Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20127H309 + (Responds to Re Ruskin Mfg Co 841106 Part 21 Rept & Associated CPC 841106 10CFR50.55 Rept.Review of Files Revealed No Direct Relationship Between Problems Identified by D Dartey or E Kent & Problems in Part 21 Rept)
- ML19207C462 + (Responds to Re S.535,Nuclear Waste Transportation Act of 1979.Primary Responsibility for Regulating Safety of Shipping Casks Remains W/Nrc.Forwards NRC 790719 Testimony on Bill)
- ML19207C459 + (Responds to Re S.535,Nuclear Waste Transportation Act of 1979.Primary Responsibility for Regulating Safety of Shipping Casks Remains W/Nrc.Forwards NRC 790719 Testimony on Bill)
- ML20214E395 + (Responds to Re SA Milam & C Stokes Allegations Concerning Commission Practice of Notifying Outside Party of Nature of Congressional Inquiry.Response to Questions Re Specific Technical Issues & to Zech Encl)
- ML20198D159 + (Responds to Re SALP 10 Board Rept 50-483/92-01 for Period 900201-920131)
- ML20078N664 + (Responds to Re SALP Board Rept.Rept Incomplete & Premature in Certain Areas.In General,Util Endorses Observations Re Facility Performance)
- ML17313A358 + (Responds to Re SALP Repts 50-528/98-99, 50-529/98-99 & 50-530/98-99,dtd 980408 & Associated Telcon Between Jm Levine & Je Dyrer on 980423.NRC Will Carefully Review Assessment,Considering All Info Provided)
- ML19336D155 + (Responds to Re SECY-90-318 on low-level Radwaste Storage)
- ML20125C377 + (Responds to Re SECY-92-287, Form & Content for Design Certification Rule. Staff Agrees W/Proposal That Documents & Refs Used in Making Staff Final Safety Determination Be Identified in FSER)
- ML20034H668 + (Responds to Re SECY-93-041, ABWR Review Schedule)
- ML17258A448 + (Responds to Re SEP Topic II.2.C, Atmospheric Transport & Diffusion Characteristics for Accident Analysis. Proposed Set of X/Q Values Re Exclusion Area Boundary Disputed.No Boundary Definition Map Needed)
- ML17258A649 + (Responds to Re SEP Topic II.4.D, Stability of Slopes. Calculation of Internal Friction Angle & Factor of Safety & Addl Boring Logs Encl)
- ML17173B006 + (Responds to Re SEP Topic VI-1.Forwards Tables & Answers to Questions 1-7 Re Major Protective Coating Sys in Containment,Pipe & Hanger Surface & Amounts of Organic Matl Inside Containment)
- ML19253A594 + (Responds to Re SEP Topic VIII-3.B.Forwards Info & Oversized Drawings Re Alarms & Voltage Monitoring Devices to Indicate Operability Status to Operators for Class IE Batteries,Associated Chargers & Direct Current Buses)
- ML17309A235 + (Responds to Re SEP Topic XV-19,LOCA.Sodium Hydroxide Valve Delay Timer Delay Will Be Lessened by Approx 10-s)
- ML13317A625 + (Responds to Re SEP Topics VI-7.C & VI-7.C.2.NRC Assumption That Util Complied w/781016 Request to Install Redundant Undervoltage Relays on 4160-volt Buses 1C & 2C During Cycle 7 Refueling Outage Is Correct)
- PY-CEI-NRR-0016, Responds to Re SER Confirmatory Issue 14 on Overheating of Gadolinia Fuel Pellets.Ge Rept Verified That Fuel Melting Not Expected to Occur During Normal steady- State Operation or During Whole Core Anticipated Transient + (Responds to Re SER Confirmatory Issue 14 on Overheating of Gadolinia Fuel Pellets.Ge Rept Verified That Fuel Melting Not Expected to Occur During Normal steady- State Operation or During Whole Core Anticipated Transient)
- ML20063M010 + (Responds to Re SER Confirmatory Items 36,37,38,39 & 40 Re Unresolved Fire Protection Issues.Info Should Resolve Issues.Util Awaits NRC Review of 820616 Submittal to Close Issue 16.Gilbert Associates Fire Protection Rept Encl)
- ML20072H051 + (Responds to Re SER Open Item,Reiterating Util Position on NUREG-0737 Requirement for Shift Technical Advisor on Shift.Shift Technical Advisor Position Need Not Be Staffed to Meet NUREG-0737 & Generic Ltr 82-33)
- ML20087M842 + (Responds to Re SER Open Items Concerning NUREG-0737,Item II.E.1.1, Auxiliary Feedwater Sys Evaluation. Open Items Listed.Appeal Meeting Requested)
- ML20023C284 + (Responds to Re SER on Environ Qualification of safety-related Electrical Equipment.Review Identified No Item in NRC Category Ii.B Requiring Justification for Continued Operation)
- ML20235Z208 + (Responds to Re SER on Revised Corporate Nuclear Performance Plan (Cnpp) (NUREG-1232,Vol 1).Revised Table 1 from Cnpp,Including Two Changes in Permanent Selection of Senior Nuclear Managers,Encl)
- ML20125B038 + (Responds to Re SL Frei Observation That Radiation Detector Signal Could Have Prevented Transfer of Contaminated Water at Tmi.Source of Radioactivity in Auxiliary Bldg Was Leakage from Reactor Coolant Letdown Sys)
- ML20011F713 + (Responds to Re Safe Operation of Facility & NRC Process for Determining Whether to Issue Full Power License for Plant.Commission Assures Protection of Public Health & Safety as First & Primary Consideration)
- ML20140F077 + (Responds to Re Safe Operation of Plant After 860131 Earthquake & Whether Plant Could Survive Similar Event.Nrc Reaffirms Adequacy of Plant Seismic Design. Confirmatory Work Must Be Completed Prior to Full Operation)
- ML20041G555 + (Responds to Re Safeguards Contingency Plan. Changes Acceptable)
- PY-CEI-NRR-0332, Responds to Re Safety Classification of Transverse in-core Probe & Subsystems.Safety Classification of Piping/Subsystems Will Be Changed to Safety Class 2 in Next Amend to FSAR + (Responds to Re Safety Classification of Transverse in-core Probe & Subsystems.Safety Classification of Piping/Subsystems Will Be Changed to Safety Class 2 in Next Amend to FSAR)
- ML20212M328 + (Responds to Re Safety Concerns at Facility. Special Insp Conducted at Facility During 861103-14 to Investigate Concerns Received from Employee Legal Project. No New Safety Issues Raised as Result of Insp)
- ML20212M278 + (Responds to Re Safety Concerns at Facility. Special Insp Conducted at Facility During 861103-14 to Investigate Concerns Received from Employee Legal Project. No New Safety Issues Raised as Result of Insp)
- ML20212M147 + (Responds to Re Safety Concerns at Facility. Special Insp Conducted at Facility During 861103-14 to Investigate Concerns Received from Employee Legal Project. No New Safety Issues Raised as Result of Insp)
- ML20212M303 + (Responds to Re Safety Concerns at Facility. Special Insp Conducted at Facility During 861113-14 to Investigate Concerns Received from Employee Legal Project.No New Issues Raised as Result of Insp)
- ML20212M213 + (Responds to Re Safety Concerns at Facility. Insp Conducted at Facility During 861113-14 to Investigate Concerns Received from Employee Legal Project.No New Safety Issues Raised as Result of Insp)
- ML20212M342 + (Responds to Re Safety Concerns at Plant.Special Insp Conducted on 861113-14 to Investigate Concerns Received from Employee Legal Project.Rept,Issued on 861219,concluded That No Specific New Safety Issues Raised)
- ML20212M232 + (Responds to Re Safety Concerns at Plant.Special Insp Conducted on 861113-14 to Investigate Concerns Received from Employee Legal Project.Rept,Issued on 861219,concluded That No Specific New Safety Issues Raised)
- ML19282D002 + (Responds to Re Safety Concerns.Proposes Upgrading Emergency Feedwater Sys & Completing Sufficient Small Break LOCA Analyses to Develop & Implement Necessary Operator Instructions in Emergency Procedures)
- ML16341C935 + (Responds to Re Safety Considerations Involved in OL Issuance)
- ML20244B607 + (Responds to Re Safety Issues Raised by Subcommittee.Two Issues Re Fitness for Duty and Terrorism Being Actively Pursued by NRC Through Formal Rulemaking or Preliminary Development of Regulatory Requirement)
- ML19322D367 + (Responds to Re Safety of Area Around TMI & Future Operation of Facilities.Very Small Dose of Radiation Came from Radioactive Gases.Nrc Ordered Public Hearing Re Restart of Unit 1.Util Studying Feasibility of Unit 2 Operation)
- ML16340B182 + (Responds to Re Safety of Facility Re Geologic Faults in Region.Fault Being Taken Into Consideration in Licensing Process)
- ML19209C386 + (Responds to Re Safety of Facility in Light of TMI Incident.Facilities Have Similar Nuclear Steam Supply Sys. B&W Reactors Shutdown Condition Pending short- & long-term Mods Licensee Granted 790614 Restart Order)
- ML19210E811 + (Responds to Re Safety of Facility.Forwards to Util Authorizing Restart of Unit.Numerous Regulations Protect Health & Safety of Public)
- ML19263F031 + (Responds to Re Safety of Nuclear Energy.Describes Investigation of 790328 Incident)
- ML19323D240 + (Responds to Re Safety of Nuclear Plants.Following TMI-2 Accident,Nrc Decided Not to License New Nuclear Power Plants Until Criteria for Improved Safety Had Been Developed.Nrc Has Authorized Fuel Loading)
- ML19344B025 + (Responds to Re Safety of Nuclear Power Plants & Insp Problems at Facility.Corrective Actions by Util to Resolve Problems Will Be Subj of Future NRC Insp)
- ML19211A772 + (Responds to Re Safety of Nuclear Power Plants. Facility 36 Miles from Nearest Population Ctr of 25,000 or More.Lessons Learned from TMI Accident Will Be Reviewed & Evaluated to Assess Need for New Safety Margins)
- ML20205F001 + (Responds to Re Safety of Perry Nuclear Power Plant & That Plant Operating with Limited Leaks in Three Fuel Rods for Several Months.Informal Public Hearing Re Leaks at Perry Facility Held in Rockville,Md on 990222)
- ML16341D011 + (Responds to Re Safety of Plant Located Near Active Earthquake Fault.Aslb 790927 Decision Found Seismic Design Adequate for Facilities.Info Available in Local PDR)
- ML20211Q356 + (Responds to Re Safety of Plant in Light of Chernobyl Accident.Radiation Dose Estimates in Event of Complete Destruction of Containment Bldg or Major Internal Malfunction Encl.Entombment Unnecessary)
- ML20030E168 + (Responds to Re Sampling Work & Vertical Fractures at Site.List of Members of Review Group for Geophysical Contracts at Facility Encl)
- ML19329B140 + (Responds to Re Schedule Change in Development of Preventive Maint Program for Periodic Calibr.Requests Program Be Expedited)
- ML17272A921 + (Responds to Re Schedule for Completing Review of Qualification of safety-related Electrical Equipment. Schedule for Completion of Review Will Be Provided After Final Issuance of NUREG-0588)