ML19210E681

From kanterella
Jump to navigation Jump to search
Requests Info Re Pipe Support & Wall,Reviews & Insps, Structural Adequacy Reviews & Insps,Unreviewed Aspects of Pipe Supports for safety-related Piping & Schedule for Planned Addl Reviews & Insps
ML19210E681
Person / Time
Site: Trojan File:Portland General Electric icon.png
Issue date: 11/01/1979
From: Frank L
OREGON, STATE OF
To: Lindblad W
PORTLAND GENERAL ELECTRIC CO.
References
NUDOCS 7912050525
Download: ML19210E681 (2)


Text

,

T

.r

'L Uyc

~; M

/

??d_b

' Wih

  • i -Q -

Q/]}

Department of Energy y.u:.4 veo"f7" LADOR & INDUSTRIES BUILDING. RCOM : ' 'aLEM. OREGON 37310 RHONE 378 4040 L

poc W S0-31(y

"""b " 1 19'9 William J. Lindblad me f1g 0 l

,9]3 D

h Vice President a )]d

~L Engineering-Construction 1

Portland General Electric 121 S.W. Sainnn Street Portland, OR 97204

Dear Mr. Lirdblad:

The purpose of this letter is to requi:5 PGE to provide the Oregon Department of Energy (0COE) with:

1) written suonary of the pipe c

support and wall reviews and inspections at Trojan completed thus far; 2) the results of the reviews and in@cctions with respect to structural adequacy; 3) a discussion of those cspects of pipe :occorts and support-ing walls for safety-related pipcing not yet reviewed and inspected; and

4) a schedule for any planned additional reviews and inspections.

000E is aware that extensive reviews.'n reviews and inspections?

Please note tha t this 1etter does not r " Fees t addi tional reviews and inspections.

This letter merely reque- clarification of what has and has not been done.

Because of the c ntinuing concern about this issue, I would appreciate a response.iit::in two weeks of receipt of this letter.

Sincerely, Lg n Frank Di. ;c tor LF/BD:swd 3

,NE U>r t ti 1502 270 D

  • fP D "D

9 ]k

~

R 4

c.

e 6

- - =

w,-

,,T W


M

- - - -