Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML19323C238 + (Requests Info Re Nuclear Reactor Safety & TMI-2 Accident)
- ML20037C919 + (Requests Info Re Nuclear Safety)
- ML20105B005 + (Requests Info Re Nuclear Wastes & Power Plant)
- ML20125B410 + (Requests Info Re Number of Employees Stationed at TMI & Qualification of Personnel)
- ML18046B125 + (Requests Info Re Number of Pins That Would Experience Departure from Nucleate Boiling for Limiting Rod Ejection Event & Effect on Dose Calculations.Response Required within 30 Days)
- ML19308D650 + (Requests Info Re Number of Plants in Operation,Number of Accidents Resulting from Plants & Amount of Radioactivity Released Into Environ from Plants)
- ML20125B045 + (Requests Info Re Number of U Dioxide Pellets in Each Zircaloy Fuel Rod)
- ML20128C745 + (Requests Info Re OL Hearing for Facility)
- ML20028H333 + (Requests Info Re Obligation of Louisiana Energy Svc to Include Public & Local Authorities in Emergency Evaluation Plan)
- ML20023D607 + (Requests Info Re Ofc of Inspector & Auditor (Oia) Inquiry Into Zimmer Matter.Reasons for Removal of Documents from Oia Ofcs Questioned.Withholding of Documents Contributed to Delay in Public Recognition of True Status of Project)
- ML19260D756 + (Requests Info Re Ongoing NRC Federal Activities Affecting Coastal Zone)
- ML20209E400 + (Requests Info Re Operability of 12-inch Vacuum/Overpressure Relief Valves Per TMI Item II.E.4.2.Util Should Choose Opening Angle to Demonstrate Operability.Info Demonstrating Ability of Valve to Close Against LOCA Requested)
- ML19326C406 + (Requests Info Re Operating Experience W/Loose Parts & Loose Parts Monitoring Sys to Assist NRC in Reg Guide Preparation. Written Response Required Prior to 761101)
- ML20235F082 + (Requests Info Re Operating Experience for HPCI Sys of Operating BWR Plants,Including Number of Times Necessary to Remove Sys from Svc & Total Number of Days HPCI Sys Has Been out-of-svc)
- ML20037D553 + (Requests Info Re Operating Impacts on Cultural Resources Near Facility for Eis.Miscellaneous Ltrs Relevant to Cultural Resources Encl)
- ML20245B523 + (Requests Info Re Operation of Facility W/Cracked Bolts in Reactor Vessel Thermal Shield)
- ML20008D958 + (Requests Info Re Operation of Facility,Comparison to Other Nuclear Power Plants & Radiation Reading Around Farm)
- ML19308C206 + (Requests Info Re Operator Action/Human Factors cross-cut Task Force,Personal Work Plans,License Granting,Shift Manning Requirements,Control Room Design & Instrumentation Requirements & Computer Use)
- ML19210C255 + (Requests Info Re Other Repts Cited in Des,Page 1X & Anticipated Radioactive Release Figures Listed in Tables 5 & 6)
- ML17256A631 + (Requests Info Re Override Capability & Problems Encountered When Manual Isolation Bypassed,Per Press Release 83-17)
- ML20234B655 + (Requests Info Re PG&E Application to Construct Power Plant at Bodega Bay)
- ML19330A744 + (Requests Info Re Percentage of Electricity Produced by Nuclear Plants,Whether Rancho Seco Will Be Closed Down & Cases Where Fuel Rods or Valves Were Found Faulty)
- ML19309F028 + (Requests Info Re Performance Evaluations of All Reactors Since First CP Was Granted)
- ML20217G640 + (Requests Info Re Performance of Leak Tests for License SNM-1045)
- ML20112J259 + (Requests Info Re Perry & Davis-Besse Nuclear Power Plants Translated in Plain English)
- ML20009F908 + (Requests Info Re Personnel Responsible for Choosing Facility Site)
- ML19210E681 + (Requests Info Re Pipe Support & Wall,Reviews & Insps, Structural Adequacy Reviews & Insps,Unreviewed Aspects of Pipe Supports for safety-related Piping & Schedule for Planned Addl Reviews & Insps)
- ML20237G160 + (Requests Info Re Placement of Epicenter in Determination of Exclusion Area.Regulations Indicate That in Evaluating Site, Applicant Should Assume Fussion Procedure Release from Core, Leak Rate from Containment & Meteorological Conditions)
- ML20091F273 + (Requests Info Re Plans for Addl Inspectors at Site in Order to Reply to Lr Romo (Lone Tree Council) .Draft Reply Encl)
- ML19331B449 + (Requests Info Re Plans for Disposal of Radioactive Water at Facility)
- ML19322D804 + (Requests Info Re Plans for Facility Decontamination Program)
- ML19206A263 + (Requests Info Re Plans for Future Operation at Harrisburg Intl Airport,Including Breakdown of Aircraft Type)
- ML17054B275 + (Requests Info Re Plans to Verify Design Process for Plant Const in Full Compliance W/Fsar.Advisement of Plans Requested within 60 Days to Determine Whether or Not IE Integrated Design Insp Required)
- ML20134E488 + (Requests Info Re Plant NOV)
- ML20127J168 + (Requests Info Re Plant Operation & Violation Records for Monticello & Prairie Island as Background for Citizens Info Handbook on Nuclear Power in State of Mn)
- ML20236P138 + (Requests Info Re Plant Response to Seven Bounding Events Intended to Mechanistically Define Accidents & Bound Uncertainties for Selected Site Suitability Source Terms,Per 871016 Meeting.Response Requested by 871127)
- ML20037B740 + (Requests Info Re Plant Status,Disposal of Radioactive Water from Containment Bldg & Emergency Planning)
- ML20098F427 + (Requests Info Re Plant.Concerns Re Welfare of Family Expressed)
- ML19208D698 + (Requests Info Re Plants & Animals,Present in Vicinity of Proposed Sites,That Are Listed or Proposed to Be Listed as Endangered or Threatened Species.Site Maps Encl)
- ML20084N212 + (Requests Info Re Plants Contacted Concering Valve Blowout. Committee Concern Re Degree to Which Nonavailability of Nuclear Plants Affecting Power Supply in Parts of Country)
- ML17202G587 + (Requests Info Re Plants or Animals Listed as Endangered or Threatened Species Present in Vicinity of Plant or Associated Transmission Corridors to Assist NRC in Processing Documentation for full-term License)
- ML20041C034 + (Requests Info Re Policy Statement on Low Level Waste Vol Reduction)
- ML20097G354 + (Requests Info Re Positions of Individuals Responding Affirmatively to Util Questionnaire Concerning Knowledge of 790328 Hydrogen Explosion or Combustion)
- ML18043A350 + (Requests Info Re Positive Displacement Charging Pump Vibration Levels & Discharge Pressure Pulsations to Complete Review)
- ML17177A324 + (Requests Info Re Positive Testing of Licensed Operator for Marijuana Following Random Drug Test Taken on 920318, Including Details of Circumstances Re Occurrence,Answers to Questions Listed in Encl & Other Related Info)
- ML19330A062 + (Requests Info Re Possible Consequences & Effect of Dow Chemical Co Chlorine Spill on Operating Facility)
- ML19308B631 + (Requests Info Re Possible Danger of Sending Children to Camp at Waynesboro,Pa.Waynesboro Is 60 Miles from TMI)
- ML20059N922 + (Requests Info Re Possible Flaw in Nuclear Valves Mfg at Raleigh Plant That May Put Valves at Risk for Fatigue Failure)
- ML19309G962 + (Requests Info Re Possible Groundwater Contamination Resulting from Church Rock U Mill Tailings Spill.Also Requests Comments on Encl Groundwater Contamination Data Provided by Southwest Research & Info Ctr)
- ML20136C904 + (Requests Info Re Possible Relationship of Human Factor Problems to TMI Accident,On Behalf of Public Interest Committee of Human Factors Soc.June 1979 Newsletter Encl)
- ML19257A975 + (Requests Info Re Possible Revocation of Facility Cp. Deficiencies Exist in Base Mat Const.Nrc Supervisor of Project Has Been Lax)