Search by property
Jump to navigation
Jump to search
This page provides a simple browsing interface for finding entities described by a property and a named value. Other available search interfaces include the page property search, and the ask query builder.
List of results
- ML20033B353 + (Requests Extension to Spring 1982 Refueling Outage for NUREG-0737,Item II.F.1.2 Implementation Re SPRING-4 Air Monitor.Tech Specs for Items II.F.1.1 & II.F.1.2 Will Be Submitted by 820101)
- ML20151F064 + (Requests Extension to Submit 90-day Inservice Insp Rept Until 880914 Due to Extensive Reviews)
- ML20027C388 + (Requests Extension to Submit Mark I Containment Program plant-unique Analysis.Delay Due to Need for Extensive QA Verification Not Previously Identified by Teledyne Corp)
- ML20024F664 + (Requests Extension to Submit Response to Generic Ltr 83-26 Re Conformance W/Nrc Positions on Generic Implication of Salem ATWS Events.Schedule for Response Based on BWR Owners Group Completion of Review)
- ML19350E390 + (Requests Extension to Submit Results of Investigation Re Possible Nonconservatism of Scram Setpoints for Transient as Compared to Setpoints Assumed in Safety Analysis.Results Will Be Submitted by 810831)
- ML19256F444 + (Requests Extension to mid-Mar 1980 to Verify Remaining Isometric Piping Drawing to Complete Response to IE Bulletin 79-14, Seismic Analysis for As-Built Safety-Related Piping Sys)
- ML20203L301 + (Requests Extension,On Behalf of EEI & Util Nuclear Waste Mgt Group,Of Comment Period Until 861126 for Proposed Rule 10CFR60 Re Draft Generic Technical Position Re High Level Waste Geologic Repository Program)
- ML20133L461 + (Requests Extensions Until 851115 & 1201 for Submitting Inservice Test Program for Second 10-yr Interval & Response to Safety Evaluation,Respectively,Due to outage-related Work Which Must Be Completed Before Program)
- ML17340A702 + (Requests Extensions in Schedule for Implementation of Fire Protection Mods Re Water Supression Sys,Fire Doors,Curbs & Control Room Combustibles.Mods Will Be Completed by 810802. Class III & Class I Fees Encl)
- ML20197D584 + (Requests Extensions of Licenses SNM-1865 & SNM-1883 Until 910531,due to Const Delays.Pages 1 & 2 of License SNM-1865 & Pages SNM-1 & SNM-2 of License SNM-1883 Encl,Reflecting Util Current Directors & Principal Officers)
- ML18033B203 + (Requests Extingent Review of 900306 Tech Spec Change Request 276 Re Standby Gas Treatment/Secondary Containment Sys & Waiver of Compliance.Maintaining Secondary Containment Integrity Will Extend Outage Mod Schedule Approx 4 Wks)
- ML19341B207 + (Requests Exxon Nuclear Co,Inc Export License Application Be Withdrawn from Records,Per Encl .W/O Encl)
- ML20197J939 + (Requests F Coffman Audit Mods to Facility Re Potential for Seismically Induced Sys Interaction Between in-core Flux Mapping Sys & Seal Table on 850709,per IE Info Notice 85-45. Util Will Have Calculation/Design Packages Available)
- ML20039F216 + (Requests FEMA Assistance in Responding to Intervenor Interrogatories Re Emergency Evacuation Plans)
- ML20062A161 + (Requests FEMA Findings on Adequacy of Offsite Preparedness Around Facilities to Determine Whether to Invoke Provisions of NRC Regulations Requiring Licensee to Demonstrate Removal of Identified Significant Deficiencies)
- ML20030D274 + (Requests FEMA Prepare Testimony on Offsite Emergency Preparedness Per NRC & FEMA 801104 Memorandum of Understanding.Contentions Encl)
- ML20247E114 + (Requests FEMA Provide Evaluation of Upcoming 1989 Full Participation Exercise in Support of Licensing Schedule for Plant & Confirmation That Any Revs to State & Local Plans Since 1984 Have Not Degraded Effectiveness of Plans)
- ML20235S150 + (Requests FEMA Review & Response to Two of Five Questions Re Plant Emergency Planning Issues Raised in Moyer . Moyer Ltr,Commissioner Asselstine 860109 Response & Staff 860214 Response Also Encl,For Info)
- ML17086A282 + (Requests FEMA Review State & Local Planning Efforts for Areas Around CA Nuclear Power Plant Sites W/Respect to Complications Arising in Event of Extreme Natural Phenomena)
- IA-87-823, Requests FEMA Review of Encl Final Rule Revising Exercise Timing Prior to Licensing.Only Last Two Sentences of Proposed Rule Revised for Clarity.Response Requested by 870327 + (Requests FEMA Review of Encl Final Rule Revising Exercise Timing Prior to Licensing.Only Last Two Sentences of Proposed Rule Revised for Clarity.Response Requested by 870327)
- ML20245A295 + (Requests FEMA Review of Encl Final Rule Revising Exercise Timing Prior to Licensing.Only Last Two Sentences of Proposed Rule Revised for Clarity.Response Requested by 870327)
- ML20127C371 + (Requests FEMA Take Lead in Evaluation of Scope & Objectives of Emergency Exercise Proposed for Wk of 850211.Evaluation Involves Outstanding Plan Inadequacies & Legal Authority Issues.Util & Addl Correspondence Encl)
- ML19329D488 + (Requests FSAR & FSAR Amends)
- ML20031G249 + (Requests FSAR Be Amended to Include Addl Info Required to Complete License Application Evaluation.Questions Encl)
- ML20154C188 + (Requests FSAR Be Sent to Listed Address)
- ML20197E782 + (Requests FY84 Obligations from Apr-Sept Using Mar 1984 Actuals as Base Forecast)
- ML20041E633 + (Requests Facilities Be Shut Down)
- ML20032E139 + (Requests Facilities Be Shut Down)
- ML20032E141 + (Requests Facilities Be Shut Down)
- ML20011B061 + (Requests Facilities Be Shut Down Pending Remedial Action Re Reactor Pressure Vessel Shock)
- ML19319B480 + (Requests Facilities W/Westinghouse or Combustion Engineering Design Steam Generators Take Actions,Including Possible Design Mods,To Assure Acceptably Low Health & Safety Risks. NRC Continues Assessing Water Hammer Effects on Safety)
- ML19305A966 + (Requests Facility 790722 SER & Placement on NRC Mailing List for Future Updated SERs)
- ML19284A423 + (Requests Facility Allowable Settlement Not Be Increased. Requests Hearing.Asks Why Util Waited Until 780428 to Rept Major Pumphouse Sinking in Aug 1977)
- ML19284A424 + (Requests Facility Allowable Settlement Not Be Increased. Requests Hearing.Asks Why Util Waited Until 780428 to Rept Major Pumphouse Sinking in Aug 1977)
- ML19260D894 + (Requests Facility Be Closed Down.Plant Violates NRC Rules & Congressional Intent Re Locating of Nuclear Power Facilities in Densely Populated Areas.Facilities Store Spent Fuel on Site Rather than Shipping to Waste Plant)
- ML17249A480 + (Requests Facility Be Closed Until Review of Documentation Assuring Quality & Reliability of Electrical Connectors in Facility Reactor Safety Sys & Review of TMI Accident to Determine Reactor Safety Sys Adequacy)
- ML19297E440 + (Requests Facility Be Shut Down & Requests Funds for Any Legal Fees Incurred in Connection W/Filing Petition)
- ML20041E636 + (Requests Facility Be Shut Down Until Workable Evacuation Plan Has Been Devised)
- ML19326D059 + (Requests Facility CP Stage Environ Rept & Federal Agency Comments Re Unit 2.Requests Clarification Re Unit 1 & 2 Environ Offsite Radiation Limits)
- ML19259C392 + (Requests Facility Const Cease)
- ML19259C391 + (Requests Facility Const Cease Due to Possible Health Hazards)
- ML19259C393 + (Requests Facility Const Cease Due to Radiation Hazards)
- ML19329B152 + (Requests Facility Control Circuit Review within 60 Days, Assuring Deficiencies Do Not Exist.Need for Review Based on Two Incidents Involving Inadvertent Disabling of Component by Racking Out Breaker for Different Component)
- ML20126M180 + (Requests Facility Decommissioning)
- ML17297B178 + (Requests Facility Des & List of Groups Involved in Licensing Proceeding)
- ML20107E854 + (Requests Facility Determination Re Compliance of Util Leakage Testing W/App J)
- ML19326D056 + (Requests Facility Environ Rept.Expresses Interest in Cooperating in Facility Development)
- ML20126A813 + (Requests Facility Exemption from Examination of Reactor Coolant Makeup Sys Components Under LOCA Conditions,As Described in GE Document 22A2756,Revision 2)
- ML20034D454 + (Requests Facility Furnish Items Listed in Encl, Reference Material Requirements at Least 60-days Prior to Exam Date to Able Examiners Adequate Preparation for Visit)
- ML20031G464 + (Requests Facility Hearing in Lehigh Valley in Evening or on Weekend Day to Accommodate Working Schedules)
- ML20052A490 + (Requests Facility Inspectors Be Asked to Conduct Trend Analysis of Performance of Each of Active Licensees During 1976.Specific Areas to Be Considered Listed)
- ML17249A466 + (Requests Facility Not Reopen Until All Findings Available on TMI-2)
- ML17249A463 + (Requests Facility Not Reopen Until Safety Sys Checked)