Requests Info Re Plans to Verify Design Process for Plant Const in Full Compliance W/Fsar.Advisement of Plans Requested within 60 Days to Determine Whether or Not IE Integrated Design Insp Required
ML17054B275
Person / Time
Site: Nine Mile Point Constellation icon.png
Issue date: 12/04/1984
From: Eisenhut D
Office of Nuclear Reactor Regulation
To: Hooten B
NIAGARA MOHAWK POWER CORP.
References
NUDOCS 8412130576
Download: ML17054B275 (2)


Text

Docket No. 50-410 Mr. B. G. Hooten Executive Director, Nuclear Operations Niagara Mohawk Power Corporation 300 Erie Boulevard West

Syracuse, New York 13202

Dear Mr. Hooten:

SUBJECT:

DESIGN VERIFICATION ACTIVITIES - NINE MILE POINT 2 As you are aware, the NRC staff has been seeking additional assurances from applicants for operating licenses that the design process used for constructing their plants has fully complied with the Final Safety Analysis Report (FSAR) commitments.

To provide this necessary assurance, a number of applicants have undertaken an Independent Design Verification Program (IDVP), performed by an independent contractor, to review and evaluate the design process, including a sample of design details and as-built conditions.

In other cases, the staff's Office of Inspection and Enforcement

( IE) has conducted an Integrated Design Inspection,( IDI).

The staff needs to determine your plans in order to decide whether or not it will conduct an IDI or take other action to obtain the needed assurance.

Accordingly I request that, within 60 days from the date of this letter, you present any plans you have for assuring that your plant has been designed in accordance with FSAR commitments.

The NRC staff is prepared to meet with you to discuss this request.

If you desire a meeting, you should notify the project manager, Mary Haughey, (301) 492-7897.

Sincerely,

'frank Miraglia/for Darrell G. Eisenhut, Director Division of Licensing Office of Nuclear Reactor Regulation OELD, Attorney ACRS (16)

EJordan RHeischman 84i2130576 84i204 PDR ADOCK 050004i0 PDR cc:

See next page DISTRIBUTION C~

Nslc NRC PDR L842 Reading Local PDR EHylton PRC System MHaughey

~~ WsS~

LB82/DL OELD~~p/LB'DL,~AD/

L MHaughey:dh BBord'enick 'Schwencer

'Mht vgk 11///n/84 11/14 84 11/gg/84 11/9g84 FMiragl.ia e hut gag/84

W II H

1 b

f