l SEC. XI IIEMAIIKS AAEA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

'I 3 2 7 8 84.8 8-J 23 Tcc-to-Pipe 84.10 8-K-2 23PR (Typo A)

Pipe Restraint 84.8 24 Pipe-to-V303A 84.8 8-J 25 V303A-to-Pipe 8-J 26 Pipe-to-Tcc 84.8 8-J 27 Tce-to-3/4" Pipe

84. 8 8-J 28 Tee-to-Pipe
84. 8 8-J 29 Pipe-to-V306A 2"-Cll-12 Seal In ection,

~rura n-M) 84.8 B-J I CV2988-to-Pipe 84.11 8-P 18C 3/4" Test Connection Branch Connection 84.8 8-J 2 I'ipc- to-V298II 8-J 3 V29BII-to-Pipe

84. 10 8-K-2 3PR (Typo A)

I'ipc Restraint 8-J PT Pipe-to-lilbow

3 TURKEY POINT PLANT UNIT 4 INSHNICH HXANINATION PLAN FOR 1IIE SECOND 40-IIONlll PERIOD OF TllE PIRST 10-YEAR INSPECTION INTERVAL - CLASS I CIIENICAI, AND VOlllHE COITTROL SYSTEN (Sco Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont~d)

INSPECTION INTEIIVAL ASME ASME 0-3 I/3 YEAIIS 3 I/3-6 2/3YEAIIS 6 2/3-10 YEAIIS EXAMINATION EXAM.

SFC. XI SEC. XI OUTAGES REMARKS ~

, AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

5 6 7 8 9 2"-CII-12 Cont'd) 84.8 5'lbow-to-Pipe 8-K-2 SPR (Type A)

Pipe Restraint 84.8 8-J G Plpo-to-Elbow

84. 8 8-J 7 Elbow-to-Pipe 84.10 7PR (Type A)

Pipe Restraint 84.8 8-J 8 Pipe-to-Elbow 84.8 8-J 9 Elbow-to-Pipe 8-J 10 Pipe-to-Elbow

84. 8 8-J il L'lbow-to-Bend 84.10 8-K-2 11PR-1 (Type A)

Pipe Restraint 84.10 8-K-2 llPR-2 (Type A)

Pipe Restraint 8-J 12 Bend-to-Elbow 84.8 8-J 13 Elbow-to-Pipe 84.8 8-J l4 Pipe-to-Elbow 8-J ls Elbow-to-Bend

TURKEY POINT PLANT UNIT 4 INSERVICE EXAIIINATION PLAN POR TIIE SECOND 40->Kgml t ERIOD OP TIIE PIRST IO-TEAR INSPECriON INTERVAL - CuSS 1 CIIIÃICAL AND VOLUIIE CONmOL STSTEN (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-'3.1/3 YEARS 3 i/3-6 2/3 YEARS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC, XI REMARKS AREA IDENTIFICATION METHOD OUTAGES ITEM NO. CATGY.

6 6 7 8 9 2"-CII-12 Cont'd 84.10 0- K-2 15l'R (Type A)

Pipe Restraint 84.8 8-J ]6 Bend- to-Coup 1 lng

'7 84.8 Coup 1 I ng- to- Bend 84.8 8-J 18 Bend-to-Coupling 84 ~ 8 8-J 19 Coupling-to-Bend 84.8 8-J 20 Bend-to-Elbow 84.8 8-J 21 Elbow-to-Pipe 84.8 22 Pipo-to-Elbow 84.8 8-J 23 Elbow-to-Pipo D4. 10 8-K-2 23PR-1 (Typo A)

Pipe Restraint 84.10 8-K-2 23PR-2 (Type A)

Pipo Restraint

84. 10 8-K-2 23PR-3 (Type A)

Pipe Restraint 84.8 B-.I 24 Pipe-to-Coupling 84.8 8-il 25 Coupling-to-Pipe

84. 10 8-K-2 25I'R-1 (Type A)

Pipo Restraint r<

TURKEY POINT PlANT UNIT 4 INSERVICE EXAMINATION PLAN FOR TllE SECOND 40-IIDNTII PERIOD OF TIIB FIRST 10-YEAR INSPECTION INfERVAL - CLASS I CIIEHICAI, AND VOINHE CONTROL SYSTEH (See Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASM E ASME SEC. XI SEC. XI EXAMINATION EXAM. OMI/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS AREA IDENTIFICATION METHOD OUTAGES REMARKS ITEM NO. CATGY.

I 2 7 8 2"-Cll-12 Cont 'd

84. 10 8- K-2 251'R-2 (Type A)

Pipe Restraint 84.8 8-J 26 Pipe-to-Elbow 84.8 8-J 27 Elbow-to-Pipe

84. 8 8-J 28 I'ipc-to-Elbow 84.8 8- J 29 Elbow- to- Pipe 84.8 8-J 30 Pipe-to-CV2988 84.8 8< 31 CV298B-to-Pipo
84. 8 8-J 32 Pipe-to-Tec 33 Pipe-to-Tco 84.8 8-J 34 Tcc-to-3/4" Pipe 84.8 8-J 35 Pipe-to-Elbow 8-J 36 L'lbow-to-Pipe 84.8 8-J 37 Pipe-to-Flango
84. 12 8- K-2 Flange (I'odo 8-8) Boltin 8 studs, 16 nuts 84.8 8-J 38 'X

-'Flange-to-Pipe

TUINEY POINT PLANT UNIT 4 INSERVICE EXAHIHATIOH PISH FOR:IIIE SECOHD 40-IONTII PERIOD OF TIIE FIRST 10-YEAR INSPECTION IHTERVAL - CLASS 1 CIIEIIICAL AND VOIAIHE CONTROL SYSTEH (Scc Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEDVAL ASME AShIE 0-3. I/3 YEARS 3.1/3-6.2/3 YEARS, 6.2/3-ID YEARS EXAMINATION EXAM.

SEC. XI SEC. XI O'EhIABKS AIIEAIDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

5 6 2"-CII-12 Cont~d 64.S 6-J 39 Pipo-to-Elbow 64.6 8-J 40 Elbow-to-Pipe 84.8 6-J 41 Pipe-to-Elbow 64.8 8-"J 42 Elbow-to-Pipe 64.8 8-J 43 Pipe-to-Flange D4 ~ 12 6-0-2 Plange (Code 6-D) Bolting 4 studs, 8 nuts 64.8 44 Flange-to-Pipe 64.8 8-J 4S Pipo-to-RCP"6" 2"-CII-121 Ho. I Seal Leak Of I'I urc A-38 8-J I RCP"Du-to-Pipe

64. S 6-J 2 Pipe-to-Flange 64.12 D-G-2 Flange (Code 6-8) Bolting 8 studs, IG nuts 84 ~ 8 6-J' Flange>>to-Plpo 64.8 6-J Pipe-to-Plbow 6-J 5 Illbow to Pipe

TURKEY POINT PLANT UNIT 4 INSERVICG EXAHINATION PIJUI POR 1118 SECOND 40-WNTII PERIOD OF TIIG FIRST 10-YEAR 'INSPECTION INTERVAL - CIASS I CIIIBIICAL AND VOLUHG CONTROL SYSTEN (Sec Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6 2/3 IO YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES REMAIlKS ITEM NO. CATGY. AREA IDENTIFICATION h1ETIIOD 3 4 7 8 2"-Cll-121 Cont'd) 84.8 8-J 6 I'ipe-to-Elbow 84.8 7 Elbow-to-Bend 8-J 8 PT Dcnd-to-Elbow 84.8 8-J 9 Flbow-to-Pipe 84.8 D-J 10 Pipe-to-Elbow M.8 8-J ll Elbow-to-Pipe 8-J 12 Pipo-to-Tco 84.8 8-J 13 Tcc-to-3/4w Pipo 84.8 8-J 14 Tcc-to-Pipo 84.8 15 Pipe-to-Tcc

84. 8 8-J IG Tec-to-.3/4" Pipe 84.8, 0-J 17 Tce-to-Pipe 8-J 18 Pipe-to-L'lbow 84.8 19 Llbow-to-Plpo 84.8 R<<J 20 Pipe-to-V3038

TURKEY POINT PIJNT UNIT 4 IHSERVICE EXINIHATIOH PLAN FOR TIIB SECOND 40-fIDHTII PER10D OF IIIE FiRST 10-YEAR INSPIRATION INTERVAL - CLASS 1 CIIENICAI. AHD VOI.UN0 CONTROL SYSTEH (Sce Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTE IIVAL ASME ASME EXAMINATION EXAM. OM I/3 YEARS 3. I/3-0 2/3 YEARS 8.2/3-10 YEARS SEC. Xl SEG XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATOY.

5 6 7 8 9 2"-Cll-121 Cont'd

04. 8 0-J 21 V3038- to- Pipe 0-.1 22 Pipe-to-Tco 04.8 0-J 23 Tee-to-3/49 Pipe 04.8 24 Tce-to-Pipe
04. 8 0-J 25 Pipe-to-V3060 2"-CII-13 Seal In ection,

~Pure A-39 04.8 0-J I CV298C-to-Pipo 04.8 0-J 2 Pipe-to-Tcc 04.8 0-J 3 Tcc-to-3/4" Pipe 04.8 0-J 4 Tcc-to-Pipe 04.8 0-J 5 I'ipc-to-V298J IN.8 0-J 6 V298J-to-Pipe

04. 10 0-K-2 6PR (Type A)

I'ipc Restraint 04.8 0-J 7 I'ipc-to-Elbow

04. 8 0-J 8 Iilhow-to-Pipe

0 TURKEY POINT PIAliT 11NIT 4 INSERVICE EXAHIHATION PLAN FOR 'HIE SFCOND 40-IKMITII PERIOD OP 'lllE FIRST IO-YEAR IHSPFCTIOH INTERVAL - CLASS 1 CIIIDIICAL AND VOLlll!F. CONfROL SYSfEM (Scc Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEAVAL ASME ASME 0-3 I/3 YEARS 3.'I/3-6 2/3 YEARS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES IIEMAAKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

I 2 . 3 5 6 7 8 9 2"-CII-13 Cont'd 84.10 8-K-2 8PR (Type A)

Pipe Restraint 84.8 8-J 9 Pipe-to-Elbow 84.8 8-J 10 Elbow-to-Pipe

84. 10 8- K-2 10PR (Typo A)

Pipe Restraint 84 ' 8-J 11 Pipe-to-Flbow 84.8 8-J 12 f bow- to- Pipe 1

84.8 13 Pipe-to-Elbow 84.8 8-J 14 Elbow-to-Pipe 84.10 8-K-2 14PR-1 (Type A)

Pipe Rostraint 84.10 8-K-2 14PR-2 (Type A)

Pipe Restraint

84. 8 B-J 15 I'ipc-to-'Elbow 8-J l6 Elbow-to-Pipe 8-J 17 Pipe-to-Elbow B-J 18 Elbow-to-Pipe B-.l 19 I'ipc-to Elbow

TURKEY POINT PLANT IIHIT 4 IHSERVICE EXAHIHATION PLAN FOR lllE SFCOHD 40-IKINll PERIOD OF 'nIG FIRST 10-YEAR IHSPECTIOH INTERVAL - CLASS I CIIEHICAI. AHD VOID/HE COHrROL SYSTDI (Scc Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEIlVAL ASME ASME 0-3.I/3 YEAAS 3 I/3-6-2/3 YEARS 6.2/3-IO YEAAS EXAMINATION EXAM.

SEC. XI SEG XI IlEMARKS AREA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATO Y.

3 4 5 6 1 2"-Cll-13 Cont'd 20 L'lbow-to-I'lpe D4.10 0-K-2 20PR-I (Type A)

Pipe Restraint BI. 10 0-K-2 20PR-2 (Type A)

Pipo Restraint 04.8 21 Pipe-to-Coupling 04.8 8-J 22 Coup I ing-to-Bend

04. 10 0-K-2 22PR (Typo A) vr Pipe Restraint 04.6 0-J 23 Bend-to-Elbow 04.6 0-J 24 Elbow-to-Pipe 04.8 25 Pipe-to-Elbow 04.6 0-J 2G Elbow-to-Pipe D4.8 27 Pipe-to-CV298F 04.8 0-J 26 CV298F-to-Pipo
84. 11 0-P 280C 3/4n-CII-I31 Branch Conncctlon 04.8 0-J 29 I'Ipc- to- Flange 04.12 0-6-2 Flango .(Code 0-0) Bolting vr 8 studs, IG nuts

TURKEY POINT PLANT UNIT 4 INSERVICE EXAMINATION PLAN FOR 'HIE SECOND 40-IMll PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS I CIIENICAL AND VOLUIIE COITIROL SYSTEH (Scc Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-6 2/3 YEARS 6 2/3-10 YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES IlEMAllKS ITEM NO. CATGY.

6 T 2"-Cll-13 Cont'd 04.8 8-J 30 PT Flange-to-Pipe 04.8 31 Pipe-to-Elbow M.S 0-J 32 Elbow-to-Pipe

04. 8 0-J 33 Pipe-to-Elbow
04. 8 8-J 34 Elbow-to-Pipe 04.8 35 Pipe-to-Elbow 04.8 8-J 3G Elbow-to-Pipe 04.8 0-J 37 Pipe-to-Elbow 04.8 38 Elbow-to- Pipe 04.8 ~ 0-J 39 Pipe-to-Elbow 04.8 0-J 40 Elbow-to-Pipe 04 ~ 8 41 Plpo-to-Flange 04.12 B-G-2 Flange (Code 0-0) Bolting 4 studs, 8 nuts 04.8 42 Flange-to-Pipe 04.8 0-J 43 Plpc-to-RCP C~

TURKEY POIHT PLANT UNIT 4 IHSERVICE EXANINATIOH PLAN FOR Il(E SECOND 40-1$ HTll'ERIOD OF TIIE FIRSf 10-YCAR INSPECTION INTERVAL - CITS 1 CIIIDIICAI. AND VOIl/NE COI/TROI. SYSTEM (Scc Appendix A, Figures A-22, 23, 32 and 34 through 39) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEARS 3 I/3-8.2/3 YEARS 0.2/3-10 YEAIIS SEC. XI SEC. XI IIEMARKS AIIEA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

I 2 3 7 8 2"-CII-131 Ho. 1 Seal I.ea Of F urc A-39 84.8 8-J 1 RCP C -to-Bend 84.8 8-J 2 Bend-to-Flango 84.12 B-G-2 Flange (Code 8-8) Bolting 8 studs, 16 nuts M.B 3 Flange-to-Pipe 84.8 8-J Pipe-to-Elbow M.B '8- J 5 Elbow-to-Pipo M.B 8-J 6 Pipe-to Elbow 84.8 8-J 7 Elbow-to-Pipe 84.8 8 Pl po-to-L'Ibow

84. 8 8-J 9 Elbow-to-I'ipe M.B 8-J 10 Pipe-to-Elbow 84.8 8-J 11 Elbow-to-Pipe M.B 8-J 12 I'ipc-to-Tcc 84.8 8-J 13 Tcc-to-3/4u Pipe 84.8 B-.I 14 Tco-to-Plpc

TURKEY POINT PLAHT llHIT 4 IHSERVICE EXAJIINATION I J>W FOR mlE SECOND 40-IeNIII PERIOD OF TIIE FIRST Io-YEAR IHSPECnOH INKRVAL - CuSS I QII0IICAL AND VOI.WlE CONTROL.SYSTEN (See Appendix A, Figures A-22, 23, 32 and 34 thro0gh 39) -(Cont'd)

INSPECTION INTERVAI.

ASME ASME 0-3.l/3 YEARS 3.I/3-6.2/3 YEARS 6.2/3-IOYEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES REMARKS ITEM NO, CATOY.

AREA IDENTIFICATION METNOO 2, 3 4 5 6 ~ 7 2"-CII-131 Cont'd 8-J 15 Pipe-to-Tcc 84.8 8-J 16 Tce-to-3/4" Pipe 8-..J 17 Tce-to-Pipe

84. 8 8-J IS Pipe-to-Elbow 84.8 8-J l9 Elbow-to-I'lpe 04.8 20 Pipe-to-V303C
04. 8 8-J 21 V303C-to-Pipe 8-J 22 Pipe-to-Tee
84. 8 8-J 23 Tcc-to-3/4" Pipe
84. 8 24 Tcc-to-Pipe
84. 8 25 Pipe-to-V306C

TURKEY POINT PLANT UHIT 4 INSERVICE EXQIIHATINI PION FOR 'IIIE SLCOHD 40-IIOIFIII PERIOD OF TIIE FIRST 10-YEAR INSPECTIOH INTERVAL -"CLASS I SAFETY IH.IMTIOH SYSTIM (Scc Appendix A, FiyIres A-12 through 14, 30, 31 and 40 thrnugh 42)

INSPECfIONINTEIIVAL ASMI ASME 0-3.1/3 YEAIIS 3.)/3-6.7/3 VEABS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC XI SEC. XI IIE MAIIK8 AREA I 0ENIIF ICAllON METI!OFI OUTAGES 11EM NO. CA1GY.

5 6 In ection Fi urc A-12 84.5 8-J I Reducer-'to-Tcc 84.5 .

'-J 2 CV8758- to-Elbow 84.5 8-J 3 Elbnw-to-Pipe

.8-J Pipo-to-Elbow 5

Elbow-to-Pipe 84.9 8-K-I SPL-I through 9 (4-S I I I- G7)

Integrally Ifelded Lugs 84 ~ 10 8-K-2 SPLS-I through 9 Supper't Coaponents 8-J G Pipe-to-Tcc 84.5 8-J 7 Tcc-to-Pipe 7PL-I through 9 (4-S III-105)

Integrally lfclded Lugs 84.10 8-K-2 7PLS-I through 9 Support Coapnaents 84.5 8 Pipe-to-Pipo 84 as 8-J 9 I'ipc-to-Elbnw 8- K- I 9PS (4-Sill- IO)

Integrally Welded Support

TIJRKEY POINT PLANT IJHIT 4 IHSERVICE EXAI4IHATIOH PLAN FOR IIIE SECOND 40-HONTII PERIOD OF ITIE FIRST 10-YLAR INSPECTION ItfKRVAL - CUISS 1 SAFLTY IH.JECTIOH SYSTIBI (Scc Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTERVAL ASMI AShlE EXAMINATION EXAM. 0-3.1/3 YEARS 3 I/3-6 7/3 YEARS 8 2/3-10 YEARS SEC XI SEC. XI REMARKS AREA IDENT IF ICATION MET1300 OUTAGES ITEh1 NO. CATGY.

I 2 ,4 10"-S1-30 Cont'd 84.10 8-K-2 9PSS Support Conlioncnts 84.5 10 Elbow-to-Pipe 84.5 11 Pipe-to-Pipe 84.5 12 Pipe-to-Elbow 84.7 12/2"-SI-30 I3T Branch Connection 84.11 8-P 128C 3/433-51-301 Branch Connection 84.5 8-J 13 Elbow-to-CV875A

~ln ection ~PI urs A-33) 84.5 8-J I rVS758-to-Pipe 84.5 B-.J 2 Pipe-to-Elbow 84 ~ 5 B-.I 3 rlbow-to-Pipe 84.5 B-.J Pl pc-to-Elbow 84 5 5 Elbow-to-Tce B-J G Tcc-to-I'ipc 84.10 8- K-2 GI'R I'ipc Restraint

TURKEY POINT PIJNT UNIT 4 INSL'RVICB EXAHIHATIOH PLAH 1'OR IIIB SECOND 40-WttTlt PERIOD OF TIIB FIRST IO-Yt!AR IttSPLCTIOH IIITBRVAL - CLASS I SAFETY IN.)t:.CTIOH SYSTIQI (See Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTERVAL ASMI ASM F 0-3 EXAMINATION EXAh1. I/O YEARS 3 I/3-6.2/3 YEARS 6 2/3-10 YEARS SEC XI SEC. XI AIIEA IDENTIFICATION AEMARKS METI!00 OUTAGES ITEM NO. CATGY.

I 2 4 6 6 7 6 9 04.5 0-J 7 l'lpe-to-Elbow 04.5 8 Elbow-to-Elbow 04.5 9 Elbow-to-Pipe 04.11 '-P 98C 3/4"-Sl-311 Branch Connection 04.5 0-J 10 Pi po- to-F.1 bow 84.9 0-K- I 101'S(4-Silt-101) /UT Integrally tfelded Support

04. 10 0- K-2 10PSS Support Components 0-J 11 Elbow-to-Pipo 04.5 12 Pipe-to-Elbow 04.11 120C 3/4"-SI-312 Branch Connection 04.7 12/2"-Sl-31 Branch Connection 04.5 B-J 13 Elbow-to-CV8750

TURKEY POINT PLANT UNIT 4 IHSGRVICG EXAHIHATIOH PLAN FOR 1llE SECOND 40-IIOIrril PERIOD OP IllE Fll8f 10-YEAR INSPECrIOH INTERVAL - CLASS I SAFETY INJECTION SYSTDI (Scc Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTEllVAL ASMf ASMF 0-3.1/3 YEARS 3.1/3-6 2/3 YEARS 6 2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OIjTAGES REMAIIKS AnEA IDENTIFICATION MET POO ITEM NO. CATOY.

3 10"-SI-32 SGI'ct In ect on F re A-14 84.5 1 CV875F- to- Tco 84.5 . 8-J 2 Tcc-to-Pipe 84.5 8-J 3 Pipo-to-Elbow

84. 11 38C 3/4"-Sl-321 Branch Connection 84.5 4 Elbow-to-ripe 84.11 8-P 48C 3/4"-S1-322 Branch Connection 84.5 8-J 5 Pipe-to-Bend
84. 10 8- K-2 SPR Pipe Restraint 84.5 8-J 6 Bond-to-Elbow 81.5 8-J 7 Plbow-to-Pipe 84.10 8-K-2 7PR-I Pipe Restraint 84.10 8-K-2 7PR-2 Pipe Restraint 84.5 8 Pipe-to-Elbow 84, lO 8-K-2 8PR Pipe Rcstralnt

TURKEY POIIA'LANT UHIT 4 INSERVICB EXAHINATION I'LAN FOR ITIE SLCOHO 40-110Iml PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS I SAFETY INJECTION SYSTEH (See Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) ( Cont'd)

INSPECTION INTEIIVAL ASMI. ASMF 0-3 I/3 YEARS 3.1/3-6 2/3 YEAIlS 6.2/3-10 YEAAS EXAhllNATION EXAhI.

ILFC XI SFC. Xl IIEhIAAKS AREA IDENTIFICATION MET@or> OUTAGES I1FM NO. CATGY.

I 2 4 5 10"-S1-32 Cont'd 84.5 0-J 9 Elbow-to-Pipe M.S 0-J 10 Pipe-to-Elbow 84.11 108C 3/4"-S1-323 Branch Connection 84.7 0-.1 10/2"-SI-32 Branch Connection 84.5 11 Elbow-to-CV875C 8"-SI-30 (RNR 04.5 8-.1 1 CV87GA-to-Pipe 04.in 8- K-2 iPR Pipe Restraint 84.5 2 Pipe-to-Elbow 84.5 8-J 3 Elbow-to-Pipe 04.5 Pipe-to-Elbow 04.5 8-J 5 Elbow-to-Tco M. 1 I 8-P 58C 3/4"-Sl-302 Branch Connection 84.5 B-J G CV87GE-to-Elbow M.S 8-.1 7 L'lbow-to-Tcc

mRKEY POINT PLANT DNIT 4 INSERVICE EKANINATION PLAN FOR TIIE SECOND 40-IIONTll PERIOD OF IIIE FIRST 10-YEAR INSPECl'ION INTERVAL - CLASS I SAFETY INJECTION SYSTDI (Sce Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTEIIVAL ASM I. ASME 0-3 I/3 YEARS EXAMINATION EXAM. 3 I/3-6.2/3 YEARS 6.2/3-10 YEARS SEC XI SEC. XI AREA IDENTIFICATION OUTAGES IIEMABKS MET NOD ItEM NO. CATGY.

3 4 6 7 8"-Sl-30 Cont'd 84.5 8-J 8 Tce-to-Elbow 84.5 8-J 9 ELbow-to-Pipe 84.5 8-J 10 Pipe-to-Reducer 8"-SI-31 RIIR,

~FUI6 A L D4.5 8-J I CV8768-to-Bend n4.s 8-J 2 Bend-to-Elbow 84.11 8-P 2DC

.3/4"-SI-313 Branch Connection 84.5 8-J 3 Elbow-to-Pipe 84.11 ~

3DC 3/4"-SI-314 Drench Connection 84.5 8-J Pipe-to-Tcc 84.5 '8-J 5 CV876D-to-Bend 84.10 8-K-2 SPR(4-SIII-97)

Pipe Restraint 84.5 6 Bend-to-Tec 84.5 n-.l 7

. Tcc-to-Tce

-'TURKEY POIIIT PLANT llNIT 4 INSL'RVICF. EXAMINATION PLAN FOR TllH SECOND 40-IINITll PERIOD OF lllE FIRST 10-YEAR IIISPECTION IIITERVAL - CIJISS 1.

SAPID INJIXTION SYSTFJI (Sce Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTEIIVAL ASMI ASMF 0-3 I/3 YEAIIS EXAMINATION EXAhl. 3 I/3-6-2/3 YEAllS 6 2/3-10 YEARS SEC XI SFC. XI AEhlAIIKS AIIEA IDENTIFICATION METI.OO OUTAGES I IEM NO. CATGY.

I 2 4 5 6 8"-SI-32 RIEI, F ure A-I 84.5 8-J I CV876F-to-Elbow 84.5 2 Ell ow-to-Pipe 84.5 8-J 3 Pipe-to-Pipe 84.5 8-J 4 Pipe-to-Tce 2"-S1-331 Sa Eet In ection Fi urc. A-30 1

IIV866A-to-Pipe 84.10 8-K-2 IPR Pipo Restraint

84. 8 8-J 2 Pipe-to-Elbow 84.8 8-J 3 Elbow-to-Pipe 84.8 8-J 4 Pipe-to-Tce 84.8 8-J 5 Tcc-to-Pipe 84.10 8-K-2 5PR I'ipo Restraint 84.8 6 Pipe-to-Elbe~

84.8 8-.1 7 Elbow-to-Pipe 84.10 8-K-2 7PR Pipe Restraint

0 TlmKEY POIIff PLANT IINIT 4 IHSERVICE EXAHINATION PLAN FOR TllE SECOND 40-mill PERIOD OF 'IIIE FIRST IO-YEAR IHSPECTIOH INTERVAL - 'CITS I SAFETY INJECTION SYSTUI (Scc Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTERVAL ASM[ Ash1F 0-3 I/O YEAIIS EXAMINATION EXAht 3 I/3-6 2/3 YEARS 6 2/3-IO YEAAS SEC, XI SEC. XI IIEMAIIKS AnEA IDENTIFICATION METHOD OUTAGES ITEM NO. CATGY.

3 4 5 6 7 8 9 2"-SI-331 Cont'd 8

Pipo-to-Elbow 84.8 8-J 9 L'lbow-to-Pipe 84.8 8-J 10 Pipe-to-Elbow 84.8 8-J 11 Elbow-to-Pipo 84.11 8-P IIDC 3/4"-SI-33II Branch Connection

84. 8 8-J 12 Pipe-to-Elbow 8-J 13 Elbow-to-Pipe 84 ' 14 Pipe-to-Elbow 8-J 15 Elbow-to-Pipe
84. 10 8-K-2 ISPR Pipe Restraint 84.8 8-J lG Pipe to-Coupling 17 Coupling-to-Bend 84.10 8- K-2 17PR-' X.

Pipe Rcstralpt, 84.10 8-K-2 17PR-2 vr Pipo Restraint B-.I 18 Bend-to-Elbow

TURKEY POINT PLANT UNIT 4 INSERVICE EXAIIINATION PLAN FOR IIIE SECOND 40-hSNlll PERIOD OF IIIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS 1 SAFETY INJIICTION SYSTEH (Scc Appendix A, Flgurcs A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION I NTE IIVAL ASMI ASMF 0-3 I/3 YEAIlS 3 'I/3-6 2/3 YEAIIS 6 2/3-10 YEAIIS EXAMINATION EXAh1.

SIC XI SEC. XI OVTAGES AEhIAIIKS AREA IDENTIFICATION hIETVOO ITEh1 NO CATGY.

I 2 4 5 6 7 8 9 2"-SI-331 Cont'd 0-4 ' 0-J 19 Elbow-to-Pipe 04.8 20 Pipe to-Elbow 04.8 0-J 21 Elbow-to-Pipe 04 ~ 8 0-J 22 Pipe-to-CV874A 2"-SI-332 Safct In cct on F ure A-31) 04 F 8 0-J I HV8660-to-Pipe 04.10 0-K-2 IPR Plpc Restraint 2

Pipe-toiEIbow

04. 8 0-J Elb'ow-to-Pipe 04.8 0-J 4 Pipe-to-Tco 04.8 0-J 5 Tce-to-Pipe 04.8 6 Pipe-to-L'lbow 04.8 0-J 7 Elbow-to-Pipe
04. 8 0-.1 8 Pipe-to-Tco.

04.8 9 Tcc-to-I'ipc

TURKEY POINT PLAIIT UNlT 4 1NSrRvlCE EKANiNAT1ON Puw FOR TIIE SEICON0 40->IONTII PERlon Or vIE F1RST 10-YEAR 1NSPECT1ON iNTERvAI. - Cms 1 SAFETY INJECI'ION, SYSrrJI (Sec Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INT EA VAL ASMF 0-3.1/3 YEAnS EXAMINATION EXAM. = 3 I/3-6.2/3 YEAIIS 6.2/3-10 YEAllS SEC. XI SEC. XI REMARKS anEA IOENTIFICATION METHOD OUTAGES iTEMNO. CATGY.

4 "5 2"-Sl-332 (Cont'd 84.8 8-J 10 Pipe 'to Elbow 84.8 8-J 11 Elbow-to-Pipe 8-J 12 Pipe to Elbow 84.8 8-J 13 Elbow-to-Bend

84. 10 8- K-2 13PR Pipe Restraint 84.8 B-.I 14 Bend-to-Coupling 84.8 B-.I IS Coupl ing-to-Bend 84.8 8-J 16 Bend- to-Coupl ing 84.8 B-,I 17 Coupling-to-Pipe 84.8 8-J 18 Pipe- to- Elbow 84.8 B-.J 19 Elbow-to-Pipe
84. 10 8-K-2 19PR vr I'ipc Restraint 84.8 8-J 20 Pipe-to-Elbow B-.I 21 Elbow-to-Pipe B-.I 22 Pipe-to-Elbow

- TURkEY POINT PMNT UNIT 4 INSHRVICE EXAIIIIIATIONPLAN FOR Illa SECOND 40-IMll PERIOD OF TIIE I:IRST 10-YEAR INSPECTION INTERVAL - CIJiSS I SAFETY IN.)ECTION SYSITJI (Scc Appendix A, Figures A-12 through 14, 30, 31 cnd 40 through 42) (Cont'd)

INSPECTION INTERVAL ASME Ash>C 0-3 I/3 VEADS 3 1/3-6.2/3 YEARS 6 2/3-10 YEARS EXAhRNATION EXAht SEC. XI SEC. XI AREA IDENTIFICATION OUTAGES REMARKS METRO/>

>1Ehl NO. CATGV.

I 2 8 9 8-J 23 Elbow-to-Pipe 04.8 0-J 24 Pipe-to-Elbow 04.11 240C 3/4"-SI-3321 Bronch Connection 0-J 25 Elbow- to- Pipe

04. & 0-J 26 Pipe to Elbow 04.8 8-J 27 Elbow-to-Pipo 04.& 0-J 28 Pipe-to-Elbow 04.8 D-J 29 Elbow-to-Pipe 84.8 30 Pipe-to-Elbow 0-J 31 Elbow-to-Pipe a4.& 8-J 32 Pipe-to-f!bow 04.8 D-.I 33 Elbow-to-Pipe 04.8 D-.l 34 I'ipc-to-Elbow 0-J 35 Flbow-to-Bend
04. 10 0- K-2 35PR-I Pipe Restrnint

ON'URKEY POINT PLANT I/NIT 4 INSERVICF. EXANINATION I'ue FOR TIIE'ECONB 40-WNITI PERIOn OF TIIE FIRST 10-YEAR INSI'ECTION INTERVAr. - CLASS I SAFIT>Y INJFXTION SYST04 (Sce App ndix A, I'igurcs A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTERVAL ASME ASM F 0 3.I/3 vEAns 3.I/3-6.2/3 YEARS 6.2/3-10 YEARS E XAMIMATION EXAhI.

SEC. XI AEh'IAAKS AIIEAIDENT IF. CATION NOI> OUTAGES 4,5 MET ITEMNO. CAIGY.

I 2 2"-Sl-322 Cont'd 84.10 8-K-2 3SPR-2 Pipe Restraint 84.8 36 Bend-to-Coupling 84.8 37 Coupling-to-Band 84.10 8-K-2 37I'R Pipe Restraint 84.8 8-J 38 Bend-to-Elbow 84.8 8-J 39 Elbow- to- Pipe 84.8 8-J 40 Pipe-to-Elbe>>

04.8 8-J 41 Elbow-to-Pipo 84.10 8-K-2 41PR Plpo Restraint 84.8 8-J 42 Pipe-to-CV8748 2"-SI-30 Boron

~>~t urc n-Io 84.8 8-J I CV873A-to-Pipe 84 ~ I 0 8- K-2 IPR Pipe Restraint 2

I'lpe-to-Elbow 04.8 8-J 3 Elbow-to-Pipe

TURKEY POIHT PIJDIT WIT 4 INSERVICE EXANINATIOH I'LAN FOR 'IIIE SLCDHD 40-IKINll PERIOD OF 'INE FIRST 10-YEAR INSPECTION INTERVAI. - CITS I SAFETY INJECTIOH SYSTFJI (Sco Appendix A, Figurc A-12 througJI 14, 30, 31 nnd 40 tbrough 42) (Cont'd)

INSPECTION INTEnVAL ASMI ASMF EXAMINATION EXAM. 0& I/3 YEABS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS SEC. XI SEC. XI AREA IDENTIF ICATION METHOD OUTAGES AEMAAKS IIEM NO. CATGY. 4 3 4 6 7 6 0 2"-SI-30 Cont'd

04. 8 0-J '4 Pipo-to-Teo 04.8 0-J 5 Tcc- to-3/4" Pipe G

Tec-to-Pipe 0-J 7 Pipe-to-VBG8A 04.8 B-J 8 V868A-to-Pipo

04. 8 9 Pipe to Elbow 04.8 0-J 10 Elbow-to-Bend 04.10 0-K-2 10PR I'lpo Rostraint 04.8 0-J 11 Bend-to-Coupling 04.8 0-J 12 Coupling-to-Bend 04.8 0-J 13 Bend-to-Coupling 0-J 14 Coupling-to-Pipe 04.8 0-J IS I'ipc-to-Elbow 8-J 16 Elbow-to- Pi po 04.10 0-K-2 IGPR I'ipc Restraint 0

TURKEY POINT PLANT UNIT 4 INSERVICE EXAMINATION PLAN FOR 'IllE SECOND 40-IKNlll PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAL - CLIPS I SAFIITY INJ!ATION SYSFFhl (Sec Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTEflVAL ASME ASMF EXAMINATION EXAM. 0-3-1/3 YEARS 3 1/3-6 2/3 YEARS 6 2/3-IO YEARS SEC, XI SEC. XI IIEMAIIKS AREA IDENTIFICATION METHOD OUTAGES ITEM NO. CATGY.

4 6 6 7 6 9 2"-SI-30 Cont'd 84.8 8-J 17 Pipe-to-Flbow 84.8 18 Elbow- to- Pipe 84.8 19 Pipe-to-Elbow 84.8 8-J 20 Elbow-to-Pipe 84.11 8-P 20BC 3/4"-81-30 Branch Connection 84.8 8-J 21 Pipe-to-Elbow 04.8 22 Elbow-to-Pipe 8-J 23 Pipe-to-Elbow 04.8 8-J 24 Llbow-to-Pipe

84. 8 8-J 25 Pipe- to-Coup 1 ing 84.8 26 Coupling-to-Pipe 84.8 27.

Pipe-to-Elbow 84.8 8-J 28 Blbow-to-I'ipe 84.8 8-J 29 Pipe-to-Elbow 84.8 B-.l 30 I'.lbow-to-Pipe

TURKEY.POINT PLANT IINIT 4 INSERVICH EXAIIINATION PLAN FOR TIIE SECOND 40-NNIII PERIOD OF 'llIE FIRST 10-YILAR INSPECTION INlTRVAL - CLASS I SAFI.IY INJL'CTION SYSTLM (Scc Appendix A, Figures A-12 through l4, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTEBVAL ASM< ASMF EXAMINATION EXAM. 0-3 I/3 YEABS 3 I/3-8-2/3 YEARS 0 2/3-10 YEABS BEMAIIKS SEC. XI SEC. XI OUTAGES AREA IDENTIFICATION METIIOO ITEMNO. CA1GY, 8 3 4 7 2"-SI-30 Cont'd 04.8 31 Pipe-to-Branch Connection 2"-SI-31 Boron In'ection, P~ara 4-41 M.S I CV8730-to-Pipo D4. 8 0-J 2 Pipe-to-Tce M.B 8-J 3 Tcc-.to-3/4" Pipe

04. 8 0-J Tee-to-Pipe 04.8 0-J 5 Pipe-to-VSGSD 04.8 0-J 6 VSGBD-to-Pipo 04.8 B-J 7 PIpc-to-Elbow 84.8 8 Elbow-to-Pipe 0-J 9 Pipe-to-Elbe~

M.S 0-J 10 Elbow-to-Pipe 04.11 0-P IODC 3/4"-DI-31 Branch Connection 04.10 0-K-2 IOPR YT Pipe Rcstralnt

l C

I 5

g C

0 tg o

SF I

Z i O VQ IO D

I O

IO gZ n Co Ci 00

.5 0

~J 8

g IC 0 Z O

I C Cl C Z o5 I

I II

'0 JJ C 0 2 0 2 0 2 0 0 0

~ J, 00 C

0 C

0 0 0 C O C 0 Ce 0 C 0 0 0 Ds 0 C C I IZ 0 J7 C O'I Cl Cl 0 0 0 0

JJ I VQ I I Cl I I IC I JJ I O I 0 0 I 0 I 0 I 0 0 VI 00 X 0

~J JJ 0 I 0 0 JJ 0 JJ 0 ~J 0 0 C III C I I JJ I I JJ I I JJ H I I 3 I 2 '0 2 I I 3 CO Cl 0 Cl 0 0 0 0 0 0 0 0 0 LO I Ce N ~

~

Cl 0 m ~ O~ C N ~

J5 C C NM F 0

wC m Ce tt ill ~ 0 ~ gi ~ CO Ch

~ v C N VQ N0 N Cl N 0 N S N ~g O

N L I 00 CO I

CO I

hC I

I Cl Cl I

CO IJ X O

?

Z 00 00 o,

~

III <~ CO CO CO CO CO CO CO CO CO CO tll III I CO CO Cl I Cl IO CCI CO CO CO C 125

TURKEY POItfr PMHT UNIT 4 INSL'RVICB EXAttIHATIOH PLIQI FOR 'llIB SECOtID 40-IIOtrlll PERIOD OF TIIB FIRST 10-YEAR IttSPECTIOH INTERVAL - CLASS 1 SAI:ETY INJICTIOH SYSTEH (Scc Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTERVAL ASML ASME EXAMINATION EXAh1. 0-3.1/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS SEC. XI SEC. XI AEh1AAKS AIIEA IDENTIFICATION METHOD OUTAGES ITEM NO. CATGY.

2 4 5 6 7 8 9 64.10 8-K-2 ~ 241'R

~

Pipe Restraint 61.8 25 Pipe-to-Blbow 64.8 6-J 26 Elbow-to-Plpo 64.8 8-J 27 Pipe-to-Elbow 28 Blbow-to-Plpo

64. 10 8-K-2 28PR-1 Pipe Restraint 84.10 8-K-2 28PR-2 Pipe Restraint
64. IU 8- K-2 28PR-3 vr Pipe Restraint 84.10 6-K-2 28PR-4 Pipe Restraint 64.8 8-J 29 Pipe-to-Coupling 64.8 30 Coupling-to-Bend
64. 10 8-K-2 30l'R-l Pipe Rostraint 64.10 6-K-2 30PR-2 Pipe Restraint
84. 10 6- K-2 301'R-3 I'ipc Rostraint 64.8 31 Bend-to-Elbow

TURKEY POINT PLANT UNIT 4

~ .

rNsaRvlca HxANINATION PLAN roR ala sacoND 40->KiNTII PERlon oF Tlla F1RST lo-YEAR iNSPIICTION 1NTHRYAL - cuiss 1 SAFI!TY INJECTION SYSII (Sce Appendix A, Figures A-12 through 14, 30; 31 and 40 through 42) (Cont'd)

INSPE'CTION INTERVAL ASME ASMF 0-3 I/3 YEARS 3 I/3-0 2/3 YEARS 2/3-IO YEAIIS EXAMINATION EXAM. 6 SEC. XI SEC. XI AREA IOENTIFICATION OUTAGES AEMAIIKS METVOO ITE M NO. CATGY.

3 4 2"-S1-31 Cont'd 84.8 8-J 32 liibow-to-Pipe 84.10 8-K-2 32PR I'lpc Restraint 84.8 8-J 33 Pipe-to-Elbow 84.8 8-J 34 Elbe>-to-Pipe 84.8 8-J 35 Pipe to-Hlbou 84.8 8-J 3G Elbow-to-Pipe 84.8 8-J 37 Pipe-to-Dranch Connection 2"-SI-32(Boron ln ect on ~

~Pure ru2 2)

D-J 1 CV873C-to-Pipe 84.8 8-J 2 Pl pc- to-Elbow 84.8 8-J 3 Hlbou-to-Pipo

84. 10 8- K-2 3I'R Plpo Restraint 84.8 8-J 4 Pipe-to-Tec D-J S Tcc-to-3/422 I'ipc

TIIRKEY POlttT PLAtfT llNIT 4 INSERVICE EXAHINATION PLAN FOR TIIE SECOND 40-IKINTII PERIOD OF IIIE FIRST 10-YEAR IttSPECTION INTERVAI. CLASS I SAFLTY INJI:.Cl'ION SYSTBI (Scc Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd)

INSPECTION INTEAVAL nsML ASME 0-3.I/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS E XnMINnTION EXAM.

SEC XI SEC.XI OUTAGES AEMAAKS AAEA IDENTIFICATION METI!00 IIEMNO. CATGY. '

3 6 7 2"-SI-32 Cont'd

~

6 Tcc-to-Pipe 84.8 8-J 7 I'lpc-to-VSGSC 8-J 8 VSGSC- to- Pipe 84.8 9 I lpc-'to ElboM n4.8 8-J 10 Elbow-to-Pipe II4. I I 8 P IOBC 3/4u-81-32 Branch Connection

84. 10 8- K-2 IOPR-I I'ipe Restraint 84.10 8-K-2 IOPR-2 Pipe Restraint 84.8 8-J 11 Pipe-to-Elbow 84.8 0-J 12

'lbow-to-Pipe 84.8 13 Pipe-to-Elbow 0-J 14 ElboM-to-Bend 84.10 0-K-2 141'R I'ipo Restraint

84. 8 'IS Bend-to-Elbow 84.8 B-.l IG Et tloM-to Pipe

TURKEY POINT PLANT EHIT 4 INSBRVICB EXANIHATIOH PLAN FOR TllB SECOHD 40-)IONTll PERIOD OF TNB FIRST IO-YEAR INSPECTION IIITERVAL>> CLASS I SAFETY INJECTION SYSTIB4 (See Appendix A, Figures A-12 through 14, 30, 31 and 40 through 42) (Cont'd) I INSPECTION INTERVAL ASM'SMF EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6 2/3-IO YEARS SEC, XI SEC. XI OUTAGES REMAIIKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

I 2 5 6 2"-SI-32 Cont 'd 84.8 8-J 17 Pipe-to-Elbow 8-J 18 Bibo~-to-Pipe 84.8 8-J 19 Pipe-to-Coupling 8-J 20 Coupling-to-Bend 84.10 8-K-2 20PR Vt I'ipc Restraint 8-K-1 20PS Integrally T/clded Support 84.10 8-K-2 20PSS Support Components 84.8 8-J 21.

Bend-to-Elbow 84.8 B-J 22 Elbow-to-Pipe 84.8 8-J 23 Pipe-to-Elbrus 84.8 8-J 24 Elbows-to-Branch Connection

TURKEY POINT PLANT UNIT 4 INSERVICE EX/NIHATION PLAN l'OR TIIE SECOHD 40-IKINlll PERIOD OF 'llIE FIRST 10-Yl'AR INSPECTION INTERVAL - CMSS I AUXllIARY COOIANT SYSTBI (Scc Appendix A, Fignro A-10)

INSPECTION INTERVAL ASM( ASME 0-3 I/3 YEAAS 3 I/3-6.2/3 YEARS 6.2/3-IO YEAAS EXAMINATION EXAh1.

SEC, XI SEC. XI AIIEA IDENTIFICATION OUTAGES IIEh1ARKS METVOO I IEh1 NO. CATGY.

I 2 4 5

~24"-AC-23 IIIIA,

~Pi ure A-IA) 04.5 0-J I lfV750-to-Pipe 04.11 8-P IDC 3/4u-AC-231 Dranch Connection 2

Plpc-to-Pipe 0-K-1 2PS Integral ly Ife1 dad Support 04.10 8-K-2 2PSS Support Coa2poncnts 8-J 3 Pipe-to-Elbow 4

Elbow-to-Pipo 04.5 8-J 5 Pipe-to-Elbow 04.5 6 Elbow-to-Pipe D4.5 D-J 7 Pipe-to-Elbow 04.5 0-J 8 Elbow-to-Pipe 04.11 0-P SDC 3/4"-AC-232 Branch Connection 04.S 0-J AJ Pipe-to-Elbow 84.S 0-J 10 Ur Elbow-to-Pipe (0

e . ~ TURKEY POINT PLANT UHIT 4 IHSERVICE EXANINATIOH PLAN FOR lttB SECOND 40-flOtmt PERIOD OF TllE FIRST IO>>YEAR ItlSPECTION IHTERVAl. - CLASS 1 AUXILIARYCOOLANT SYSTEM (Sec Appendix A, Figurc A-10) (Cont'd)

INSPECTION INTEAVAL AShIE - ASMF EXAMINATION EXAh1.

3 I/3 YEAAS '.1/3>>6-2/3 YEAAS 6 2/3-10 YEAAS XI'EC.

SEC. XI AREA IOEIITIFICATION METNOO OUTAGES IIEMAIIKS ITEM NO. CA TOY.

3 4 14"-AC-23 Cont'd 84.5 8-J ll Pipe-to-EIV751 CH

TlIRKEY POINT PLANT UNIT 4 iNSERvICB EKAHIHATIOH PLAN rOR Tllm SECON0 40-IIONTII PERIO0 OF TIIB FIRST IO-YEAR IHSI rCTION INTERvAL - CLASS I RrACTOR COOIANT Pl/HPS (Scc Appendix A, Figures A-43 and 44)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEAIlS SEC. XI SEC. XI AIIEAIOENTIFICATION METIIOD OUTAGES IIEMARKS ITEM NO. CATGY.

I 2 3 4 RCP "A" 85.1 B-G-I RCP-(FSA)-I through 24 In place Studs 05.2 0-G-I RCP-(I'SA)-I through 24 Sc Rema ks Tho oxamlnations to bc performed <<hencvcr thc Studs studs arc rcmovcd during the interval.

85.3 0-G-I RCP-(FSA)-I through 24 vr Sc Rema ks Tho examination to be performed whcncvcr the Studs studs are removed during the interval.

85.3 B-G-I RCP-(ITIA)-I through 24 Sc Rema ks The examination to bc performed whencvor the nuts Huts arc rcmovcd during tho interval.

05.4 0-K-I RCP "A"-I'-l through 3 Integral ly Ifoldcd Supports

05. 5 0- K-2 RCP "A"-PSS-I through 3 Support Components BS.G 0-L-I RCP "A" Casing Ifcld 05.7 B-l.-2 RCP "A" Casing 05.9 8-G-2 RCP "A" Ho. I Seal Ilcuslng Bolting RCP "A" Flywheel RCP "8"
05. 1 0-G- I RCP-(FSB)-I through 24 In place Studs 85.2 B-G-I RCP-(FSB)-I through 24 Sc Rcm, ks Thc examinations to bc performed whcncvcr thc Stfwls studs aro rcmovcd during the interval.
05. 3 B-G-I RCI'-(FSB)-I through 24 Sc Rcm. ks Thc examination to be pcrformcd whcncvcr thc studs Studs arc rcmovcd.during tho interval.

05.3 B-G-I RCI'-(I'HB)-I through 24 Sc Rem rks Thc examination to bc performed whcncver thc nuts Huts are removed during the interval.

TURKEY POINT PLANT UNIT 4 IHSERVICE EKAHINATIOH PLAN FOR VIE SECONO 40-Wml PFRIOO Or TIIB FIRST Io-YUAR INSPECTION INTERVAL - CLASS 1 RL'ACTOR COOLANT I'UHPS (Sce Appendix A, Figures A-43 and 44) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3 I/3-6-2/3 YEaRS 6.2/3-IOYEAAS EXAMINATION EXAM.

SEC. XI SEC. XI AEMAAKS AAEA IDENTIFICATION METIIOO OUTAGES ITEM NO. CATGY.

2 3 7, 8 .0 RCP 'igw Cont'd 05.4 0- K-I RCP "0"-PS-I through 3 If UT techniques are availnblc to pcnctratc thc "8"-I'-2 will bc integrally Wcldcd cast SS Lug type supports, RCP Supports examined. If UT not feasible, PT to l>c performed.

85.5 0-K-2 RCP "0"-PSS-I through 3 Support Components 05.6 0-L-1 RCP "0" Casing Ifeld 05.7 8-L-2 RCP "0" Casing 0-G-2 RCP "0" No. I Seal Housing Bolting RCP "0" Flywheel RLP wCw 05.1 8-G-I RCP-(FSC)- I through 24 Studs 05.2 B-G-I RCP-(FSC)-I through 24 Rcm, rks Tho examinations to bc perforacd whcncvcr tho-Studs studs are removed during thc interval.

05 ~ 3 0-G-I RCI'-(FSC)-I through 24 Se Re ks Thc examination to bc performed whcncvcr thc studs Studs aro removed during the interval.

0' 0-G-I RCP-(ITIC)-I through 24 Sc Rc rks Tho oxamination to be performed whcncvcr Ihc nuts Huts arc rcmovcd during tho interval.

05.4 8-K-1 RCP "C"-PS-I through 3 Integrally Ifcldcd Supports 05.5 8-K-2 RCP "C"-PSS-I through 3 Support Components 05.6 D-I.- I RCI'C" Casing Meld

05. 7 0-1-2 RI'P "C" Casing

TUNBY POINT PMNT UNIT 4 INSBRVICB BmeuNATION PLAN POR TIIB SBCONO 40-emI PBRIOO Or TNB PIRST Io-YL'AR INSrrCTION INTERVAL - CLASS I REACTOR COOLANI'ONPS (Scc Appendix A, Figures A-43 and 44) (Cont'd)

INSPECTION INTEIIVAL ASM'E ASh'IE EXAMINATION EXAM. 0-3 I/3 YEAIIS 3 I/3-0.2/3 YEARS 6.2/3-IO YEAIIS SEC. XI SEC. XI IIEMAIIKS AIIEAIDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

2 3 0 9 ncv c ~cant a B5.9 B-G-2 RCP "C" No. I Seal Ilousing Bolting RCP "C" Plynhcel

i 3 TURKEY POINT PLANT IIN1T 4 INSERVICE EXAMINATION PLAN FOR TIIE SECOND 40-TIONTll PERIOD OF TIIE FIRST 10-YEAR INSPECT10N 1NTERVAL>> CLASS I VALVFS INSPECTION INTE OVAL ASME ASME 0-3.1/3 YEARS EXAMINATION EXAM. 3. I/3-6.2/3 YEARS 6 2/3-10 YEARS SEC. XI SEC. XI IIEMAIIKS ITEM NO. CATOY. AIIEAIDENTIFICATION METIIOO OUTAGES 2 3 4 5 6 7 6 6 NOTFS (1) ASIIL SEC X1 ITF3I NOS.: 86.1 ASM(I SEC. Xl CA1EGORYI  ; for thc Class 1 Valves listed bclo~, do not exist.

86.2 D-G-l 86.3 DG.4 8-K-1 BG.S 8-K-2 86.6 8-H-1 86.8 8-P (2) For the location of each Class 1 Vilve listed below, Scc Appendix A. >The Figure No. ls given ln parenthesis after the Valve No.

(3) One valve in each group to be cxhmincd during the inspection interval.

(4) The bolting of each Class 1 Valve to bc cxaalncd 100% during the inspection interval.

l4'i TYPE Q!48SIIZ IIV750 Fi ure A-10 DG.7 8-M-2 Valve Body 86.9 86.7 B-G-2 8-H-2 Valve Bolting w~~zs>

Valve Body r>~<<re n to-DGi.9 B-G-2 Valve Bolting 10" TYPE C4BZ 86.7 8-M-2 Valve Body 86i.9 D-G-2 Valve Bolting 86i.9 8-M-2 Va)vo Body 86.9 B-G-2 Valve Bolting Vf

TURKEY POINT PLhNT UNIT 4 INSERVICE DKAIIINATIONPun POR mlE SECOND 40-hIDII r DRIOD Or Tllri PIRST IO-YEAR INSPECTION INTERVAI. - Cuss I VAI.VIS (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-6 2/3 YEAR$ 6.2/3-10 YEARS SEC. XI SEC. XI RF.MARKS AREA IDENTIFICATION METI IOD OUTAGES ITEM NO. CATGY.

I 2 6 7 10" TYPE C48Z Cont'd) 06.7 B.-h!-2 Valve Body 06i.9 0-Ci-2 Valve Bolting CV875D (Pi ure A-12 06.7 0-M-2 Volvo Body B-G-2 Valve Bolting vr CV8758 Pl ure A-l3 06.7 0-M-2 Valve Body 06.9 0-0-2 Va I vo Dol ting CV875P (Iil urc A-l4 06.7 0-M-2 Valve Body D6.9 0-Ci-2 Valve Bolting CV876A Pi urc h-12

06. 7 0-hl-2 Valve Body 06i.9 0-Ii-2 Valve Bolting CV8760 Pi urc A-l3 06i.7 0-hl-2 Valve Body vr 06.9 D-G-2 Valve Bolting

TURKEY POINT PLANT UNIT 4

-IHSERVICE EXANIHATION PLAN FOR TIIE SECOND 40-IIONIll PERIOD OF lllE FIRST 10-YFAR INSPECTION INTERVAL 0'AI.VES

- CMSS I INSPECTION INTERVAL AS ME ASME 0-3 I/3 YEARS EXAMINATION EXAM. 3 I/3-6.2/3 YEARS 6 2/3-10 YEAIlS SEC. XI SEC. XI IIEMAIIKS AREA IDENTIFICATION METIIOO OUTAGES ITEM NO. CATGY.

I 2 3 4 5 0 7' 0 NOTES: .

P ASHU SEC Xi ITEN NOS.: aS.> ASHE SEC. XI enrGORY: for tho Class I Valves listed below, 86.2 B-G- 1

do not exist.

86.3 86.4 8-K-I 86.5 8-K-2 86.6 8-H-I 86.8 8-P (2) For the location of each Class I Valve listed below, Sce Appendix A. zThc Figure Ho. is given in parenthesis nftcr thc Valve No.

(3) One valve in each group to be examined during the inspection interval.

(4) Thc bolting of each Class I Valve to bc cxanlncd 100% during thc inspection interval.

14" TYPE GII48SIIZ lrV7SO Fi ure A-10 86.7 8-N-2 Valve Body B-G-2 Valve Bolting

~e iii riguure n-to 06 ~ 7 8-H-2 Vnlvc Body 86.9 B-G-2 Valve Bolting io" TYPE C482 CV875A Fi urc A-12 86.7 8-II-2 Valve Body 86i.9 B-G-2 Valve Bolting CV8750 Fi ure'A-13 BI'i.9 8-H-2 Valve Body 86.9 8-G-2 Valve Bolting

TURKEY POItIT PLAtlT UNIT 4 INSERVICE EXAHINATIOH PI,AN FOR TIIP. SECOIID 40-tDHTll PERIOD OF TIIF. FIRST 10-YEAR IHSPECTIOH INTFRVAI, - CLASS I VAI.VLS (Cont.'d)

INSPECTION INTERVAL ASh'IE ASME EXAMINATION EXAM. 0-3 I13 YEARS 3 I13--6 2/3 YEARS 6.213-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION MET IIOD OUTAGES REMARKS ITEM NO. CATGY.

2 6 6 7 86.9 B-G-2 CV312C Bolting (Figurc A-35)

BG.9 D-G-2 HV535 Bolting (Figure A-18)

BG.9 B-G-2 HV53G Bolting (Figure A-16)

BGi.9 8-Ii-2 PCV455C Bolting (rigurc A-is)

DG.9 B-G-2 PCV456 Bolting vr (Figurc A-18) 86.9 8-G-2 V310A Bolting (Figure A-23)

DGi.9 8-Ci-2 V3108 Bolting (Figurc A-22)

BG.9 8-Ci-2 V560A Bolting (rigurc A-i9) 8-li-2 V5608 Bolting (Figurc A-20)

BG.9 8-Ci-2 V560C Bolting (Figurc A-21) 2" VAIVES 86.9 D-G-Z CV298A Bolting (Figurc A-37) 86.9 8-G-2 CV2988 Bolting (Figurc A-38)

DG.9 D-G-2 CV298C Bolting (Figurc A-I)

TURKEY POItrr PLANT UHIT 4 IHSFRVICF. EKAHIHATION PLAN FOR 'IIIE SECOND 40-IIONlll PERIOD OF 'llIE FIRST 10-YEAR INSPECTION INTERVAL - CITS I VAI,VRS (Cont'd)

INSPECTION INTEIIVAL ASME ASME 0-3 I/3 YEARS EXAMINATION EXAM. 3 I/3-6.2/3 YEARS 6 2/3-IO YEARS SEC. XI SEC. XI IIEMAnXS AIIEAIDENTIFICATION METI IOD OUTAGES ITEM NO. CATOY.

0 7 8' 2" VALVES Cont'd 86.9 B-G-2 CV298D Bolting (Figurc A-37)

BGi. 9 B-G-2 CV298F. Bolting (Figurc A-38)

BG.9 8-G-2 CV298F Bolting (Flguro A-39) 86.9 8-G-2 CV313 Bolting (Figure A-34)

BG.9 B-G-2 CV873h Bolting (Figure A-40) 86.9 B-G-2 CV&738 Bolting (Figurc A-41)

BG.9 D-G-2 CV873C Bolting (Figure A-42) 86.9 8-G-2 CV874A Bolting vr

'Figurc A-30)

D-G-2 CV874D Bolting (Figurc A-31)

B-G-2 LCV460 Bolting (Figiirc A-32)

BGi.9 D-G-2 HV86GA Bolting (Figurc A-30)

BG.9 B-G-2 HV8668 Bolting (Figurc A-31) 86.9 D-G-2 V200A Bolting (Iilgure A-3G)

BG.9 8-G-2 V2008 Bolting (Figurc A-3G)

TURKEY POINT PLAtIT UHIT 4 INSBRVICB EXNIIHATIOH PLAN FOR Il!B SECOND 40-[Will PERIOD OF TIIE FIRST l0-YEAR IHSPECfIOH lNTERVAI - CITS l VALVES (Cont'd)

INSPECTION INTEIIVAL ASME ASME 0-3.1/3 YEARS 3.1/3-6.2/3 YEARS EXAMINATION EXAM. 6 2/3-10 YEARS SEC. XI SEC. XI IIEMARKS AREA IDENTIFICATION METHOD OUTAGES ITEM NO. CATGY.

3 6 7 8 2" VALVES Cont'd 86i.9 8-C-2 VZOOC Bolting vr (Figurc A-36) 86.9 8-Ci-2 V2988 Bolting vr (Figurc h-37) 86i.9 8-C-2 V298II Bolting (Figure A-38)

D-Ci-2 V298J Bolting vr (Figurc A-39)

D6.9 0-C-2 V303A Bolting (Figure A-37) 8-G-2 V3038 Bolting (Figure A-38) 8-Ci-2 V303C Bolting (Figurc A-39) 8-C-2 V306A Bolting (Figurc A-37) 86.9 D-G-2 V3068 Bolting (Figurc A-38) 86.9 8-Ci-2 V306C Bolting (Figure A-39) 86i. 9 D-Ci-2 V309D Bolting (Figurc 'A-32) 8-Ci-2 V311 Bolting VI' (Figurc A-34) 8-C-2 VSOSA Bolting (Figiire A-33) 8-C-2 V5058 Bolting (Figurc A-33)

~:

TURKEY POINT PLANT UNIT 4 INSERVICE EXIOIINATION PLAN FOR 'llIE SECOND 40-)IOIml PERIOD OF TIIE FIRST 10-YEAR INSPI!CTION INTERVAL - CLASS I VAI.VES (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-G 2/3 YEARS 8 2/3-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD -OUTAGES REMARKS ITEM NO. CATGY.

5 6 7 8 8 2" VALVES (Cont'd)

BG.9 B-G-2 VSOBA Bolting (Figurc A-33) 86.9 8-G-2 V5088 Bolting vr (Figurc A-33) 86.9 8-G-2 V515A Bolting (Figure A-33) 86.9 8-G-2 VS ISB Bolting (Figurc A-33)

B-G-2 V554A Bolting vr (Figurc A-24)

BG.9 B-G-2 V5548 Bolting (Figurc A-26) 86.9 8-G-2 V554C Bolting (Figure A-28) 86.9 8-G-2 VSSSA Bolting (Figure A-24)

BIi. 9 B-G-2 VSSSB Bolting (Figure A-2G) 8-G-2 VSSSC Bolting (Figurc A-28) 86.9 8-G-2 V556A Bolting (Figurc A-24)

BG.9 8-G-2 V55GR Bolting (Figurc A-2G)

RG.9 R-G-2 V556C Bolting (Fipurc A-28) 86i.9 8-G-2 VS57A Bolting (Figurc A-25)

TURKIIY POINT PLANT UHIT 4 INSBRVICB BXAIIIHATIOHFIJI FOR lllE SLCONII 40-IIONTII PrRIOD.OP lllH FIRST 10-YEAR INSPECTION IHTLRVAI, - CLASS 1 VAl.vriS (Cont d)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3. I/3-6 2/3 YEARS 6.2/3-10 YEARS SEC. XI SEC. XI REMARKS AREA IDENTIFICATION METIIOO OUTAGCS ITEM NO CATGY.

6 6 8 0 86.9 8-fi-2 V5578 Bolting (Figurc A-27) 86i.9 8-G-2 V557C Bolting (Figure A-29) 86.9 8-G-2 V558A Bolting vr (Figurc h-25) 86.9 8-G-2 VSSBD Bolting (Figurc A-27) 86.9 8-fi-2 VSSSC Bolting (Figure A-29) 86.9 D-G-2 VS59A Bolting (Figurc A-25) 86.9 8-G-2 V5598 Bolting (Figurc A-27) 86.9 8-fi-2 V559C Bolting (Figurc A-29) 86.9 B-G-2 V668A Bolting (Figurc A-40) 86.9 B-G-2 V8688 A-42)'r Bolting (Figurc A-41)

VI' 86.9 D-G-2 V868C Bol ting (Figurc

Table II - Nondestructive Examinations - Class 2 TABLE II. TURKEY. POINT PLANT UNIT 4 CLASS 2 COMPONENTS AND SYSTEMS Title ~Pa e Ne.

Steam Generators . 145 Excess Letdown Heat Exchanger ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ ~ ~ '47 Residual Heat Exchangers . 148 humain Steam System ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 149 Feedwater System . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 159 Safety Injection System ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ e ~ 166 Auxiliary Coolant System . ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 177 Pumps ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 194 Valves ~ ~ ~ ~ ~ ~ ~ ~ "~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ ~ 195 143

0 0

1IIRKEY POINT PMNT UNIT 4 INSERVICB EKANINATION PLAN FOR IIIE SECOND 40-NKlll PERIOD OF 'IIIB FIRST.IO-YEAR INSPECTION INTERVAL - CIASS 2 I'RL<SSURB VESSELS (Sec Appendix 8, Figures 8-1 through 8-5)

INSPECTION INTEIIVAL ASME ASME 0-3 I/3 YEARS EXAMINATION EXAM. 3 I/3-6 2/3 YEARS 6 2/3-10 YEARS SEC. XI SEC. XI REMARKS AIIEAIDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

'I 2 3 4 7 8 Stcam Generators Fi ures

~S-I sn i-2 Steam Generator Loo A Cl.l C-A SG-A-I vr 20% of the Meld length to bc examined evenly Upper Vessel Assembly-to- divide<l in threo areas.

Upper I)omc Cl.l C-A SG-A-2 vr Transition Assembly-to-Upper Vessel Asscayly Cl. 1 C-A SG-A-3 Upper Shell-to-Transition Assembly Cl.l C-A SG-A-4 Extension Ring-to-Upper Shell Cl.l C-A SG-A-5 Tube Sheet-to-Extension Ring C1.2 C-8 sr<-A-)ls lysin Steam Noxxlc-to-Shcll C1.2 C-8 SG-A- I<)I Feed<<atcr Noxxlc-to-Shell C1.3 C-C 'SG-A-Sl through S6 Sunnorts Sl and S3 to be examined during thc Integrally Ifeldcd lifetime of the plant.

Supports cl.4 r.-D SG-A-Bolting 7 bolts to bc cxamlncd at ran<lcm in plncc or <<hcn Secondary IL~n><ay removed.

2 bolts to bc cxamlncd at ran<Iom in place or mhcn removed.

Stcam Generator lao 8 Cl. 1 C-A sr.-8-1 Upper Vessel Asscmbiy-to-Upper I)omc

TURKrv POINT Pt&fi'NIT 4 INSERVICE EXNIINATION PLAN FOR llll: SCCOND 40-NNII PERIOD OF tlIE FIRST 10-YEAR INSPECrION INTERVAL - CU5S 2 I'RL'SSURE VI'hsl!IS (Scc Appendix 8, Figures D-t through D-s) (Cont'd)

INSPECTION INTEIIVAL ASME ASME 0-3 I/3 YEARS EXAMINATION 3 I/3-6.2/3 YEAAS 8 2/3-10 YEAIIS SEC, XI SEI'I EXAM.

IIEMARKS ITEh1 NO. CATGY.

AIIEAIDENTIFICATION hIETIIOO OUTAGES I 2 7 8 Stcam Generator Loop 8

~Cont n)'G-8-2 Cl. I C-A Transition Assembly-to-Uppcr Vcsscl Assembly Ct.l C-A SG- 8-3 11pper Shell-to-Transition Assembly Cl ~ I C-A SG-8-4 Extension Ring-to-Upper Shell Cl.l C-A SG-8-5 Tube Sheet for Extension Ring CI.2 C-D SG-D-FIS IIatn Stcam Notate-to-Shcll Cl.2 C-8 Sr 8-Fw Fccdwater Norxtc-to-Shet I Ct.3 C-C SG-B-SI through SG Supports S2 and SS to be cxamincd during thc Integrally Ifeldcd lifctiae of the plant.

Supports Ct,4 C-D SG-8-Bolting Secondary Hanway Ctoon Con~oottor too C Ct.l C-A SG-C-t Upper Vessel Assembly-to-Uppcr Dose CI. I C-A SG-C-2 Transition Asscxbty-to-Uppor Vessel Assembly

O TURKEY POINT PLANT UNIT 4 INSERVlCE EXAHINATIOH PLAN FOR IIIE SECOND 40-INHTII PERIOD OP TIIE FIRST 10-YEAR INSPECTIOH INTERVAL - CLASS Z PRESSURL> VESSEIS (Sce A > cndix B, Figures B-l through B-S) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/O YEAIIS 3. I/3-6.2/3 YEA)IS 6 2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI REMARKS AREA IDENTIFICATION METIIOO OUTAGES ITEM NO. CATGY.

5 6 Stcam Gcncrator Loo C

~Cont'd>

Cl. 1 C-A SGi-C-3 Upper Shell-to-Transition Asse>>I>ly CI. 1 C-A SG-C-4 Extension Ring-to-Upper Shell Ci.l C-A SG-C-S Tube Sheet-to-Extension Ring CI:2 C-B SG-C-hIS hlaln Steam Noxzlc-to-Shcll CI.Z C-B SG-C-FII Fccdwatcr Nozxlc-to-Shcll C1.3 C-C SG-C-Sl through S6 Supports S4 and S6 to be examined <h>ring Ihc Intcaral ly Ifcldcd lifetime of the plant.

Supports Cl.4 C-D SG-C-Bolting 7 bolts to be examined at random in place or

.Secondary hlanway when removed.

Excess Letdown llcat Exc>an or P ure B-3 Cl ~ I C-A. ELIIL-1 Cap-to-Tube Sheet CI. I C-A ELIIE-2 Tube Shcct-to-Flange C1,4 C D I!UIE-Bolting l2 bolts tu hc oxamincd at randnm in place nr 12 Studs, 24 Hots when removed.

2 l>nits to ho examined at rand<>m in pine'c nr when removed.

C mRVEV rOINT rWNF uNIT C INSERVICE EXAWINATTON IIWN FOR TIm SECOND OO-XIONTII PERIOD OF TIIE FIRST 1O-VF~R INSVECTION iI/rERVAL -

CITS 2 I'RIESSIIRE VIISSLIS (Scc Appendix 8, Figures B-l through 8-5) (Cont'd)

INSPECTION INTEIIVAL ASME ASME 0-3.l/3 YEARS 3.1/3-62/3 YEARS 0.2/3-IOYEADS SEC. XI SEI'I EXAMINATION EXAM.

OUTAGES REMARKS ITEM NO CAT GY.

AREA IDENTIFICATION METI ION 2 3 7 8 9 RlSIDUAL IIEAT EXCIIANGERS

.~Pi ure 0-4 C2.1 C-A RIIH-A-1 Cap-to-Tube Sheet Cz.l C-A RIIE-A-2 Tube Sheet-to-Flango C2. 2 C-8 RIIE-A- I inlet Noxxic-to-Shell C2.2 C-8 RIIL'-A-0 Outlet Nozxlc-to-Shell C2.4 C-D RIIE-A 100% of the required bolting to bc cxamincd.

F1ango Bolting 2% of the bolting to be examined.

C2.1 C-A Rl IL' l Cap-to-Tube Sheet C-A RI IL'-8-2 Tube-Sheet-to-Flange C2.2 C-8 RIIE-B-I Inlet Noulc-to-Shell C2.2 C-8 RIIE-8-O Outlet Nozxle-to-Shell C2.4 C-D RIIE-8 Flange Bolting

TURKEY POINT PIJQIT UN1T 4 INSERvICE ExAHINm'ION PI>N POR TIIII SECOND 48-uIIriII I PRIDD op TIIE PIRST IO-YEAR 1NSPI:CTION INTEINm. - CL/ISS 2 I'IPING-NIN STI!N SYSTEH (Sce Appendix 8, I'lgurcs 8-6 through 8-8)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3 I/3-6-2/3 YEARS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI REMARKS AREA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATGY.

I 2 3 4 7 8 26" FIS-1 Pl ure 8-6 C2. 1 C-G(a) I Nozzle-to-Reducer C2.1 C-G(a) 2'educer-to-Elbow C2.1 C-G(a) 3 Elbow-to-Pipe C2.1 C-G(a)

Pipe-to-Elbow C2.1 C-G(a) 5 Elbow-to-Pipo C2.1 C-G(a) 6 Pipe-to-Plpc C2. 1 C-G(a) 7 vr Pipe-to-Elbow C2.5 C-8-1 7PS (4-HSII-21)

Integrally I/clded Support C2.6 C-E-2 7PSS Support Components C2.1 C-G(a) 8 Elbow-to Pipe C2.1 C-G(a) 9 Pipe-to-Ocnd C2.1 C-G(a) 10 Bend-to-Pipe C2. 1 C- G(b) 11 Pipo-to-Pipe C2.3 C-G(d) III6w-HS-OI Rranch Connection C2.3 C-G(d) II/12"-HS-OI Oranch Connection

TURKI!Y POINT PlANT UNIT 4 IHSERVICL'XAHIHATIOHPION FOR TIIE SI!COHI) 40-IDNfll PL'I\IOD OF TIIE FIRST 10-YEAR IHSPI!CfION INTL'RVAL - CLASS 2 PIPING-I!AIH SfEAH SYSTBI (Sec Appendix 8, Fig>>rcs 8-6 thro>>gh 8-8) (Cont'd)

INSPECTION INTE!IVAL ASME ASME EXAMINATION F.XAM. 0-3 I/3 YEARS 3.!/3-6 2/3 YEARS 6.2/3-IO YEARS SEC. XI SEC. XI

~ AREA IOENTIfICATION METIIOD OUTAGES REMARKS ITEM NO. CATOY.

3 4 C2.3 c-r(d) II/I2>>-HS-04 Branch Connection C2. I C-G(a) 12 Pipo-to-POV2604 r2.1 C-G(a) 13 POV2604-to-CVIO-004 26"-HS-2 Fi ure 8-7 C2.I C-G(a) I Host.lc-to-Reducer C2.1 r.-G(a) 2 Reduce r- to-Elbow C2.1 C-G(a) 3 Elbow-to-Pipe C2.1 C-G(a)

Pipe-to-Elbow C2.1 C-G(a) 5 Elbow-to-Pl pc C2. I C-G(a) 6 Pipe-to-Pipe C2.1 C-G(a) 7 Ur Pipe-to-Elbow ~

C2;5 c-r:-I 7I'S (4-HSII-20) Hr Integrally Ifolded Support C2.6 C-E-2 7I'SS Support Colponcnts C2. I C-G(a) 8 Elbow- to-Plpo C2.1 C-G(b) 9 I ipc to-.Pipe (0

IXIIYPOINT PuWT I/NIT 4 INsriiIVICB I:.xNIINATloN I ue Fog Tim SEcoNO 40-wlffil I iBIloo oF Tim rlgsT Io-YDEII INSI I:.CTION IIfri:RVAI. - CI>ss 2 PIPING-HAIN STEAH SYSTBl (Sco APPcndix 8, Figures 8-6 through B-S) (Cont'd)

INSPECTION INTEBVAI.

ASME ASME 0-3 I/3 YEARS 3.I/3-6 2/3 YEARS EXAMINATION EXAM. 6.2/3- IO YEAIIS SEC. XI SEC. XI AEMAAKS AIIEAIOENTIF ICATION METIIOD OUTAGES IfEMNO. CATO Y.

3 4 6 7 26"-HS-2 Cont'd C2. 3 C-G(EI) 9/6"-HS-02 Br'anch Connection C2. 3 C-G(41) 9/12"-HS-02 Branch Connection C2. 3 C-G(EI) 9/12"-IIS-OS Branch Collection C2.1 C-G(a) 10 Pipe-to-POV2GOS C2.1 C-G(Q) II POV2GOS-to-CV10-005 26"-HS-3 Fi ure 8-8 C2.1 C-G(a) I Noulc-to-.Reducer C2.1 C-G(6) 2 Reducer-to-Elbow C2.1 C-G(A) 3 Elbow f0 I ipc C2.l C-G(a)

I'ipe-to-Elbow C2.1 C-G(a) S lllbow-to-Pipe C2.1 C-G(a) G Pipe-'to Pipe C2.1 C-G(a) 7 I'ipc- to-F I bow C2.1 C-G(n) 8 Iill)ow 'to-Bcnll C2. 6) C-P)-2 BPR (4-HSII-22A)

I'ipc Restraint

TIRIKRY rOte PLAI/r WIT 4 INSERVICE L'XAHINATION PION I'OR TIIE SECOND 40-IK)NIII PERIOD Ol'IRI FIRST 10-YILAR INSPIXTION INfL'RVAI. - CIJLSS 2 PIPING-IIAIN STTAH SYSfEH (Seo Appendix D, Figuros 8-6 through 8-8) (Cont'd)

INSPECTION IN'IERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-G 2/3 YEARS 8 2/3-IO YEARS SEC. XI SEC. XI AREA IDEN flFICATION MET IIOO OUTAGES REMARKS ITEM NO. CATGY.

2 7 8 C2.1 C-G(a) 8 Bend-to-Bend C2.1 C-G(a) 10 Bend-to-Pipe C2 ~ I C-G(I>) 11 PI pc- to- PI po C2.3 C-G(d) 11/6"-HS-03 Branch Connection C2.3 C-G(d) I I/)2u-HS-03 Drench Connection C2.3 C-G(d) ll/12"-lS-06 Branch Connection C2.1 C-G(a) 12 Pipo-to-POV2606 CZ.I C-G(a) 13 POV2606-to-CVIO-006 12"-55-OI Fi uro 8-6)

C2.1 C-G(a) 1 Brand> Connection-to-Pipe CZ.3 C-G(d) I/6"-lIS-Oll Branch Connection C2.5 C-L'-I IPS-I (4-mII-18) Hr Intcgrnlly Ifelded Support CZ.S C-R-I I I'-2 (4-lSII-18) Hr Integrally IIclded Support C2.6 C-II-2 IPSS Support components C2.3 C-G(d) I /6u-IS-012 Branch Connection

0'l)BKDY POIlff PLANT UNIT 4 INSFRVICD BXANINATION I IWN FOII TIIB SFZOND 40-IIONTII PFRIOD OF TIBI FIRST 10-YEAR INSPI::LVION INTlmVAL - CLASS 2 D

I'll'ING-IIAINm!AN SYSTFSI (Sec Appendix 0, Flgurcs 0-6 through 8-8) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION F.XAM. 0-3 I/3 YEARS 3.1/3-6.2/3 YEARS 0.2/3-10 YEARS SF.C. XI SEC. XI ITL'ts NO. CATOY. AREA IDENTIFICATION METIIOD OUTAGES REMARKS I 2 3 5 6 7 8 12 -WS-OI Fi,urc 8-6)

Cont C2.1 C-G(a) 2 Pipe-to-Cap I2"-15-02 Fi uro 0-7 C2.1 C-G(a) I Branch Connection-to-Pipe C2.3 C-G(d) I/6"-I5-02I Branch Connection C2.5 C-L'-I IPS- I (4-151!-16) IIC Integrally Ifelded Support C2.5 C-B-I ll'S-2 (4-1511-16)

Integrally Ifcldcd Support C2.6 C-8-2 IPSS Support Components C2.3 C-G(d) I/6"-HS-022 Branch Connection C2.1 C-G(a) 2 Pipe-to-Cap 12"-l5-03 Fi ure D-B C2.1 C-G(a)

Branch Connection-to-Pipe C2.3 C-G(d) I/6"-HS-031 Branch Connection C2.5 C-D-l IPS-I (4-1511-14)

Integrally lfclded Support C2.5 C-D-l I PS-2 (4-ILSII-14)

Integrally lfcldcd Support C2.6 C-0-2 IPSS vr Support Components

1IIRKliY I'OllflUNTUNIT 4 INSIIRVICE EXAHINATIOH PlAN FOll TIIE SL'COHII 40-IIONTII PL'RIOD Ol'IB: FIRST IO-YFAR INSI'ECTIOH INTERVAI, - CIA% 2 I'IPIHG-IIAIN STEAN SYST131 (Scc Appendix 8, Figures 8-6 through 8-8) (Cont'd)

INSPECTION INTERVAL ASME ASME SEC. XI E XAMINATI OII EXAM. 0-3.1/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS SEC. XI AREA IDENtIFICATION METIIOD OUTAGES AEMAIIKS ITEM NO. CATGY.

I 2 3 7 8 0 C2.3 C Gi(d) I/6" I5-032 UT Branch Connection C2.1 C-G(a) 2 Pipe to-Cap 12"-l5-04 Fi uro 8-6 C2.1 C-G(a) I Branch Connection-to-Pipe C2.3 C-G(d) I/6"-h5-041 Branch Connection C2.5 C-E-I IPS-I (4-15ll-19)

Integrally Ifeldcd Support C2.5 C-E-i IPS-2 (4-HSII-19)

Integrally Ifclded Support C2.6 C-E-2 IPSS Support Components CZ ~ 3 C-G(d) I/6u-I5-042 Branch Conncctlon C2.1 C-G(a) 2 Pipe-to-Cap 12"-HS-05 Fi ure 8-7 C2;I C-G(a) I Branch Connection-to-Pipe C2. 3 C-G(d) I/6u-I5-051 Branch Connect ion C2.5 C-E-I I PS-1 (4-HSII-17) Hr Integrally Ifcldcd Support C2.5 C-Li-I IPS-2 (4-HSII-17) Hr Integrally Ifcldcd Siipport

)

TIIRKIP/ POII(f PLANT UNIT 4 INSI!I\VICE I!XAhl(NATION PION FOR Tllg SIXOND 40-hKINl71 PRRIOI) OF TIIL'IRST 10-YIMR INSI'I!CTION INTI RVAI, - CLLIS 2 h

PIPING-h(AIN SfLiAH SYSTBI (Sec Appendix 8, Figures 8-6 through 8-8) (Cont'd)

INSPECTION INTERVAL ASME AShlE EXAMINATION EXAM. 0-3.I/3 YEARS 3,1/3-6.2/3 YEA(IS 6.2/3-IOYEAIIS SEC. XI SEC. XI AIIEAI 0ENTIF ICATION METIIOD OUTAGES REMARKS ITEM NO. CATOY.

, Bi 8 9 12"-h15-05 Fi ure 8-7) jCollt 1 C2.G C-8-2 IPSS Vf Support Components C2. 3 C-G(EI) I/Gu-h(S-052 Branch Connection C2.1 C-G(a) 2 Pipe-to-Cap 12"-h(S-06 Fi urc 8-8)

C2.1 C-G(a) I Branch Connection-to-Pipe C2.3 C-G(EI) I/6"-h8-061 Branch Connection C2.5 C-ri-I IPS-1 (4-hISII-15) hlr Integrally Ifclded Support C2.5 C-r:-I I PS-2 (4-h(SII-15) hlr Integrally Ifcldcd Support C2.G C-8-2 IPSS Support Conponcnts C2.3 C-G(EI) I/6"-HS-062 Branch Connection C2. I C-G(a) 2 Pipe-to-Cap C2.1 C-G(a) 1 Branch Connection-to-Pipe C2.1 C-G(a) 2 Pipe-to-V 10-001 C2.1 C-G(a) 3 V IO-001-to-I'ipc

11IIIKIIY POINr PLANT l/NIT 4 TNsrnviCB mAHI//ATION Pua< rGNI Tiig SLtCONO 40-loNTII. Pl:.II TOO OF TIIII FIIIST IO-Ylm II/sn:CTIOII IvrEIIVAL - CLASS i I'll'IIIG-f!AINSTIMULI SYSTEH (Scc Appendix 8, Figures 8-6 through 8-8) (Cont'd)

'NSPECTION INTERVAL ASME ASME 0-3 I/3 YEARS 3.l/3-6 2/3 YEARS 62/3-10 YFARS EXAMINATION SEC. XI SEC. XI EXAM'ETIIOD REMARKS AREA IDENTIFICATION OUTAGES ITEM NO. CATGY.

7 8 9.

6"-$ 5-Ol Fi urcs 8-6

~cont o>

C2.i C-G(a) 4 Pipe-to-CVlG06 G"-HS-02 Fi urc 8-7)

C2.1 C-G(a) 1 Branch Connection-to-Plpo C2.1 C-G(a) 2 vr Pipe-to-V10-002 C2.1 C-G(a) 3 VIO-002-to-Pipe C2.1 C-Io(a) 4 Pipe-to-CVIG07 Gtc-15-03 Fi urc 8-8 C2. I C-G(a) 1 Branch Connection-to-Pipe C2. I C-G(a) 2 Pipe-to-V)0-003 C2.i C-G(a) 3 VIO-003-to-Pipe C2.1 C-G(a) 4 I'ipc-to-CV1608 6"-b5-011 I'1 urc 8-6 C2.1 C-G(a) 1 Branch Connection-to-I'I ange 6"-15-012 Fi urc 8-6 C2.1 C-G(n) 1 vr Branch Connection-to-I'Iange

0'IURKI!Y POINf PLANT IINIT 4 INSERVICI'IIXAHINATIONPLAN FOR TIIE SPEND 40-HONlll PERIOD OI'IIE PlRST 10-YIPAR INSPEC1'lON 1NTERVAL - CLASS 2 PIPING-HAIN STEAH SYSTEH (Sce Appendix 8, Figures 8-6 through 8-8) (Cont'd)

INSPECTION INTEBVAL ASME ASME 0-3 I/3 YEAIIS EXAMINATION EXAM. 3 I/3-6 2/3 YEAIlS 6 2/3-10 YEAIlS SEC. XI SEG XI BEMABKS AAEA IDENTIFICATION, METIIOD OUTAGES ITEM NO. CATGY.

6 6 7 6"-15-021 Fi urc 8-7 C2. 1 C-G(a) 1 Branch Connection-to-Flango 6"-15-022 Fi ure 8-7)

C2.1 C-G(8) 1 Branch Connection-to-Fl ange 6"-15-031 Fi uro 8-8 C2. 1 C-G(a) 1 Branch Connection-to-Flange 6"-HS-032 Fi ure 8-8)

C2. 1 C-G(a) 1 Branch Connection-to-Flangc 6"-HS-041 Fi ure 8-6 C2.1 C-G(0) I Branch Connection-to-Flangc 6"-N-042 Fi ure 8-6)

C2.1 C-G(a) 1 Branch Connection-to-F1 ange C2. 1 C-G(a) 1 Branch Conncctlon-to-Flangc 6"-HS-052 Fl urc 8-7 C2.1 C-G(a) I Branch Connection-to-I'longe

llIRXIIY POINf PLANf INIT 4 INSERVICE EX/SIIHATIOH PLAN FOR TIIL'LCOHD 40-IXlNIII PERIOD OF TIIE FIRSf IO-YILAR IHSI'I!LFION,ItffERVAL- CLASS 2 I'IPING-NIH STITCH SYSfEH (Sco Appendix 8, Figures 8-6 through 8-8) (Cont'J)

INSPECTION INTEAVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEAIIS 3-1/3-6.2/3 YEARS 6 2/3-10 YEAAS SEC. XI SEG XI AREA IDENTIFICATION METIIOD OUTAGES IIEMARKS ITEM NO. CATOY.

3 4 6"-IIS-061 Fi urc 0-8 C2.l C-G(a) l Branch Conncctlon-to-I'I ange 6"-NS-062 Fi uro 8-8)

C-C(a) I Branch Connection-to-Flange

TURKEY POINT PI%IT UNIT 4 1NsERVlcE EmenNATloN PLAN FOR TIIE srcoND 4D-wITIII PrRloD oF mlE rlRST lo-YEAR 1NsprcrloN lIITERVAI. - CbASS z PII'ING-FEI!DIIATIIRSYSTEM (Sce Appendix 8, Figures 8-9 through D-ll) (Cont'd)

INSPECTION INTEIlVAL ASME ASME SEC. XI SEC. XI EXAMINATION EXAM. 0-3.1/3 YEAIIS 3 I/3-6 2/3 YEAIIS 6 2/3-10 YEAIIS AIIEAIDENTIFICATION METIIOD OU TAGES IIEMAIIKS ITEM NO. CATGY.

I ' 7 8". 9 C2.1 C-G(a) 1 X; CV2900-to Elbow C2.1 C-G(a) 2 Elbow-to-V133 C21. C-G(n) 3 Ur V133-to-Pi pe C2.1 C-G(a) 4 Pipe-to-Elbow C2.1 C-G(a) 5 UI'2.6 Elbow- to- Pipe C-E-2 SPR (4-FIIII-4I) vr Pipe Restraint C2 ~ 1 C-G(a) 6 Pipe-to-Elbow C2.1 C-G(a) 7 =

Elbow-to-Pipe C2 ~ 3 C-G(d) 7/G FN Dl Drench Connection C2.1 C-G(b) 8 Ur I'ipc-to-Pipe C2.G C-1:.-2 Bl'R I'ipe Restraint CZ.l C-G(a) 8 I'ipc-to-Elbow UI'r C2.1 C-G(a) 10 Elbow-to-I'ipe Cz.l C-G(a) 11 I'Ipc- to-8 1bbw

. CZ.I C-G(a) IZ Elbow-to-I'ipo

TIIRKI!Y POINT PIJWT IINIT 4 INSERVICE EXAHINATION PLAN FOR 'IIIE SFCOND 40-IKINTII PERIOD OF.TII8 FIRST 10-TEAR INSPLCTION INTERVAL - CLLSS 2 Ill ING-FEEDWATER SVSTIDI (Scc Appendix 8, Flgnrcs 8-9 thronph 8-II) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. -3.1/3 YEAIIS 3 I/3-8 2/3 YEAIIS 8 2/3-IO YEAIIS SEC. XI SEC. XI IIEMABKS AREA IDENTIFICATION METIIOD OIJTAGES ITEM NO. CATGY.

7 8 9 C2.G C-8-2 12PR (4-FIIII-16)

I'ipe Restraint C2.1 C-G(a) 13 I'ipc-to-DcnJ C2.G C-P.-2 13PR (4-FNII-17)

Pipe Rostraint C2.1 C-G(a) 14 Dead-to-Pipe C2.6 C-E-2 14PR-I (4-FIIII-18),

Pipe Restraint C2.G C-E-2 14PR-2 Pipo Rostraint C2.G C-P.-2 14PR-3 (4-FIIII-19)*

Pipe Rostraint C2.1 C-ri(a) IS Pipo-to-Elbow C2. 1 C-G(5) l6 Elbow-to-Pipo C2.1 C-G(a) 17 Pipe-'to Elbow CZ.l C-G(a) 18 Elbow- to- Pipe C2.6 C-E-2 18PR Pipe Rcstralnt CZ. I C-C(a) 19 Pipe to Elbe'w CZ.I C-r(a) 20 Elbow-to-I'ipo CZ.I C-G(a) 21 Plpc-to-Elbow

TllRKEV POItrr PIANT UNIT 4 INSERVICE HXAIIINATIONPLAN FOR TIIH SECOND 40-tKINill PERIOD OF 'IIIH FIRST 10-THAR INSPECTION INTHRVhL - ClASS 2 PIPING-FHI!DITATHR SYSTEII (Scc Appendix B, Figures 8-9 through B-ll) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEA!IS 3 I/3-6 2/3 YEARS 0 2/3-IO YEAIIS SEC. XI SEC. XI AIIEAIDENTIFICATION METI IOD OUTAGES . REMARKS ITEM NO. CATGY. Cont'd 3 4 7 8 14"-Flf-I C2.1 C-G(a) 22 vr blbow-to-Pipe C2.1 C-G(a) 23 vr Pipe-to-Reducer C2.1 C-G(a) 24 vl' Reducer-to-Norsle 14"-Flf-2 Fi urc A-10 C2.1 C-G(a) 1 CV2901- to-Elbow C2. 1 C-G(a) 2 Elbow-to-V233 Cz.i C-G(a) 3 V233-to-Pi pe .

CZ. I C-G(a)

Pipe-to-Elbow CZ.I C-G(a) 5 Elbow-to-Pipe C2.6 C-H-2 SPR (4-Flf!I-42)

Pipe Restraint C2 ~ 3 C-G(d) S/6 '-FN-Oz Branch Connection Cz.l C-G( ) 6 vr Pipe-to-Pipe C2.6 C-E-2 6PR (4-FIfll-14)

Pipe Restraint C2.1 C-G(a) 7 I'ipc-to-Elbow C2. 1 C-G(a) 8 Elbow to Pipe C2.6 C-H-2 Bl'R Plpc Restraint

TUINEY POINT PIJQIT UNIT 4 INSERVICE EXAHIHATIOH PLAN FOR lllE SECOND 40-TIDNlll PERIOD OP 'IIIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS 2 I'll'ING-FEIR)IfATER SYSTEH (Scc Appendix 8, Figures 8-9 through 8-11) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 f/3-6 2/3 YEAAS 6-2/3-IO YEAIIS SEC. XI SEC. XI AREA IDEIITIFICATION MET IIOD OUTAGES IIEMARKS ITEM NO. CATliY.

I 2 3 7 8 14"-Flf-2 Cont'd C2.1 C-G(a) 9 Pipe-to-ElboM C2.1 , C-G(a) 10 IllboM 'to Pipe C2. 1 C-G(a)

Pipe-to-Elbow CZ.l C-G(a) 12 Eibo~-to-Pipe C2.1 C-G(n) 13 Pipe-to-Elbow r.2.1 C-r(aj 14 L'Ibov- to-Pipe C2.1 C-G(a) 1S Pipe-to-Reducer C2.1 C-G(a) 16 Reducer-to-Noxxle 14"-Flf-3 Fl urc 8- ll CZ.l C-f'(a) 1 CV2902-to-Elbow C2.1 C-G(n) 2 Elbe<-to-V333 C2.l C-G(a) 3 V333-to-Pipe C2.1 C-G(a) 4 I'ipc-to-Elbow CZ:I C-G(a) lilboM-to-I'ipc C2.6 C-8-2 SPR (4-1 IIII-43)

I'ipc Restraint

0 TURKEY POINf PIJLNf UNIT 4 INSI!RVICB BXAH)NATION PLAN FOR TIIE SKOND 40-NNTII PERIOD OF TIIB FIRSf IO-Y!FAR INSPECTION IIWRVAI. - CIJNS 2 INSPECTION INTERVAL ASMF. ASME 0-3 I/3 YEARS EXAhllNATION EXAM. 3 I/3-6 2/3 YEARS 6.2/3-!0 YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGY.

14"-Flf-3 Cont'd)

CZ. 3 C-G(EI) 5/6"-FW-03 Branch Connection C2. I C-G(a) G Pipe-to-Pipe C2.1 C-G(8) 7 Pipe-to-Elbow C2. I C-G(8) 8 vf Elbow-to-Pipe C2.6 C-E-2 BPR-I Pipo Restraint C2.6 C-E-2 Bl'R-2 (4-Fifll-13)

Pipe Restraint C2.1 C-G(5) 9 I'ipe-to-Elbow C2. I C-G(9) 10 Elbow-to-Pipe C2.G C-F.-2 IOPR-I Pipe Restraint C2.6 C-E-2 IOPR-2 Pipe Restraint C2.1 C-G(n) 11 Pipe-to-Elbow C2.1 C-G(8) '12 Elbow-to-Pipe C2. I C-G(8) 13 ~ vr Pipe-to-Reducer C2.1 C-G(a) 14 Reducer-to-Nozzle

TIIRKEY POIITf FIANT IIHIT 4 IHSERVICE EXAHIHhTIOH PIAN FOR TIIE SECOHD 40-IIOITTII PERIOD QF TIIP. PIRSI'0-YPAR IHSI'I!CTIOH IIWRVhI. - CIASS 2

'l l'l'PiN+ lHLSK'IR!~hPRmQ~ IXOIlgh INSPECTION INTERVAI.

ASME ASME 0-4 I/3 YEARS 3 I/3-6 2/3 YEARS 6 2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI REMARKS AREA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATO Y.

5 6 7 6"-Fll-01 (Fl >>re 8-9)

C2. I C-G(a)

'CV131-to-Pipo C2.6 C-8-2 IPR (4-FIRI-40)

Pipe Restraint C2.1 C-G(a) 2 Pipe-to-V132 C2. I C-G(a) 3 V132-to-Elbow C2. I C-G(Q) 4 Elbow-to-Pipe C2.1 C-G(a) 5 Pipe-to-Branch Connection 6"-FII-02 Fi ure 8-10 C2. I C-G(a) I CV231-to-Pipe C2.6 C-E-2 IPR (4-FIRI-25)

Pipe Restraint C2.1 C-G(a) 2 I'lpc-to-V232 C2.1 C-G(a) 3 V232-to-Elbow C2. I C-G(a) 4 Elbow-to-Pipo C2.1 C-G(a) 5 Iff Pipe-to-Branch Connection

~G"-I'l-05 1'i <<rs B-1l)

C2. I C-G(a)

CV331-to-Pipe C2.6 C-8-2 I I'R (4-FITII-28)

Pipe Restraint

TURKEY P01NT PLAN'NlT 4 rNSERVlCE EXANrNATiON r LAN FOR TIIE SECONII 40-WNTII PERlon OF TIIm FlRST 10-YEAR lNSPrcrlON INTERVAI. -

CIWSS 2 PlPIHG-FEEOIIATL'R SYSTQI (Seo A endlx 8, Fi ores 8-9 throw b 8-ll Cont'd INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0&.I/3YEAAS 3.I/3-6.2/3 YEARS 6.2/3-IOYEAAS SEC. XI SEC. XI AIIEAIDENTIFICATION MEl IIO0 OUTAGES REMARKS ITEM NO. CATGY.

2 3 5 6 7 6"-FIT-03 Fi ure 8-11)

~Cont '

C2. 1 C-G(a) UT Pipe-to-V332 C2.1 C-G(a) 3 V332-to-Elbow C2. 1 C-G(a) 4 Elbow-to-Pipe C2.1 C-G(a) 5 UT Pipe-to-Branch Connection

TLIRKEY POINT PIJNT INIT 4 INSERVICH EXAhIINATION PLAN FOR lllE SFCONII 40-hIONlll PERIOII OF IIIE I'IRST IO-YEAR INSPIXTION INTPRVAI. - CIASS 2 P I I'INC-SAFETY IN.IECllON SYSTL'hl Scc A>)culix 0 I'1 urcs B-12 t)rou 'I INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEARS 3 I/3-0 2/3 YEARS 0 2/3-10 YEARS SEC. XI SEC. XI AflEAIDENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

2 3 5 0 7 14"-SI-1 (Fi ure B-12 C2. 1 C-F(a) 1 hlV862A-to-Pipe C2.5 C-H-I IPS (4-ACII-24)

Integrally Welded Support C2.6 C-H-2 IPSS Support Components C2.1 C-F(a) 2 Pipe-to-Elbow C2.1 C-F(a) 3 Elbow 'to Pipe C2.1 C-F(a) 4 UT Pipo-to-Elbow C2.1 C-F(a) 5 Elbow-to-hlV8628 C2.1 C-F(a) 6 hlV8620-to-Elbow C2 1 C-F(a) 7 Elbow-to-Pipe C2.1 C-F(a) 8 Pipe-to-Tcc 14"-SI-21 (Fi ure B-13 C2.1 C-F(a) I hlVBGOA-to-Pipe C2.1 C-F(a) 2 Pipe-to-Elbow

1TIRKEY POINT PLANT I/NIT 4 1NSERVICF. EXAHINATION PLAN FOR TIIE SILONO 40-NNIII I'ERIOD OF TIIE FIRST 10-YEAR INSPK'rION INTERVAI. - CI.ASS 2 Pll'ING-SAFI!TY INJECf ION SYSTBI (Scc Appendix 8, Figures 8-12 through 8-17) (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6 2/3 YEARS 6-2/3-IO YEARS SEC>> XI SEC. XI AREA IOENTIF ICATION METllOO OUTAGES REMARKS ITEM NO. CATGY.

2 5, 6 V 14"-SI-21 Cont'd C2.5 C-E-l 2PL(4-Sill-22)

Integrally Nclded Lug C2.6 C-E-2 2PLS X Support Coaponcnts CZ.1 C-r(a) 3 Elbow-to-Pipe CZ.1 C-r(a) 4 Pipe-to-Elbow CZ.1 C-r(a) 5 Flbow-to-Pipe C2.1 C-F(a) 6 Pipe-to4VSGIA CZ.1 C-r(a) 7 HV861A-to-Pipe CZ.i C-r(a) 8 Pipe-to-Tce 14"-SI-22 Fi ure 0-13 C2. 1 C-F (a) 1 HVSG08-to-Elbow C2.1 C-F(a) 2 El l>ow-to-I'ipc C2.1 C-F(a) 3 Pipe-to-Elbow CZ.S C-E-i 3PL(4-5 ill-20)

Integrally Ifcldcd Lug

lllIII:I!YPOINT PlAN'IHIT 4 INSI!IIVICII BXAhiINATION I'IAN FOII Tllll Sl!OINI) 40-hNINTII I'IIRIOI) Oli lllli IiIIIST 10-YIJLII INSPFCTION INTERVAI. - (:IJLSS ?

I'll'IN('-SAI:ITY INI!CTION SYSTBI Scc A>>cndlx II, Fi .urcs 8-12 tbrouPh 11-17) (Cont'd)

INSPECTION INTERVAL ASM 8 ASME EXAMINATION EXAM. 0 D.I/3 YEARS - 3.1/3-G 2/3 YEARS B 2/3-10 YEARS SEC. XI SEC XI REMARKS AREA IDENTIFICATION METIIOO OUTAGES ITEM NO. CATGY.

I 2 14"-SI-22 Cont'd C2.Bi C-li-2 31'I S Support Components C2.1 C-F(a) n lllbow-to-Pipe C2.1 C-F(a) 5 Piiic-to-pll>ow C2.1 C-I'(a) Bi Iilbow-to-I'ipc C2. I C-I'(a) 7 I'lpc-to-F llicw C2. I C-F(a) 8 liibow-to-Pipe Si C I BPS(4-SIII-21) integrally Ifcldcd Support C2.B C-PI-2 81'SS Support Components C2. I C-F(a) 9 I'ipc-to-filbow C2. 1 C-F (a) 10 Elbow-to-I'ipc C2. I C-F(a) 11 I'ipc-tn-ll1 bow C2.1 '-F(a) 12 I'.Iliow-to-Pipe C2.1 C-F(n) 13 Pipe-to-ISV881II

~ .

TIIRKEY POINT PLANT IIIIT 4 IHSERVICE EX/OIIHATION I'LAN FOR TIIE SECOND 40-NNIII PERIOD OF TIIB FlRST 10 YEAR 1NSI'rMION INFERVAL - CIJISS 2 Pll'1HG-SAFETY INJECTION SYSTQI Sco A cndix 8 Fi urcs 8-12 throu h 8-17 Cont'd INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-6.2/3 YEARS 6.2/3-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION METHOD OuTAGES REMARXS ITEM NO. CATGY.

3 4 5 6 7 14"-Sl-22 Cont~d C2.1 14 HV8618-to-Pipe C2. 5 C-E-l 14PS Integrally Ifeldcd Support C2.6 C-8-2 14PSS Support components C2.1 C-F(a) 15 Pipe-to-Tce 10"-Sl-301 Fi urc 8-14 C2.1 C-F(a) 1 FIV7448-to-Pipe C2.1 C-F(a) 2 Pipe-to-Tec C2.1 C-I'(a) 3 Tcc-to-Plpo C2.1 c-r(a) 4 Pipe-to-Tec C2.1 c-r(a) 5 Tcc-to-Pipo C2.1 c-r(a) 6 Pipe-to-ribes C2.1 c-r(a) 7 vr Elbow-to-Pipe C2.1 c-r(a) 8 VT Pipo-to-V885

IIJ O

I r0 2 0 2 Q 20 rI I ICI I

Q CC 2'

I 0

4J V;

0 Se

~

F CC g

. C Q C2 IC C I X ill h g g ~ g g h rQ (C Ih Q O I CO I og LI r0 ~ ( Cl 5e Le 0 3 0 3 5'2 V 0

Cl 0 l

Cl 0

0 ICI CC Q

0 I 0

< rl R ~ CO 0 0 rl C

0I X

Iu ( CO I I 0 I 0 0,I L" I 0 I Q

rl III

( V)

I 0

I I

Ch I

0 I 0 4J I

0 4J I

4J I ( I 0

4J 0

4J I

I '0I hl 0

0 I

I 0

I IO I

Cl Q

I IO I

Cl

.Q rQ Q 0 0

I Cl Cl 0 Q

Q I CO I Q I 0 I rc 0 Ih m r o CI + CC Cl hl III X >. r.

U 0 III 0 I-C III I III ~ ~ I lU X 2 Q

I" III

.I, I rl PI 0

I 0

Q III I C4 170

TIIRKPY POINT PI.ANT IINlT 4 INSERVICE EXAMINATION PIAN FOR 11II'. SECOND 40-IKNTII I'ERIOII OF 'IIIE FIRST 10-YIPAR INSPfcTION INTERVAI CI.ASS 2 PIPING-SAFETY INJECTION SYSTBI (Sec Appendix 8, Figures 8-12 through II-17) (Cont'd)

INSPECTION INTEIIVAL ASM E ASME 0-3 I/3 YEARS 3 I/3-0.2/3 YEAIIS 6 2/3-'IGYEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI AEMAOKS AREA IDENTIFICATION METIIOD OUTAOES ITEM NO. CATGY.

I 2 3 / 6 8"-Sl-221 Cont'd C2.1 C-F(a) 3 Elbow-to-Pipe C2.1 C-r(a) 4 Pipe-to-Elbow C2.1 C-F(a) 5 Elbow-to-Pipe C2.1 C-r(a) 6 Pipe-to-Elbow CZ. I C-F(a) 7 Elbow-to-HVBG3A 8"-S1-222 Fi ure 8-15 C2.1 C-F(a) 1 Tcc-to-Pipe C2.1 c-r(a) 2 Pipe-to-Elbow C2 ~ 1 C-F(a) 3 UT X=-

Elbow-to-Elbow C2. I C-r(a) 4 Elbow-to-Pipe C2.1 C-I'(a) 5 Pipe-to-HVBG38 8"-S1-301 Fi urc 8-16 CZ.I C-r(a) 1 Reducer-to-.Elbow C2.1 c-r(a) 2 I'.Ihow-to-Pipe

TIIRRI!Y POINT PIJQA'!NIT 4 INSI:,RVICI! HXAHINATION I'IJIN ITIN IIIB SrcONI> 40-IIONTII PPRIlII> Op TIIB PIRST 10-TIER INSI'IR.I'ION INrl!RVAI. - CIJLSS 2 I'll'ING-SARI!TY IN.II:.CTION SYSTID4 (Scc Appcmlix 8, Pigurcs 8-12 through 8-17) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-6 2/3 YEARS 6 2/3-IO YEAAS src. XI SEc. XI IIEMABKS AREA !OENT!r!CATION ME TIIOI) OUTAGES ITEM NO. CATGY.

I 2 8"-Sl-301 Cont'd C2.1 C-P(a) '3 I'ipc-to-Elbow C2. 1 C-I'(a)

Bibow to-Blbow C2. I C- F (a) 5 Elbow-to-Dead cz.( c-p.-z 5PR- I (4-S III-84) X I'ipe Restraint C2. (i C-I!-2 SPR-2(4-S III-87)

I'ipe Restraint (l

Bend-to-Bend cz.o c-r:-z 6l'R (4-Sill-8$ )

Pipe Restraint 7

Bend-to-Bend C2.6 C-I!-2 7PR(4-Sill-92)

I'ipe Restraint 8

Bend-to-Bend C2.li C-I!-2 DPR-1(4-Sill-95) vr Pipe Restraint C2.li C-I!-2 DPR-2(4-Sill-98)

Pipe Rcstralnt 9

Bcml-to-Bend

TIIRKEY POlHT PLANT 'IIHIT 4 INSERVICE EXAHINATIOH PIAH FOR lllE SEOIND 40-hKINlll I'I RIOD OF TIIE FIRST IO-YEAR INSPECTION II/I'ERVAL - CIRCLES 2 PIPING-SAI:l!TY INJECTION SYSTEII Sce A cndix 0 Fi urcs 0-12 through 0-17) (Cont'd)

INSPECTION INTEIIVAI.

ASME ASME 0-3 I/3 YEAllS 3.1/3-6.2/3 YEAIIS 0.2/3-IO YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES REMAIIXS ITEM NO. CATO Y.

AIIEAIDENTIF!CATION METHOD 2 3 5 8 7 8"-SI-301 Cont'd C2. G C-E-2 9PR(4-Sill-99)

Pipe Restraint 10 Dcnd-to-Dcnd C2.6 C-E-2 IOI'R (4-S III-100)

Pipe Restraint 11 Dend-to-Dcnd C2.6 C-E-2 11PR-1(4-Sill-101)

Pipe Restraint C2.6 C-E-2 11PR-2(4-SIII-102)

Pipo Restraint 12 Dcnd-to-Dcnd C2.G C-E-2 12PR(4-SI I I-103)

Pipe Restraint 13 Bend-to-Pipe C2.1 C-F(A) 14 Pipe-to-Elbow C2.1 C-F(a) 15 Elbow-to-Pipe C2.1 C-F(A) 16 Pipe-to-Elbow C2.l C-F(a) 17 Elbow-to-Pipe

TNRKI!Y I'OINT FIANT UNIT 4 INSI!RVICI! I!XAIIINATIUNI'I,AN I'OR Till! SIXONN 40-N)NITI I'I!RIOII Ol'llll! FIRST IO-Yl'JIR INSI'I!CTlON Ilfl'I!RVAI.- I:MSS 2 ItJSPFCT ION INTERVAL ASMr: ASME SFC. XI src. xl EXAMINATION EXAM. 0-3 I/3 YEAIIS 3.I/3-0 2/3 YEARS G.2/3-10 YEAIIS ITEM NO. CAfOY. ARFA IDENT IF ICATION MET IIOO OUTAGES IIEMAAKS G 7 C2.6 C-I!-2 '7PR I'ipc Restraint r2.1 C-F(a) 18 UT Pipe-to-CV876F 8"-Sl-310 Fi rc 8-17 C2.1 C-I'(a) I Tcc-to-Pipe 2

Pipe-to-Pipe C2.1 C-I'(a) 3 UT Pipe-to-Elbow C2. I C-I'a) 4 UT I!I bow- to-Pipe rz. I r.-p(a) 5 I'lpe-to-I!Iipew r2. I C-F(a) 6 I!I bow-to-Pipe CZ.I r.-p(a) 7 Pipe-to-I!Ibcw I.'2. I C-I'(a) 8 UT I!Ibcw 'to Rentl r.z.6 C-F!-2 8P 8- 1 (4 -S I I I-82)

I'lpc Restraint r.z.6 C-I!-Z 81'R-2 (4-S III-85) vr Pipe Restraint

9 TORKL'Y POINT PLANT UNIT 4 INSERVICB EXAN)NATION PLAN FOR TIIB SECOND 40-NNlll I'ERIOD OF lllB FIRST .10-YEAR rNSPL'CTION INTERVAl. - CLASS 2 PIPIN(l-SAFI:"rY INECTION SYSTQI Sec A cnd~lx 0 Pi urcs 0-12 throu h D-I7 Cont'd INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEAIIS 3 I/3-6 2/3 YEARS 6.2/3-10 YEAIIS SEC. XI SEG XI AIIEAIDENTIFICATION METIIOO OUTAGES IIEMARKS ITEM NO. CATGY.

I 2 5 6 6 9 8"-SI-310 Cont'd 9

Bend-to-Bend C2.6 C-B-2 9PR(4-SIII-80)

Pipe Restraint 10 Bend-to-Bend c2.6 c-r;-2 IOPR(4-SIII-90)

Pipe Restraint ll Bend-to-Pipe C2.6 C-E-2 IIPR(4-Sill-93)

Pipe Restraint C2.1 C-r(a) 12

'Pipe-to-Elbow C2.1 C-F(a) 13 Elbow-to-Pipe c2.6 c-r:-2 13PR-I Pipe Restraint C2.6 C-E-2 13PR-2 Pipe Restraint C2.1 C-F(a) 14 Pipe-to-Elbow C2.1 C-r(a) 15 Elbow-to-Pipe C2.1 C-F(a) 16 Pipe-to-Elbow

1TIRKI!Y I'OINT I'ICANT IINIT 4 INSI!RVICI! L'I(AHINATI(N I'IAN FOR llll!SI!(:ONII 40-TXNTII Pl!RIND OF TIIIS FIRST 10-YFAR INSI'IDION INTDIVAI. - ClcASS 2 I'll'INII-SAPITI'7 IHJI CI100 ST"T~SII Scc A Ccc llx II I I nrcc II-72 tl>rcc 0 ll-l7 Cant' INQ ECTION INTERVAL ASME ASME SEC. XI SEL XI EXAMINATION EXAM. 0.4 I/3 YEARS 3 I/3-6.2/3 YEAIIS 6 2/3-(0 YEARS ITEM NO. CATGY, AREA IDENTIFICATION METI IOO OUTAGES IIEMAIIKS 2 3 5 6 C2.6 C-I!-2 IGPR Pipe Restraint C2.1 C-r(a) 17 ill!Tcu-to-Pipe C2 ~ (I r.-r!-2 17l'R-l I'ipc Restraint C2.6 C-I:.-2 17l'R-2 (4-Sill-96)

I'ipc Restraint C2. I C-F(a) 18 I'ipc-to-CV87G0 8"-SI-820 Fi urc !I-14 C2.1 C-F(a) 1 Itcsluccr-to-Pipe C2.1 C-F(a) 2 I'ipc-to-CV876A

TIIRKHY POlNT PLANT IINIT 4 INSHRVJCF. EKAIIINATION PLAN FOR TIIH SECONII 40-WNTII PERION OF TIIH FIRSr Io-n~R INSPECTION INTERVAL - CI.ASS 2 PII~ING-AUXILIARYCOOIANT SYSTEH (See Appendix 8, Figures 8-18 through 8-22)

INSPECTION INTERVAL ASME ASME 0-3-l/3 YEAIlS 3 I/3-6.?/3 YEAllS 6?/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI IIEMARKS AB'EA IDENTIFICATION MET IIOO OUTAGES ITEM NO. CATGY.

2 0 7 14"-AC-1 Fi ure 8-18 C2. 1 C-F (a) 1 EIV751-to-Pipe C2.5 C-E-l I PS (4-AOI-173)

Integrally lfclded Support C2.6 C-E-2 IPSS Support Components C2. I C- F (a) 2 Pipe-to-Elbow C2. I C-F (a) 3 Elbow-to-Elbow C2. I C-F (a) 4 Flbow-to-Pipe C2.6 C-E-2 4PR Pipe Restraint C2. I C-F(a) 5 Pipe-to-Elbow C2. I C-F(a) 6 Hlbow-to-Pipe C2. 5 C-I'.-I 6PI.-I through 4 (4-ACII-17)

Integrally Ifcldcd Lugs C2.6 C-I'-2 6PIh-I through 4 Support Coaponents C2.5 C-H-l 6I'S (4-ACII-17) PT integrally I/clded Support C2.6 C-E-2 6PSS Support Components

~o TNRKI!Y I'OINT VIVANT IINIT 4 INSI!RVICII IPXIQIINATION PloAN FOR lllli SIKONO 40-IXINnl I'I'.RI00 Ol'IIH I'IRST IO-YIMLR INSI'I:(."rlON INTERVAI. - (:Ihss 2 I'll'IN('IIXIIIAPY COOI ANT SYSTrzl (s A di 0 I" 0 18 tl I 0 22 (d INSPEC'llON INl E RVAL ASME ASME SEC. XI sEr xl EXAMINATION EXAM. 0 4 I/3 YEAIIS 3.I/3-6?/3 YEARS 6?/3-IO YEARS AREA IOEN(IF ICATION ME Il(OO OU TAGES AEMARKS ITEM NO. Ch(OY.

~lo"-liL'-I C~oot 'd r2. I C-P (a) 7 UT Plpc-to-Plbou C2.1 C-r(a) 8 I!Ibad- to-l'1pc

.C2.1 C-r(n) 9 I'Ipc-to-rl bow C2.1 C-I:(a) 10 NT I(Ibad-to-Plpc C2.6 C-Ii-2 IOI R(Z-AOI-18)

I'lpc Rcstralnt C2. 5 IOPS(4-A(31-19)

Integrally Ifclded Support C2. 6 (:-11-2 10PSS Support Components C2. I C-P (a) ll I'lpc to IllboM C2.1 C-I:(a) 12 (elbow-to-Pl pc C2.1 C-P(n) I3 Plpc-to-Tcc C2.1 C-I'(a) Id Tcc-to-V752A C2. I r.-p(n) 15 Tcc-'to-Tcc C2. I C-I'(n) 16

'cc-to-Plpc

TURKEY POINT FIANT IINIT 4 INSERVICE EXAHINATION PLAN I'OR TIIE SECOND 40-HONTII PERIOD OF TIIE FIRST IO-YEAR INSPrcf ION lI/KROAI, - CLASS 2 PIPING-AUXILIARY COOLANT SYSTEH (Sec A )cndix 8, Figures 8-18 through 8-22) (Cont d)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3-I/3 YEAIIS 3 I/3-6 2/3 YEAIIS 6 2/3-10 YEARS SEC. XI SEC. XI AIIEAIDENTIFICATION METI IOO OUTAGES RE MAflKS ITEM NO. CATOY.

6 6 7 14"-AC-1 Cont'd C2.6 C-E-2 IGI'R Pipe Restraint C2.1 17 Pipe-to- Elbow C2.1 C-F(a) 16 Elbow-to-V7528 14"-AC-11 Fi re 8-18 C2.1 1 V752A-to-Pipe C2.1 2 Plpc-to-Teo C2.1 3 Tce-to-Flbow C2. 5 c-r:-1 3PS(4-ALll-20)

Integrally Welded Support C2.6 C-8-2 3PSP Support Coaponcnts C2.1 C-F(a) 4 UT Elbcw-to-Pipe C2.1 C-F(a) 5 UT Pipe-to-Elbow C2.1  :-I'(a) G UT Elbow to I i pc r2.5 GPS(4-AI3I-21) PT Integrally Ifcldcd Support

lllRKIY POINT PI.ANT I(NIT 4 INSI;RVICL UXAIIINATION I IAN IOR 11N:. SECONII 40-FXIICTII I'I'.RID(I OF Tllp. IIIINT Io-YNAR INSPI:.(;I'ION INTI'RVAI. - CI.ASS 2 I'll'IN(I-A(IXII,IARYONINIT SYSTEll (Sco AIq>endix II, Figures II-18 through 8-22) (Cont'd)

INSPECTION INTEIIVAL ASM C: ASME EXAMINATION EXAM. 0"3 I/3 YEARS 3.1/3-6.?/3 YEAAS 6 2/3-'IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES OEMAIIKS ITEM NO. CATOV.

5 6 14"-AC-I 1 Cont'd C2.6 C-II-2 6PSS Support Compollcnts C2. I C-I'('a)- 7 UT I'ipc-to-Reducer C2. I C-F(n) 8 Rcduccr-to-RIIRPA 14"-AC-12 Fi urc 8-18 C2. 1 C-I'(a) 1 VT V?528-to-I'i pc (2. 1 C-F(n) 2 UT I'ipc-to-Tco C2.1 . C-F(a)

Tcc-to-HlboM C2. I C-F(a) n lilbov-to-Pipe (2. I C-F(a) UT Pipe-to-lilbow C2. I C-F(a) 6 III bow-to-I'i pc C2.5 C-I:-1 Gl'S (4-AGI-23)

Integral ly Ncldcd Support C2. Ci C-II-2 CiPSS VT Support Components C2. I C-F(n) 7 UT I'ipc-to-Rcduccr

TURKEY POINT PIJNT IINIT 4 IHSERVICE EXANINATION PION I-OR Tlltl SECOND 40-IIONIll PERIOD OF.TIIE FIRST 10-YEAR INSI'ECTION INTERVAI, - CI.ASS 2 Pll'INC-AUXII,IARYCOOLANT SYSTDI Sce A>>cndix 8 Fi urcs 8-18 throu h 8-22 Cont'd INSPECTION INTEAVAL AQJIE ASME 0-3 I/3 YEARS 3 I/3-6 2/3 YEARS 6-2/3-10 YEARS EXAMINATION EXAM. \

SEC. XI SEC XI IIEMAllKS AAEA IDENTIFICATION h'IETIIOD OUTAGES ITEM NO. CATGY.

6 6 7 8 9 14"-AC-12 Cont<d C2.1 c-r(a) 8 UT Reducer-to-RIIRP8 12"-AC-I Fl uro 8-19 C2. 1 C-F (a) I V757D-to-Reducer C2.1 C-F(8) 2 Reducer-to-Tec C2.1 c-r(a) 3 V757C-to-Reducer C7.. I c-F(a) UT Rcduccr-to-Tcc C2. I c-I:(a) 5 Tcc-to-Elbow C2. 1 C-I'(8) 6 Elbow-to-Pipe C2.1 c-r(n) ,7 UT Pipe-to-Elbow C2. I c-F(a) 8 UT Elbow-to-Plpc C2.1 C-F(e) 9 Plpc-to-Elbow C2.1 c-r(n) 10 Elbow-to-Plpc C2. I C-F (a) 11 I'lpc-to-illbow

TIIRKEY POINT FIANT IINIT 4 INSERVICH I!XANINATION I'I.AN I'OR TIIH SEOINII 40-NNfll I'ERIOII OF Tllr: rlRST 10-YIFAR INSI'IR."rION, INTNVAI. - CIASS 2 I'll'ING-AIIXII.IARY(XIOIJQIT SYSTI'.H Scc A>>cndix 8 Fi n r c s 8-18 throw h 8-22 Cont'd INSPECTION INIEIIYAL hsMF. nsME 0-3 I/3 YEA11S 3.1/3-8 2/3 YEARS 0 2/3-10 YEARS EXAMINATION ExnM.

SEC. XI SEC. Xl REMARKS AREA IOENTIFICATION MET((OO OUYAGES FIEMNo. CnYov.

I 2 2 8 9 12"-AC-I Cont'd cz.r c-r:-2 ilPR Pipe Restraint CZ. I C-r(a) 12 Elbow-to-Pipe CZ. I C-r(a) 13 Iipc-to-FCVGOS C2.1 C-F(a) 14 rCVGOS-to-Pipe CZ.I C-r(a) 15 Pipe-to-Elbow C2. 1 C-F(a) IG lilbow-to-Pipe C2.1 C-F(a) 17 Pipe-to-Tec rZ.I C-F(a) 18 IICV758-to-I'I pe C2. I C-F (n) ID Pipe-to-Tco C2. 1 C-F(a) 20 Tcc-to-Pipe Cz.l C-I'(a) 21 Pipe-to-Elbow C2. 1 C-I'(a) 22 Elbow-to-Pipe C2.6 C-F.-2 221'R Pipe Rcstralnt

TURKEY POINT PLANT UNIT 4, INSERVICB EXNIINATION PLAN FOR TIIB SECOND 40-NONTN PL'RIOD OF TIIE FIRST 10-YEAR INSPECTION INTL'RVAI, - CLASS 2 PIPING-AUXILIARY COOLANT SYSTEH (See Appendix 8, Figures 8-18 through 8-22) (Cont'd)

INSPECTION INTEIIVAL ASME ASME 0-3 I/3 YEARS 3 I/3-6-2/3.YEARS 6.2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI IIEMARKS AREA IDENTIFICATION METHOD OUTAGES ITEM NO, CATGY.

3 4 12"-AC-I Cont'd C2. I C-F (a) 23

.Pipe-to-rEOOS C2.1 C-F (a) 24 rr6OS-to-Pipe C2.6 C-E-2 24I'R(4-ACII-33)

Pipe Restraint C2. I C r(a) 25 Pipe-to-Elbow C2.1 C-F (a) 26 Elbow-to-Pipo C2.1 C-F(a) 27'ipe-to-Elbow C2.1 C-f(8) 28 L'Ibow-to-Pipe C2.6 c-r:-2 28PR Pipe Restraint C2.5 C-E-l 28PS-I (4-Aal-32)

Integrally Ifclded Suppor C2.6 C-8-2 28PSS-I Support Components C2.5 C-B-l 28PS-2(4-AOI-51)

Integrally IIclded Suppor C2.6 C-E-2 28PSS-2 Support Components L'2. I C-r(a) 29 I'ipe-to-Elbow

TIIRKRY I'OINT PIJWT IINIT 4 INSI.RVI(,l. CXANINATION I IJLN I OR Till: Sll.ONII 40 N)Nill PI.RIOR Ol'IIC FIRsr

~

10-Yr>R INsl I:.nioN rvrrRvAI. - Class ".

I'll'IN(-AIIXII.IARYCOOIANl'YSTDI (Seo Appendix 8, Figures 11-18 through II-22) (Cont'd)

INSPECTION IN1ERVAL ASME ASME SEC. XI SEC XI EXAMINATION EXAM. 0&.1/3 YEARS 3.1/3-6-2/3 YEARS 6.2/3-10 YEARS AREA IDEN1IF ICATION ME1I IOD OUTAGES REMARKS ITEM NO. CATGY.

5 6 12"-AC-1 Cont'd)

C2 ~ 1 C-I'(a) 30 Iilbos-to-Pipe C2. I C-F(a) 31 Pipe-to-Dlbw C2. I C-F(a) 32 Iilbow-to-PIpc C2.1 C-r(a) 33 Pipe-to-Dlbow C2.1 C-I'(a) 34 IllboM-to-'rec C2. 5 C-Il-I 34 PS (4-AG 1-30)

Integrally lfcldcd Support C2. G C-P.-2 34PSS Support Components C2.1 C-F(b) 35 UT Tcc-to-Pipe C2. I C-I'(a) 3G Pipe-to L'Ibolf C2.1 C-F(a) 37 Iilboir-to-Pipo 38 Pipe-to-Pipe C2.G C-F.-2 38PR(4-AOI-73)

Pipe Restraint C2.1 C-F(a) 39 Pipe-to-Hll>ow

TURXHY I'OIHT PLANT UNIT 4 IHSHRVICF. HXANIHATIOH PLAN FOR TIIH SIXOHO 40-NHTII PERIOD OF TIIH FIRST IO-YEAR INSPECTION IIWRVAL - CIJlSS 2 PIPIHO-AUXILIARY COOPT SYSTHN (Sce Appendix 8, Figures 8-18 through 8-22) (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3.I/3 YEARS 3. I/3-G 2/3 YEARS 8-2/3-IO YEARS EXAMINATION. EXAM.

SEC. Xl SEC. XI REMARKS AREA IDENTIFICATION ME 7 IIOO OUTAGES I/EM NO. CATGY.

I 2 3 5 B 8 12"-AC>>I Cont'd C2. I C-F (a) 40 Hlbow-to-Pipe C2.6 C-H-2 40PR Pipe Restraint C2.1 C-F(a) 41 Pipe-to-Tec C2. I C-F (a) 42 Tce-to-Reducer C2.1 C-F(a) 4$

Reducer-to-IIV7448 12"-AC-2 Fi re 8-20 C2.1 C-F(a) I V759A-to-Reducer C2.1 C-F(a) 2 Reducer-to-Pipe C2.1 C-F(a) UT Pipe-to-Flbow C2.5 C-H-l 3PS(4-ACII-35)

Integrally I/aided Support C2.6 C-8-2 3PSS Support Coaponcnts C2.1 C-F(a) 4 Hlbow-to-Pipe C2.1 C-F(a) 5 Pipe-to-Tee

TURKIIY POINT PLAHr UNIT 4 INSERVICE BXAHIHATION I IAH l>OR TIIL Sts:nHR 40-WHTU Pr8101> OF TIIU FIRST 10-YIAR INSPBI:TION 1HTERVAI. - CUSS 2 PIPING-AUKII,IARY COOLAN1 SYSTEH (Scc h >pcndlx 8 Pigar 8 18 tl I 8 22) (C t'd)

INSPECTIO/l INTERVAL ASME ASME ME%I'IOO 0-3 I/3 YEARS 3 I/3-0 2/3 YEARS 6 2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SF.C. XI REMARKS ARFA IOFNYIFICATION OU TAGES ITEM NO. CA1GY.

I 2 7 8 12"-Ac-2 (Cont'd)

C2.1 C-r(a) G Tcc-to-Pipe C2.1 C-r(a) 7 UT Pipe-to-Tec C2.1 C-r(a) 8 UT Tee-to-Cap C2.1 C-F(a) 9 Tee-to-Pipo C2.1 C-r(a) 10 Pipe-to-IICV758 10"-AC-Ol I>l re 8-21 C2. I C-F(a) I Tce-to-EIbo>I C2.1 C-F(a) 2 Elbow-to-V757A C2.1 C-F(a) 3 UT V757A-to-Pipe C2.1 C-r(a) 4 Pl pc-to-RIIEA 10"-Ac-02 Fi rc 8-21 C2.1 C-r(a) I UT Tcc-to-Elbe>/

C2.1 C-F(a) 2 Iilbo>/-to-Pipe C2.1 C-r(a) 3 I'ipc-to-El l>o>>

0 TIIINEY POINT FIANT IINIT 4 INSERVICB EXAMINATION PLAN FOR TIIB SECOND 40-IIONIII PERIOO OF TIIE FIRST IO-YFJLR INSPECTION INTERVAL - CLASS 2 PIPING-Al)XILIARYCOOLANT SYSTEM (See A>>endix 8 Fi .ures 8-18 throu h 8-22 Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEAIlS 3 I/3-6 2/3 YEARS 0 2/3-IO YEAIIS SEC. XI SEG XI AREA IDENTIFICATION MET IIOD OUTAGES BEMAllKS ITEM NO. CATGY.

3 4 7 8 IO"-AC>>02 Cont'd C2.1 C-F (a) 4 Elbow-to-Pipe C2.1 C-F(a) 5 UT Pipe-to-Elbow C2. I 6 Elbow-to-Pipe C2.1 C-F (a) 7 Pipe-to-Elbow C2.1 8 Elbow-to-V7578 C2. I C-F (a) 9 V7578-to-Pipe C2.1 10 Pipe-to-RIIEB 10"-AC-I Fi re 8-21 C2. I C-F(a) I RIIRPA-to-Plpo C2.1 2 Pipe-to-Reducer C2.1 3 Reducer-to-CV753A C2.1 4 CV753A-to-Elbow C2.1 C-F(a) 5 Elbow-to-Pipe

TIIRKIIY I'OINT FIANT IINIT 4 INSLRVICR FKANINATION I'IAN FOR TIIII SI!(:OND 40-NONTII I'I!RIOD OF 11IE FlRST 10-YIIAR INSI'I'A:TION INTrRVAI

~ - CIASS 2 I'll'IN('-A(lÃII.IARYCOOIANT SYSTIW (Scc A appendix 8, Figures 8-18 through 8-22) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAh(INATION EXAh(. 0-3 I/3 YEARS 3 I/3-0 2/3 YEARS 0 2/3-(0 YEAIIS SEC. XI SEC. XI Af(EA IDENTIFICATION METIIOD OUTAGES IIEMAllKS ITEM NO. CATOY.

2 3 10"-AC-1 Cont 'd C2.1 C-I'(a) 6 Pipe-to-Elbow C2. I c-r(a) 7 ur I(Ibex-to-V754A C2. 1 c-r(a) 8 V754A-to-Pipe C2.1 C-r(a) 9 Pipe-to-lilbov C2.1 c-r(a) 10 Flbou-to-Pipe C2.6 C-Ii-2 10PR Pipe Restraint C2.1 C-F(a) li Pipe-to-Tcc C2.1 C-F(a) 12 Tcc-to-V7570 10"-Ac-2 Fi ure 8-21 C2. I c-r(a) 1 RIIRPR-to-I'Ipe C2.1 c-r(a) 2 Pipe-to-Reducer C2.1 C-I'(a) 3 Reducer-to-CV7538 C2.1 c-r(a)

CV7538-to-rlboM

TURKEY POINT PIANT UNIT 4 INSERVICB BXAHINATION PlAN FOR IIIB SECONO 40-NNTII PERIOD OF 'IIIB FIRST 10-YEAR INSPKTION INTERVAI. - CLASS 2 Pll'.ING-AUXILIARYCOOLANT SYSTEN (Sce A cndix 8, Fi res 8-18 through 8-22 (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEAIIS 3 I/3-6 2/3 YEAIIS 6.2/3-10 YEAIIS EXAMINATION EXAM.

SEC. XI SEC. XI AEMAIIKS AREA IDENTIFICATION METIIOO OUTAGE S ITEM NO. CATGY.

6 6 7 10"-AC-2 Cont'd C2.1 C-F(a) 5 Elbow-to-Plpc C2.1 C-F(a) 6 UT Pipe-to-Elbow C2.1 C-F(a)  ? UT Elbow-to-V7548 C2. I C-F (a) 8 V?548-to-Pipe C2. 1 C-F (a) 9 Pipe-to-Tcc" 10"-AC-21 Fl re 8-20 C2.1 C-F(a) I RIIPA-to-Pipe C2. I C-F (a) 2 Pipe-to-Elbow C2.1 C-F(a) 3 Elbow-to-Plpc C2.1 C-r(a) 4 UT Pipe-to-Elbow CZ.I C-r(a) 5 UT Elbow-to-Pipe C2.1 C-r(a) 6 Pipe-to-Blbow C2.1 C-F(a) 7 Flbow-to-Tcc

TIIRKI!Y POINT I'IflNT IINIT 4 INSI:.RVII:P. nx/oIINATION PMN rOR TII8 srxONII <0-NINTII PER108 Or. nIr: FIRST IO-TER INsvlxxION INTlmvAI. - rLAss 2 I'll'INO-AIIXII.IARYCOOIANT SYSTBI (Sco Appendix 8, Figures 8-18 through 8-22) (Cont'd)

INSPECTION INTENVAL ASME AShlE EXAMINATION EXAM. O.D I/3 YEAAS 3 I/3-6.2/3 YEARS 6.2/3-10 YEAIIS SEC. XI SEC XI ITEM NO. CATO Y. AIIEA IDENTIFICATION METIIOO OU TAGES nEMAIIKS 3 8 10"-AC-21 Cont'd C2.1 C-F(1) 8 Tcc-t'o-I'ipc C2. I C-F(a) 9 Pipe-to-V759A 10"-AC-22 I'1 urc 8r20 C2.1 C-I'(a) I UT RIIL'8-to-Illbow C2.1 C-F(a) 2 Elbow-to-Pipo C2.1 C-r(a) 3 Pipe-to-Tco C2. I C-F(n)

Tcc-to-Pipe

('.2. 1 C-r(a) 5 Pipe to Elbow C2.1 C-F(a) 6 Elbow-to-V7598 r2.1 C-F(a) 7 V7598-to-Pipe C2 ~ I C-F (a) 8 Pipe-to-Tcc 6"-AC-01 Fi uro 8-22 C2.1 C-F(a) I Tcc-to-I'I pe C2. I C-F(n) 2 Pipe-to-Ill how

TIIMBY POINT PLANT UNIT 4 INSERVICB.EXAMINATION I'IJLH FOR TIIB SFlONII 40-WTII PERIOD OF TIIB FlRST 10-TER INSPECTION INTERVAl - CLASS 2 PIPING-AUXILIARY COOLANT SYSTQI (Sce Appendix 0, FISuros 0-18 tbrouph 0-22) (Cont'd)

INSPECTION INTEIIVAL AS ME ASME 0-3 I/3 YEARS 3 I/3-0 2/3 YEAIIS 6.2/3-10 YEAIIS EXAMINATION EXAhl.

SEC. XI SEC. XI OUTAGES IIEMAAKS ITEM NO. CATGY. AIIEA IDENTIFICATION METIIOO 3 . 4 7 8 6"-AC-01 Cont'd C2.5 C-E-l 21'S Integrally Ncldcd Support C2.6 C-B-2 2PSS Support I~nponcnts C2.1 C-F(a)

Elbow-to-Pipe C2.6 C-E-2 3PR(4-ACII-95)

Pipe Restraint C2. I C-F (a) 4 UT Pipo-to-Elbow C2.6 C-E-2 4IR(4-ACII-94)

Pipe Restraint C2.1 C-F(a) 5 Elbow-to-I'ipe 6

Pipe-to-Pipe C2.1 C-F(a) 7 P I pc-to-Elbow, CC.I C-F(a) 8 Elbow-to-Elbow C2.1 C-F(a) 9 UT Elbow-to-Elbow C2.6 C-B-2 9PR(4-AOI-93)

Pipe Restraint C2. I C- F (a) 10 Pipe-to-Plbow

TIINI!Y I'OINT PILI/f IINIT 4 Ol'IIH FIW IO-YEAR INSI'Ii(.fl(MI INTHRVAI. - CI ASS 2 INSHRVICH HWIINATI(WI PI AN FOR TIIH Sl!CONII 40-HONTII Pl RIOO I'll'INIl-AUXII.IARYCIX)IDENT SYSTHII (Scc Appendix 0, Fipurcs II-18 through II-22) (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAM. 0-3 I/3 YEARS 3 I/3-6.2/3 YEAIIS 6 2/3-10 YEARS EXAMINATION IIEMAAKS SEC. XI SEC. XI OuTAOES AREA IOENTIFICATION METIIOD ITEM NO. CATGY. 5 6 7 2 ~

3 6"-Ac-01 Cont'd C2.1 C-I'(a) 11 Hlbow-to-I'ipe C2.6 C-H-2 11PR(4-ACTI-91)

I'lpo Restraint 12 Pipe-to-Pipe C2.6 C-H.-2 I Zl'R(4-AOI-90)

I'lpc Restraint C2.1 C-r(a) 13 Pipe-to-Hlbow C2.1 C-r(a) 14 Hlbow-to-Pipe C2. 6 C-H-2 14 I'R (4-AO I-89)

I'ipc Restraint C2.1 C-F(n) 15 Pipe-to-Flbow C2. 5 c-r:-I 151'S(4-AOI-88) PT Integrally IIcldcd Support C2. G C-H-2 ISPSS Support Components C2.1 C-F(a) IG H lbow-to-Pipe 17 Pipe-to-Plpo C2.1 C-r(a) 18 Pipe-to Hlbcw

TURKEY POlNT PLANT UNlT 4 1NSERvrcr: EXAMINATION PLAN FOR TIIE SECOND 40-NNTII PERIOD OF TIIB FlRST 10-YEAR INSPECTION 1NTERVAl. - CLASS 2 PIP1NG-AUXILIARY COOLANT SYSTEM (See Appendix D, Figures 0-18 through 0-22) (Cont'd)

INSPECTION INTERVAL ASM'E ASME 0-3.l/3 YEARS 3.I/3-6.2/3 YEARS 62/3-IOYEARS EXAMINATION EXAM.

SEC. XI SEC. XI REMARKS AREA IDENTIFICATION METI IOO . OUTAGES ITEM NO. CATGY.

5 6 /

6"-AC-01 Cont'd C2.1 lq UT Elbow-to-Pipe C2.6 C-E-2 19PR(4-AQI-97)

Pipe Restraint C2. 1 C-F(a) 20 Pipe-to-Elbow C2 F 1 21 Flbow-to-V754

TIIRKf>Y I'Ottff PIJLNf IINIT 4 IHSI'.RVICII DXAIIINATION I'IJLN FOR Tllll SECOND 40-IKINftl Pt!RIOD OF TIIB FIRST 10-YIIAR INSPI!CfION INTIIRVAI. - CIJLSS 2 I'ljhlPS - (Scc hppcndlx B, Figures B 233 nnd B-234)

INSPECTION INTERVAL ASME ASME 0-atI3YEARS 3113-6.213VEADS 6213-IOYEAnS EXAMINATION EXAM.

SF(:. XI SEC. Xl REMARKS A(LEA IOENTIfICATION ME 1llOO OUTAGES ITEM NO. CATOY.

5 6 7 CIIAROINC PDWPS

~P> <<cc II-2IC)

C3.4 C-ll-2 Clll'-A Support C3.4 C-II-2 CIIP-B Support C3.4 C-II-2 CIIP-B Support Rl!SIDllhl IIIIAT RtWOVAI.

C3. I C-I'($ ) ILIIRP-A-S Suction Houle-to-Pump C3.1 C-F($ ) RIRIP-A-D Dlschorgc Hoxtlc to Pump C3. 2 C-D RIIRP-h-Bolting Vf Hr C-D-2 ILIIRP-h-Support C3. I C- I>($ ) RIIRP-B-S Suction-Hout c-to-Pump C3.1 C-F($ ) RIIRP- B-D Dischergc Hott Ic to Pump C3. 2 C-D RIBIP-B Bolting VT 100% of thc rcquircd bolting to l>e cxamlncd.

Ifr 2't of thc required bolting to bc cxnmincd.

C3. 4 C-rl-2 RIIRI -B Support

TURKEY POINT PLANT UNIT 4 INSERVICE EXAHINATION PLAN FOR TIIE SL'COND 40-HONTII PERIOD OF TIIE FIRSI'O-YFhR INSPKTION INTERVAL - CLASS 2 VAIVES INSPECTION INTERVAL ASME ASM E 0-3 I/3 YEARS 3 I/3-6.2/3'YEARS 6 2/3-'IO YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES REMARKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

I 2 3 4 5 6 7 8 9 NOTE: (I) For tho location of each Cla ss 2 Valve listed below, Sco Appendix B. The Figure No. is given in parenthcsls after the Valve No.

(2) 100% of thc rcqulrcd bolting to be examined visually and 2% of,the required bolting to bc examined voiumctricaily.

C4.2 C-D V752A (Figure 8-18)

Bolting C4.2 C-D V7528 (Figure 8-18)

Bolting C4.2 C-n HV744A (Figure 8-14)

Bolting C4.2 C-D HV7448 (Figure 8-14) VT Bolting IIT C4.2 C-D HV860A (Figuro 8-13)

Bolting C4.2 C-D HV8608 (Figure 8-13)

Bolting C4.2 C-D HV861A (Figurc 8-13)

Bolting C4. 2 C-D HV8618 (Figure 8-13)

Bol t'lng C4.2 C-D HV862A (Figurc 8-12)

Boi ting C4.2 c-n HV8628 (Flguro 8-12) YP Bolting UT C4.2 C-D HV863A (I'igurc 8-15)

Bolting C4.2 C-D HV8638 (Figure 8-15)

Bolting C4.2 C-D HV872 (Figurc 8-58)

Bolting

TOBKI!Y I'OINI'lhtfl'HIT 4 Iwslolvicl: rxANINATIOII I uoI Fog Tinl socono ao-wIml rBBIoo OF TIIr; FIRST io-YIBIB INsvI:.a ION INTBIIVAI. - russ z VAI.VI!S (Cont'd)

INSPECTION INTERVAL ASME ASME SEC. XI Sf:C. XI EXAMINATION EXAM, 0 4 I/3 YEARS 3 I/3-6 2/3 YEARS 6 2/3-IO YEARS IIEKINO. CATGY. AREA I DENT IF ICATION MEllIOD Ourn GES REMARKS I 2 7 8 9 ce.z c-o FCV605 (I'lgure 8-lo)

Bolting CA. 2 c-o IICV758 (Figure 0-20) ~

Bolting C-0 rOVZ604 (Figuro 8-6) VT Bolting OT C4.2 C-0 Cvlo-004 (Figurc 0-6) Vf Bol ting Irr IA.Z C-O I'OV2605 (figurc 0 7) VT Bol ting Irf C4. 2 C-0 Cvlo-005 (Figure 0-7) vr Bolting IJT cw. z ('.-0 I'OV2606 (Figuro B-8) Vf Bolting I/f C'I. 2 C-II Cvlo-006 (I'iguro 8-8)

Bolting

Table III - Pressure Tests - Class 1, Class 2, and Class 3 TABLE III. TURKEY POINT PLANT UNIT 4 CLASS 1, CLASS 2, AND CLASS 3 COMPONENTS AND SYSTEMS .

Title Page No.

Class 1 Components and Systems . . . . . . . . . . . . . . . . . 199 Class 2 Components.and Systems . ~ ~ ~ ~ ~ 203 Class 3 Components and Systems . . . . . . . . . . . . . . . . . 216 197

TIIRKPY POINT PLANT ONIT 4 INSRRVICS BXAHIHATIOH PIN FDR TIIE SECOND 40-NHTH PERIOD OF iil8 FIRST 10-YEAR INSPECTION INTERVAL - CLASS I I'RESSURE TESTS INSPECTION INTERVAL ASME ASME 0-3. I/3 YEARS 3 I/3-6 2/3 YEARS 6.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI IIEMARKS AREA IDENTIFICATION METIIOD OUTAGES ITEM NO. CATOY.

I 2 3 4 5 6 7 8 9 (I) The components and systems listed below to bc examIned during thc system hydrostatic test.

(2) FPL personnel to bc conducting leakage tests during each start up of the reactor.

(3) Vent, drain,and test lines arc not listed as separate lines, but aro to be tested with the wain components and are identified on t he respective Figures of the components.

RPV (Figures A-I 8 A-2)

PRE (Figures A-3 Il A-4) VT SG-A (Figure A-5)

Primary Side SG-8 (Figure A-5)

Primary Side SG-C (Figure A-5) vr Primary Side RGX (Figurc A-6)

RC-I (Figure A-71 (29 I/2 y 31 y and 27-1/2" diameter)

RC-2 (Figure A-8)

(29-1/2", 31", and 27-1/2" diameter)

RC-3 (Figure A-9)

(29 I /2 31 p and 27-1/2" diamctcr) 14"-RC-23 (Figure A-10) Vf 12"-RC-19 (Figure A-ll) Vf 10"-RC-61 (Figure A-12) VT 10"-RC-62 (Figure A-13) VT 10"-RC-63 (Figure A-14) Vf 4"-RC-112 (Figure A-15) VI'

TIIRKEY POINT PIANl'INIT 4 ILsl:.Rvico I:xnNIIIATION ruN TIIE 40-FKINTII rrgloo oF T184 Figsr Io-YEAR INSI rcrroN FOR SI:.CORO INrrawnI. - cuss I'Rl!SSIIRI! 'I'I:.Fl'S (Cout'8)

INSPECTION INTERVAI.

ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3 I/3-G.2/3 YEARS G 2/3-10 YEARS SEC. XI SFI XI AREA IDENTIFICATION METI IOO OUTAGES REMARKS ITEM NO. CAI GY.

I 2 4"-RC-113 (Figure A-1G) 4"-Rc-19 (Figure A- IS) vr 4"-Rc-11 (Figurc A-IS) 4"-RC-221 (Flguro A-17) 4"-RC-222 (Figure A-17) 4"-Rc-223 (Figure A-17) 4"-RC-7 (Figure A-18) 3"-RC-22I (Figurc A-18) vr 3"-RC-222 (I'igurc A-18) 3"-Rc-121 (Figure A-19) vf 3"-RC-122 (Figurc A-20) 3"-RC-123 (Flguro A-21) 3"-RC-23 (Fl guro A-23) 2"-Rc-IOII (Figurc A-24)

Z '-RC-IOI (Figurc A-ZS) 2 -RC-IO21 (Figurc A-2G)

Z -RC-IOZ (Pgiurc n-27) 2"-RC-103 (Figurc A-28) 2"-RC-3 (Figuro A-29) 2"-RC-lll (Figurc A-30) vr 2"-RC-112 (Flguro A-31) 2"-RC-4 (Figurc A-32)

TIIRKEY I'OINT PLAHT IINIT 4 INSL'RVICB EXAHIHATIOH PIAH FOR TIIB SECOND 40-hKINfll PERIOD OF TIIE FIRSr 10-YEAR INSPECTlON INTBRVAI, - CIJLSS I PRBSSIIRB TBSrS (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEARS 3 I/3-6.2/3 YEARS 6 2/3-10 YEARS SEC. XI SEC XI AREA IDENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATGY.

I 2 ,5 7 8 2"-RC-151 (Figure A-33) 2"-RC-152 (Figure A-33) 2"-RC-153 (Figure A-33) 2"-RC-5 (Figure A-34) 3"-CII-2 (Figure A-35) 3"-CII-3 (Figuro A-23) 3"-CII-5 (Figuro A-22 2"-CII-4 (Figure A-34) 2"-Ql-6 (Figure A-32) vr 2"-CII-7 (Figure A-36) 2"-CII-11 (Figuro h-37) 2"-CII-lll (Figure A-37) 2"-CII-12 (Figure A-38) 2"-CII-121 (Figure A-38) 2'I-CII-13 ( Figure A-39) 2"-QI-131 (Figure A-39) 10"-Sl-3O (Figure A-12)

IO"-SI-31 (Figure A-13) vr IO"-Sl-32 (Figure A-14) 8"-SI-3n (Figure A-12) 8"-Sl-3l (Figuro A-13) 8"-Sl-32 (Figure A-14)

TIIRKCY POINT I'IAI/f iINIT 4 INSERVICL'IXAlllNATIONI'IJLN FOR Till'. SI!I:ONII 40-IKINIII I'ERIOO OF TTIB I:IRFf IO-YIMR INSPI!CCION INfERVAI. - CIASS I I nl:SSIIRI:. 11:.Srs (Cout~d)

INSPECTION INTEAVAI.

ASMC ASME EXAMINATION EXAM. 0-3. I/3 YEAIIS 3. I/3-G 2/3 YEAAS G 2/3-'IO YEARS SEC. XI SEC. XI AAEA IDENTIFICATION ME TIIOO OUTAGES IIEMAAKS I TEM NO. CATOY.

I 2 7 8 2"-Sl-331 (Figure A-30) 2"-Sl-332 (Figure A-31) 2"-Sl-30 (Figurc A-40) 2"-Sl-31 (Figure A-4l) vr 2"-SI-32 (Figure A-42) 14"-AC-23 (Figure A-10)

RCP "A" (Figures A-43 5 A-44)

RCP "IV'Figures A-43 5 A-44)

RCI'C" (Figures A-43 fi A-44)

TURI3!Y POINT POINT UNIT 4 INSERVICE EXAMINATION PLAN FOR TIIE SECOND 40-IIONIII PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS 2 PRESSURE TESTS (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/O YEARS 3-1/3-6-2/3 YEARS 6-2/3-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION, METIIOD OUTAGES REMARKS ITEM NO. CATOY.

3 4 SG-A (Figures 8-1 6 8-2) VT SG-B (Figures 8-1 8 8-2)

SG-C (Figures B-l 8 8-2) VT EUIE (Figure 8-3)

RIIE-A (Figure 8-4)

RIIE-8 (I'igure 8-4)

VCT (Figure 8-23)

SNIF (Figure 8-24)

RCF (Figure 8-25)

RIIST-A (Figure 8-26)

RIPEST-8 (Figure $ -27) ,X BIT (Figure 8-28)

ACC-A (Figuro 8-29)

ACC-8 (Figure 8-29)

ACC-C (Figure 8-29)

ECCU:A (Figure 8-30) VT ECCU 8 (Figurc 8-30)

I-:CCU-C (Figure $ -30) 54"-PAR-21 (Figurc 8-31) VT 4$ "-PS-21 (Figuro 8-32) 26u-15-1 (Flguro $ -6) 26"-I5-2 (Figurc 8-7) 26"-55-3 (Figurc 8-8)

TURI3!Y POINT POINT UNIT 4 INSERVICE EXAIIINATION PION I'OR 1TIE SECOND 40-hlONTII PERIOD OF ?TIE I'IRST 10-YLAR IllSI'I!CTION INTERVAI. - CLASS 2 PRI SSURII TI STS (Cont'd)

INSPECTION INTEIIVAL ASME ASME OM I/O YEARS 3.l/3-8 2/3 YEARS 0.2/3-IO YEARS EXAMINATION ~ EXAM.

SEC. XI SEC. XI OUTAGES IIEMAIIKS CATCY.

AIIEAIDENTIFICATION METIIOD ITEM NO 2 3 4

.12"-h5-01 (Figurc 8-6) 12u-h5-02 (Figure 8-7) 12"-h5-03 (Figure 8-8) 12"-h5-04 (Figurc 8-6) 12"-h5-05 (Figure 8-7) 12"-h5-06 (Figurc 8-8)

Gu-h5-01 (Figurc 8-6) 6"-h5-02 (Figure 8-7)

G"-h5-03 (Figure 8-8) VT 6"-h5-011 (I'Iguro 8-6)

G"-HS-012 (Figure 8-G) 6"-h5-021 (Figurc 8-?)

6"-15-022 (Figuro 8-7) 6"-HS-031 (I'iguro 8-8)

G"-HS-032 (Figurc 8-8)

G"-h5-041 (Figure 8-6) 6"-HS-042 (Figurc 8-6)

G"-h5-051 (Figure 8-7) 6"-h5-052 (Figurc 8-7) 6"-h5-061 (Flguro 8-8) 6"-I5-062 (I'igure 8-8) 3"-h5-21 (Figuro 8-33) VT 3"-h5-22 (Figurc 8-34)

TURKEY POINT POINT UNIT 4 INSERVICE h)USIINATION PLAN FOR TIIE SECOND 40-IIONTII PERIOD OF TIIE FIRST 10-YEAR INSPECTION INTERVAL - CLASS 2 PRESSURE TESTS Cont'd INSPECTION INTERVAL ASME ASME 0-3.1/3 YEARS 3-1/3-6.2/3 YEARS 6 2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OI/TAGES REMARKS ITEM NO. CATGY.

AREA I OF NT IF ICATION MET BOO 3 4 6 7 3"-15-23 (Figure 8-3S)

Iu-KIS-21 (Figure 8-36)

Iu-HS>>22 (Figure $ -37)

I"-55-23 (Figure $ -38) . VT 14"-Flf-I (Figure 8-9) 14"-Flf-2 (Figure $ -10) 14"-Flf-3 (Figure 8-11) 6"-Flf-01 (Figure 8-9) 6"-FW-02 (Figure $ -10) 6"-FW-03 (Figure 8-11) 4"-Flf-21 (Figure 8-39) VT 4"-Flf-22 (Figure 8-40) 4"-FW-23 (Figure $ -41) VT 16"-S1-21 (Figure 8-42) 16"-S1-22 (Figure $ -43) 14"-Sl-l (Figure 8-12) 14"-SI-21 (Figure 8-13) 14"-Sl-22 (Figurc $ -,13) 14"-Sl-211 (Figure 8-44) VT 14"-S1-212 (Figuro $ -45) VT 14"-S1-213 (I'lguro 8-46) VT 14"-SI-214 (Figure-8-47) 10"-Sl-21 (Figure $ -48)

TURKEY POINT POINT UNIT 4 INSERVICU EXQIINATION I'IJN FOR lllE SECOND 40-llONIII I'ERIOD OF 1118 FIRST 10-Yl!AR INSI'EI:TION INTERVAI. - CIJLSS 2 INSPECTION INTEIIVAL ASME ASME EXAMINATION F.XAM. 0-3 I/O YEATIS 3.1/3-0 2/3 YEAIIS 0 2/3-10 YEAIIS SEC. XI SEC. Xl AREA IDENTIFICATION METI IOD OUT'AGES REMARKS II EM NO. CATGY.

.10"-SI-22 (Figure 8-49) 10"-SI-23 (Pigure 8-50) 10"-Sl-211 (Figure 8-51) VT 10"-SI-212 (Figurc 8-52) VT 10"-SI-213 (Figure 8-53) VT 10"-SI-300 (Figure 8-14) VT 10"-Sl-320 (Figure 8-14) VT 8"-Sl-211 (Figure 8-54) 8"-Sl-212 (Figure 8'-55) 8"-S1-213 (Figurc 8-56) 8"-S1-22i (Flguro 8-15) 8"-Sl-222 (I'iguro 8-15) 8"-Sl-223 (Figure 8-57) 8"-SI-230 (Figurc 8-58) 8"-SI-301 (Figuro 8-15) 8"-S1-310 (Figurc 8-16) 8"-Sl-320 (Figurc 8-17) 6" SI-21 (Figure 8-59) VT Sce I mark Open ondcd system exempted from examination.

6"-Sl-22 (Figurc 8-60) VT Sce I mark Open cndcd system excepted from examination.

G"-SI-211 (Figvro 8-61)

G"-Sl-212 (Figure 8-62)

G"-Sl-213 (Figurc 8-63)

G"-Sl-214 (Piguro 8-64) VT

TuRKBY roittr POWr Wn 4 IHSBRVICE BXNIIIIAYIOttPIAN FOR TIIB SECOttD 40-HONlll PERIOD OF lllB FIRST IO-YIUin ItISPECTIOII IttTLRVhL - CLASS 2 PRPSSU OJlM~ 0 INSPECTION INTERVAI.

ASME ASME SEC. XI Scr. XI EXAMINATION EXAM. 0-wn vEAns 3.113-6.213 vEAns 6.m-io YEAns AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGV.

6 ~

6 7 6"-Sl-215 (Figure 8-65) 6"-SI-216 (Figure 8-66) Vr G"-SI-217 (Figure 8-67) 4"-SI-21 (Figurc 8>>68) 4"-SI-211 (Figuro 8-69) 4"-SI-212 (Figure 8-70) 4"-SI-213 (Figurc 8-71) 3"-SI-211 (Figure 8-?2) 3"-SI-212 (Figure 8-73) 3"-SI-213 (Figuro 8-74) 3"-SI-214 (Figure 8-75) 3"-SI>>215 (Figure 8-76) 2"-SI-21 (Figure 8-77) 2"-SI-22 (Figure 8-78) 2"-SI-23 (Figure 8-79) 2"-Sl-24 (Figure 8-80) 2"-Sl-25 (Figure 8-81) 2"-SI-26 (Figuro 0-82) 2"-SI-27 (Figurc 8-83) 2"-SI-28 (Figurc 8-84) 2"-SI-231 (Figuro 8-85) 2"-Sl-232 (Figuro 8-BG) 2"-SI-233 (Figure 0-87)

mRKEY VOre rOWr OHIT 4 IHSI!RVICE EXAttIHATIOH I'IAH I'OR IIIE SECOND 40-fimmt I'ERIOD Ot'tlIE FIRST IO-YEAR IHSPI!CTIOH IHTERVAI. - CLOS 2 I'Rl!SSURL '}7: +Cont'd INSPECTION INTERVAL ASMF. ASME EXAMINATIOtJ FXAM. 0-3 I/3 YEARS 3 I/3-0 2/3 YEARS G 2/3-10 YEARS SEC. XI SEG XI REMARKS AREA IOLNTIFICATION MET IIOO OUTAGES I TEM NO. CATIIY.

I 2 7 8 2"-SI-234 (Figurc B-BB) 2"-S1-235 (Figuro 8-89) 1"-SI-2 (I:igure 8-90)

I"-SIY21 (Figure 8-91)

I"-Sl-24 (Figuro 8-92)

I"-Sl-25 (Figure 8-93)

Iu-SI-211 (Figure 8-94)

I"-SI-212 (Figure 8-95)

I"-Sl-213 (Flguro 8-96)

I ~-Si-214 (Figuro 8-92)

I"-Sl-215 (Figure 8-98) .

3/4"-S1-21 (Figuro 8-99) 3/4"-S1-22 (Figuro 8-100) 3/4"-Sl-23 (Figure 8-101) VT 3/4"-SI-24 (Figuro 8-102) 3/4"-SI-230 (t:igure 8-103) 3/4"-SI-231 (Figure 8-104) VT 3/4"-Sl-232 (Figure 8-105) 14"-AC-I (Figuro 8-18) 14"-AC-II (Figurc. 8-18) 14"-AC-12 (Figurc 8-18)'2"-AC-I (Figure 8-19) 12"-AC-2 (Figurc 8-20)

0'l/RKEY PRFSSURE TESTS Cont'd)

POINT POINT UNIT 4 IHSERVICE EXAHINATION PUN I'OR Tllg SECOND 40-llONTll PERIOD OF TIIE FIRST 10-YL'AR INSPECTION INTL'RVAL - CITS 2 INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEAIIS 3-I/3-6 2/3 YEAIIS 6.2/3-IOYEAIlS SEC. XI SEC. XI AAEA IDENTIFICATION MET IIOD Ovl'AGES IIEMARKS ITEM NO. CATGY.

I 2 10>>-AC-01 (Figurc 8-21) 10>>-AC-02 (Figure 8-21)

IIF'-AC-I (Figure 8-21) 10"-AC-2 (Figure 8-21) 10"-AC-21 (Figure 8-20) 10>>-AC-22 (Figure 8-20) 6>>-AC-01 (Figure 8-22) 6>>-AC-22 (Figure 8-106) 3>>-AC-21 (Figure 8-107) 3>>-AC-27 (Figurc 8-108) 3>>-AC-28 (Figure 8-109) 3>>-AC-211 (Figure 8-110) 3>>-AC-239 (Figure B-ill) 3>>-AC-251 (Figure 8-112) 3>>-AC-2392 (Figure 8-113) 2>>-'AC-21 (Figure 8-114) 2>>-AC-25 (Figuro 8-115) 2>>-AC-211 (Figurc 8-116) 2>>-AC-212 (Flguro 8-117) 2>>-AC-251 (Figure 8-118) 2>>-AC-252 (Figure 8-119)

I-I/2>>-AC-21 (Figurc 8-120)

TIIRXEV POINT Pier IIHIT 4 IHSERVICE EXAHIHATIOH PLAN FOR ITIE SECOHB 40-IIOtml PERIOII OP TIIE FIRST 10-YEAR INSPECTION IHKRVAI. - CIASS 2 PRESSlIRE TIESTS (Cont'd)

INSPECTION INTEBVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-0 2/3 YEARS G 2/3-IO YEARS SEC. XI SEC. XI

~ AREA IDENTlfICATION METIIOD OUTAGES BEMABKS ITEM NO. CA1GY.

2 3 5 G 7 Iu-AC-28 (Figurc 8-121)

I"-AC-281 (Figurc 8-122) VT 1"-AC-282 (Figurc 8-123) VT I"-AC-283 (Figure 8-124) VT 10"-ECC-21 (Figure 8-125) VT 10"-ECC-22 (Figure 8-126) VT JO"-ECC-23 (Flguro 8-127) VT 10"-ECC-24 (Figure 8-128) VT 10"-rCC-25 (Figure 8-129) VT 10"-ECC-26 (Figure 8-130) VT 10"-ECC-27 (Plgure 8-131) VT 10"-ECC-28 .(Flguro 8-132) VT 10"-LCC-29 (Figure 8-133) VT 8"-ECC-21 (Figure 8-B4) VT 8"-EK-22 (Flguro 8-135) VT 8"-L'CC-23 (Figure 8-136) VT 8"-ECC-24 (Figure 8-137) VT 8"-ECC-25 (Figure 8-138) 8"-ECC-26 (Flguro 8-139) VT 6"-ECC-21 (Figure 8-140) VT 6"-ECC-22 (Figuro 8-141) VT 6u-EIX:-23 (Figure 8-142) VT 10"-CC-21 (Figure 8-143) VT

TIIRKBY POIIff PLANT DIIIT 4 INSBRVICE EXAHINATIOII PLAII FOR 11IH SECOND 40-IIONll PERIOD OF 'HIE FIRST 10-YEAR IIISPBCT10N INTERVAL - CLOS 2 PRBSSORF. TESTS (Cont'd)

INSPECTION INTEIIVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-62/3YEAIIS 6-2/3-10YEAIIS SEI>> XI SEC. XI AIIEAIDENTIFICATION MET IIOD OUTAGES IIEMAAKS I TEM NO. CATGY.

5 6 7 10"-CC-22 (Figure 8-144) VT 8"-CC-21 (Figure 8-145) 8"-CC-22 (Figure 8-14G) 8"-CC-23 (Figure 8-147) 8"-CC-24 (Figure 8-148) 6"-CC-21 (Figure 8-149)

G"-CC-22 (Figure 8-150)

G"-CC-23 (Figure 8-151) 6"-CC-24 (Figure 8-152) 6"-CC-25 (Flguro 8-153)

G"-CC-26 (Figure 8-154) 3"-CC-21 (Figure 8-155) 0 3u-CC-22 (Figure 8-1SG) 3"-CC-23 (Figure 8-157) 3"-CC-24 (Pigure 8-158) 1-1/2"-CC-21 (Flguro 8-159)

I-112'-CC-22 (Figure 8-160) 4u-CII-21 (Figuro 8-161) 3"-Cll-22 (Figuro 8-162) 3"-Cll-25 (Figure 8-163) 3"-CII-210 (Figure 8-164) VT 3u-CII-211 (Figure 8-1.65) VT

TIIBKI!Y POIIIY PILI/r IIIIIT 4 INsl:.nvicr: rxAIIIIIATTOIII'uII ron TIIB srco/BI 40-IKmlll Prnion or Tile FTBST Io-TnAn TIISI I'.n'TON wrnnvAI. - cuss 2 Pnl!SSIIBL'l'STS (Cont'd)

INSPECTION INTERVAL ASME ASM C 0-3 I/3 YEARS 3 I/3-6 2/3 YEARS 0 2/3-10 YCARS EXAKIINATION EXAM.

src. XI SEIL XI OUTAGES .RCMARKS ITCM NO. CATGY.

ARE* IOENT IF ICATION MET I IOO I 2 2>>-GI-22 (Figure B-166) 2>>-Ol-23 (Figure 8-1G7) 2>>-Gl-25 (Figure 8-168) 2>>-Ql-26 (Figure 8-169) 2>>-CII-210 (Figurc 8-170) 2>>-CII-2I1 (Figure 8<<171) 2>>-CII-212 (Figuro 8-172) 2>>-OI-213 (Figurc 8-173) 2>>-Cll-214 (Figuro 8-174) 2>>-Cll-215 (Figure 8-175) 2>>-Ql-216 (Figure 8-17G) 2>>-Q!-217 (Figuro 8-177) 2>>-OI-218 (Figure 8-178) 2>>-Clt-230 (Figurc 8-179) 2>>-Ql-244 (Figurc 8-180) 2>>-Ql-251 (Figure 8-181) 2>>-O!-252 (Figuro 8-182) 2>>-QI-253 (Figure 8-183) 2>>-Ol-290 (Figure 8-184) 1>>-Cll-22 (Figure 8-185) X .

1>>-Ql-210 (Figurc 8-ISG)

I>>-Ql-211 (Figurc 8-187)

I>>-Ql-212 (Figurc 8-188)

<O

~

POINT PLANT uIITT 4

'IIRKEV INSERVICE EXAHIIIATIOIIPLAN FOR TIIE SECOND 40-HOIITII PERIOD OF TIIE FlRST 10-YL'AR IIISPECT10N IQQVAL - ClASS 2 PRESSURE TESTS (Cont'd)

INSPECTION INTERVAL ASME ASME 0-3 I/3 YEAIIS 3.1/3-6.1/3 YEA!IS EXAMINATION EXAM. 6.1/3-IO YEARS SEC. XI SEI XI IIEMAIIKS AIIEAIDENTIFICATION METIIOO OUTAGES ITEM NO. CATGY. ~

3 6 7 8 3/4"-QI-25 (Figure 8-189) 3/4"-Ql-26 (Figurc $ -190) 3/4"-CII-202 (Figure 8-191 3/4"-Ql-209 (Figure $ -192 3/4"-Ql-210 (Figure 8-193 3/4"-Ql-221 (Figure 8-194 3/4"-QI-222 (Figure 8-195 3/4"-CII-223 (Figure 8-196 3/4"-CII-224 (Figurc 8-197 3/4"-CII-225 (Figurc 8-198 3/4"-Ql-291 (Figure $ -199 3/4"-Ql-292 (Figure $ -200 3"-RC-22 (Figurc 8-201) 3/4"-RC-21 (Figurc 8-202) 3/4"-RC-22 (Flguro 8-203) 3/4"~RC-23 (Figure $ -204) 3/8"-RC-21 (Figure 8-205) 3n-WD-21 (Figure $ -206) Exempted from examination duo to high radintinn.

3n-ND-22 (Figure 8-207) Exempted from examination duc to high radiation.

Zn-IID-21 (Figure 8-208) Exempted from examination duc to high radiation.

Zn-IID-22 (Figure 8-209) Exempted from examination due to high radlatinn."

2"-IID-'23 (Flguro $ -210) Excmptcd from examination duo to high radiatlnn.

1"-IID-21 (Flguro $ -211)

TIIRKDY POINT PIJQIT IINIT 4 INSDRVICE BIIAIIINATIONI'LAH FOR TTIB SECOtll) 40-IIONTII PIIRIOII OF TIIE FIRST 10-YEAR INSPII(.TIOH IHITIRVAI, - CLASS 2 PRISSIIRD TIFSTS (Cont'd)

INSPECTION INTEBVAL ASME ASME 0-3 I/3 YEABS 3. I/3-G 2/3 YEABS G 2/3-10 YEABS EXAh!INATION EXAM.

SF.C. XI SFC. XI OUI'AGES BI'.MABKS I 'IEM NO. CATOY.

ABEA IOENTIFICATION METIIOO 2 3 5 G 7 3/4>>-N0-21 (Figurc 0-212) VT 3/4>>-N0-22 (Piguro 8-213)

(Figurc 8-214)

Vl'/4>>-lfl)-23 VT 3/8>>-lfn-21 (Figure 8-215) VT 2>>-8-21 (Figuro 8-216) 2>>-8-22 (Figure 8-217) 2>>-0-23 (I'lgurc 0-218) 1<<-0-21 (I'igurc 8-219) 1<<-0-22 (Figurc 0-220) 1>>-0-23.(Figurc 0-221) 2>>-IA0-21 (Flguro 8-222). VT 2>>-IA-21 (Figurc 8-223) 2>>-PACV-21 (Figure 8-224)

I>>-V>>21 (Figure 8-225)

I>>-V-22 (Flguro 0-226) 3/8>>-SL-4 (Flguro 0-227) VT 3/8>>-SI 10 (Figurc 0-228) VT 3/8>>-Sl ll (Figure 0-229) VT X 3/8>>-SL-12 (Figurc 0-230) VT CIIP-A (Figurc 0-233)

QIP-8 (Figurc 0-233)

QIP-C (Figurc 8-233)

IUIRP-A (Plgure 0-234)

I TURKEY POINT FLAIR'H1T 4 IHSERVlCE EKAIIIHATION PLAN FOR TIIE SECOND 40-HOHlll PERIOD OF TIIE FIRST 10-YIAR 1HSPFCTIOH MRVAL - CIASS 2 PRESSURE TESIS (Cont'd)

INSPECTION JNTEDVAL ASME ASME EXAMINATION EXAM. 0-3.I/3 YEARS 3 I/3-6.2/3 YEARS 6.2/3-IO YEAIIS SEC. XI SEC. XI AAEA IDENTIFICATION METHOD Ol/TAGES REMARKS ITEM NO. CATGY.

7 8 9 RIIRP-8 (Figure 8-234)

CSP-A (Figure 8-231)

CSP-8 (Figure 8-231)

IIILSIP-A (Figure 8-232)

IlllSIP-8 (Figure 8-232)

IIISIP-C (Figure 8-232)

IUISIP-D (Figure 8-232)

TURKEY POINT PIJLHT IIHIT 4 IHSERVICE IPXAHINATIOH PION FOR 118! SIICOHD 40-IIONIII PERIOD OF IIIE FlRST 10-YPAR IHSPIXTION INTERVAL - CULSS 3 PRESSIIRE TI'SN (font d)

INSPECTION INTL'OVAL ASME ASME 0.4 I/3 YEARS 3,I/3-6 2/3 YEABS 6 2/3-10 YEARS EXAMINATION .EXAM.

SFC. XI SEC. XI REMARKS AIIEA IDENTIFICATION METIIOD OU TAGES ITEM NO. CATGY.

I 2 7 8 DAT-A (Figaro C-1)

DAT-0 (Flguro C-1) VT DAT-C (Figurc C-1)

CDD (Figurc C-2)

NDD (Figurc C-3) VT SNIP. (Fipure C-4)

NRI(E (Figure C-5) VT Shell side only.

DAP (Flpurc C-6) VT SITF (I'igure C-7)

ELIIE (Figurc C-8) Shell side only.

RIIE-A (Figurc C-5) Shell side only.

RIII'.-8 (Figure C-5) Shell side only.

CCST (Figurc C-10)

CQIE-A (Figurc f.-ll)

CCIIE-8 (Plgurc C-11)

CCIIE-C (Figure C-ll)

CChllE-A (Figure C-12) VT fChIIE-8 (Figurc f.-l2)

CCIIIIE-C (Figure C-12)

ODT-1 (Figurc C-13) VT Sco cwarl Excwpt frow cxawlnatlon duc to high radiation.

00T-2 (Figurc C-13) Sco cwarl Excwpt frow cxawinatlon duc to high radiation.

ODT-3 (Fipure C-13) VT , Sec ewarl Excwpt frow cxawination duc to high radiation.

Olrr-4 (Figurc r.-l3) VT Scc cwarl Excwpt frow cxawlnntion due to high radiation.

03 TlIRKPY POINT PLANT IINIT 4 INSFRVICP. HXAIIINATION PMN FOR 1118 SHOINII 40-IIINIll PHRIOI) Of TIIP. FIRST 10-YIPAR INSPl:.CTION INWRVAL - CLASS 3 PRFSSURH TFSTS (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3 I/3 YEARS 3.1/3-8 2/3 YEARS 8.2/3-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOO OUTAGES REMARKS ITEM NO. CATO Y.

2 3 7 . 8 GDT-5 (Figurc C-13) Sce cmarks Hxcmpt from cxamlnation due to high radiation.

I GOT-6 (Figurc C-13) iSce cmarks Hxcmpt from examination duc to high radiation.

SFPIIE (Figure C-14) VT 36>>-CW-31 (Figure C-IS) 36>>-Clf-32 (I'lgure C-16) 30>>-Of-31 (Figure C-17) 30>>4lf-32 (Figure C-18) VT 30>>-Clf-33 (Figurc C-19) 30>>-Of-34 (Figurc C-20) 30>>-CS-35 (Figure C-21) 24>>-Clt-31 (Figure C-22) 24>>-Of-32 (Figure C-23) 24>>-Of-33 (Figure C 24) 24>>-Clf-34 (Figure C-25) VT 4>>-Clf-31 (Figure C-26) 4>>-Clf-32 {Figure C-27) 4>>-CIf-33 (Figure C-28) VT 4>> Of 34 {Figurc C-29) 2>>-Clf-31 (Figure C-30) VT 2>>-Of-32 (Figurc C-31) VT 18>>-AC-31 (Figure C-32) 18>>-AC-32 (Figure C-33) 16 -Ar.-31 (Figurc C-34) VT

TIIIIKI!Y POINT FIANT UNIT 4 tHst8tvrtx rxAtttHATtoH pew ron Tttp srcoHII 40-txtHttt prttton or. mtF: FrLsT to-Ypstt ittsprcTTOH THTI:IIVAI. - Ct,ass 3 Pnltsstlglt Tt<<SPS (Cont'd)

INSPECTION INTEnVAL ASME ASME EXAMINATION EXAM. 0-3. I/3 YEAnS 3-I/3-G 2/3 YEAHS G.2/3-IOYEABS sgc. Xt SEC. XI ITEM NO. CATGY. AOEA IDENTIFICATION METI Iol) OUTAGES nEMAnxs 3 4 I 6<<-Ac-32 (Figurc C-35) X 16<<-AC-33 (Figurc C-36) 12<<-AC-31 (Flguro C-37) 12<<-AC-32 (Figurc C-38) 12<<-AC-33 (Flpuro C-39) 12<<-AC-331 (Figurc C-40) 10<<-AC-31 (Fiylrc C-41) 8<<-AC-31 (Figuro C-42) 8<<-AC-32 (Flguro C-43) VT 8<<-AC-33 (Figure C-44) VT 8<<-AC-311 (Fly>ro C-45) VT 8<<-AC-312 (Fipuro C-4G) 8<<-AC-331 (Figurc C-47) 6<<AC-31 (Figurc C-48) VT 6<<-AC-32 (Figurc C-49) VT 6 -Ar.-33 (rlgure C-SO) VT 6<<-AC-311 (Flpurc C-Sl) 4<<-AC-31 (Figurc C-52) 4<<-AC-32 (Figure C-S3) 4<<-AC-33 (I'lguro C-54) 4<<-AC-34 (rlgure C-SS) VT 4<<-AC-331 (Figure C-56) 4<<-AI.-332 .(Fl pure C-S7)

TURKEY P01NT PLANT l'INIT 4 1NSERV1CE EX/IltIIATtON PIJIN FOR TIIE SrCOND 40-NONTII PERron OF VIE Pter 10-YEAR tNSPECTtoN tNTERVAL - CIZSS 3 PRESSURE TFSTS Cont'd INSPECTION INTERVAL ASME ASME OM I/O YEARS 3.I/3-6 2/3 YEARS 6.2/3-IO YEARS EXAMINATION EXAM.

SEC. XI SEC. XI OUTAGES IlEMARKS AREA IDENTIFICATION METIIOD ITEM NO. CATGY.

3 4 4"-AC-341 (Figure C-58) 3"-AC-35 (Figurc C-59) VT 3"-AC-36 (Figuro C-60) VT 3"-AC-39 (Figure C-61) VT 3"-AC-310 (Figure C-62) 3"-AC-311 (Figure C-63) 3"-AC-313 (Figurc'C-64) 3"-AC-314 (Figure C>>65) 3"-AC-315 (Figure C-66)

P-AC-351 (Figure C>>67) 3"-AC-391 (Figure C-68) 3"-AC-392 (Figure C-69) VT 2"-AC-31 (Figure C-70) 2"-AC-32 (Figuro C-71) 2"-AC-35 (Figure C-72) 2"-AC-36 (Figuro C-73) 2"-AC-38 (Piguro C-74) 2"-AC-39 (Figure C-75) VT 2"-AC-311 (Figure C-76) 2"-AC-312 (Figure C-77) 2"-AC-313 (Figuro C-78) 2"-AC-321 (Figuro C-79) .VT 2"-AC-322 (Figure C-80)

TIIRKPY TOlttT PLAIT'N1T 4 lVSERVICE EtmwttIATtott Ptwtt FOR VIE SECOND 40-tiomt r ERlon OF Tttm FTRST to-VPSR TIISPrCTTOW TNTrttvht. - CITS 3 PRESSIIIIE TMTS (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. OM I/3 YEARS 3.I/3-6.2/3 YEARS 6-2/3-IO YEARS SEC. XI SEC. XI AREA IDENTIFICATION METIIOD OUTAGES REMARKS ITEM NO. CATGY.

'I 3 2 5 6 7 8 9 2 -AC-351 (Figurc C-81) VT 2"-AC-352 (Figurc C<<82) VT 2"-AC-353 (Figuro C-83) 2"-AC-354 (Figure C-84) VT 2"-AC-361 (Figurc C-85) VT 2"-AC-391 (Figure C-86).

2"-AC-392 (Piguro C-87) VT l-l/2"-AC-32 (Figure C-88) l-l/2"-AC-321(Figurc C-89) 1-1/2"-AC-322 (Figure C-90) 1"-AC-36 (Figure C-91) VT 1"-AC-37 (Pigure C-92) 1"-AC-38 (Figurc C-93) VT 1"-AC-39 (Figuro C-94) VT, 1"-AC-311 (Figure C-95) 1>>-AC-313 (Figure C-96) 1"-AC-361 (Figure C-97) 1"-AC-362 (Flguro C-98) VT I"-AC-371 (Figure C-99) 1"-AC-372 (Figurc C-100)

I"-AC-381 (Figuro C-101) VT 1"-AC-382 (Figurc C-102)

I"-AC-383 (Figuro C-103)

TURKEY FOIIIT FLANf INIT 4 INsrnvtcr; ExAttttIAnoN IMN ron Ttta sEcotttt 40-text rERIon or Tttn Ftnsr Io-YF>n Ittsrrcnott INTEnvat. - cEAss 3 FnrSSURE TFmS Cone~d INSPECTION INTERVAL ASM E ASME 0-3 I/O YEARS 3 I/3-G.2/3 YEARS G.2/3-10 YEARS EXAMINATION EXAM.

SEC. XI SEC. XI REMARKS AREA IOENTIFICATION METIIOO OUTAGES

'ITEM NO. CATGY.

5 0 7 8 1<<-Ac-384 (Figurc C-104) 1<<-Ac-385 (Figure C-105)

I<<-AC-386 (Figurc C-106) 1"-AC-387 (Figure C-107) 14<<-ECC-31 (Figuro C-108) 14"-ECC-32 (Figure C-109) 14<<-rCC-33 (Figure C>>llo) 14<<-FCC-34 (Figure C<<ill) 10<<-ECC-31 (Figure C-112) 10"-ECC-32 (Figuro C-113) 10<<-ECC-33 (Figuro C>>114) to<<-rCC-34 (Figurc C-115) 10<<-ECC-35 (Figuro C-116) 10"-rCC-36 (Figure C-117) 6<<-ECC-31 (Figure C-118) X" 6<<-ECC-32 (Figure C-119) 6<<-ECC-33 (Figuro C-120) 10<<-C-35 (Figuro C-121) 8<<-C-33 (Figurc C-122) 8<<-C-34 (Figurc C-123) 10<<-CC-31 (Figurc C-124) 10<<-CC-32 (Figure C-125) 6<<-t II-36 (Figurc C-126)

TUREEY FOINT PLhwT UNIT 4 lwsrnvicE ExllwiwATiow llaw Fon Tllr: sEcowo 40-InwTII Frnloo or TIIE FinsT to-Yr>R iwsvrniow lwTFnvAI, - cuss 3 rnrssunr: TEsTs (cont'd)

INSPECTION INTE BVAL ASME ASME EXAhBNATION EXAM. OA.I/3 YEABS 3 I/3-6 2/3 YEABS 6.2/3-10 YEARS SEC. XI SEC. XI ABEA IDENTIFICATION METIIOO OUTAGES BEhIABKS ITEM NO. CATGY.

7 8 9 G"-Flf-361 (Figuro C-127) 6"-Flf-362 (Figurc C-128) 6"-Flf-363 (Figurc C-129) 4"-Rf-31 (Figurc C-130) 4"-Flf-32 (Figure C-131) 4u-Flf-33 (Figure C-132) 4"-115-33 (Figure C-133) 4"-lm-34 (Figurc C<<134) 3"-CII-322 (Figure C-135) 3"-CW-323 (Figure C-136) 3u-QI-324 (Figuro C-137) 3"-Ql-325 (Fip1ro C-138) 3"-OI-326 (Fi pure C-139) 3"-Ol-350 (Figuro C-140) 3"-OI-3GO (Figure C-141) 3"-Ql-361 (Figure C-142) 2"-Ol-03G (Fi piro C-143) 2"-Cll-32 (Figurc C>>144) VT 2"-CW-34 (Figure C-145) 2"-Q!-38 (Fip1re C-14G) 2"-CII-310 (Figurc C-147) 2"-QI-311 (Figurc C-148) 2"-Ql-331 (Figuro C-149)

TURKBY POINT PLANT UIIIT 4 1NSrRVTCO RK/OliIIAT1OII PIJIN FOR SIIF. Sr<OIIII 40-~amI PERiOn OF Tlla FTRST 10-VWR WSPrCTTON iNITRVAL - ASS 3 PRBSSURH TPSTS (Cont'd)

INSPECTION INTERVAL ASME ASME EXAMINATION EXAM. 0-3-1/3 YEARS 3.1/3-6 2/3 YEARS 8.2/3-\0 YEARS SEC. XI SEC. XI REMARKS AREA IOENTIFICA'TION h'IE TI IOD OUTAGES ITEM NO. CATO Y.

6 7 2"-Cll-332 (Figure C-150) 2"-CII-333 (Figure C-151) VT 2"-CII-340 (Figure C-152) 2"-Ql-341 (Figure C-153) 2"-Cll-342 (Figure C-154) 2"-CII-343 (Figure C-155) 2"-CII-351 (Figure C-156) 2"-QI-352 (Figure C-157) 2"-Ql-3GO (Figure C-158) 2"-Ql-3G1 (Figure C-159) 2"-CII-362 (Figure C-160) 2"-CII-363 (Figurc C-161) 2"-CII-364 (Figurc C-1G2) 2"-Ql-365 (Figure C-1G3)

I"-Ql-032 (Figure C-1G4) VT 1"-QI-31 (Figure C-165) 1"-Q!-32 (Figure C-166) 1"-CII-33 (Figurc C-167) 3/4"-Ql-331 (Figurc C-168) VT 3/4n-Ql-332 (Figurc C-160) VT 3/4"-CII-333 (Figure C-170) 3/4"-CII-334 (Figure C-171) 3/4"-Ql-341 (Figurc C-172) VT

TURKEY MINT PIJLNT UNIT 4 INSHRVICF. FXQIINATION PIJLII MR Tltp. SECOND 40-IONTII PERIOD OP IIIB FIRST 10-YPAR IttSPECTIOtt INTHRVAI. - CLASS 3 PRISSIIRH TESTS (Cont'd)

INSPECTION INTEOVAE ASME ASME 0-3 I/3 YEARS 3 I/3-6.2/3 YEARS 6 2/3-IO YEAIIS EXAMINATION EXAM.

S'EC. XI SEC. XI IIEMAIIKS AREA IDENTIFICATION METI IOD OVTAGES ITEM NO. CATGY.

2 3 5 6 7 3/4"-Ctl-342 (Figure C-173) VT 3/4"-Clt-343 (Figure C-174) 3/4"-CII-360 (Piguro C-175) 3/4"-Qt-361 (Figure C-176) VT 3/4"-Clt 362 (Figure C-177) VT I"-,IfD-31 (Figure C-178) Exempt from examination due to high radiation.

Iu-IID-32 (Figurc C-179) Except from examination due to high radiation.

Iu-Iftf-33 (Figurc C-180) Exempt from examination duc to high radiatinn.

Iu-IfD-34 (Figure C-181) Exempt from examination due to high radiation.

'xempt I"-IID-35 (Figure C-182) Exempt from examination duc to high radiation.

I"-lfD-36 (Figurc C-183) VT Exempt from examination duc to high radiation.

I"-IfD-37 (Figure C-184) Exempt from examination due to high radiation.

Iu-IfD-38 (Figure C-185) VT from examination duc to high radiation.

Iu-IfD-39 (Figure C-186) Exempt from examination duo to high radiation.

I"-t/D-40 (Figure C-187) . 'T Exempt from examination duc to high radiation.

I"-IfD-41 (Pigure C-188) Exempt from examination duc to high radiation.

I -IID-42 (Fipuro C-189) Exempt from examination duc to high radiation.

3/4"<<IfO-31 (Figure C<<190) VT Exempt from examination duc to high radiation.

3/4"-IfD-32 (Figure C-191) VT Exempt frow examination duc to high radiation.

3/4u-IfD-33 (Figure.C-192) VT Hxcmt>t from examination duc to high radiation.

3/4"-IfD-34 (Figure C-193) VT Except from examination duc to high radiation.

3/4"-IID-35 (Figuro C-194) VT Exempt from examination due to high radiation,

/4"-ND-36 (Plgurc C-195) VT Exempt from examination duc to high radiation.

'IIBKFY Il/SEBVICB BXWINATIOW PLAN FOB Tlm FOIE'LAN'/HIT 4 Srmxn 40-IKMIZI PEBIOO OF TIIB FInST Io-Vr>II IIISrrxnON IIImIVAL- CLASS 3 PIIBSSIIIIB Tl~S (Cont'd)

INSPECTION INTEBVAL ASME ASME EXAMINATION EXAM. 0-3.1/3 YEAIIS 3 I/3-6 2/3 YEABS 6-2/3-IOYEAIIS SEC. XI SEC. XI AIIEAIDENTIFICATION METI IOD OUTAGES IIEhIAIIKS ITEM NO. CATGY.

6 7 SFPP (Figure C-196)

IClfP-A (Figurc C-197)

ICIIP-8 (Figure C-197)

ICIfP-C (Figurc C-197) VT OATP-AI (Figure C-198)

OATP-A2 (Figure C-198) VT BATP-81 (Figure C-198)

OATP-82 (Figure C-198)

CCP-A (Figure C-199)

CCP-8 (Figure C-199)

CCP-C (Figure C-199) VT AFlfP-A (Figure C-200)

AFlfP-8 (Figurc C-200)

AFlfP-C (Figure C-200)

(0 ;0