Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20140G678 + (Responds to Re License Applications XSNM2966, XSNM2967 & XSNM2969 for Export of Nuclear Fuel to Taiwan)
- ML20064D947 + (Responds to Re License Change Request 93-05 Re Ultimate Heat Sink Temp Changes.Provides Listed Info to Address Concerns Raised by Nj Dept of Environ Protection & Energy)
- ML20084H339 + (Responds to Re License Change Requests 94-08,94-11 & 94-12 to License NPF-57)
- ML20050A793 + (Responds to Re License Condition 2.C.(21)(i)(4)(i),NUREG-0737 Item II.K.3.30.Westinghouse Will Provide Draft Rept in Apr Re Small Break LOCA Model & Final Rept,Applicable to All Westinghouse Sys,In Jul 1982)
- ML20050M285 + (Responds to Re License Expiration.Application for Different License to Include Matl Covered by License SNM-882 to Be Sent within 2 Wks)
- ML19210B711 + (Responds to Re License Moratorium.Commission Requested That No Ol,Cp or LWA Be Issued W/O Prior Commission Approval)
- ML20237D762 + (Responds to Re License Renewal Applications & Recommending License Restriction for Sro.Nrc Determined That License Condition Not Warranted for Individual)
- ML19341D675 + (Responds to Re License Renewal for Triga Reactor. Requests Extension of 810331 Submission Date to 810531. Delay Caused by Program Review Re Projected Budget Reductions)
- ML19339B113 + (Responds to Re License Review,Field Evaluation of Inspectors & Procedures for Enforcement Actions.License for Joy Mfg Co Will Be Reviewed.Supervisory Personnel Will Conduct Field Evaluations of Inspectors)
- ML20211K435 + (Responds to Re License SNM-1412.Consents to Changes &/Or Mods to License as Outlined in Ltr)
- ML19269G333 + (Responds to Re Licensed Activities at 239 First Street,Cambridge,Ma.Insp of Both Records & Premises Revealed No Radioactive Matls in Bldg)
- ML18089A534 + (Responds to Re Licensed Operator Requalification Program.Quizzes Used to Determine Weaknesses & Need for Emphasis on Subjs.Licensed Operator Training Program Training Procedure TP-305 Revised)
- ML20084G479 + (Responds to Re Licensee 831103 Response to Notice of Violation & Proposed Civil Penalty .Core Configuration Change Controls Established.Xenon Reactivity Worth Curve Developed)
- ML20245D878 + (Responds to Re Licensee Appeal of NRC Position on Plant ATWS Rod Injection/Recirculation Pump Trip Sys Instrument Diversity Requirement.Atws Rod Injection Design Not in Compliance W/Atws Rule)
- ML19297E549 + (Responds to Re Licensee Ltr Concerning Recent Insp & Fee Assessment.Fee Is Designed to Cover NRC Cost of Performing Routine Insp of Licensed Program Authorizing Use of Byproduct Matl for Gas Chromatography Purposes)
- ML20195F541 + (Responds to Re Licensee Nuclear Research Reactor. NRC Working to Issue possession-only Amend to License)
- ML19329G235 + (Responds to Re Licensee Withholding of Info from Public on Reactor Operation Decisions.Licensee Not Required to Provide Documents to Concerned Party Since Issue Is Not Under Litigation)
- ML20055E792 + (Responds to Re Licenses for Operating Nuclear Power Plants.Licensee Should Continue to Transport as Much Waste as Possible for Disposal to Existing Disposal Sites)
- NUREG-0001, Responds to Re Licensing & Insp of Nuclear Facilities post-TMI.NRC Initiated Specific Actions to Assure Similar Incident Will Not Occur.Forwards NUREG-0625, NUREG-0001-ES & NUREG-0578.Cover Sheets Only Encl + (Responds to Re Licensing & Insp of Nuclear Facilities post-TMI.NRC Initiated Specific Actions to Assure Similar Incident Will Not Occur.Forwards NUREG-0625, NUREG-0001-ES & NUREG-0578.Cover Sheets Only Encl)
- ML19209B518 + (Responds to Re Licensing Changes & Fees.Fee Not Required.Change in Dates for Taking Inventories Will Not Be Valid Unless NRC Receives Mod to Page 5.1 of Fundamental Nuclear Matl Control Plan)
- ML19282B938 + (Responds to Re Licensing Delays in Issuance of Permit.Anticipates Licensing Board Will Decide Whether Const Permits Should Be Issued Sometime This Spring)
- ML19320D033 + (Responds to Re Licensing New Nuclear Power Plants.Licensing of New Plants Stopped After TMI Until Criteria for Improved Safety Could Be Developed.Three Units Have Been Authorized to Begin Low Level Power Testing)
- ML20132E864 + (Responds to Re Licensing Plan for Advanced Htgr. DOE long-range Plan Acceptable to NRC.Short-term Goal Dependent on Funding.Prioritization Requested on All Future DOE Requests)
- ML19208D496 + (Responds to Re Licensing Procedures for Facility. State of Oh Has Completed Evacuation Plans.State of Ky Will Complete Plans in Sept 1979.Plant Is Equipped W/Radiation Monitoring Equipment.Tmi Repts Due Before Fuel Loading)
- ML19247B141 + (Responds to Re Licensing Procedures.Discusses Phases of Reactor Licensing Process & Factors Impinging on Resumption of Operation of Plant,Following TMI-type Incident)
- ML20133J190 + (Responds to Re Licensing Requirements)
- RBG-11-799, Responds to Re Licensing Review Group II (LRG-II) Item 9,long-term Operability of Deep Draft Pumps.Upon Summer 1982 Resolution,Any Required FSAR Amends Will Be Provided + (Responds to Re Licensing Review Group II (LRG-II) Item 9,long-term Operability of Deep Draft Pumps.Upon Summer 1982 Resolution,Any Required FSAR Amends Will Be Provided)
- ML17138B562 + (Responds to Re Licensing Schedule for Facilities. Ofc of Nuclear Reactor Regulation Will Strive to Reduce Impact of Licensing Process on Fuel Load Dates.List of Outstanding Unanswered NRC Questions Encl)
- ML20003G114 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20003G120 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20003G118 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20003G117 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20003G123 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20003G111 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20003G113 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20003G122 + (Responds to Re Licensing Schedule for Facility. NRC Shares Concerns About Licensing Delays.Proposals Are Being Considered to Reduce Length of Hearing Process & Authorize Interim Reactor Operation for Fuel Loading)
- ML20236B247 + (Responds to Re Licensing for Berthold Mold Level Controls)
- ML20134A794 + (Responds to Re Licensing of Euxenite Plant)
- ML20126J291 + (Responds to Re Licensing of Facilities.Nrc Review in Support of Full Power OL for Unit 1 Is Expected to Be Completed in Apr 1981.Unit 2 Is Projected to Receive OL in 1982)
- ML17212B283 + (Responds to Re Licensing of Facility.Forwards Reactor Licensing Process Which Details Procedures Applicant & NRC Must Follow Before Nuclear Power Plant Can Be Constructed or Issued License to Operate.W/O Encl)
- ML20107B854 + (Responds to Re Licensing of Facility.Informs That Commission Aware of Problems Cited & Identified & Addressed in Draft Environ Statement Issued in Jul 1973.Final Recommendation Will Be Relected in Fes)
- ML19210E161 + (Responds to Re Licensing of Facility.No License Will Be Issued Until Applicability of TMI Investigation Results Determined)
- ML20024D945 + (Responds to Re Licensing of Facility.Request to Make Limited Appearance Statement Before ASLB Re Emergency Plan Can Be Filed.Final Rept from Ny Governor Ofc Re Economic Costs Will Be Available Shortly)
- ML19332F487 + (Responds to Re Licensing of ISFSI at Plant.Util Has Not Submitted Any Request for Licensing Action Re ISFSI, But Will Submit Application in Near Future)
- ML19269G272 + (Responds to Re Licensing of Nuclear Plants.Nrc Is Preparing Action Plan Re New or Improved Safety Objectives, Criteria for Implementation & Schedules.Effort Being Made to Avoid Unnecessary Licensing Delays)
- ML19269G258 + (Responds to Re Licensing of Nuclear Plants.Nrc Is Preparing Action Plan Re New or Improved Safety Objectives, Criteria for Implementation & Schedules.Effort Being Made to Avoid Unnecessary Licensing Delays)
- ML19269G275 + (Responds to Re Licensing of Nuclear Plants.Nrc Is Preparing Action Plan Re New & Improved Safety Objectives, Criteria for Implementation & Schedules. Effort Being Made to Avoid Unnecessary Licensing Delays)
- ML20049A249 + (Responds to Re Licensing of Nuclear Plants.Tmi Accident Resulted in Need for Changes in Approach to Safety. NRC Is Preparing for Review & Approval of Action Plan That Will Specify Actions to Be Taken)
- ML19269G269 + (Responds to Re Licensing of Nuclear Plants.Nrc Is Preparing Action Plan Re New or Improved Safety Objectives, Criteria for Implementation & Schedules.Effort Being Made to Avoid Unnecessary Delays in Licensing)
- ML19269G262 + (Responds to Re Licensing of Nuclear Plants.Nrc Is Preparing Action Plan Re New or Improved Safety Objectives, Criteria for Implementation & Schedules.Effort Being Made to Avoid Unnecessary Delays in Licensing)
- ML19322D389 + (Responds to Re Licensing of Nuclear Power Plants. NRC Is Preparing Action Plan,Including Improved Safety Objectives,Detailed Criteria for Implementation & Various Implementation Deadlines)